You are on page 1of 1

NOTES

- FOUL WATER CONNECTIONS TO BE 150Ø NOTE


UNLESS STATED OTHERWISE THIS DRAWING SHOULD BE READ IN CONJUNCTION
- DIRTY WATER CONNECTIONS TO BE 100Ø WITH DRAINAGE MASTER PLAN. REFER TO DRAWING No. CONSTRUCTION RISKS MAINTENANCE / CLEANING DEMOLITION RISKS
UNLESS STATED OTHERWISE NCGM-MP-XX-D-AEC-DR-930-1100 RISK
- SURFACE WATER CONNECTIONS TO BE 150Ø In addition to the hazard/risks normally associated with the types of work
UNLESS STATED OTHERWISE ALL 1100, 1101, 1104, 1153 & 1154 INFORMATION SHOWN detailed on this drawing take note of above.
- ROAD GULLIES CONNECTIONS TO BE 150Ø WITHIN THIS BOUNDARY HAS BEEN DEVELOPED FOR STAGE IS It is assumed that all works on this drawing will be carried out by a competent
UNLESS STATED OTHERWISE AND IS NOT ISSUED FOR CONSTRUCTION contractor working, where appropriate, to an appropriate method statement.
- DISTRIBUTION UNITS CROSS PASSAGE GULLY
CONNECTIONS TO BE 100Ø UNLESS STATED SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX
OTHERWISE

PIPE GRADIENTS UNLESS SHOWN ARE:

FOUL/DIRTY WATER: MINIMUM GRADIENT WITHOUT W.C.


TO BE 1:40
G 12
MINIMUM GRADIENT WITH W.C. TO BE 1:80

SURFACE WATER: MINIMUM GRADIENT 1:80 \ \ \ \ \ \

G 10

CGMA Easement
on NR Ownership

Lift
Outline of bridge link above Outline of Football decks above

Substation
Switchroom
Tankroom

Workshop Sprinkler Tank


to M&E details
Sprinkler
Pumproom

1:54

THESSALY ROAD
Fire escape route from football pitches +5.39
Fire escape route from football pitches

Pallet yard +6.68

Waste Compound
Cycle Storage

Pedestrian Route
New pedestria
MSCP Exit MSCP n walkway
restricted head-room
below ramp above
Exit

RG
Lobby

Blue Pallets White Pallets

Potential
access through
1 arches

G 11
MSCP Pedestrian Exit

Access
A 2
3
Ground at
Level
New
4
AOD
FFL
3700
3.250
UP
UP
Entrance B pedestr
ian walkwa 5
y
6
C
Access
Ground at
Level

7
Shared
Surface 8
Securi 9
ty D Exit 10 11
12
13
Unit
101 E 14
15
Shared 16
Surface 17
Unit 18
Emergency 102 19
20
Access Unit
Market Loop Road 21
22
Unit 23

+3.120
103 +3.100
24
201 Turning Head
+3.125
25

+3.040
+3.030 26
Unit Unit
1:40
+3.000
27
Fire Access

1:22
104 202 Unit +3.010
1:21
+3.400
+3.600 TOW

301

+3.350
+3.600 +2.880

+3.600
+3.285
+3.425

+3.435
TOW
+3.600
+3.600
+3.324

TOW
TOW

+3.449

+3.442
1:40

+2.830
+3.440
Unit +3.600
+3.485 TOW

Unit 1:60

1:60
105 Unit

1:60
203
+2.840

302 +3.520 FFL +3.92

+3.520
+3.525 FFL

+3.520

+3.520
+3.525 +3.525
+3.525

+3.525
+3.525
FFL

1:60

Unit Unit Unit


106 Unit

RG
204 303 401
Extent of MSCP above

Fire Escape Stair


Unit Unit Unit
107 205 Unit
304 402

Unit Unit
108 Unit Unit
206 305 403

Unit Unit Unit


109 207 Unit Unit
404

5.5m deep van parking spaces


306 501
Unit Unit
208 Unit Unit Unit
110 307 405 502

Unit Unit Unit


111 209 Unit Unit
308 406 Unit
503

Riser
601

120 Van Parking Spaces


Unit Unit

T2 112 Unit Unit Unit


210 309 407 Unit
504 602
Unit Unit
113 Unit Unit
211 310 408 Unit Unit
505 603
Unit Unit

HGV
114 212 Unit Unit Unit Unit
311 409 506 604
Unit Unit
115 213 Unit Unit Unit
312 410 Unit
507 605

Unit Unit Unit Unit


116 214 Unit Unit

Accommodation Stair
313 411

Market Loop Road


508 606

Lockers
Double
Unit Unit

THESSALY ROAD
117 215 Unit Unit Unit
314 412 Unit
509 607

Secure Access
Unit

Cycle Storage
Unit

72 spaces
118 Unit Unit
216 315 413 Unit Unit
510 608
Unit Unit Unit Unit

Bin Store
119 217 316 Unit Unit
414 511 609
Unit

T3
Unit Unit Unit
120 218 317 415 Unit Unit
512 610
aisle Unit Unit Unit
121 219 318 Unit Unit Unit
416 513 611

Fire Escape Stair


Unit Unit
122 Unit Unit Unit Unit
220 319 417 514 612

Fire Escape Corridor


Unit Unit
123 Unit Unit Unit
221 Unit

Ramp 1:12
320 418 515 613
Unit Unit
124 Unit Unit
222 321 419 Unit Unit
516 614
Unit Unit
125 223 Unit Unit Unit
322 420 Unit HGV
-01.20
517 615
HGV 1:80
Unit Unit
126 224 Unit Unit Unit Unit
323 421 518 616 -01.07

RG
HGV
-01.00

Unit Unit 1:40


127 Unit Unit Unit Unit

CONTINUED ON DRAWING No.NCGM-XX-XX-D-AEC-DR-930-1102


225 324 422 519 617
-00.75
-00.25

Unit Unit Unit Unit


-00.50

128 226 325 423 Unit Unit -00.25

RG
520 618 1:40
-00.25

00.00
Unit Unit -00.65 -00.50

Unit

T4
129 Unit Unit Unit
227 326 424 521 619
-00.28

Unit
522
Unit Unit
130 Unit Unit Unit 620
228 327 Unit
425 523
Unit
Unit Unit Unit Unit 621
131 229 328 426 UP

Unit
Unit Unit 524
132 Unit Unit
230 329 427
Unit
Unit 525
133 Unit Unit Unit
231 330 428
Unit m

Unit Unit 526 HV


Switchroom
Temp 8500x5000m

134 232 Unit Unit


331 429

Unit Unit Unit


135 233 Unit
332 430

MILL
RG
Unit Unit Unit
136 234 333
Unit

PO
Unit 431
Unit Unit

2.43
137 334

ND
235
Unit
Unit 432

CL
Unit

2.33
Road
138 236
Unit

OS
335 Unit
Unit 433
Loop

2.39
Unit
t

E
139 237
rke
Unit Unit
Unit
336 4500
Unit
434 Ma
140 238

2.47
Unit
337
ent
Unit
2.50
141
er
Barri Easem
AD
Unit RO
stic
3.725

338

DEELEY

2.44
e TH
Acou bl OR
2.34
Unit Ca IMSW
339 HV CR
PN

3.10
3.10

2.31
Unit UK

ROA
340
2.68 3m

2.76
2.61

2.97

2.40
2.52

2.32
D
1.58

2.69

1.01
1.86
1.88

Brick

2.12
Approx tree canopy

Wall
2.04

2.09 (not surveyed)


cl=2.39

cl=2.51

2.20

7.0m
HGV

land
r

scap
tic Barrie
Acous

e buffe
HGV

AD

r
AD
H RO
HGV

RC RO
PA O'
OR OR
UKPN
TH SB

Acou
ROOM

LD
INTAKE LV
Switch
HV

stic
GO
IDNO
ROOM
PANEL

Barr
ier
r
tic Barrie

SU
Acous

Approx tree canopy


(not surveyed)

RG

BLOCK A2 STAGE E UPDATE

.21
RM C33

DS

.01
29
SU
BLOCK A2 STAGE E UPDATE

.21
C32

DS
RM

.01
22
SU NOTES ADDED

.20
C31

DS
TB

.06
16
DRAINAGE UPDATED

.20
C30

DS
TB

.04
29
DRAINAGE UPDATED - GULLY IN SPRINKLER ROOM ADDED. UNIT

.19
DS C29

MO

.02
NUMBERS REVISED

20
BD

.18
DRAINAGE UPDATED
C28

27.

TB
RK

.12
13

DRAINAGE UPDATED
SIC09

.18
C27

DS
MO

.12
07
FWIC84 FWIC218
150Ø 1:19 DRAINAGE UPDATED

8
1.1
C26

DS
AP
SIC07

.1
09
DRAINAGE UPDATED

.18
C25

DS
AP

.10
25
STUB STACK SECURITY LODGE, SLIP LANE AMENDMENTS

8
DS

9.1
SIC07A C24

MO

.0

CAST IRON PIPE

14
19

15
ia 1: FLOOR GULLY
150d 101 SMH11, FMH04 MOVED. CONNECTION FROM SECURITY LODGE ADDED

150Ø

.18
FWIC02 C23

TB
AP

.08
FLOOR GULLY

08
DN 100 1:32 SMH11/FMH04 MOVED, SMH10A ADDED
DWIC02

.18
C22

DS
MO

.06
STUB STACK SIC08

08
SLIP LANE REMOVED, CONNECTIONS ADDED, MINOR AMENDMENTS

.18
CAST IRON PIPE C21

DS
MO

.04
18
FLOOR GULLY FOUL / DIRTY WATER
FWIC03
102 SS SU VENTILATION PIPE SHEET LAYOUT UPDATED

8
FLOOR GULLY

3.1
C20

DS
MO

.0
19
FG FG
DWIC03 By
STUB STACK CAST IRON PIPE Revision Details Date Suffix
PIPE TO BE CONCRETE Check
ENCASED
CAST IRON PIPE Purpose of issue
FWIC04 FLOOR GULLY FLOOR GULLY
103
FLOOR GULLY 201
GULLY INVERT
LEVEL 2.875
FLOOR GULLY FLOOR GULLY FWIC44
DWIC43 FWIC86
STAGE F
DWIC80
DWIC04
STUB STACK
CAST IRON PIPE ³ Client
STUB STACK VINCI CONSTRUCTION UK
CAST IRON PIPE
FWIC05 FLOOR GULLY
104 FLOOR GULLY LTD.
FLOOR GULLY 202 FLOOR GULLY FLOOR GULLY FWIC45
DWIC44 FWIC87
DWIC81
DWIC05 CAST IRON PIPE
STUB STACK
Project Title
STUB STACK
CAST IRON PIPE
FWIC06 FLOOR GULLY
105GULLY 203 DWIC45
FWIC88
FLOOR GULLY NEW COVENT GARDEN
FLOOR FLOOR GULLY
DWIC06
FLOOR GULLY
CAST IRON PIPE
FWIC46 DWIC82 MARKET
STUB STACK
STUB STACK
CAST IRON PIPE
FWIC07 FLOOR GULLY FLOOR GULLY
106
FLOOR GULLY 204 FLOOR GULLY FLOOR GULLY FWIC47
DWIC46
FWIC89
DWIC83
Drawing Title

DWIC07 CAST IRON PIPE


STUB STACK
DRAINAGE LAYOUT
STUB STACK
CAST IRON PIPE
FLOOR GULLY FWIC90 FLOOR GULLY
SHEET 1 OF 8
FWIC08
107GULLY
FLOOR 205 FLOOR GULLY FLOOR GULLY FWIC48
DWIC47

DWIC85
450mm DIA DISPOSAL SHAFT DWIC08 CAST IRON PIPE
WITH D400 ACCESS STUB STACK Designed Drawn Checked Approved Date
STUB STACK
HP HP MC MC NOV 2015
CAST IRON PIPE
FLOOR GULLY FWIC91 URS GULLY
FLOOR Internal Project No. Suitability
FWIC09A
FWIC09
100mm DIA
VENTILATION PIPE
108
FLOOR GULLY 206 FLOOR GULLY FLOOR GULLY FWIC49
DWIC48
47074524

DWIC09
100dia 1:16 CAST IRON PIPE PROVISION OF RATIONALISED DWIC86 Scale @ A1
1:250
Zone / Mileage

GREASE TRAP VENTIALTION

BD
STUB STACK DRAINAGE TO TENANT UNITS a
e
m
hp
rta
e
o
p
m
tn
so
a
u
e
tsfU
in
b
rcid
tyjecR
.tn
lstiS
a
ih
lw
b
ctie
nsip
Tdso
lot
hciumh ean
bsteep
n
erp
a
ne
crid
orah
n
se
th
cw
o
eU
tpo
e
iR
fap
S
p
m
no
'tient

FWIC92 hdp
e
sta
o
h
u
ep
nciru
tw
o
fyd
so
tm
e
n
crfilshita
h
o
eb
n
ityrt
BD BD
BD
DN 100 1:8
109GULLY 207 DWIC49 TO BE AGREED PRIOR TO START OF FLOOR GULLY wapesrpaeradnpedom O
rn
te
vid
tw
y.e
n
ib
o
n
lru
e
n
sih
e
sla
dl.
©
UR
u
a
&
e
rcE
n
stS
fo
Irnvm
iU
enK
tm
e
Ld
tii
FLOOR GULLY FLOOR FLOOR GULLY FLOOR GULLY FWIC50
BD
BD FWIC10
STUB STACK CAST IRON PIPE CONSTRUCTION DWIC87
URS Infrastructure & Environment UK Limited
STUB STACK St. GEORGES HOUSE
CAST IRON PIPE 5 St. GEORGES ROAD
DWIC11 FWIC93 WIMBLEDON SW19 4DR
DWIC50 FLOOR
DN 100 1:15 TELGULLY
FWIC10A
FLOOR GULLY
110
FLOOR GULLY 208 FLOOR GULLY FLOOR GULLY
DN 100 1:17
FWIC51
DWIC89
+44 (0)20 7963 9800
FAX +44 (0)20 7963 9801
FWIC11 CAST IRON PIPE
www.urs.com
CAST IRON PIPE
Drawing Number Rev
STUB STACK STUB STACK

CONTINUED ON DRAWING FWIC94 NCGM-XX-XX-D-AEC-DR-930-1101 C33


111 No.NCGM-XX-XX-D-AEC-DR-930-1104
DWIC12 FLOOR GULLY
FLOOR GULLY FLOOR GULLY 209 FLOOR GULLY
DWIC51

You might also like