Professional Documents
Culture Documents
BOOSTER PUMP
SKID
(BY ZIEMANN)
TP
TP TP
120
122 121
DEMO EXISTING LINE
350-AS-XXXX-06-N-N
RACK F
EXISTING
RACK "R"
DN300-AS-1702-06-N-N
DN300-AS-1701-06-N-N
350x300
DN300
DN50 BF-01
H.P. VENT AN-01
(PUNTO ALTO DE
RACK A
VENTILACIÓN)
NOTE 2 (NOTA 2)
TP
123
DN300-AS-1701-06-N-N
DN50
BF-01
600-AS-XXXX-06-N-N
SELTZER BUILDING LOW POINT DRAIN
(DRENAJE DE PUNTO
(EDIFICIO DE BAJO)
SELTZER)
EXISTING
RACK "S" RACK "F" RACK "F" RACK "R" RACK "R" RACK "A" RACK "A"
PLANO DE CONSTRUCCION
CONSTRUCTION DRAWING
Vº Bº FIRMA de INGENIERIA NOMBRE & FIRMA FECHA
SEEN by the ENGINEERING FIRM NAME and SIGNATURE DATE
COMPA Ñ Í A
CO
The Pines Office Center
IFC 0 25-OCT-2021 DESIGN FIRM: VESTAL CORPORATION TITULO DEL PLANO:
AHU I LA
1 The Pines Court, Suite A WORK PACKAGE:
Chesterfield, MO 63141
UFD - PLANT WATER
BUSINESS UNIT: CCC
Tel: (314) 439-9900 BUILDING NUMBER: 0000 - GENERAL (DIAGRAMAS DE FLUJO DE
Fax: (314) 439-9906
FUNCTIONAL AREA: 00 - GENERAL SERVICIOS - AGUA DE RED)
www.vestalcorporation.com SUB AREA GROUP: 00 - GENERAL COTAS: Units ESCALA: As Indicated
engineers architects construction consultants SUB AREA OR SYSTEM: 00 - GENERAL DIBUJO NO: