Professional Documents
Culture Documents
CO 2
Contains 15 questions
work schedule
Plant capacity
Materials and inputs cannot be classified into following broad categories: * 1 point
raw materials
utilities
auxiliary materials
Government Policies
Availability of infrastructure
None of these
https://docs.google.com/forms/d/1c8jUetc0ky8pOgZt0anz3calS6ZgcbuXW-Dmscw_pto/edit#response=ACYDBNit0Pa-fQVGSqTxuwsQhepnarX8… 2/6
6/29/2021 CO 2 Project Management
Structures and civil works should include following categories of works * 1 point
___________reflects the plan of work concerning installation as well as initial operation 1 point
Work schedule
Time schedule
Cost schedule
None of these
All of these
"The quality of limestones determines whether the wet or dry process should be used 1 point
Principal Inputs
Product mix
Ease of absorption
https://docs.google.com/forms/d/1c8jUetc0ky8pOgZt0anz3calS6ZgcbuXW-Dmscw_pto/edit#response=ACYDBNit0Pa-fQVGSqTxuwsQhepnarX8… 3/6
6/29/2021 CO 2 Project Management
To facilitate the most optimal formulation of the project in terms of technology, size, location
To ensure that the project is technically feasible, that all inputs required for the project are
available.
Both of these
None of these
Which of the following is the first step in market & demand analysis? * 1 point
Specification of Objectives
Census of India
Questionnaire
https://docs.google.com/forms/d/1c8jUetc0ky8pOgZt0anz3calS6ZgcbuXW-Dmscw_pto/edit#response=ACYDBNit0Pa-fQVGSqTxuwsQhepnarX8… 4/6
6/29/2021 CO 2 Project Management
Arrange the steps in survey in logical manner: 1- Define the target population, 2- 1 point
1,2,3,4
1,2,4,3
1,3,2,4
1,4,3,2
demographics? *
Preference
Profession
Habits
Attitude
demographic survey
opinion survey
none of these
https://docs.google.com/forms/d/1c8jUetc0ky8pOgZt0anz3calS6ZgcbuXW-Dmscw_pto/edit#response=ACYDBNit0Pa-fQVGSqTxuwsQhepnarX8… 5/6
6/29/2021 CO 2 Project Management
all of these
A ___________ plan shows the specifics of how you will market or attempt to sell your 1 point
product or service. *
Marketing
Project
Promotion
Technical
Marketing Strategy
All of these
This form was created inside MAIMS (GGSIP University), Rohini, Delhi.
Forms
https://docs.google.com/forms/d/1c8jUetc0ky8pOgZt0anz3calS6ZgcbuXW-Dmscw_pto/edit#response=ACYDBNit0Pa-fQVGSqTxuwsQhepnarX8… 6/6