You are on page 1of 1

Measure Name Calculation Logic(s)

Total Unconstrained Qty Sum of QTY, ADJALLOCTOTFCST, TotInTransOut


UnconstrainedForecast (Unconstrained Demand and VBEP_Lmeng
Forecast)
Forecast Qty (Constrained Sum of ADJALLOCTOTFCST,
Demand Forecast) DEPDMD, TOTSHIP,
TOTINTRANSOUT, and
VBEP_Lmeng
ConstrainedForecast SOProcOrdConstrainedForecastSum of DEPDMD and ADJALLOCTOTFCST
STOConstrainedForecast Sum of TOTSHIP and
TOTINTRANSOUT
SOConstrainedForecast Sum of ADJALLOCTOTFCST and VBEP_Lmeng
ProdConstrainedForecast DEPDMD

Source data
Constrained Demand SourceSystem LocationId Region MaterialId MaterialName
MaterialCode EMAPSSMaterialId MaterialBaseUoM
Requirement ap 0UA0 AP ap-110049 110049 STOCK 3074 S110049 KG

SourceSystem SourceLocationId SourceRegion DestinationLocationId MaterialCode


DestinationRegion MaterialId MaterialName
Unconstrained Demand Requirement
No data

Unconstrained Future SourceSystem LocationId Region MaterialId MaterialName


MaterialCode EMAPSSMaterialId MaterialBaseUoM
Requirement No data

Final data
Version.[Version Name] SourceSystem MaterialCode LocationId Time.[Day] SCSItem.[Item] SCSLocation.[Location] Constrained Demand Forecast
Fact data
CurrentWorkingView ap ap-110049 0UA0 9/10/20 110049 STOCK 3074 0UA0 LSR SPEC OILS:LUB:7020

You might also like