10 Difference between Pert and CPM and their


advantages

10 Difference between Pert and CPM

Table of Contents 

10 Difference between Pert and CPM and their


advantages
The main difference between Pert and CPM stands for program evaluation and
review technique But Cpm stands for critical path method. And the difference between
Peat and CPM comes below.

What is the main difference between pert and CPM


PERT CPM
PERT stands for program evaluation
CPM stands for the critical path method.
and review technique.
Pert is project management CPM is a statistical technique of project in

https://www.civilknowledges.com/10-difference-between-pert-and-cpm/ 1/4
2/2/2021 10 Difference between Pert and CPM and their advantages

techniques, whereby planning, management in which planning, scheduling


scheduling, organizing uncertain control of well-defined activity takes place.
activity is done.
It is an event-oriented technique It is an activity-oriented technique which
which means that network is means that network is constructed on the
constructed on the basis of the event. basis of activities.
It is probobality model. It is deterministic model.
It majorly focuses on time as meeting
time targets or estimation of It majorly focuses on time cost trade-off as
percentage completion is more minimizing cost is more important.
important.
It is appropriate for high precision It is appropriate for reasonable time
time estimation. estimation.
It has non- repetitive nature of job. It has repetitive nature of job.
There are no chance of crashing as There may be crashing because of a certain
there is no certainty of time. time boundation.
It uses dummy activities for representing
It doesn’t use any dummy activities.
activities.
It is suitable for projects which
It is suitable for construction projects.
required research and development.

Difference between pert and cpm

Difference between pert and CPM


Pert was developed by the USA navy for the planning and control of the polarities
missile program pert was developed essentially to simplify the planning and scheduling
of large and complex projects.

This happened in 1957 to support the U.S navy polarities nuclear submarine project.
Pert is a project management planning tool used to calculate the amount of time it will
take to realistically finish a project.

Pert stands for the program evaluation review technique. PERT chart are tools used to
plan tasks within a project – making it easier to schedule and coordinate team members
accomplishing the work.

PERT is similar to a critical path in that they are both used to visualize the timeline and
the work that must be done for a project. Pert create three different times estimates for
https://www.civilknowledges.com/10-difference-between-pert-and-cpm/ 2/4
2/2/2021 10 Difference between Pert and CPM and their advantages

a project.

Pert is calculated backward from a fixed end date since the contractor deadline typically
cannot be moved.

CPM was developed by Dupont to solve project scheduling problems. Critical path
analysis is required in order to predict the timing of projecting completion.

The critical path method was quickly separate from agriculture and construction
projects where people wanted to learn how to avoid routine tasks.

The critical path method is the most widely used scheduling technique and is often
referred to as critical path scheduling this scheduling technique is used to LAN and
control a project and calculate the minimum completion time for a project along with
the possible start and finish time for the project activities.

The difference between Pert and CPM is that the pert is mainly used where the time
required for completion of each of the activities involved accurately defined nor are the
resources to be used for the activity readily available this technique is based on the
probability of completing each activity in time.

Large Dam In india

The time is not too much importance in this technique and completion of each event is
taking care of. This technique is, therefore, most suited to a project like research and
development, investigation design, etc. Analysis of pert and CPM –

The project must consist of a well-defined collection of a project or activities which


when completed will mark the end of the project.

The job must be such that they can be started and stopped independently of each
other within a given sequence.

The job is ordered i.e. they must be performed in technological sequence.

Advantages of CPM

https://www.civilknowledges.com/10-difference-between-pert-and-cpm/ 3/4
2/2/2021 10 Difference between Pert and CPM and their advantages

They method visualize the project in a clear graphical form.

It defines the most important.

Saves time and helps in the management of the deadline.

Helps to compare the planned with the real status.

Identifies all critical activities that need attention.

Makes dependencies clear and transparent.

Advantages of pert
Planning for large projects.

Visibility of critical path.

Analysis of activities are analyzed from the pert network these are analyzed
independently as well as combination.

Coordanating activities good integration is developed between all the department


which will helps in improving the planning and the desicion making capabilities of
the in project team.

Also, Read

10 Test On Building Stone: Stone Test names, Tensile strength

Investigation and planning of bridge, bridge construction planning

10 Types of levelling in surveying| Two Pages test levelling

Construction Procedure of WBM road, Material, Advantages, Disadvantages

https://www.civilknowledges.com/10-difference-between-pert-and-cpm/ 4/4

You might also like