Area and Volume Assessment.

You have been assigned the challenge of building Goolwa an aquatic centre that will service the whole community. You are in charge of costing and are
designing/ supervising the whole project. You will need to design an aquatic centre including pools for both leisure and competition. You will need to come
up with a costing of the total project including concrete, water to fill the pool, tiles, water slides etc. The council are after a creative design with the
recreational pools which will add character to the aquatic centre, for example triangles and circles. You will need to provide the council with a scale
drawing of your intended design.

The council have included a list of must haves (below) and a budget of 3 million dollars.

 At least three pools


 A 50 metre pool with 8 lanes( 2 metres wide) and a depth of at least 2 metres (Olympic
size)
 A recreational pool for the public
 1 Olympic rated diving pool (7m deep) or water polo pool (25m long, 20m wide, and 3m
deep)
 A grassed area of at least 50 metres squared.
 Concrete paths between pools.
 At least 50 sets of tables and chairs.
 A café area (cost of café is coming from a separate budget)

The costing details are below:

 Concrete $120 per square metre.


 Water (1 cubic metre = 1000 litres) 25c per litre
 Tiles (needed to line the pools) $25 per square metre
 Water slides (sections of water slides are 3 metres long) $60 per section
 Full water park (40 metres squared, can be purchased as half or quarter sized parks) $3995
 Full 10 metre diving platform (can be purchased as 5 metre or a 2 metre) $50, 000
 Grass $20 per square metre.
 Tables and chairs (come in sets of four chairs, 1 table) $100
Poor Below Satisfactor Good Excellent
(E) Average y (B) (A)
(D) (C)
Understanding Has Has minimal Has shown a sound Is confident with Knows and can
completed understanding of volume understanding of most calculations demonstrate their
of volume and
little to no and area. calculations and and has understanding of
area. work and has Cannot use formulas has demonstrated demonstrated volume and area.
shown no effectively to correctly understanding of understanding of Can use formulas
understandin solve problems. both volume and both volume and effectively to correctly
g of volume area for squares area. Has tried to solve problems. Has
and area. and rectangles. use complicated used more
shapes. complicated shapes
such as triangles and
circles.
Understanding Cannot or has Has provided little Has demonstrated Has mostly Excellent
not evidence of some provided accurate understanding of
of money and
attempted to understanding and understanding and calculations and budget and money.
budget. understand or cannot consistently solve correctly solved has sown Can accurately use
(mathematical solve problems. problems. understanding. math’s processes to
processes) problems. solve problems.
Logical No evidence Has not consistently met Has mostly thought Has logically Has logically thought
thinking and the criteria or though through the thought through through the process
thinking and
no criteria logically through the criteria and has the process and has and has met all
following met. process. met most of the met the criteria. criteria to a high
criteria. criteria. standard.
Total cost of Olympic size swimming pool = $545,280 (concrete = $127,680) (tiles = $26,600) (water = $400,000)

Total cost of water polo pool = $476,650 (concrete = $92,000) (tiles = $19,250) (water = $375,000)

Total cost of diving pool = $372,500 (concrete = $60,000) (tiles = $12,500) (water = $250,000) (diving platform = $50,000)

Recreational pool = $ 281,200 (water= $200,000) (concrete = $67,200) (tiles = $14,000) (pool size 20 by 20 by 2)

Water park = $3,995

Min. Total cost of tables and chairs = $5000

Min. Total cost of grassed area = $1000

Diving platform = $50,000

Water slides = $6000 (for 100 metres)

Concrete Paths = $24,000 (for 200m of path 1 metre wide)

Total cost of basic pool design = $ 1,765,625