E 259679.3701 E 259763.4530
N 2694790.3070 N 2694894.7757
G.B Ø 75 mm RP F/A TO BE
CONNECTED TO STORM
SERVICES GENERAL NOTES :
WATER NETWORK
CB-60
Ø 75 mm RP F/A TO BE
CONNECTED TO STORM
WATER NETWORK
BLOCK
Ø 150 mm PVC
CLASS-16
1%
SL
OP
EL
=1
2m
CB-61
General Notes:
1- ADQCC STANDARD & REQUIREMENTS SHALL BE
PART-C CB-66 1 % SLOPE L= 16.6 m CB-65 CB-68
Ø 150 mm PVC
CLASS-16 CB-67 PART-D CB-05
CB-06
FOLLOWED AND APPLIED .
1 % SLOPE L= 5.8 m
1 % SLOPE L= 14 m
1 % SLOPE L= 5.8 m
Ø 150 mm PVC
CB-57 Ø 150 mm PVC
CLASS-16
CLASS-16 2- Minimum 12” UPVC pipe should be used to connect manholes
1 % SLOPE L= 22.2 m
Ø 150 mm PVC CB-01
to manholes.
CLASS-16
Ø 300 mm PVC 3- The class of pipes shall be as ADQCC standard.
SMH-B02 CLASS-16 SMH-B01
4- All manhole cover size is to be 600 X 600 mm.
0.5% SLOPE L= 29.1m CONSTRUCTION STAGE
Ø 150 mm PVC Ø 75 mm VP T/A
5- Surface water/storm water should not be connected to the
Ø 110 mm RP F/A TO BE
CLASS-16
sewerage network.
1 % SLO
CONNECTED TO STORM
1 % SLOPE L= 15 m
1 % SLOPE L= 20 m
Ø 300 mm PVC
Ø 150 mm PVC CLASS-16 WATER NETWORK
1%
CLASS-16
PE L=
SLO
Ø 150 mm PVC Ø 150 mm PVC
7- The storm water system should be properly ventilated and the
PE
CLASS-16 CLASS-16
15
L
vent pipe should extend higher than the building .minimum height
= 21
m
Ø 150 mm PVC
10 CLASS-16
m
FAHU02
of vent pipe from roof level should be 1.5m. 00 ISSUE FOR CONSTRUCTION 14/01/2019
CB-58
1%S
CB-59 8-Separate ventilation pipe should be provided to discharge foul REV. NO. DESCRIPTION Date
LOPE Ø 110 mm RP F/A TO BE
L= 1 5.8 m Ø 300 mm PVC
CLASS-16 SMH-B04
Ø 300 mm PVC
CLASS-16 SMH-B03
Ø 110 mm RP F/A TO BE
CONNECTED TO STORM
CONNECTED TO STORM
WATER NETWORK SMH-A01
Ø 300 mm PVC Ø 300 mm PVC gases in the drain into the atmosphere.
Ø 150 mm PVC WATER NETWORK
CLASS-16 SMH-A02 CLASS-16
CB-07
9-All pipes should be water tight. OWNER :
CLASS-16 SMH-B05 1% 0.5% SLOPE L= 16.6m
0.5% SLOPE L= 7.7m Ø 75 mm VP T/A L= 18.2m ; SLOPE=0.5% L= 7.7m ; SLOPE=0.5%
1%
SL m
=7
10.The pipe slop depends on diameter of the pipe shall be as
L= 6 m
OP L SMH-A03
EL PE
SL
=7 SLO
O
.2 Ø 150 mm PVC 1%
ADQCC standard.
PE
m
LOPE
CLASS-16 CB-04
L
Ø 110 mm RP F/A TO BE
LEARNING
=6
CB-62 AHU04 AHU03
CONNECTED TO STORM
11-Manholes should be provided at every bend, junction change of
1%S
.6
WATER NETWORK
m
Ø 110 mm RP F/A TO BE
CONNECTED TO STORM CB-64 CB-03
gradient or change of diameter. These are constructed at a
WATER NETWORK
COMMUNITY
1 % SLOPE L= 6.6 m
1 % SLOPE L= 7 m
maximum of 30 to 40 m intervals in straight line.
02 Ø 150 mm PVC
CLASS-16
12-A/C drainage is to free discharge or connect to the rain water
MAF-2 SEF-2 pipe.
Ø 110 mm RP F/A TO BE
0.5% SLOPE L= 32.9m
L= 32.4m ; SLOPE=0.5%
MAF-1
EMPLOYER :
CB-08
1 % SLOPE L= 14 m
1 % SLOPE L= 15.2 m
Ø 150 mm PVC
CLASS-16 LEARNING Ø 150 mm PVC
LEARNING
SEF-4
CLASS-16
6 COMMUNITY
CB-56
COMMUNITY
CB-55 1%
SLO
PE
L= 1
5.8
m
Ø 150 mm PVC
Ø 110 mm RP F/A TO BE
CONNECTED TO STORM
WATER NETWORK
01
KG . BUILDING AHU07
03 FAHU01
Ø 110 mm RP F/A TO
BE CONNECTED TO
STORM WATER
NETWORK
CB-09
CONSULTANT :
SMH-A04
CLASS-16
SMH-B06
ADMIN / AMENITY BUILDING
CB-44 CB-15
Ø 150 mm PVC
Ø 300 mm PVC Ø 110 mm RP F/A TO BE CLASS-16
CLASS-16 CONNECTED TO STORM Ø 75 mm VP T/A
L= 33.7m ; SLOPE=0.5%
WATER NETWORK
WATER TANK
SMH-B09 Ø 75 mm VP T/A SMH-A06 Ø 300 mm PVC
CLASS-16
AHU08
Ø 110 mm RP F/A TO
BE CONNECTED TO
STORM WATER
0.5% SLOPE L= 34m
NETWORK
L= 15.2 m ; SLOPE=0.5%
L= 15.2 m ; SLOPE=0.5%
Ø 300 mm PVC
SEF-3
CLASS-16 SEF-1
PROJECT NAME :
FAHU04 Ø 300 mm PVC
CLASS-16
CB-52
KEF-1
ABU DHABI FUTURE SCHOOLS
5 CB-50
Ø 110 mm RP F/A TO BE
Ø 110 mm RP F/A TO BE
CONNECTED AHU01
TO STORM
CB-10 PROGRAM (PHASE 8)
CONNECTED TO STORM WATER NETWORK
WATER NETWORK Ø 110 mm RP F/A TO BE
CONNECTED TO STORM CB-14
Ø 300 mm PVC
Ø 150 mm PVC
CLASS-16
SHAKHBOUT - ABU DHABI
WATER NETWORK
Ø 110 mm RP F/A TO CLASS-16 SMH-A08
CB-43
1 % SLOPE L= 13.5 m SMH-B10 BE CONNECTED TO
1 % SLOPE L= 8.6 m
ZONE :
CB-42 STORM WATER L= 6.5 m ; SLOPE=0.5% CB-13
SUBSTATION
CHILLER-2 CHILLER-1
NETWORK
1 % SLOPE L= 15.3 m
1 % SLOPE L= 18.8 m
SMH-A07
Ø 150 mm PVC Ø 150 mm PVC
SHAKHBOUT CITY ,ABU DHABI
L= 10.6 m ; SLOPE=0.5%
1 % SLOPE L= 15 m
CLASS-16 CLASS-16
MEF-1
Ø 300 mm PVC
CLASS-16
BLOCK Ø 75 mm RP F/A TO BE
CONNECTED TO STORM
Ø 150 mm PVC
AHU10
WATER NETWORK
CLASS-16 CB-11
SECTOR NO : PLOT NO :
L= 32.5 m ; SLOPE=0.5%
AHU09
Ø 300 mm PVC
CLASS-16
Ø 300 mm PVC
CLASS-16
Ø 300 mm PVC
360 KG STUDENTS.
CLASS-16
L= 27 m ; SLOPE=0.5%
RAMP
38 Ø 150 mm PVC 35 34 31Ø 150 mm PVC
1 % SLOPE L= 11 m
CLASS-16
1 % SLOPE L= 9.8 m
1 % SLOPE L= 8.7 m
L=
PE
SLO
1
% Ø 150 mm PVC
Ø 150 mm PVC CLASS-16
CLASS-16
RAMP
Ø 300 mm PVC
CLASS-16
DRAWING TITLE :
CB-46 1 % SLOPE L= 15.5 m
SMH-B11 1 % SLOPE L= 10 m 1 % SLOPE L= 11.6 m
1 % SLOPE L= 12.3 m CB-38 CB-37 CB-22
CB-21
SMH-B08 L= 28 m ; SLOPE=0.5% 1%
Ø 150 mm PVC CB-39 SL
OP
CLASS-16 Ø 150 mm PVC EL
=1
CLASS-16 0m
.6 m
SITE PLAN
= 13
Ø 150 mm PVC
L= 26.5 m ; SLOPE=0.5%
1 % SLOPE L= 12.5 m
Ø 300 mm PVC CB-19
CLASS-16
24 17
PE L
30 CLASS-16 25 SMH-A10
SLO
Ø 150 mm PVC
Ø 150 mm PVC
CLASS-16
STORM WATER LAYOUT
1%
CLASS-16
Ø 300 mm PVC
CLASS-16
PART-B
SL
O PE
L=
13
.8
Ø 150 mm PVC
CLASS-16
PART-A 56990-8-B-IFC-00-ME-SW00-00 00
m
Ø 150 mm PVC
1 % SLOPE L= 14 m
CLASS-16
RAMP
1 % SLOPE L= 5.8 m
1 % SLOPE L= 5.8 m
%
m
9
1:350
SL
PE CLASS-16 CLASS-16
E
O
SL
L=
Ø 150 mm PVC
Ø 300 mm PVC % Ø 300 mm PVC Ø 300 mm PVC
7
G.B
CB-25
E 259794.5563 E 259804.5833 L= 16.4 m ; SLOPE=0.5%
SMH-B13 L= 20 m ; SLOPE=0.5%
SMH-A12
L= 20 m ; SLOPE=0.5% E 259866.7057 E 259878.6300 PROJECT ID : DRAWING SIZE :
SMH-B12
Ø 150 mm PVC
1 % SLOPE L= 5.7 m
1 % SLOPE L= 11 m
Ø 300 mm PVC
CLASS-16 Ø 150 mm PVC
CLASS-16
ED-1-05-56990-8-B A1
CB-26
MUNICIPALITY MANHOLE
TIE IN CONNECTION POINT
MH
CL=109.06
IL=107.67
MANHOLE DEPTH = 1.39 m