N-2793105.

851

9
76.84 29

DEWA G+4 Office Building—Site Progress Layout A

UG Water Tank
A
E-494790.337
Revised Commencement Date
N-2793069.734
10.04.2016

Activities Status Revised Completion Date 31.05.2017

1 Water tank wall 2nd lift reinforcement works in Report Date 10.12..2016
Progress

Excavation Up to 2.5 m in progress


Auditorium & Multi Pur-
37.32
2 Pump Room Wall reinforcement upto mid slab

Current Activities
E-494704.989
N-2793072.911
Parking Block
E-494657.672
N-2793098.115 7 53.61
8 Upto Construction Joint
1 5
Activities Status
1 Raft Water Proofing Works 100%
E-494650.996
Building A

1
M M

14.2
E-494601.732 N-2793085.582
2 Raft Reinforcement Works Up to Const. Joint 100%
N-2793111.823 Activities Status

96.30
55.82 LANDSCAPE 3 Raft Form works 100%
11' 1 GF—Solid Block Work 1st layer in progress
1'
4 Raft Concrete 100% Completed
2 GF—MEP works at High level in progress
S
A' A' 5 Neck Columns & Beams in Progress
3 1F—Solid Block Work 1st layer in progress 9
U
Workshop Building 4 1F—MEP works at High level in progress
Activities Status
5 4F Slab Form works completed 1 First Floor Slab RCC 100% Completed
1. Removing of soil in progress
6 4F Slab Reinforcement Works completed 2 First Floor Column RCC in progress 30

7 4F Slab RCC 100% Completed 3 2F Slab Formworks in progress


8 4F Column Reinforcement in progress
50.87

W Building B
1

Z Z Z Z

H' H' H'


5 12 17 27

1' 5' 10'


E-494744.29

63
N-2792985.155

8.
179.24
E-494577.82 E-494736.023
N-2793066.933 N-2792982.674