This is to certify that, ASAP GENERAL TRADING CONSTRUCTION AND MAINTENANCE had fully
mobilized the Initial/Minimum Equipment Requirement on Aug 30, 2020 for the Construction of Intake
Structure, Ground Level Reservoir & Installation of Pipe Line at LINDUMAN SIP , under Contract No.
NIAREG9-0401-2020-SIPCY2020-051(INFRA), in accordance with the approved construction program, to
wit.
AS REQUIRED MOBILIZED
This Certification is being issued to support the Contractor’s claim for the (1st Billing)
Done this 28TH day of October, 2020 at NIA – ZAMBASULTA RSO, Gov. Ramos Ave. Sta. Maria,
Zamboanga City.