You are on page 1of 1

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES CONT'D.: 20. BUILDING RISK ASSESSMENT (BRA) WAS DEVELOPED NOTES:
4295 4615 2000 4615 2665
IN FEL-2 STAGE AND DETERMINED THAT THE 13.8KV

3000
14.VENDOR INFORMATION IS NOT AVAILABLE PRESENTLY 16.A MINIMUM OF FACE SHIELD, RUBBER GLOVES, APRON 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
AND RUBBER BOOTS SHALL BE PROVIDED IN THE SUBSTATION IS REQUIRED TO BE BLAST RESISTANT, OTHERWISE NOTED.
FOR ELECTRICAL EQUIPMENT WHICH IS INDICATED ON

5846
BATTERY ROOM WITH IN A STAINLESS STEEL EQUIPMENT TOUCHING AN EXTERIOR WALL INSIDE
THIS DRAWING. 2. DIMENSIONS OF EQUIPMENT INDICATED ON THIS
STORAGE CABINET. THE BUILDING WILL BE MOVED 150MM AWAY FROM
DRAWING ARE TENTATIVE & MAY VARY DUE TO
15.THE FOLLOWING SAFETY SIGNS SHALL BE PROVIDED THE WALL AND SUPPORTED WITH FLOOR STEEL
17.STRUCTURE AND EQUIPMENT GROUNDING SHALL BE IN ACTUAL VENDOR INPUTS. ACTUAL CERTIFIED NMR 602
AT BATTERY ROOM ENTRANCE IN ARABIC & ENGLISH. SUPPORT TO COMPLY WITH SAES-M-009.
ACCORDANCE WITH SAES-P-111. IS REQUIRED BY CONSTRUCTION CONTRACTOR, AND
A. SIGN DANGER CAUSTIC / ACID

SEE NOTE 33
21.BATTERY CHARGER & 125VDC DISTRIBUTION PANELS SHALL BE UTILIZED, FOR CONSTRUCTION, PRIOR TO
B. SIGN DANGER CAUSTIC / ALKALINE 18.EXISTING OUTDOOR PLANT LIGHTING FIXTURES ARE
SHALL HAVE ONLY FRONT ACCESS. CONCRETE POURING.
C. SIGN DANGER NO SMOKING

4239
BEING RETAINED AS PERMITTED BY SAES-P-100.
3. SUBSTATION SWITCHGEAR BUILDING ELECTRICAL
77 78 D. SIGN EYE PROTECTION

11039
19.ALL EQUIPMENT TAG NUMBERS ARE PREFIXED BY DESIGN AND CONSTRUCTION SHALL BE BASED ON
THE PLANT NUMBER. ARAMCO STANDARD SAES-P-103, SAES-P-104, SAES-P-
123, SAES-P-126, SAES-P-119, SAES-P-116 & ALL
OTHERS STANDARDS REFERENCED THEREIN.

4. MAINTENANCE & SAFETY CLEARANCES SHALL BE


MAINTAINED AS PER REQUIREMENT OF SAES-P-116,

6954
67010 19670 SAES-P-119 & OTHER APPLICABLE SAUDI ARAMCO
STANDARDS.

5. BATTERY ROOM SHALL COMPLY WITH THE

3000
REQUIREMENTS OF SAUDI ARAMCO STANDARD SAES-P-
103, SAES-B-069, SAES-B-014 AND SAES-K-002.

6. EYEWASH SHALL BE INSTALLED IN THE BATTERY


ROOM PER REQUIREMENT OF SAES-P-119. THE
18190
EYEWASH SHALL BE 1.5 METERS OR MORE FROM THE

6000
TRANSFORMER YARD 2 3 NEAREST BATTERY AS PER SASE-P-103.
B 7. CATCH BASINS FOR OIL FILLED TRANSFORMER SHALL
A C D
1 TA-680745 BE INSTALLED IN ACCORDANCE WITH ANSI/IEEE STD
TA-680745 SH 002 TA-680745 TA-680745
979, NFPA 70 (NEC), SAES-S-020 AND SAES-P-119.
SH 002 SH 002 SH 002
8. TWO HOURS FIRE RATED BARRIER SHALL BE
1750 2000 7675 2000 2000 7675 2000 2000 5600 2000 2000 5600 2000 2000 5800 2000 2000 5800 2000 2000 3392 2000 3392 2000 3392 2000 3392 5288 INSTALLED IN ACCORDANCE WITH ANSI/IEEE STD 979
AND NFPA 70 (NEC). SEE SAES-P-119 FOR FURTHER
FIRE WALL MANDATED CONSTRUCTION DETAILS.
75 76

(TYP.)
LCLM-3
9. SUBSTATION TRANSFORMER YARD SHALL BE

600

2000

2000
LCLM-6
LB-01 LB-02 LCLM-4 COMPLETELY COVERED WITH ASPHALT AGGREGATE
600 600

(TYP.)
LCLM-5 MIXTURE AS PER SAES-P-119.

600
2900 2900 2900 2900
2800 2800 2800 2800 10. ELECTRICAL ONE LINE DIAGRAMS ASSOCIATED WITH

2818

2818
27540

1696 1696 1696 1696 1696 1696 1696 1696 THE ELECTRICAL EQUIPMENT INSTALLED WITHIN THE

2048

2048
5635

1891

1891
SUBSTATION SHALL BE FRAMED AND INSTALLED ON
C C C C
L L L L
H1 H2 H3 H1 H2 H3 H1 H2 H3 H1 H2 H3

13701452

13701452

13701452
THE SUBSTATION INTERNAL BUILDING WALL.

3782

3782

3973

3973
7 8 9 10

2822
2816

2816
2580

2580

18780
1925

1925
11. DRY TYPE TRANSFORMERS SHALL BE PLACED A MIN.

R2

R3

R2

R3

R2

R3

R2

R3
1500 1450

1500 1450

1540

1540
1891

1891
F1 F2 F1 F2 F1 F2 F1 F2

C.G. C.G. C.G. C.G.


C
L C
L C
L C
L

1312
R1

R1

R1

R1
R4

R4

R4

R4
1 2 OF AT LEAST 150mm FROM THE WALL.
3 4 5 6

1500

1500
X0 X0 X0 X0

1700

1700
3807 3868 3807 3868 430 430 385 385 150
X1 X2 X3

150
X1 X2 X3

150
X1 X2 X3

150
X1 X2 X3

12. OUTDOOR CABLE BUS SUPPORTS WILL BE DESIGNED

2096
(TYP.)
(TYP.)
3000

3000

3000

3000

3000

3000
AND SUPPLIED BY CABLEBUS VENDOR. CABLE BUS

600
662 662 472 472 472 472

600
SUPPORTS SHALL BE DESIGNED AND INSTALLED
LCLM-2

2635
WITHOUT OBSTRUCTING THE ACCESS TO TRANSFORMER
7000

7000
1150

1150
67

2859 1140

2859 1140

2859 1140

2859 1140
64 68 69 70 71 72 SECONDARY TERMINAL BOX,

3687
13 63 14 15 65 16 66 17 18
13. FIRE STOPS SHALL BE APPLIED AS PER SAES-U-101

6865

2900
1860 2000 750 2000 750 2000 750 2100 750 2100
2850

2850
REQUIREMENTS FOR ANY THROUGH WALL
E

2500
1860 2000
PENETRATIONS. MULTICABLE TRANSITS (MCT)

1275

1275
TA-680745 9867 6027 9900 7768 9594 9623 9302 2280
ASSEMBLY, FILLERS AND FRAMES SHOULD BE MADE
SH 002 E
A BY THE SAME ORGANIZATION, AND SHOULD HAVE

1150

1020

1020

1020

1020
90 91 92 THIRD PARTY CERTIFICATIONS &CALCULATIONS.
CFU
1000 914 13716 914 3126 914 7315 914 1367 914 7315 914 1500 900 8800 900 1054 900 8800 900 1000 LEGEND

2337
AHU-1

2337
DISCONNECT SWITCH EF EXHAUST FAN
19 20 21 (DUTY)

1000
22 23 EYEWASH AHU AIR HANDLING UNIT
NOTES CONT'D.: 59
48 2600 11260 4052
23.MINIMUM CLEARANCE BETWEEN BATTERY RACK & EYEWASH 2500 8530 2000 6702 2000 5788 2000 5788 2000 8860 EQUIPMENT FRONT ACCU AIR COOLED
SHALL BE MAINTAINED AS 1.5 METERS AS PER CLAUSE 7.2.1 (H) CAGE LADDER 32
CONDENSING UNIT
30 LOCAL CONTROL PANEL
15719

OF SAES-B-069.
2160

26 27 28 29 LB-XX LINK BOX


39

1500
24.BATTERY CHARGER DRY-TYPE TANSFORMER 125VDC DISTRIBUTION

2086
5000 8800 4550 3200 POWER/LIGHTING PANEL
G SWITCHGEAR ROOM 34
41 42 43 36 MECH. ROOM CFU CHEMICAL FILTER UNIT
38

1000
PANELS AND DDC PANEL SHALL BE FLOOR MOUNTED. 2000 31 12860 4070 88
3400
TA-680745
24 51 52 25 33 BUS DUCT ELBOW
25.BATTERY TOOLS/PPE CABINET SHALL BE FLOOR MOUNTED SH 002 89 60
95

1500
1400 7200 1000
AND INSTALLATION SHALL BE AS RECOMMENDED BY VENDOR. 79 SECTION VIEW
40 BUS RISER DOWN

2000 750750
26.DDC PANEL INSTALLATION SHALL BE AS PER HVAC 80 81 103104
1600 2600 35 4860 53

3782
2700 2000 1500 1800 12270

1600
VENDOR & SHALL BE FLOOR MOUNTED TYPE. 55 54 WALL OPENING
FIRE WALL
7580 4000
27.INSTALLATION OF BATTERY RACKS SHALL BE 98 85 84 83 82 100 56 59 97 BATTERY AHU-1
RECOMMENDED BY ATTERY RACK VENDOR. 94 99
50 45 49 46 47 44 17 57 58 96 (STANDBY)
800 ROOM REFERENCE DRAWINGS
93
28.BATTERY ROOM INSTALLATIONS SHALL BE AS PER
B 102 101 37 DSW
DWG. CONTROL FOR J.O.10-00243-0002 TD-112849
SECTION 6.0 OF SAES-P-103. DSW
62
F F EF2 EF1
3000

61 CONSTRUCTION SCOPE OF WORK TE-112850


29.BATTERY ROOM SHALL MEETS THE VENTILATION REQUIREMENTS
TA-680745 ACCU-2 ACCU-1 ELECTRICAL ONE LINE DIAGRAM TA-680751
PER CI.6 FO SAES-P-103. FURTHER THE HORIZONTAL BATTERY
SH 002 XFR(T)-309 (STAND BY) (DUTY)
CLEARANCE OR MORE THAN 1.5M IS MAINTAINED FROM R3 R4
73 74 UP UP UP UP UP FLOOR PLAN - SUBSTATAION BUILDING TA-427039.001
L
C

64540 10280
1696 1696

F2

ELECTRICAL EQUIPMENT, ACCORDINGLY EXPLOSION PROOF TYPE HVAC LAYOUT - 13.8 KV SS BUILDING TA-426699.001
3392

H3

X3

OF DISCONNECT SWITCH ENCLOSURES ARE NOT CONSIDERED.


C.G.

EQUI. LAYOUT - SECTION & ELEVATION TA-680745.002


H2

X2
L
C

B C D
X1
H1

150

30.BATTERY DISCONNECT SHALL BE PLACED ONE ABOVE THE OTHER ELECTRICAL GENERAL NOTES TA-680749
X0

11
F1

KEEPING A DISTANCE OF 300MM BETWEEN THEM AND MAINTAINING R2 R1


ELECTRICAL LEGEND & ABBREVIATION TA-680748
1312 2097 8713
2000

CLEARANCE FOR THE TERMINATION OF THE CABLES.

31.DRY TYPE TRANSFORMER SHALL BE PLACED A MINIMUM XFR(T)-310 R3 R4


L
C
1696 1696

F2

OF 150MM AWAY FROM THE WALL.


EQUIPMENT LAYOUT - 13.8kV SUBSTATION BUILDING
3392

H3

X3
C.G.

32. LEVELING STEEL CHANNELS SHALL BE PROVIDED UNDERNEATH


H2

X2
L
C

X1
H1

THE SWITCHGEARS AND CONTROLGEARS IN ORDER TO ENSURE SCALE 1 :150M


150
X0

THE EQUIPMENT IS MAINTAINED ON AN EVEN PLANE AS PER 12 A ITEM EQUIPMENT


DESCRIPTION

PA
CU
-01
PA
(
ST

CU
F1

A
AN

-0
DB

1B
Y)
R2 R1

NO. TAG NUMBER MA


RL

NEW
SAES-P-6.16

FE
NCE
TY
PE
I
II
1312 2097 12713 ITEM EQUIPMENT

AD
RO
RL
MA
DESCRIPTION 76
010483-2
3016

CABLE CEILING END FOR POWER TRANSFORMER (XFR(T)-602)


N 2 873 708.365

CSE
E 323 175.558
ELEV. 216.061m

33. THE DIMENSIONS OF CAPACITOR BANK SHED ARE PRELIMINARY &


P.K. NAIL IN ASPHALT

NO. TAG NUMBER


SHALL BE UPDATED UPON FINAL APPROVED NMR 602 DOCUMENT
14521370 ITEM EQUIPMENT 50 U52-001-CP-003 SPACE HEATER CONTROL PANEL 77 U52-001-CAB-301 PFC AND CAPACITOR BANK

D
ROA
DESCRIPTION

RL
MA
FROM VENDOR. LCLM-1
NO. TAG NUMBER
51 U52-001-CP-601 REMOTE TAP CHANGER CONTROL T601 78 U52-001-CAB-302 PFC AND CAPACITOR BANK
24 U52-001-SG-003 480V SWITCHGEAR
3000 2822 3000 52 U52-001-CP-602 REMOTE TAP CHANGER CONTROL T602 79 U52-001-ATS-001 480V AUTOMATIC TRANSFER SWITCH
25 U52-001-SG-004 480V ESSENTIAL SWITCHGEAR

ISSUED FOR CONSTRUCTION


53 U52-001-SB-001 STORAGE BATTERY 80 U52-001-PSA-007 PSA SYSTEM PANEL-1
26 U52-001-MCC-201 4.16KV MOTOR CONTROL CENTER (MCC) THIS DRAWING
54 U52-001-SB-002 STORAGE BATTERY 81 U52-001-PSA-008 PSA SYSTEM PANEL-2
27 U52-001-MCC-202 4.16KV MOTOR CONTROL CENTER (MCC)
55 U52-001-BC-001A REDUNDANT BATTERY CHARGER 82 U52-ESD-MTC-01 MASTER TERMINATION CABINET
ITEM EQUIPMENT KEY PLAN
NO. TAG NUMBER
DESCRIPTION 28 U52-001-MCC-203 4.16KV MOTOR CONTROL CENTER (MCC) 15-Feb-2022
56 U52-001-BC-001B REDUNDANT BATTERY CHARGER 83 U52-ESD-MTC-02 MASTER TERMINATION CABINET
29 U52-001-MCC-204 4.16KV MOTOR CONTROL CENTER (MCC)
1 U52-001-XFR(T)-601 POWER TRANSFORMER 115kV-13.8kV, 60/80MVA
U52-001-DSW(D)-001 DISCONNECT SWITCH BATTERY BANK # 1 84 U52-DCS-MTC-03 MASTER TERMINATION CABINET 0 5.0 10.0 15.0
30 U52-001-MCC-001 480V MOTOR CONTROL CENTER (MCC) 57
2 U52-001-XFR(T)-602 POWER TRANSFORMER 115kV-13.8kV, 60/80MVA NEMA 4X VAPOUR TIGHT
85 U52-DCS-MTC-04 MASTER TERMINATION CABINET
31 U52-001-MCC-002 480V MOTOR CONTROL CENTER (MCC) DISCONNECT SWITCH BATTERY BANK # 1 METERS
3 U52-001-XFR(T)-301 POWER TRANSFORMER 13.8kV-4.16kV, 15/20MVA 58 U52-001-DSW(D)-002
NEMA 4X VAPOUR TIGHT 86 - NOT USED
32 U52-001-MCC-003 480V MOTOR CONTROL CENTER (MCC)
4 U52-001-XFR(T)-302 POWER TRANSFORMER 13.8kV-4.16kV, 15/20MVA U52-001-DSW(D)-003 AHU-1 (DUTY) DISCONNECT SWITCH 60AMP, 480V, 3PH+G, 60HZ, NEMA-1 SCALE: 1 :150M
59 87 - NOT USED
33 U52-001-MCC-004 480V MOTOR CONTROL CENTER (MCC)
5 U52-001-XFR(T)-303 POWER TRANSFORMER 13.8kV-4.16kV, 20/26.66MVA
60 U52-001-DSW(D)-004 AHU-2 (STANDBY) DISCONNECT SWITCH 60AMP, 480V, 3PH+G, 60HZ, NEMA-1 88 U52-AJB-5001 ANALOG JUNCTION BOX
34 U52-001-MCC-005 480V MOTOR CONTROL CENTER (MCC)
6 U52-001-XFR(T)-304 POWER TRANSFORMER 13.8kV-4.16kV, 20/26.66MVA REVISION VALIDATION
61 U52-001-DSW(D)-005 ACCU-1 (DUTY) DISCONNECT SWITCH 200AMP, 480V, 3PH+G, 60HZ, NEMA-4 89 U52-DJB-5001 DIGITAL JUNCTION BOX
35 U52-001-MCC-006 480V MOTOR CONTROL CENTER (MCC)-ESSENTIAL
7 U52-001-XFR(T)-305 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
62 U52-001-DSW(D)-006 ACCU-2 (STANDBY) DISCONNECT SWITCH 200AMP, 480V, 3PH+G, 60HZ, NEMA-4 90 - 13.8kV BREAKER TEST CABINET REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
36 U52-001-XFR(T)-001 480-400/230V, 75kVA, DRY-TYPE TRANSF.
8 U52-001-XFR(T)-306 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA
63 U52-001-CBD-301 13.8kV CABLE BUS 91 - 13.8KV BREAKER TEST CABINET 10-00243-0002-001
37 U52-001-XFR(T)-003 480-208/120V, 112.5kVA, DRY-TYPE TRANSF.
9 U52-001-XFR(T)-307 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA
64 U52-001-CBD-302 13.8kV CABLE BUS 92 - 0.48KV BREAKER TEST CABINET DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
38 U52-001-PP-001 MAIN DISTRIBUTION PANEL
10 U52-001-XFR(T)-308 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
65 U52-001-CBD-201 4.16kV CABLE BUS 93 - 0.48KV BREAKER TEST CABINET ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
39 U52-001-PP-002 POWER PANEL
11 U52-001-XFR(T)-309 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA NAA AHA NHK DPG
66 U52-001-CBD-202 4.16kV CABLE BUS 94 - 50" LCD WALL MOUNTED ANNUNCIATOR TOUCH SCREEN 09/15/21 09/15/21 09/15/21 09/15/21
40 U52-001-PP-004 MAIN DC POWER PANEL
12 U52-001-XFR(T)-310 POWER TRANSFORMER 13.8kV-480V, 2.5/3.125MVA
67 U52-001-CBD-203 4.16kV CABLE BUS 95 U52-FACP-001 FIRE ALARM CONTROL PANEL REV.NO. DATE REVISION DESCRIPTION
41 U52-001-PP-005 DC POWER PANEL
13 U52-001-GR(Y)-301 NEUTRAL GROUND RESISTOR 00 09/15/21 ISSUED FOR CONSTRUCTION
68 U52-001-CBD-204 4.16kV CABLE BUS 96 - DIRECT DIGITAL CONTROL PANEL (DDC)
42 U52-001-PP-006 DC POWER PANEL
14 U52-001-GR(Y)-302 NEUTRAL GROUND RESISTOR JOB ORDER/EWO NO.
97 THIS REVISION IS NOT TO BE USED FOR
69 U52-001-CBD-001 480V CABLE BUS - MAINTENANCE TOOL BOX
15 U52-001-GR(Y)-201 NEUTRAL GROUND RESISTOR
43 U52-001-PP-007 DC POWER PANEL 10-00243-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

98 - PAGE/PARTY SYSTEM
16 U52-001-GR(Y)-202 NEUTRAL GROUND RESISTOR 44 U52-001-PP-008 MAIN DISTRIBUTION PANEL (MDP-A) 70 U52-001-CBD-002 480V CABLE BUS
99
SAUDI ARABIAN OIL COMPANY
- TELECOM
45 U52-001-PP-010 POWER PANEL (SPACE HEATER) 71 U52-001-CBD-003 480V CABLE BUS DRAWING TYPE
17 U52-001-GR(Y)-203 NEUTRAL GROUND RESISTOR
100 U52-001-XFR(T)-002 480-400/230V, 45kVA, DRY-TYPE TRANSF. EQUIPMENT LAYOUT EQA
46 U52-001-LP-001 LIGHTING PANEL 72 U52-001-CBD-004 480V CABLE BUS
18 U52-001-GR(Y)-204 NEUTRAL GROUND RESISTOR
101 U52-001-JB-007 ELECTRICAL JUNCTION BOX 13.8KV SUBSTATION BLDG. & XFR YARD
47 U52-001-LP-002 LIGHTING PANEL 73 U52-001-CBD-005 480V CABLE BUS
19 U52-001-SG-301 13.8kV SWITCHGEAR
102 U52-001-JB-009 ELECTRICAL JUNCTION BOX
48 U52-001-CP-001 LIGHTING CONTACTOR 74 U52-001-CBD-006 480V CABLE BUS GOSP-2
20 U52-001-SG-201 4.16kV SWITCHGEAR
103 U52-001-PSA-009 PSA SYSTEM PANEL-3
21 U52-001-SG-202 4.16kV SWITCHGEAR 49 U52-001-CP-002 LIGHTING CONTROL PANEL 75 CSE CABLE CEILING END FOR POWER TRANSFORMER (XFR(T)-601) AIN DAR SAUDI ARABIA
104 U52-001-PSA-010 PSA SYSTEM PANEL-4 PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
22 U52-001-SG-001 480V SWITCHGEAR

23 U52-001-SG-002 480V SWITCHGEAR U52 A TA-680745 001 00


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05

You might also like