You are on page 1of 14

Dye – Penetrant Test Report

Project M.V. Accord Energy Inspector Name Md. Ariful Islam


ASNT NDT Level – ll (UT
Client Accord Shipping Ltd. Qualification
& DPT)
Bay-Tech Shipbuilders, Inspection
Location 09.03.2023
Minarbari, Bandor, Narayangonj. Date

Page 1 of 14
Dye-Penetrant Test Report
Project Name M.T. Accord Energy Date of Inspection 09.03.2023

Name of the
Accord Shipping Ltd. Component Propeller & Bottom Plug
Company
Bay-Tech Shipbuilders, BTNDT/Accord Energy/2023/DPI-
Location of Report No.
Minarbari, Bondor, 007
Inspection
Narayangonj.

Condition of Test Procedure


Dwell Time 10 min. Material -----
Method of applying
Surface Temp. 37°C Spraying
penetrant
Method of applying
Light intensity White light Spraying
developer
Surface condition Not Smooth DPT technique Solvent Removable
Cleaner/Remover Penetrant Developer
SKC-I cleaner/remover SKL-SP1Penetrant SKD-S2Developer
APPROVALS/SPECIFI APPROVALS/SPECI APPROVALS/SPECIFICATI
CATION COMPLINCE: FICATION ON COMPLINCE:
AMS COMPLINCE: AMS 2644E
2644E AMS ASME
Equipment Used ASME 2644E ASTME 165
ASTME 165 ASME IS3658
IS3658 ASTME 165 Nuclear Power Corp. (India)
Nuclear Power Corp. IS3658 Mfd. By: ITW India Limited
(India) Mfd. By: ITW Nuclear Power Corp. B.NO.:13658
India Limited (India) Mfd. By: ITW
B.NO.:13602 India Limited
B.NO.:13615
Evaluation: According to IRS Rules for Hull Welds

Inspector name Seal & Signature Level Date

Md. Ariful Islam ASNT Level-II(DPT) 14.04.2024


Diploma- in Mechanical &
B.Sc. in EEE

Page 2 of 14
Dye-Penetrant Test Report:

Item: Propeller.

Joint No/ Interpretation Repairs


Weld Area Remarks
Identification Accept. Reject Accept. Reject
Propeller Tip (Port Side) Yes --- --- --- Accept
01
Propeller Hub (Port Side) Yes --- --- --- Accept

Propeller Tip (Port Side) Yes --- --- --- Accept


02
Propeller Hub (Port Side) Yes --- --- --- Accept

Propeller Tip (Port Side) Yes --- --- --- Accept


03
Propeller Hub (Port Side) Yes --- --- --- Accept

Propeller Tip (Port Side) Yes --- --- --- Accept


04
Propeller Hub (Port Side) Yes --- --- --- Accept

Propeller Tip (Stbd Side) Yes --- --- --- Accept


05
Propeller Hub (Stbd Side) Yes --- --- --- Accept

Propeller Tip (Stbd Side) Yes --- --- --- Accept


06
Propeller Hub (Stbd Side) Yes --- --- --- Accept

Propeller Tip (Stbd Side) Yes --- --- --- Accept


07
Propeller Hub (Stbd Side) Yes --- --- --- Accept

Propeller Tip (Stbd Side) Yes --- --- --- Accept


08
Propeller Hub (Stbd Side) Yes --- --- --- Accept

Note: P=Porosity, C=Crack, CP= Clustered Porosity, S: Slag,


IP: Incomplete Penetration, LF: Lack of fusion, UC: Undercut

Page 3 of 14
Joint Number: 01
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-1 (Port Side)

Joint Number: 02
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-1 (Port Side)

Page 4 of 14
Joint Number: 03
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-2 (Port Side)

Joint Number: 04
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-2 (Port Side)

Page 5 of 14
Joint Number: 05
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-3 (Port Side)

Joint Number: 06
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-3 (Port Side)

Page 6 of 14
Joint Number: 07
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-4 (Port Side)

Joint Number: 08
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-4 (Port Side)

Page 7 of 14
Joint Number: 09
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-1 (Stbd Side)

Joint Number: 10
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-1 (Stbd Side)

Page 8 of 14
Joint Number: 11
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-2 (Stbd Side)

Joint Number: 12
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-2 (Stbd Side)

Page 9 of 14
Joint Number: 13
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-3 (Stbd Side)

Joint Number: 14
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-3 (Stbd Side)

Page 10 of 14
Joint Number: 15
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Tip) N-4 (Stbd Side)

Joint Number: 16
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Propeller (Hub) N-4 (Stbd Side)

Page 11 of 14
Item: Bottom Plug.

Joint No/ Interpretation Repairs


Weld Area Remarks
Identification Accept. Reject Accept. Reject
Pump Room
01 Bottom Plug Yes --- --- --- Accept
(Port Side)
Pump Room
02 Bottom Plug Yes --- --- --- Accept
(Stbd Side)
WBT – 5
03 Bottom Plug Yes --- --- --- Accept
(Port Side)
WBT – 5
04 Bottom Plug Yes --- --- --- Accept
(Stbd Side)

Note: P=Porosity, C=Crack, CP= Clustered Porosity, S: Slag,


IP: Incomplete Penetration, LF: Lack of fusion, UC: Undercut

Page 12 of 14
Joint Number: 01
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Bottom Plug (Port Side), Pump Room.

Joint Number: 02
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Bottom Plug (Stbd Side), Pump Room.


Page 13 of 14
Joint Number: 01
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Bottom Plug (Port Side), WBT - 5.

Joint Number: 02
Length:
Examination Stage: Horizontal

DPT Picture:

M.T. ACCORD ENERGY, Bottom Plug (Stbd Side), WBT - 5.


Page 14 of 14

You might also like