Professional Documents
Culture Documents
+2.3m
CEMENT CEMENT
CONCRETE CONCRETE
PATHWAY PATHWAY
MAIN CEMENT
CEMENT
+0.45m ENTRANCE CONCRETE
PATHWAY
C CONCRETE
PATHWAY
+0.3m
SECTION OF BIRD CAGE FOR
KEEPING BIRDS
BIRD
WATCHING AREA STONE STONE STAGE BENCH WATCHING CAGE FOR
SECTION - EE SEATING SEATING -0.3m
AREA KEEPING BIRDS
-0.45m
GRASS
-0.6m
STONE BENCH
BENCH
BENCH
STONE
STONE
SEATING
GREEN
PATCH
GRASS
SCULPTURE
SEATING
-0.6m
chirping. STONE
SEATING
OUTDOOR STONE
SEATING
-0.3m
50,6
CLASS BENCHES
+0.00m
OPEN +0.3m
+0.6m
BENCH AIR
+0.9m
THEATRE +1.2m
STONE
PATHWAY STONE BENCHES
BENCHES +1.5m FOUNTAIN GRASS BUILDING BUILDING SCULPTURE
A SEATING GAZEBO ENTRANCE A
+1.8m
+0.9m
BLOCK SCULPTURE
+2.7m +1.95m
BENCH
C
BENCHES +1.95m
+1.8m STONE STONE
SEATING
SEATING +1.35m
+1.5m HEDGE HEDGE
GREEN GREEN
PATCH PATCH
+0.00m SCULPTURE
GRASS
ENTRANCE FOR
-0.6m ORGANIC
FARMING
PATHWAY
GRASS
BIRD
performances, and sports. HEDGE
BENCH WATCHING
AREA
· It allows the user to merge with the +1.2m
CAGE FOR
KEEPING BIRDS
nature. +0.45m
CEMENT
CONCRETE
E
PATHWAY
+4.8m
B
PLAN
+2.8m
+1.8m
+1.35m
+1.95m
plants. SECTION - FF
+7.8m
+5.65m
+4.95m
+2.7m
+1.95m
SECTION - BB +0.45m
+0.15m
Saraca
T5
Evergreen Sr 11@ 3.5Mt c/c T3
T4 T5
T5
T6 T6
T7 T7
T5
T5
Sr 22@ 0.6Mt
c/c
T5
T5 T4
T7
CAGE FOR
KEEPING BIRDS
T4
T4
BIRD
T5 T5 T7
T5 T6 T6
Sr 18@ 2.5Mt
T4
T5 T4 WATCHING
STONE STONE STAGE T7
c/c
T5
BENCH CAGE FOR
T4
T5
SEATING SEATING (11 Nos.) T5
Sr 20@ 2.5Mt
c/c
T4 AREA KEEPING BIRDS
T5 T9 (11 Nos.)
T5
T3 GRASS T7
T5
T5
T4
T7
BENCH
5 spectabilis Shrub
T5
GREEN
PATCH
FARMING ON
STEPS
GRASS
STONE
PATHWAY
GRASS
FARMING ON
STEPS
T5
T5
T4
T6
T4 T6 T4 T5
T5
T5
T5 GREEN GREEN T5 T4
T4 STONE PATCH T5
T6 PATCH T4
T5 SEATING T5 GRASS
T3 F7 T5 SCULPTURE
Dahila Flowering T4 T5
STONE
6 Dahlias F1
SEATING
plant
T5
pinnata T4
T5 Sr 31@ 0.6Mt c/c T6
T5 (5 Nos.) T9
T4
T5
STONE
SEATING
OUTDOOR STONE
T3 SEATING
CLASS
Flowering T4 T5
BENCHES
OPEN T6
T5
BENCH AIR
T6
8 Lily Lilium F1 T5
plant T4 T5
BENCH
T6
T5 BENCHES
STONE STONE
T3 T4
T5 SEATING
Sr 33@ 0.6Mt c/c SEATING
T5
HEDGE (5 Nos.) HEDGE
T4 GREEN GREEN
Tegetes Flowering T5
PATCH PATCH
T6
9 Marigold F1
erecta plant T3
T4
T5
T5
HEDGE
HEDGE
HEDGE HEDGE
T4
T5 SCULPTURE
T5 T5 GRASS
Flowering T4
T5 T8
ENTRANCE FOR T8
T4
T5 T5
Shrub T4 T5
T4 T5 T5
T6
F1
T3 T5 STONE STONE
ORGANIC T5 T5 T4
T4 ORGANIC PATHWAY
STONE
PATHWAY
T4
T5 T5
T5
PATHWAY
FARMING
T5
FARMING T4
T5 T5 T4
rosa-sinensis F1
T3
T4 T5
T5
STONE
PATHWAY
Sr 29@ 1.5Mt c/c
(28 Nos.)
(28 Nos.) Sr 24@ 2.5Mt T5 T5 T4
T7
BENCH
CAGE FOR
c/c BENCH KEEPING BIRDS
T4 Sr 28@ 3Mt c/c (9 Nos.) T5 T5
T5
(7 Nos.) T4
T5 Sr 23@ 2.5Mt T4
BIRD
c/c
Flowering T4
T5
T5
Sr 25@ 0.6Mt
c/c T5 (9 Nos.)
GRASS
BENCH
WATCHING
(16 Nos.) T4 Sr 27@ 3Mt
12 White rose F1 T5 T7
AREA
Rosa alba Plant T3
T4 T5
HEDGE
T7 T7
T7 T4
T5
T5
Sr 26@ 0.6Mt
c/c T5 T4
c/c
(5 Nos.)
T5 (16 Nos.)
T4 T5 T5
T4
T5 T7 T5 T4 CAGE FOR
T5 T7 T7 T7
T5 F8 T7 KEEPING BIRDS
F4 F6 F9
T4 F5 T7
Ixora Flowering T7 T7
coccinea
CONCRETE
PATHWAY
14 Champa Tree
PATHWAY PATHWAY
alba / rubra
T2 T2 T2 T2
T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1
Tulsi tenuiflorum T8
oleracea 31 Shrub
'Johnson's Blue'
T2 T2 T2 T2
T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1
CHAMBER
INVERT LEVEL
CHAMBER
INVERT LEVEL
CEMENT CHAMBER
INVERT LEVEL
CHAMBER
INVERT LEVEL CEMENT CHAMBER
INVERT LEVEL
CHAMBER
INVERT LEVEL
CHAMBER
INVERT LEVEL
-0.15M -0.125M CONCRETE -0.1M -0.075M
CONCRETE -0.05M -0.025M +0.00M
PATHWAY PATHWAY
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
Sr 12@ 1Mt c/c GRASS Sr 16@ 3Mt c/c GRASS
GRASS GRASS GRASS
T4 T5 (4 Nos.)
CHAMBER
T5 PE PE T5 T5 CAGE FOR
T4
OPE
O
T6 SL Sr 22@ 0.6Mt KEEPING BIRDS
Sr 11@ 3.5Mt c/c T3 T6 PE SL SL E T5
T4 T5 T7 T7 T5 OP c/c LOP T4 T7
O
SL T4 S T5
E (20 Nos.)
(11 Nos.) CHAMBER
INVERT LEVEL
-0.05M
T4
T5 T7 T7
T5 T5
T4 BIRD
T5 T5 T7
T5 T6 T6
Sr 18@ 2.5Mt
T4
T5 T4 WATCHING
STONE STONE STAGE T7
c/c
T5
BENCH CAGE FOR
T4
T5
SLOPE SEATING SEATING
T7
(11 Nos.) T5
Sr 20@ 2.5Mt
c/c
T4 AREA KEEPING BIRDS SLOPE
T5 (11 Nos.)
CHAMBER
SL CHAMBER
SL T5
T3 GRASS T7
SLOPE
INVERT LEVEL INVERT LEVEL
T4 -0.025M OP +0.00M OP T5 T4
T5 T6 E E T4 BENCH
T5
SLOP
STONE
PE
PE
T5
T5 PATHWAY
OUTDOOR OUTDOOR
SLO
SLO
T6 T5 T4
E
T4 SLOPE SLOPE BENCH
CHAMBER
T4 T5
T5
CLASS CLASS INVERT LEVEL
-0.05M
T5
T7
SL
Sr 13@ 0.7Mt c/c T5 T5 BENCH
O
T4
PE
T4 T4 T5
(53 Nos.) T3
T5
SLOPE T5 SLOPE
T6 T5
T4 T5 T6 T5 T4
HEDGE HEDGE T6 T4
T5 CHAMBER
GREEN GRASS GRASS INVERT LEVEL
SL FARMING ON STONE T5 -0.025M
T5 SL OP PATCH FARMING ON T6
SL
O E STEPS SLOPE PATHWAY T5 T4
SL
T4 PE T6
CHAMBER
SLOPE STEPS T4
PE
INVERT LEVEL
T5
O
T5 -0.025M
PE
T5
T5 GREEN GREEN T5 T4
T4 STONE PATCH T5
T6 PATCH T4 CHAMBER
T5 SEATING INVERT LEVEL GRASS
SLOPE T5 SLOPE
T3 CHAMBER
-0.025M
SCULPTURE
STONE INVERT LEVEL CHAMBER
T4 T5 SL
CHAMBER -0.025M INVERT LEVEL
SL
E
SL
T5 O
PE
OP
OP
CHAMBER T4
E
Chamber in stone Sr 31@ 0.6Mt c/c
INVERT LEVEL
E
T5 SLO
SLOPE
-0.075M CHAMBER
INVERT LEVEL PE T6
(5 Nos.) T9 +0.00M
E
T5
OUTDOOR
OP
T4 STONE
SL
SEATING STONE
T3 T5
SEATING
T4 T5 CLASS BENCHES
T5 SLOPE
OPEN T6
T6 SLOPE
T4 T5
BENCH AIR
T5 Sr 32@ 0.6Mt c/c THEATRE
T3
T4
T5
STONE (5 Nos.) BENCHES GRASS
BUILDING SCULPTURE
PATHWAY STONE BENCHES
SEATING
Sr 34@ 0.6Mt c/c GAZEBO
T4
T5
(5 Nos.) BLOCK SCULPTURE
T5
SLOPE BENCH SLOPE CHAMBER
INVERT LEVEL
-0.05M
T4 T5
T6
T5 BENCHES
STONE STONE
T3 T4
T5 SEATING
Sr 33@ 0.6Mt c/c SEATING
T5
HEDGE (5 Nos.) HEDGE
T4 GREEN GREEN
SLOPE SL PE PATCH
SLOPE
T5
PATCH OP SLO T6
CHAMBER
INVERT LEVEL
E -0.075M
E
T4 T5
OP
HEDGE
E
HEDGE SL HEDGE
SL
OP
CHAMBER
HEDGE PE
INVERT LEVEL
T5 OP
SL
-0.1M
E O
T3 T4 SL
T5 SCULPTURE
SLOPE T5 T5 GRASS SLOPE
T5 T8 T4
T4 ENTRANCE FOR T8
SLO T5 T5
T5 PE ORGANIC T4
CHAMBER
FARMING
CHAMBER
PE
PE O T5
INVERT LEVEL INVERT LEVEL
SL T5
PE
T4
PE
-0.025M +0.00M
O
T5 SL
O
T4 LO
SLOPE
OP
SL
T6
SLOPE
S
ORGANIC T5 T5 T4
SL
T3 T5 STONE SLOPE STONE
T4
SLOPE
ORGANICSLOPE PATHWAY
STONE SLOPE
PATHWAY
T4
T5 T5
SLOPE
T5
PATHWAY
FARMING
FARMING
Drain Detail
SLOP T4
T5 T5
E
E
T5 T4
SLOP
SLOPE
T4
T5
E
T5
SLO
OP
T5 T4 BENCH
SL
Sr 30@ 1.5Mt c/c T5
PE
T4 T5
T5
T4
STONE Sr 29@ 1.5Mt c/c (28 Nos.)
BENCH CHAMBER
INVERT LEVEL
T5
Sr 25@ 0.6Mt
c/c T5 (9 Nos.)
GRASS
BENCH
WATCHING
(16 Nos.) T4 Sr 27@ 3Mt
problem will dictate how much trenching will be needed to move T3 T4 T5 T7
CHAMBER
INVERT LEVEL
T5
Sr 26@ 0.6Mt
T5
O
PE
T7
c/c AREA
HEDGE -0.2M
T7 T4 T5 T5 SL (5 Nos.)
c/c T4
the water. CHAMBER
INVERT LEVEL
T4
T5
PE
T5 SL
OP
E SL
OP
E
(16 Nos.)
T5
E
-0.225M
LO T4
OP
T5 T7 SLOPE
SLOPE
SLOPE S T5 T4 CAGE FOR
T7 SLOPE T7
SL
T7
After trenching the area, we install one or more perforated T4
T5 T7
T7
T7
CHAMBER
INVERT LEVEL
-0.175M CHAMBER
INVERT LEVEL
SLOPE
KEEPING BIRDS CHAMBER
INVERT LEVEL
-0.1M
T7 -0.15M
CONCRETE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
dry-well area, or to a designated above ground area that won't GRASS GRASS
GRASS GRASS GRASS
LEGEND T2 T2 T2 T2
T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1
SLOPE
+4.05m
+1.2m
+0.6m
+0.3m
SECTION - AA
PATH LIGHT Sr 12@ 1Mt c/c GRASS Sr 16@ 3Mt c/c GRASS
GRASS GRASS GRASS
LIGHT T4
T5 GREEN
PATCH STONE
GREEN
PATCH T4
T5
T5 T4
T6 SEATING GRASS
T5 T5
T3 T5 SCULPTURE
STONE
T4 T5
SEATING
07. T5
BENCH AIR
T6
T4 T5
T5
BENCH
T4 T5
T6
T5 BENCHES
STONE STONE
T3 T4
T5 SEATING
Sr 33@ 0.6Mt c/c SEATING
T5
HEDGE (5 Nos.) HEDGE
T4 GREEN GREEN
PATCH PATCH
T5 T6
T4 T5
HEDGE HEDGE HEDGE
T5 HEDGE
T3
T4
T5 SCULPTURE
FOCUS LIGHT T4
T5 T8
ENTRANCE FOR T8
T4
T5
T5
T5 GRASS
T5
ORGANIC
· T5
FARMING
T4 T5 T5
T4
T5
· T3
T4
ORGANIC T5 T5 T4
T6
T5 STONE STONE
T4 ORGANIC PATHWAY
STONE
PATHWAY
T4
T5 T5
T5
PATHWAY
FARMING
· T5
FARMING T4
T5 T5 T4
T4
T5 T5
T5 T4 BENCH
T5
Sr 30@ 1.5Mt c/c T4 T5 T5
T4
STONE Sr 29@ 1.5Mt c/c (28 Nos.)
BENCH
T5 T5 T4
· T3 T5 PATHWAY (28 Nos.) Sr 24@ 2.5Mt
c/c T7
BENCH
CAGE FOR
KEEPING BIRDS
T4 Sr 28@ 3Mt c/c (9 Nos.) T5 T5
T5
(7 Nos.) T4
T5 Sr 23@ 2.5Mt T4
BIRD
c/c
T4
T5
T5
Sr 25@ 0.6Mt
c/c T5 (9 Nos.)
GRASS
BENCH
WATCHING
T4
· (16 Nos.)
T5
Sr 26@ 0.6Mt
T5 T7 Sr 27@ 3Mt
c/c AREA
T4 T5 T7 T7 (5 Nos.)
HEDGE T7 T4 T5 c/c T5
T3 T4
T5 (16 Nos.)
T4 T5 T5
T4
T5 T7 T5 T4 CAGE FOR
T5 T7 T7 T7
T5 T7 KEEPING BIRDS
T4 T7
T7 T7
CEMENT
CONCRETE
PATHWAY
CEMENT CEMENT
CONCRETE CONCRETE
PATHWAY PATHWAY
T2 T2 T2 T2
T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1
UNDERWATER LIGHT
·
ELECTRICAL LAYOUT