Before start, any activity or during the erection of steel assembly on-site all requirements must
ready. This methodology required extensive analysis due to the domino effect of the traffic from
Northbound to South Bound or vice versa. This sequence can be used for the next activity in
Gridline B from Grind 1 to 10.
Index Terms
1. Trailer is an unpowered vehicle towed by a powered vehicle. It is commonly used for the
transport of goods and materials.
2. Crane Mobile is a cable-controlled crane mounted on crawlers or rubber-tired carriers or a
hydraulic-powered crane with a telescoping boom
3. Dolly is an unpowered vehicle designed for connection to a tractor unit, truck, or prime mover
vehicle with strong traction power.
4. Lifting Frames are designed to lift heavy loads with a crane safely and efficiently. Both are
considered a below-the-hook lifting devices since the attachment to the load (or loads) takes
place below the crane's hook
Procedure:
Sequence 1
a. The Site Engineer and Driver of the crane must follow the dimension fully extended
outrigger.
2. Mobile Crane QY70 and Delivery of material for Girder Assembly Mark CS-G40-1
riding in the trailer must be on the northbound road from BF Metal Corp at Cainta
Rizal to MRT Common station site project.
Sequence 2
a. Unload first the lifting steel frame from the trailer using Mobile Crane QY70
1. From the current location of the lifting frame to the right side of the girder location
and center island.
Sequence 3
a. Unload the Girder Assembly Mark CS-G40-1 from the trailer using the Mobile Crane
QY70
1. From the current location of the Girder Assembly Mark CS-G40-1 to the right side
lower part of between the lifting steel frame and Center Island.
Sequence 4
Sequence 5
1. Using Mobile Crane QY70 and Mobile Crane QY55 attached with lifting frame.
Sequence 6
a. Lifting of Girder
1. Using Mobile Crane QY70 and Mobile Crane QY55 attached with lifting frame.
2. For the final position of the girder by putting temporary support before removing it in
the steel frame.
GUTTER LINE
9591 6070
2800
ROAD BARRIER
1223
EDGE OF VIADUCT
CLEAR
2700
3790 2082
QY70
QY55
ROAD BARRIER
11696
4600
GUTTER LINE
12280
7100
659
2500
1574
8500
500
2750
3000 C.O.G.
17000
25369
EDGE OF VIADUCT
BOUND
NORTH BOUND
SOUTH BOUND
SOUTH BOUND
2400
8500
NORTH
BARRIER
16400
ROAD BARRIER
2500
2
12003
6300
ROAD
3800
2700
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 1
CRANES AND TRUCK POSITIONING
B
9591 6070
2700
4600
7100
ROAD BARRIER
7100
5764
2500
ROAD BARRIER
GUTTER LINE
5910
3790
QY70
2082
QY55
11696
659
12280
EDGE OF VIADUCT
1
12280
GUTTER LINE
1574
3900
8500
R=
89
2800
33
2750
3000
NORTH BOUND
17000
14959
C.O.G.
SOUTH BOUND
EDGE OF VIADUCT
NORTH BOUND
SOUTH BOUND
8500
2400
8873
16400
ROAD BARRIER
7523 2
ROAD BARRIER
2500
6300
12000
3800
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 2
UNLOADING OF GIRDER
& LIFTING FRAME
B
9641 6070
7100
GUTTER LINE
5764
GUTTER LINE
ROAD BARRIER
EDGE OF VIADUCT
5910
3790 2082
QY70
QY55
ROAD BARRIER
11696
3967
659
12300
CLEAR
1
1574
3900
8500
500
2800
3000
2750
SOUTH BOUND
17000
R= 15
C.O.G.
EDGE OF VIADUCT
166
NORTH BOUND
NORTH BOUND
SOUTH BOUND
8500
16400
ROAD BARRIER
2
ROAD BARRIER
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 3
POSITIONING OF LIFTING FRAME AND GIRDER
B
7123 10037
7100
GUTTER LINE
5764
GUTTER LINE
ROAD BARRIER
ROAD BARRIER
5910
3790 2082
QY70
QY55
11696
1574
659
12280
1
R=
76 R=
69 144
91
3900
8500
R=
2
690
2750
8
17000
C.O.G.
3
3
NORTH BOUND
2800
NORTH BOUND
SOUTH BOUND
8500
EDGE OF VIADUCT
ROAD BARRIER
EDGE OF VIADUCT
2
ROAD BARRIER
1
1
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 4
POSITIONING OF LIFTING FRAME
UNDER THE GIRDER
B
5674 10037
5764 7100
2750 2800
GUTTER LINE
ROAD BARRIER
ROAD BARRIER
5910
QY70 3790 2082
QY55
2000
11696
659
CLEAR
12280
GUTTER LINE
1574
3900
R= 7885
8500
R= 6877
2505
CLEAR
1500
17000
C.O.G.
EDGE OF VIADUCT
NORTH BOUND
NORTH BOUND
SOUTH BOUND
EDGE OF VIADUCT
8500
ROAD BARRIER
2
ROAD BARRIER
5416 10984
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 5
PREPERATION FOR LIFTING OF GIRDER
1 2
17000
18795
8800 9995
LIFTING FRAME
2445
GIRDER
NGL
300
3000
1009
709
SIDE ELEVATION
B
GUTTER LINE
9641 6070
7100
5764
2750 2800
ROAD BARRIER
5910
5910
5910
3790 2082
QY70
QY55
ROAD BARRIER
659
12280
1
GUTTER LINE
1574
R=
3900
8500
9
7873
22
6900
2
R=
CLEAR
1000
81
49
17000
C.O.G.
C1-2 C2-2
EDGE OF VIADUCT
NORTH BOUND
SOUTH BOUND
2000
8500
EDGE OF VIADUCT
NORTH BOUND
ROAD BARRIER
ROAD BARRIER
5416 10832
6832
MRT VIADUCT
3000 3000 3000 3000 3000 3000 5872 3000 3000 3000 3000 3000 3000
LANE- 6 LANE- 5 LANE- 4 LANE-3 LANE-2 LANE-1 ISLAND LANE-1 LANE-2 LANE-3 LANE- 4 LANE- 5 LANE- 6
SEQUENCE 6
LIFTING OF GIRDER