You are on page 1of 1

SCHEDULE OF DOORS, WINDOWS & VENTILATOR

SIZE NOS.
S.NO. TYPE REMARKS
W H G.F. F.F H.R.

1 D 1200 2100 04 04 - FULLY GLAZED DOOR SINGLE SHUTTER


EL. 111.400(BOS)

2 D1 2400 2100 01 - - FULLY GLAZED DOOR (DOUBLE SHUTTER)

ALUMINIUM FRAME WITH GLASS PANEL


3 D2 1200 2100 07 05 01
(SINGLE SHUTTER)
ALUMINIUM FRAME WITH GLASS PANEL
4 D3 1000 2100 - 01
EL. 108.450(BOS.) (SINGLE SHUTTER)

5 D4 750 2100 04 04 PVC DOOR (SINGLE SHUTTER)

ALUMINIUM FRAME WITH FIXED GLASS


6 W1 2000 2100 01 - -
PANEL
ALUMINIUM FRAME WITH SLIDING GLASS
7 W2 1800 2100 02 03 01
PANEL
ALUMINIUM FRAME WITH SLIDING GLASS
EL. 104.650(BOS.) 8 W3 1500 2100 06 - -
PANEL
ADMINISTRATIVE
OFFICE

9 ALUMINIUM FRAME WITH SLIDING GLASS


W4 1200 2100 02 - 02
PANEL

W5 3000 2100 02 01 - ALUMINIUM FRAME WITH SLIDING GLASS


10
IOCL PULL PANEL

W6 02 ALUMINIUM FRAME WITH FIXED GLASS


11 4000 2100 - -
PANEL
EL. 101.000(FFL.)
EL. 100.500(FPL.) ALUMINIUM FRAME WITH FIXED GLASS
12 W7 2500 2100 01 01 - PANEL
EL. 100.000(FGL.)

FRONT ELEVATION 13 V1 600 600 05 05 - GLAZED LOUVERED VENTILATOR


WITH AL. FRAME(FIXED)

EXHAUST FAN STEEL FRAME


SECTION X=X 14 EF. - 05 05 - PROTECTED WITH SS WIRE MESH

A B C X D X
A B C D

1 W2 W7 W6
1
D4

FALSE CEILING
PMs CABIN

W5
D4 D4

W2
PANTRY

D
GENTS FALSE CEILING
TOILET VISITOR AREA
2 D4
D3 D 2 ACRYLIC
DISTEMPER
WATER D2
W1

COOLER FALSE CEILING ACRYLIC


D2
DISTEMPER
D D
3 3
TRAINING CUM CONFERENCE ROOM HAND RAIL
(TYP)
ACRYLIC
OFFICER ROOM DISTEMPER
W2
W2

ACRYLIC
DISTEMPER
FALSE CEILING FALSE CEILING
ACRYLIC
4 W6 W6 W6 4 DISTEMPER ON
PARAPET WALL
ROOF PLAN WATER PROOFING WITH
ACRYLIC
DISTEMPER ON
X APP MEMBRANE=XPS U/S OF CEILING
X BOARD INSULATION

FIRST FLOOR PLAN


INT. EMULSION
PAINT
A B C X D
CORNER COLS. B X C
600X600(TYP)

RAMP FOR
W7 HANDICAP
1 W3 W3 W3 W3
1
HAND RAIL
FALSE CEILING

W3

(TYP)
FALSE CEILING
VISITOR AREA
TV CABINET

D4 D4 STEEL LADDER
RECORD ROOM
FOR ACCESS TO
OVER HEAD TANK
MANHOLE
W3

D INNER COLS. OUTER COLS.


500X500(TYP) 600X500(TYP)
D4
2 D2 HAND RAIL
(TYP) 2
D4
23OTHK.
FULL GLASS
PASSAGE OVER X
B/W(TYP) FALSE CEILING
PARTITION(TYP) D2 HEAD TANK
3 D D D D
PLAN
FALSE CEILING

D1
STAFF
FINANCE
W2

FALSE CEILING
W2

SAFETY MAINTENANCE ROOM


IN-CHARGE
OFFICER
FALSE CEILING

4 W5 W4 W4 W5

INDIAN OIL CORPORATION LIMITED


MUMBAI

CONSULTANCY SERVICES FOR BOTTLING


PLANT AT NAGPUR, MAHARASHTRA
ADMINISTRATIVE BUILDING
PLAN
X

GROUND FLOOR PLAN

You might also like