Consulting Engineers

Hydrock
Office of origin
REINFORCEMENT
Cardiff
SCHEDULE
Project Project no Date

NCGM - DU Blocks A, B, C C-09299 01-Apr-21


Schedule no Status
Block A2 LV, Comms & Lift Pit RC
900-9032/1 of 1 A

Drawn by Checked by Revision Date Total Wt kg


CW JA C01 1178

Member Mark Type & No No in Total Length Shape A B C D E/R Wt Rev


size off each no mm code mm mm mm mm mm kg letter

Lv & Comms Base 01 H 12 2 16 32 1400 00 1400 0 0 0 0 39.8


02 H 12 2 16 32 1150 13 550 100 550 0 0 32.7
03 H 12 2 16 32 1400 00 1400 0 0 0 0 39.8
04 H 12 2 16 32 1025 13 500 75 500 0 0 29.1
0 0 0 0 0 0 0 0 0
LV & Comms Walls 07 H 12 8 12 96 1200 11 825 400 0 0 0 102.3
08 H 12 8 12 96 1075 11 700 400 0 0 0 91.6
10 H 12 8 4 32 1925 11 1100 850 0 0 0 54.7
11 H 12 8 4 32 1425 11 1100 350 0 0 0 40.5
12 H 12 8 4 32 1175 11 850 350 0 0 0 33.4
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
Lift Pit Base 20 H 12 1 28 28 2675 00 2675 0 0 0 0 66.5
21 H 12 1 28 28 1200 21 550 140 550 0 0 29.8
22 H 12 1 30 30 2550 00 2550 0 0 0 0 67.9
23 H 12 1 30 30 1150 13 550 110 550 0 0 30.6
0 0 0 0 0 0 0 0 0
Wall A 25 H 12 2 22 44 1250 11 875 400 0 0 0 48.8
26 H 12 2 22 44 1250 00 1250 0 0 0 0 48.8
27 H 12 2 22 44 1125 11 750 400 0 0 0 44.0
28 H 12 2 14 28 2050 00 2050 0 0 0 0 51.0
29 H 12 2 14 28 1575 11 800 800 0 0 0 39.2
30 H 12 2 14 28 1075 11 800 300 0 0 0 26.7
0 0 0 0 0 0 0 0 0
Wall B 25 H 12 2 28 56 1250 11 875 400 0 0 0 62.2
26 H 12 2 28 56 1250 00 1250 0 0 0 0 62.2
27 H 12 2 28 56 1125 11 750 400 0 0 0 55.9
30 H 12 2 14 28 1075 11 800 300 0 0 0 26.7
31 H 12 2 14 28 2175 00 2175 0 0 0 0 54.1
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
Status: P Preliminary T Tender C Construction All bending in accordance with BS 8666:2005