Most Construction projects requires underground cabling system for its power supply, some
times High tension system too. The architects and builders are least bothered about how this
cables routed to the premises and equipment. If electrical professionals pointed out the
feasibility, the aesthetics of the project would touch to the intended level. Hence, in the planning
stage itself the routes and size of the power cable trench to be incorporated in the project design.

WE USE COOKIES ON THIS SITE TO


ENHANCE YOUR USER EXPERIENCE Accept No, thanks

By clicking the Accept button, you agree to us doing so.


More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 1/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

(https://www.electricveda.com/sites/default/files/image/article/2020-01/typical-cable-laying-
detail-low-tension-single-cable-direct-buried.jpg)

Typical Cable Laying Detail For Direct Buried, Low Tension Cables

STEPS FOR DIRECT BURIED CABLE


LAYING
This drawing shows how to lay a Low Tension (LT) power cable, single core direct buried
method. After taking trench keep clean the trench for the following steps:
WE USE COOKIES ON THIS SITE TO
ENHANCE YOUR Accept No, thanks
1. Make a sand bed or fineUSER
riddledEXPERIENCE
soil bed as per the measurements given in the drawing.
2. Lay
Bythe cablethe
clicking inAccept
the middle
button,ofyou
theagree
trench.
to us doing so.
More info
3. Provide sand bed on top of the cable.
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 2/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

4. Lay the protective tile just above the sand bed.


5. Backfill the excavated soil leaving 300 mm from the ground level.
6. Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the
ground level.

All the materials should be as per the relevant section of the project specification and standards.

CABLE LAYING METHOD FOR ROAD


CROSSING AND UTILITY SERVICE
CROSSING USING UPVC DUCT
Drawing below shows Installation of Underground cable in two environments. First one shows
direct buried cable installation and the second one shows cable passing through duct mainly
where road crossing comes. Another occasion for using duct due to crossing of other services like
water pipe line, telecommunication lines or petrochemical pipe lines. Duct should be uPVC
encased with concrete all along with the crossing of either road or other services.

Typical Cable Laying Detail For Direct Buried Using Duct, Low Tension Cables

DIRECT BURIED METHOD FOR


WE USE COOKIES ON THIS SITE TO
MULTIPLE
ENHANCE YOURCABLES
USER EXPERIENCEUSING SINGLE
Accept No, thanks

CABLE
More info
TRENCH
By clicking the Accept button, you agree to us doing so.

https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 3/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

Below drawing explain how to lay multiple cables in a single trench. Here cables run two tier
(layer) and parallel as a matrix system. The sequence shall be compacted sand bed, first tier cable
parallel run, sand fill, second tier cable parallel run, sand fill, protective concrete block, backfill of
the excavated soil, warning tape, sand fill or backfill of the excavated soil, and finally the
pavements.

Typical Cable Laying Detail For Direct Buried, Multiple Cables, Low Tension Cables

TYPICAL SPECIFICATION FOR


UNDERGROUND CABLE LAYING OR
INSTALLATION
Wherever the installation involves the laying of certain sections of cable direct in the ground
trenches prepared within the Contract, the Contractor shall protect the cables with reinforced
concrete or accepted PVC covers, all cables drawn into prepared pipes or ducts shall be effectively
sealed where the cables enter substations or buildings to prevent the entry of water and vermin.
Where required by the Engineer (https://www.lopol.org/article/general-questions-and-answers-
in-engineering-and-technology) duct entries into manholes shall be suitably sealed, after the
installation of all cabling.

The invert levels of all pipes or ducts entering a building shall be such that the pipes or ducts
slope away from the building. Should the pipe or duct entry into a building be below the water
table puddle flanges shall be incorporated.

Where cables are laid direct in the ground 75mm of sand or riddled earth shall be placed at the
bottom of the trench to form a bed for the cables. When the cables have been laid they shall be
inspected and accepted by the Engineer. They shall then be covered with similar riddled
sand/earth
WEwhichUSE shall be punned
COOKIES aroundSITE
ON THIS and over
TO the cables to a level of 75mm above the top of
ENHANCE
the cables. Where more YOUR
than USER layer of cables is to beAccept
EXPERIENCE
one horizontal No,sand
laid similar thanks
/earth
beddingByand coverthe
clicking shall be provided
Accept for
button, you each
agree to layer.
us doing so.
More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 4/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

Protective covers shall be placed centrally over the cables, each cover being closely butt jointed
and interlocked with the adjacent covers throughout the length of the cable. No final filling in of
trenches shall be commenced until the Engineer has accepted the placing of the protective covers.

After any cable has been laid and until the whole of the cables to be laid in the trench have been
covered with protective covers, no sharp tools or other appliances shall be used in the trench or
left in such positions that might result in damage to the cables if they fell into the trench. Any
rollers used for the cable laying operation shall be free from all sharp projections liable to cause
damage to the cables.

The Contractor shall be solely responsible for ascertaining whether the soil is chemically active
and for taking special precautions to protect the cables against chemical action. The Contractor
shall take precautions to avoid electrolytic and/or electro-chemical action occurring in situations
where the cable and accessories are likely to be installed in close proximity to other dissimilar
metals in the presence of moisture.

The arrangement of cables, all methods of laying and installation shall be agreed with the
Engineer, which shall be planned to provide an orderly formation, free from unnecessary bends
and crossings, permitting the removal of any one cable without undue disturbance to adjacent
cables.

WE USE COOKIES ON THIS SITE TO


ENHANCE YOUR USER EXPERIENCE Accept No, thanks
Direct Burried Power Cables, Product Image
By clicking the Accept button, you agree to us doing so.
More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 5/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

Where ducts have been laid the Contractor shall ensure that they have been ridden and cleaned
to remove all foreign matter before the cables are drawn in. After cables have been laid in
accordance with requirements specified the trenches shall be filled in by the Contractor and the
refilled trench shall be left and maintained in a thoroughly safe condition until the work of
permanent reinstatement is carried out. Cable ducts shall be internally glazed vitrified clay with
plastic flexible sleeve joints or PVC or pitch fibre type.

Cables shall be identified in all manholes and at equipment by an insulated tag or tape with the
circuit identification inscribed thereon. Cables shall have the phases and the number and sizes of
cores identified with a letter or numerical designation in all manholes and switchboards. The
designation shall be on non-corroding material which shall also be resistant to chemical
degradation.

Cables running through formed ducts shall be fixed with reinforced industrial nylon or
aluminium alloy cable cleats bolted to vertical or horizontal mild steel channel supports
embedded in the duct walls at 600mm fixing centres.

Cables passing under roads shall be drawn through full round ducts 600mm below ground level
for cables up to 1 kV, 1100mm below ground level for cables up to 11 kV. Cables laid in unmade
ground shall be buried minimum 600mm for 1 kV rating and 800mm for 11 kV rating below
ground level. Marker posts shall adequately indicate the routes of all buried cables. They shall be
reinforced concrete units fitted with lead inserts bearing cable sizes and references. The marker
posts shall extend above ground level or shall be flush with the final ground level, as specified.

ELECTRICAL INSTALLATION ELECTRICAL CABLE LAYING

DIRECT BURRIED CABLE INSTALLATION

TYPICAL INSTALLATION METHODS CABLE LAYING DRAWING

CABLE TRENCH

WE USE COOKIES ON THIS SITE TO


R/REGISTER? LOG IN
ENHANCE YOUR USER EXPERIENCE
or REGISTER to post comments
Accept No, thanks
MMENT%23COMMENT-
LY/NODE/27/COMMENT%23COMMENT-
FORM)By clicking the Accept button, you agree to us doing so.
More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 6/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

‹ Transformers in MV Distribution System Up Typical Installation Details Of Floor / Wall


(/power-distribution/transformers-in-mv- (/book/mechanical-
Mounted Electrical SMDB › (/electrical-
distribution-system) electrical- switchgears/typical-installation-details-of-
plumbing- floor-wall-mounted-electrical-smdb)
mep-
in-
construction-
contract)

SPONSORED SEARCHES
underground cable laying lt ug cable laying procedure

direct buried cable installation guide how to lay underground cable

Search...

Username

Password

LOG IN

Create new account (/user/register)


Reset your password (/user/password)

WE USE COOKIES ON THIS SITE TO


ENHANCE YOUR USER EXPERIENCE Accept No, thanks

By clicking the Accept button, you agree to us doing so.


More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 7/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

RELATED POSTS

(/building-services/medium-voltage- (/electrical-switchgears/medium-voltage-
distribution-system-in-electrical-construction) switch-gears-in-electrical-construction)
Medium Voltage Distribution System In Medium Voltage Switch Gears In
Electrical Construction (/building- Electrical Construction (/electrical-
services/medium-voltage-distribution- switchgears/medium-voltage-switch-
system-in-electrical-construction) gears-in-electrical-construction)

(/building-services/electrical-earthing-or- (/building-services/installation-of-audio-
grounding-methods-for-signal-and- intercom-system-for-building-project)
communication-systems) Installation of Audio Intercom System
Electrical Earthing or Grounding For Building Project (/building-
Methods for Signal And Communication services/installation-of-audio-intercom-
Systems (/building-services/electrical- system-for-building-project)
earthing-or-grounding-methods-for-
signal-and-communication-systems)
WE USE COOKIES ON THIS SITE TO
ENHANCE YOUR USER EXPERIENCE Accept No, thanks

By clicking the Accept button, you agree to us doing so.


© 2020. Electricveda.com. All Rights Reserved.
More info
https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 8/9
8/19/2020 Electricveda.com | Typical Cable Laying Details For Direct Buried, Low Tension Cables

https://www.electricveda.com/building-services/typical-cable-laying-details-for-direct-buried-low-tension-cables 9/9

You might also like