LANDSTAR 7 USER MANUAL

Technical Support Engineer


BANDWORK GPS SOLUTIONS S/B.
PROJECT
1. Open Landstar. Go to project and select PRJ MGMT to create job.

2. Select New to create Job. Insert Project Name, for example Test.
3. Select coordinate system. For example GDM2000 Selangor

4. Accept to confirm the coordinate system.


CONFIGURATION
1. Go to Config and select Connect. On receiver and link the bluetooth connection to
controller. The antenna type need to choose same with the type of receiver. For example
CHCX900R.

2. Go to Work Mode. Select MYRTKNET to workmode.


SURVEY

1. Go to Survey and choose Survey Map. Wait until the signal status is Fix to store point .
Insert code to refer data collect.
SITE CALIBRATION
1. Go to Site CAL. Click Add to add GNSS Point(Observation point) and Known Point(reference
point). The method can select Horizontal, Horizontal+Vertical or Vertical. After that, Click on
Calculate to get the result.
EXPORT
1. Go to project, select Export. Choose File Type, for example .csv or .txt.

2. Insert File Name, select the directory to save the file and click Export.
OTHER EXPORT
1. Select Other Export and choose DXF Export for format DXF to open in Autocad. After choose,
click Export. The file save in the job folder.