DETAIL ENGINEERING DESIGN

DED

PT.WHIKA PUTRA SEJAHTERA

INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)
DAFTAR GAMBAR

1. LAYOUT IPAL
2. SKEMATIK DIAGRAM ALIR IPAL
3. BAK KONTROL
4. DUDUKAN BIOREAKTOR IPAL
5. POTONGAN DUDUKAN BIOREAKTOR IPAL
6. EKUALISASI
7. BAK SCREEN
8. KOLAM INDIKATOR
9. POTONGAN KOLAM INDIKATOR
10. CANOPY BIOREAKTOR IPAL
11. CANOPY BIOREAKTOR IPAL
12. PAGAR BRC
13. DENAH & POTONGAN RUMAH PENAMPUNGAN SAMPAH
14. TAMPAK RUMAH PENAMPUNGAN SAMPAH
8000

KOLAM NATURAL FILTRATION


OUTPUT
KOLAM
KESALURAN KOTA KOLRINASI

KOLAM PENGUMPUL

KOLAM IKAN

BIOREAKTOR

DUDUKAN BIOREAKTOR
MESIN

6000
EKUALISASI

RUMAH
PANEL
BAK SCREEN

PT.WHIKA PUTRA SEJAHTERA

ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com

INLTE DARI LAYOUT IPAL


BAK KONTROL
SKALA: NTS
BIOREAKTOR

SHOWER EKUALISASI

WASTAFEL

N
N

EE
EE

CR
R
SC

ES
WC

FIN
BA
BAK KONTROL BAK SCREEN
LIMBAH CAIR SEPTICTANK
WASTAFEL &
KAMAR MANDI

SLUDGE

NATURAL FILTRATION
KOLAM PENGUMPUL
KOLAM IKAN

OUTPUT

KE SALURAN KOTA PT.WHIKA PUTRA SEJAHTERA


BAK KLORINASI ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
SKEMATIK DIAGRAM ALIR IPAL email : whikaputrasejahtera@yahoo.com

SKALA: NTS
PAS. BATA B
FIN. PLASTER, ACI
PASANGAN BATA

150

110
PIPA INLET PLESTER-ACI
PIPA OUTLET

A A

400
700

480
700
TUTUP PLAT BESI
MILD STEEL/ BORDES

150

110
150 400 150
110 480 110
700
700

B
TAMPAK ATAS BAK KONTROL
LAYOUT BAK KONTROL SKALA: 1:20
SKALA: 1:20

TUTUP PLAT
MILD STEEL/ BORDES

BESI SIKU 40X40

PASANGAN BATA
PLESTER-ACI

TUTUP PLAT BESI


MILD STEEL/ BORDES TUTUP PLAT BESI
700 MILD STEEL/ BORDES
110 480 110 700
MUKA TANAH 110 480 110
+0.10 MUKA TANAH
VAR

VAR

+0.10 PT.WHIKA PUTRA SEJAHTERA

VAR
ENGINEERING, MANUFACTURING,
PIPA CONTRACTOR AND MAINTENANCE
PIPA INLET OUTLET
OUTLET Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
TANAH URUG Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
TANAH URUG Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com
PASANGAN BATA
PLESTER-ACI PASANGAN BATA
-0.70 PLESTER-ACI
COR BETON 10 CM -0.70
-0.80 COR BETON 10 CM
PASIR URUG 5 CM -0.80
-0.85 PASIR URUG 5 CM
TANAH ASLI -0.85
TANAH ASLI
150 400 150
700 150 400 150
700

POTONGAN A-A POTONGAN B-B


SKALA: 1:20 SKALA: 1:20
SLOOF 200X300
PONDASI BATU KALI B
4400
600 400 600 2200 600

200
600 RUMAH MESIN
2000

1200
1600
PANEL BIOREAKTOR
800

A A

200
600

200 800 200 2600 200


4000

B
LAYOUT PONDASI DUDUKAN BIOREAKTOR
SKALA: 1:25

200
SLOOF 200X300 PT.WHIKA PUTRA SEJAHTERA

COR BETON T:10 CM ENGINEERING, MANUFACTURING,


CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
RUMAH MESIN Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa

1200
1600
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
PANEL BIOREAKTOR Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com

200
200 800 200 2600 200
4000

TAMPAK PONDASI DUDUKAN BIOREAKTOR


SKALA: 1:25
D8-150

300
200

4000
SLOOF 200X300
200 800 200 2600 200
MUKA TANAH
+0.20

-0.10
COR BETON T:10 CM
SIRTU T:10 CM

TANAH URUG

PONDASI BATU KALI


-0.90
PASIR URUG T:10 CM -1.00
TANAH ASLI
200 200 200
600 400 600 2200 600
4400

POTONAN A-A
SKALA: 1:25

COR BETON T:10 CM


SIRTU T:10 CM
1600
SLOOF 200X300
200 1200 200
MUKA TANAH
+0.20 PT.WHIKA PUTRA SEJAHTERA

ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
-0.10 Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com

TANAH URUG

PONDASI BATU KALI


-0.90
PASIR URUG T:10 CM -1.00
TANAH ASLI
200 200
600 800 600
2000

POTONAN B-B
SKALA: 1:25
1800
TUTUP MAIN TUTUP MAIN
HOLE HOLE

COR BETON
T:10 CM

2400

LAYOUT EKUALISASI
SKALA : 1:30

TUTUP MAIN HOLE


2400 1800
400 600 400 600 400 600 600 600
COR BETON T:10 CM +0.20 COR BETON T:10 CM +0.20
+0.10 +0.10

INLET LIMBAH OUTLET KE


BIOREAKTOR INLET
TANAH URUG TANGKI TANAH URUG
EKUALISASI PT.WHIKA PUTRA SEJAHTERA
TANGKI
ENGINEERING, MANUFACTURING,
EKUALISASI CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -

COR BETON T:10 CM -1.35 COR BETON T:10 CM -1.35 Indonesia


Telp./Fax : (021) 29490606
-1.45 -1.45 email : whikaputrasejahtera@yahoo.com
URUG SIRTU T:10 CM -1.55 URUG SIRTU T:10 CM -1.55
TANAH ASLI TANAH ASLI
2000 1400

POTONGAN A-A POTONGAN B-B


SKALA : 1:30 SKALA : 1:30
B

110
150
PASANGAN BATA
PLESTER-ACI
TUTUP PLAT BESI
PIPA
PIPA INLET MILD STEEL/ BORDES
OUTLET

600

680
900

900
A A
PASANGAN BATA
PLESTER-ACI

150

110
150 600 150 600 150 110 680 70 680 110
1650 1650
B TAMPAK BAK SCREEN
TUTUP PLAT
LAYOUT BAK SCREEN MILD STEEL/ BORDES SKALA: 1:25

SKALA: 1:25 BESI SIKU 40X40

PASANGAN BATA
PLESTER-ACI

TUTUP PLAT BESI TUTUP PLAT BESI


MILD STEEL/ BORDES MILD STEEL/ BORDES
1650 900
MUKA TANAH 110 680 70 680 110 MUKA TANAH 110 680 110
+0.10 +0.10
VAR

VAR

VAR
PIPA
PIPA PVC PIPA
PIPA INLET OUTLET
N
N

EE
EE

PT.WHIKA PUTRA SEJAHTERA


CR
CR

TANAH URUG TANAH URUG


ES
RS

ENGINEERING, MANUFACTURING,
PASANGAN BATA PASANGAN BATA
FIN

CONTRACTOR AND MAINTENANCE


BA

PLESTER-ACI PLESTER-ACI Office : Plaza Summarecon Bekasi,


-0.90 -0.90 Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
COR BETON T:10 CM -1.00 COR BETON T:10 CM -1.00 Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
PASIR URUG T:5 CM -1.05 PASIR URUG T:5 CM -1.05 Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com
TANAH ASLI TANAH ASLI
150 600 150 600 150 150 600 150
1650 900

POTONGAN A-A POTONGAN B-B


SKALA: 1:25 SKALA: 1:25
KOLAM NATURAL FILTRATION

KOLAM
KOLRINASI

KOLAM PENGUMPUL

KOLAM IKAN

TAMPAK ATAS KOLAM INDIKATOR TAMPAK DEPAN KOLAM INDIKATOR


SKALA : 1:30 SKALA : 1:30

D E F
PIPA INLET
2950
250 300 250 700 250 300 250 650
250

150

C C
300

PIPA PVC PIPA PVC


415

1000

TAMPAK KANAN KOLAM INDIKATOR


700
150

PIPA PVC PIPA OUTLET


B B SKALA : 1:30 PT.WHIKA PUTRA SEJAHTERA
296

296
300
1700
483

250 250 ENGINEERING, MANUFACTURING,


150

A A
150

CONTRACTOR AND MAINTENANCE


150 1000 150 Office : Plaza Summarecon Bekasi,
600 150 Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
450

Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -


750 Indonesia
552

150 150 KOLAM Telp./Fax : (021) 29490606


KLORINASI email : whikaputrasejahtera@yahoo.com

2100
D E F

LAYOUT KOLAM INDIKATOR TAMPAK KIRI KOLAM INDIKATOR


SKALA : 1:30 SKALA : 1:30
2100 1406
150 1800 150 193 614 150 300 150
FIN.PLASTER,
ACIAN

100
FIN. BATU ALAM PASANGAN BATA
PASANGAN BATA FIN.PLASTER,
BATU ALAM
A

700
FIN.PLASTER,
BATU ALAM

900
100

800
300

300

300
500

500

500

500
DASAR KOLAM DASAR KOLAM
TANAH URUG 400 FIN. ACI TANAH URUG FIN. ACI

400

400

400
50150

50150

50150

50150
150 1800 150 193 614 150 300 150
2100 1406
TANAH ASLI TANAH ASLI
PASIR URUG T:5 CM PASIR URUG T:5 CM
RABAT BETON T:15 CM RABAT BETON T:15 CM

POTONGAN A-A POTONGAN D-D


SKALA : 1:30 SKALA : 1:30

2850
2100 750 1650
150 250 150 1000 150 250 150 600 150 150 450 150 300 150 300 150
FIN.PLASTER,
FIN. BATU ALAM
ACIAN

100
PASANGAN BATA PASANGAN BATA
FIN.PLASTER,
BATU ALAM FIN. PLASTER,
FIN.PLASTER,
BATU ALAM
A

700
ACIAN

900
100
300

700

700

300
100

200
500

500

500
500

DASAR KOLAM DASAR KOLAM

600
TANAH URUG FIN. ACI TANAH URUG FIN. ACI
400

400

400
50150

50150

50150
DASAR KOLAM

600
FIN. ACI

50150
150 450 150 300 150 300 150
150 1800 1650
TANAH ASLI
150 600 150 PASIR URUG T:5 CM
2100 RABAT BETON T:15 CM
TANAH ASLI 900
PASIR URUG T:5 CM
RABAT BETON T:15 CM POTONGAN E-E
POTONGAN B-B BATU KERIKIL 15 CM
PASIR 10 CM
SKALA : 1:30
SKALA : 1:30 IJUK 10 CM
KARBON AKTIF 10 CM
2850 1000
BATU KERIKIL 15 CM
PASANGAN BATA 2100 750 150 700 150 PT.WHIKA PUTRA SEJAHTERA
FIN.PLASTER, 150 1800 150 600 150
BATU ALAM DETAIL A ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
SKALA : 1:30 PASANGAN BATA
FIN. BATU ALAM Office : Plaza Summarecon Bekasi,
A FIN.PLASTER,
BATU ALAM
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
FIN. PLASTER,
700

Indonesia
ACIAN Telp./Fax : (021) 29490606
900

200

200
email : whikaputrasejahtera@yahoo.com
100

200

600

600
600

TANAH URUG TANAH URUG DASAR KOLAM

600

600
400

FIN. ACI
50150

DASAR KOLAM
600

FIN. ACI

50150

50150
50150

150 1800 150 700 150


1000
150 600 150 TANAH ASLI
2100 PASIR URUG T:5 CM
TANAH ASLI 900
RABAT BETON T:15 CM
PASIR URUG T:5 CM
NB* : Bagian dalam kolam h: 50 cm
RABAT BETON T:15 CM
finishing plester aci POTONGAN F-F
POTONGAN C-C SKALA : 1:30
SKALA : 1:30
5020
350 4320 350

200

40
HOLLOW 40X60

HOLLOW 40X60

2240

2000
2080
1840
PONDASI 200X350 HOLLOW 40X60
200

40
60 60 60 60
150 4400 150
4940

LAYOUT CANOPY BIOREAKTOR


SKALA: 1:30
HOLLOW 40X40
HOLLOW 40X40 HOLLOW 40X40 HOLLOW 40X40 HOLLOW 40X40 HOLLOW 40X40

500
HOLLOW 40X40

40
ATAP SENG GALVALUM

960
HOLLOW 40X40

PT.WHIKA PUTRA SEJAHTERA

3080
40
ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,

1000
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com
HOLLOW 40X40

40
500
500 40 1000 40 1000 40 1000 40 1000 40 700 40 500
5940

RANGKA ATAP CANOPY BIOREAKTOR


SKALA: 1:30
HOLLOW 40X40
ATAP SENG GALVALUM
ATAP SENG GALVALUM 3082
5940 940 40 500
500 40 1000 60
200 140

140

200 73
60 60

60 60

60 60
200
500 60 500 60 500 60 500 60 500 60 500 60 500 60 480 500 60 500 60 500 60 320
HOLLOW 40X60 HOLLOW 40X60 HOLLOW 40X60
HOLLOW 40X60
1040
60 60
200
4140

4140

4073
4000

4000
3480

3480
1000

HOLLOW 40X60 HOLLOW 40X60


60 60
200
800

PONDASI 200X350
PONDASI 200X350 DUDUKAN BIOREAKTOR DUDUKAN BIOREAKTOR
200

200

200
60 60 60 60 40 2000 40
150 4400 150
2080
4940

TAMPAK DEPAN CANOPY TAMPAK KANAN KIRI


SKALA: 1:50 SKALA: 1:50
HOLLOW 40X40
HOLLOW 40X40
ATAP SENG GALVALUM
ATAP SENG GALVALUM
5940
3082
500 700 1000 1000 1000 1000 500 500 40 940
40 40 40 40 40 40
60 1000 40 500
273 67

158
60

200 73
60 60

60 60
200
60

480 60 500 60 500 60 500 60 500 60 500 60 500 60 500 320 60 500 60 500 60 500
HOLLOW 40X60 HOLLOW 40X60 HOLLOW 40X60
HOLLOW 40X60
1040

PT.WHIKA PUTRA SEJAHTERA


60 60
200

ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
3783
4140

4140

4073

4000
3480

3480
Office : Plaza Summarecon Bekasi,
1000

Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa


HOLLOW 40X60 HOLLOW 40X60 Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com
60 60
200
800

PONDASI 200X350
PONDASI 200X350 DUDUKAN BIOREAKTOR DUDUKAN BIOREAKTOR
200

200

200

200
60 60 60 60 40 2000 40
150 4400 150
2080
4940

TAMPAK BELAKANG CANOPY TAMPAK KANAN CANOPY


SKALA: 1:50 SKALA: 1:50
A
2502
51 2400 51 51 +1.29
+1.29 +1.25
+1.25
TIANG PAGAR TIANG PAGAR
D2"-150 CM D2"-150 CM
PAGAR BRC
PAGAR BRC HD GALVANIZED
HD GALVANIZED 120 X 240 CM, D-8 mm
120 X 240 CM, D-8 mm
TANAH URUG
MUKA TANAH
+0.05
+0.05
TANAH URUG COR BETON
COR BETON -0.25
-0.25 30X30X40
30X30X40 -0.40
-0.40 TANAH ASLI
TANAH ASLI
300
300 2151 300
2751 POTONGAN A-A
TAMPAK PAGAR BRC SKALA: 1:30

SKALA: 1:30

3000
1500 1500
+1.27
TINANG PAGAR
D-2"-150 CM
PINTU BRC
HD GALVANIZED PT.WHIKA PUTRA SEJAHTERA
150X122 CM, D-8 mm
ENGINEERING, MANUFACTURING,
RANGKA PINTU D-1,5"
CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
MUKA TANAH Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
+0.05 Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com
TANAH URUG
COR BETON
-0.25
30X30X40
-0.40
TANAH ASLI
300 2751 300
3351

TAMPAK PINTU BRC


SKALA: 1:30
B
2000
150 1700 150

150
PASANGAN BATA
FIN. PLESTER-ACI

A A

2000
1700
TL
Pasangan

2500

2500
Kramik 40X40
CM
+0.25

SK
ST

150
Teras

500

500
+0.20

2000

LAYOUT RUMAH SAMPAH


SKALA : 1:40

ATAP GALVALUM
3000
+3.51 3006
ATAP GALVALUM
+3.41
BESI HOLOW +3.33 500
40X40 500 500 HOLOW +3.25
40X40 MM 500
RING BALK RING BALK
300

300
15X15 CM 15X15 CM
+2.75 +2.75
100 100
LUBANG LUBANG
VENTILASI VENTILASI

D8-150
PT.WHIKA PUTRA SEJAHTERA
300

PASANGAN PASANGAN
BATA BATA
FIN. PLESTER-ACI FIN. PLESTER-ACI ENGINEERING, MANUFACTURING,
KRAMIK 40X40 CM D12-200, KRAMIK 40X40 CM
SPESI T:5 CM L:500 MM SPESI T:5 CM CONTRACTOR AND MAINTENANCE
SIRTU T:5 CM 200 SIRTU T:5 CM TERAS Office : Plaza Summarecon Bekasi,
+0.25 +0.25 +0.20 Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
SLOOF 20X30 CM +0.25 SLOOF 200X300 SLOOF 20X30 CM +0.25 Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
MUKA TANAH MUKA TANAH COR BETON +0.20 Indonesia
SKALA : NTS T:20 CM Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com

SIRTU T:5 CM

TANAH URUG TANAH URUG

PONDASI BATU PONDASI BATU


KALI KALI
PASIR URUG -0.85 PASIR URUG -0.85
T:10 CM -0.95 T:10 CM -0.95
TANAH ASLI TANAH ASLI
200 200 200 200
600 1250 600 600 1250 600
2450 2450

POTONGAN A-A POTONGAN B-B


SKALA : 1:40 SKALA : 1:40
PINTU KAWAT

MUKA TANAH MUKA TANAH

TAMPAK DEPAN TAMPAK KANAN


SKALA : 1:40 SKALA : 1:40

PT.WHIKA PUTRA SEJAHTERA

ENGINEERING, MANUFACTURING,
CONTRACTOR AND MAINTENANCE
Office : Plaza Summarecon Bekasi,
Jl. Bulevar Ahmad Yani, Kav. 01. Level 7, Desa
Harapmulya, Kec. Medansatria, Kota Bekasi, Jawa Barat -
Indonesia
Telp./Fax : (021) 29490606
email : whikaputrasejahtera@yahoo.com

MUKA TANAH MUKA TANAH

TAMPAK BELAKANG TAMPAK KIRI


SKALA : 1:40 SKALA : 1:40