ALL DRAWINGS (ARCHITECTURAL, STRUCTURAL and SERVICES )
SHALL BE READ TOGETHER AND ANY DISCREPANCIES FOUND
SHALL BE REFFERED BACK TO THE MINISTRY OF HEALTH
SEE "DETAIL A" FOR DESIGN OFFICE PRIOR TO CONSTRUCTION.
AS EXISTING.
2300
EXISTING
LOUVER
LEGEND:
EXISTING TO BE RELOCATED
EXTRACT FAN TO OTHER AREA
FLOOR TF TS SKIRTING
150x150
EXISTING DISK
WALL EP EX CEILING
300x250
ADDITIONAL VCD
TS 300x100 HIGH TERRAZZO TILES FOR SKIRTING
400x300
VT 200x200 VITRIFIED NON-SKID FLOOR TILES
VCD VF SEAMLESS ANTI-STATIC VINYL FLOOR
OVER SELF-LEVELLING EPOXY
200 250x250
7500
300x250
CS 300x100 HIGH NON-SKID CERAMIC SKIRTING
EXISTING DISK
WP APPROVED WALL PAINT
3450
SCD 450x450 @
600CFM TYP. TO 2 DOORS AND WINDOWS LEGEND:
ND2
ED EXISTING DOOR
ED3
ND NEW DOOR
NW NEW WINDOW
NOTE:
ALL PROPOSED NEW WALLS TO BE GYPSUM BOARD,
REFER TO DETAILS.
2. ELECTRICAL CONTRACTOR TO MAKE POWER CONNECTION TO EQUIPMENT INSTALLED BY 11. VERIFY ALL ROOFTOP UNIT AND EXHAUST FAN OPENINGS AND WEIGHTS WITH THE
MECHANICAL CONTRACTOR. FURNISH, INSTALL AND CONNECT ALL RELAYS, SWITCHES, STRUCTURAL ENGINEER AND LANDLORD WITH DIMENSIONS AND WEIGHTS OF THE ACTUAL RTU'S &
FUSES, DISCONNECT, CONDUITS AND TRANSFORMERS AS REQUIRED, ALL IN ACCORDANCE FANS USED.
WITH WIRING DIAGRAMS, MANUFACTURER'S RECOMMENDATIONS, AND LOCAL CODE LIMIT OF
CORRIDOR
IN PHASE
ONE
REQUIREMENTS. 12. COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED BY OTHERS,
1900
REQUIREMENTS OF THE OWNER, AND WITH THE CONSTRAINTS OF THE EXISTING CONDITIONS OF EXISTING PEDIATRIC WARD
3. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL THE HVAC UNITS, CONTROL WIRING THE PROJECT SITE. PROVIDE DUCT RISES AND DROPS AS REQUIRED FOR FIELD INSTALLATION AND
2300 AND CONDUITS; DUCT WORK, REGISTER, START-UP AND BALANCE THE COMPLETE SYSTEM. TRADE COORDINATION. NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE STARTING WORK. EXISTING MALE WARD
EXISTING PHYSIOTHERAPY
BUILDING
4. PROVIDE BACKDRAFT DAMPERS ON ALL EXHAUST FANS IF NOT A STANDARD ITEM. 13. DRAWINGS FOR HVAC WORK ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, EXISTING STORES
EXISTING
OPERATION THEATRE BUILDING
LAYOUT, AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT EXISTING KITCHEN, LAUNDRY, PHARMACY
5. ALL DUCT WORK SHALL BE CONSTRUCTED, ERECTED, AND TESTED IN ACCORDANCE WITH MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO
450x450
THE MOST RESTRICTIVE OF LOCAL REGULATIONS, ASHRAE, SMACNA, OR THE APPLICABLE MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND EXISTING ADMIN.
BUILDING
STANDARDS ADOPTED BY LOCAL AGENCIES. INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS, EXISTING C.S.S.D.
ACCOUNTING EXISTING O.P.D.
BEING PROVIDED AND INSTALLED BY HIM TO FIT DIMENSIONALLY AND CLEAR OTHER 14. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODE REQUIREMENTS AS APPROVED AND
EQUIPMENT/COMPONENT IN LOCATION SHOW ON THE DRAWINGS. MECHANICAL AMENDED BY THE GOVERNING CITY. PURCHASE ALL PERMITS ASSOCIATED WITH THE WORK.
CONTRACTOR SHALL VERIFY DUCT SIZES AND DUCT ROUTES SHOWN ON THE DRAWINGS TO OBTAIN ALL INSPECTIONS REQUIRED BY CODE.
CLEAR OTHER EQUIPMENT AND COMPONENTS OF THE BUILDING BEFORE COMMENCING
3450
WORK. ANY DISCREPANCY SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION 15. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL UTILITIES ABOVE THE CEILING TO
IMMEDIATELY. PROVIDE THE GREATEST POSSIBLE CLEARANCE FOR INSTALLATION AND FUTURE CHANGES IN
N
MECHANICAL EQUIPMENT. CONDUIT AND PIPE TO BE RUN UP IN JOISTS SPACE. COORDINATE
7. CONTRACTORS AND SUBCONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION SERVICE AND ACCESS POINTS ABOVE CEILING TO MINIMIZE REQUIRED.
450x450 DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED KEY PLAN
THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT
VCD
REFERENCE TO THE COMPLETE DOCUMENT SET.
200
7500
VOLTS PHASE Hz
REV. DATE DESCRIPTION BY CKD.
UNIT MUST BE DAIKIN, MITSUBISHI
1 SEE PLAN 800 100 CEILING CONCEALED - 220-240 1 50
OR APPROVED EQUIVALENT
P.O.BOX 393
POSTAL CODE 100
SULTANATE OF OMAN
NOMINAL ELECTRICAL SOURCE OPERATING
AIR FLOW
DESIGNATION QUANTITY AREA SERVED COOLING CURRRENT TYPE REMARKS
CAPACITY(TR) VOLTS PHASE HERTS
(CFM)
(AMPS) PROJECT
TITLE