NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
STEEL POLE STEEL POLE COATS OF COAL TAR EPOXY PAINT AS PER APCS-3
300
300
FOUNDATION SHALL BE SELECT FILL. EXCAVATION
100
100
AND COMPACTION SHALL BE IN ACCORDANCE WITH
TOC TOC
SAES-A-114.
200 100
200 100
7. ALL DIMENSIONS SHALL BE FIELD CHECKED AND
VERIFIED PRIOR TO CONSTRUCTION OR FABRICATION.
SEE NOTE-4
8. THIS DRAWING IS PREPARED FOR OVER HEAD POWER
FGL FGL LINE POLE AS PER SAUDI ARAMCO STD. DRAWING NO.
AA-036142-015 REV. 00.
200
9. GALVANIZED STEEL POLE SHALL BE COATED WITH
600
NGL
ANTI-CORROSSION COATING OF COAL TAR EPOXY
AS PER 14-SAMSS-603. COATING SHALL BE APPLIED
FOR THE EMBEDED DEPTH PLUS 300MM ABOVE THE
NGL TOP OF CONCRETE.
2100
11. MARL PAD FOR SABKHA/POOR SOIL SHALL BE
ANTI CORROSION COATING ANTI CORROSION COATING
CONSTRUCTION BEFORE INSTALLATION OF POLE
FOUNDATION. COMPACTION OF THE MARL PAD SHALL
B
B
75 MIN. SIDE 75 MIN. SIDE
BE AS PER SAES-A-114
CLEAR COVER CLEAR COVER
DRILLED HOLE FILLED WITH
(TYP) (TYP) DRILLED HOLE FILLED WITH 12.NUT SHALL BE COVERED DURING COATING WORK.
CONCRETE
A
A
CONCRETE
13.OVER EXCAVATION SHALL BE BACKFILLED WITH
SELECT FILL AND COMPACTED AS PER SAES-A-114.
C
(SEE DETAIL-1) DETAIL DESIGN WITH APPROVED GEOTECHNICAL REPORT.
CAST-IN-PLACE
CONCRETE
CAST-IN-PLACE
WELD
CONCRETE
BOTTOM COVER
BOTTOM COVER
100 MIN.
100 MIN.
D D
LEGEND
CJ - CONSTRUCTION JOINT
- MARL PAD
MK-1001 TIES D
POLE
FOUNDATION HDG. STEEL POLE - ANTI CORROSION COATING
(2A+D)
REFERENCE DRAWINGS
150
DRAWING CONTROL FOR BI 10-10214-0001 PD-A00001
BLACK STRIPE
PROJECT PROPOSAL NARRATIVE PE-A00002
150
YELLOW STRIPE
D
150
BLACK STRIPE
A S E C T I O N
-
SCALE 1 :20M 0 0.5 1.0 1.5 2.0
SH
150
YELLOW STRIPE
1200
METERS
SCALE: 1 : 20M
300
REVISION VALIDATION
10-10214-0001-001
100
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
200
GMD MAP