Professional Documents
Culture Documents
DESIGN &CONSTRACTION
whether foed or moveable
Aiparts incduding the working gear,
of every lifting machine and every chain, rope or Iifting tacde
and adequate YES
shal be of good construction, sound material
defect as per as ascertainable?
strength and free from 08/2021
takern into sevice
5 Date when the above machine was 09.08.2022
Date of Eamination
NIL
What parts inaccessible (if any)?
7
the chain &other lifting N. A
8 Dste of annealing or heat treatment of
tadde & by who it was carried out? Visual lnspection & load Test
What eamination was carried out? 1.25 times load of SWL
10 Test load withstood
Examination. NIL
11 Particulars f any defects found at the time of NIL
12 Repars if any required to be carried out in the opinion of the
person examining 35 MT
12
Maximum permsible working load
NIL
14 Parts rernewed NIL
15 Overrunning devikes NIL
atachments
16 suspension ropesor chain & their NIL
17 Brakes NIL
Other Electrical equipment's
OK
19 Other Parts
20 Other obervation 4. Pin always seated &Check opening width.
1. Not to be over load Safe using plan must be done before using BS.
his cracks
2, Belore using Bow Shace nust be check 6. Alog book should be maintained showing the history
bending and twisting of BS.
3. Check wear and straighhness
09.08.2022, /we thoroughly examined the above mentloned lifting machines/ lifting tools and
lcertity that on date certification.
within the
Tackles and lound satsíYctory and suitable lor use
Nest Due Date:-08.08.2023.