Name OF Road & Pkg No: T01- Tarhasi to Tetrain Via Sonpura, Pkg. No-JH-P3-22-23-PAL-02-FDR,
Dist-Palamu, Jharkhand
Pkg No.: JH17ACPL08
It is hereby declared that tests reported in this document have been done by the following NABL accredited lab.
Further, the tests have been done in presence of our representative. Mr. Abhinav Prakash
ISO/IEC 17025:2017
''General Requirements for the Competence of Testing &
Calibration Laboratories''
for its facilities at
3/6, UPSIDC, SITE-II, AJANTA COMPOUND, GHAZIABAD, UTTAR PRADESH, INDIA
in the field of
TESTING
Certificate Number: TC-8144
Issue Date: 09/08/2022 Valid Until: 08/08/2024
This certificate remains valid for the Scope of Accreditation as specified in the annexure subject to continued
satisfactory compliance to the above standard & the relevant requirements of NABL.
(To see the scope of accreditation of this laboratory, you may also visit NABL website www.nabl-india.org)
N. Venkateswaran
Chief Executive Officer
DESIGN MIX FINAL REPORT ON
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
Name of Project
Construction and 5- year Maintenance of Road Under Full Depth
Reclamation/ In-Situ Stabilization with Cement and
Additive of Pkg. JH-P3-22-23-PAL-02-FDR
SUBMITTED TO:
M/s Sildiliya Construction
December- 2023
SUBMITTED BY:
Ml/Cum 100
2 ANT STABILIZER --
% 0.00481
PROPERTIES
Specifications
Results
S.No Description Test Method Units As Per IRC:37- Remark (if Any)
Obtained
2018/ IRC-SP-
89-Part-II-2018
a) 7 Days 4.66
Mpa 4.5- 7.0
b) 28 Days 5.90
as per
Morth Table
4 Gradation IS:2386-(Part - I) obtained
No.400-4
data
as per
5 Flexural Strength IRC SP : 89-2018-II N/mm2 1.113
obtained data
6 Durability IRC SP : 89-2018-II
Not less than
Avg. Residual UCS 20 % of 28
i Mpa 3.69
Strength after 12 cycles days UCS
Strength.
ii Avg. Total Weight loss % 6.18 Max 14
as per
7 Rate of spray cement Kg/Sqm 20.791
obtained data
as per
8 Cement Kg/Cum 83.164
Contractor: Concessonaires: obtained data
Independent Engineer:
UPGRADATION OF ROADS UNDER [FULL DEAPTH RECLAMATION(FDR)]
PRADHANMANTRI GRAM SADAK YOZNA
Road Name : Road Name : T01- Tarhasi to Tetrain Via Sonpura, Pkg. No-JH-P3-22-23-PAL-02-FDR,
Dist-Palamu, Jharkhand
PROJECT DESCRIPTION
Sample
Chainage as Road Width WBM (G1) Brick / Total Crust
S.No Pit Size (m) WBM/GSB
per DPR (km) (m) BT (mm) / Boulder Stone/Mur Thickness (mm)
(mm)
(mm) rum (mm)
1 0+350 3 1x1x0.400 0 250 0 0 250
2 0+600 3 1x1x0.400 0 70 0 330 400
3 0+950 3 1x1x0.400 0 200 0 0 200
4 1+050 3 1x1x0.400 0 80 0 90 170
5 1+400 3 1x1x0.400 0 130 0 150 280
6 1+600 3 1x1x0.400 0 140 0 130 270
7 1+750 3 1x1x0.400 0 80 310 150 540
8 2+300 3 1x1x0.400 0 130 0 150 280
9 3+450 3 1x1x0.400 0 90 110 150 350
10 3+650 3 1x1x0.400 0 0 0 400 400
11 3+950 3 1x1x0.400 0 120 90 150 360
12 4+600 3 1x1x0.400 20 80 110 180 390
13 4+950 3 1x1x0.400 0 0 0 400 400
14 5+100 3 1x1x0.400 0 130 0 180 310
15 5+600 3 1x1x0.400 0 0 0 400 400
16 5+900 3 1x1x0.400 0 100 160 210 470
17 6+300 3 1x1x0.400 0 0 0 400 400
18 6+500 3 1x1x0.400 0 40 120 250 410
19 6+950 3 1x1x0.400 0 0 110 300 410
20 7+350 3 1x1x0.400 0 120 100 180 400
21 7+850 3 1x1x0.400 0 0 110 220 330
22 7+900 3 1x1x0.400 0 100 0 300 400
23 8+350 3 1x1x0.400 0 80 130 80 290
24 8+500 3 1x1x0.400 0 0 0 400 400
25 8+950 3 1x1x0.400 0 80 120 100 300
26 9+100 3 1x1x0.400 0 0 0 400 400
27 9+500 3 1x1x0.400 0 0 210 100 310
28 9+950 3 1x1x0.400 0 0 130 250 380
29 10+100 3 1x1x0.400 0 0 0 400 400
30 10+600 3 1x1x0.400 0 50 200 0 250
31 10+800 3 1x1x0.400 0 100 0 300 400
32 11+200 3 1x1x0.400 0 0 170 120 290
33 11+500 3 1x1x0.400 0 0 0 400 400
34 11+950 3 1x1x0.400 0 0 110 180 290
35 12+200 3 1x1x0.400 0 0 0 400 400
36 12+500 3 1x1x0.400 0 0 0 400 400
37 12+800 3 1x1x0.400 20 0 0 300 320
38 13+200 3 1x1x0.400 0 0 0 400 400
39 13+500 3 1x1x0.400 0 0 180 150 330
40 13+800 3 1x1x0.400 0 0 0 400 400
41 14+200 3 1x1x0.400 0 100 0 300 400
42 14+500 3 1x1x0.400 0 100 0 300 400
43 14+800 3 1x1x0.400 0 0 120 80 200
44 15+150 3 1x1x0.400 0 0 110 140 250
45 15+500 3 1x1x0.400 0 100 0 300 400
46 15+800 3 1x1x0.400 0 80 0 150 230
47 15+950 3 1x1x0.400 0 200 0 200 400
48 16+200 3 1x1x0.400 0 0 180 0 180
49 16+500 3 1x1x0.400 0 100 0 300 400
50 16+800 3 1x1x0.400 0 0 0 400 400
51 17+100 3 1x1x0.400 0 160 180 0 340
52 17+500 3 1x1x0.400 0 0 0 400 400
53 17+800 3 1x1x0.400 0 80 0 100 180
54 18+300 3 1x1x0.400 0 80 120 130 330
55 18+500 3 1x1x0.400 0 0 0 400 400
56 18+800 3 1x1x0.400 0 90 0 230 320
57 19+000 3 1x1x0.400 0 0 0 0 0
58 19+520 3 1x1x0.400 0 0 120 200 320
59 19+900 3 1x1x0.400 0 80 240 0 320
60 20+100 3 1x1x0.400 0 80 100 240 420
Existing Crust Detail
Existing Width Road (m) 3 m
Proposed Width FDR (m) 3.9 m
Existing Crust mm ( 1mx 1 m)
BT- 0 mm
Granular Material (WBM/GSB) 120 mm
Total Crust (mm) 120 mm
Existing Crust ( %) ( 1mx 1 m)
BT 0%
Granular Material 100%
Note:
The JMF has done on the base of average crust of total road and the crust shall be added at low crust
portion accordingly
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
TABLE MORTH&H-400-4
Result lower limit upper limit
120.00
100.00
% PASSING
80.00
60.00
40.00
20.00
0.00
0.01 0.1 1 10 100
SIEVE SIZE (MM)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
TABLE MORTH&H-400-4
Result lower limit upper limit
120.00
100.00
% PASSING
80.00
60.00
40.00
20.00
0.00
0.01 0.1 1 10 100
SIEVE SIZE (MM)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
10.00
Cement vs UCS strength
9.00
7 DAYS UCS STRENGTH
8.00
7.00
6.00
(MPA)
5.00
4.00
3.00
2.00
1.00
0.00
0 1 2 3 4 5 6 7 8
CEMENT (%)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
Road Name:-T01- Tarhasi to Tetrain Via Sonpura, JH-P3-22-23-PAL-02-FDR, Dist-Palamu, Jharkhand Pkg No.:JH17ACPL08
FLEXURAL STRENGTH OF FDR MATERIAL MIX (As Per IRC:SP:89-(Part-II)
Sample Id :- Date of Sampling :- 29-08-2023
Road Name:-T01- Tarhasi to Tetrain Via Sonpura, JH-P3-22-
Source :- Date of Casting :- 19-10-2023
23-PAL-02-FDR,
Road Name:-T01- Tarhasi to Tetrain Via Sonpura, JH-P3-22-
Location :- Date of Testing :- 16-11-2023
23-PAL-02-FDR,
Material
Combined Material and 4% Cement With ANT Stabilizer
Description :-
Mold Size 100 MM x 100 MM X 500 MM
Avg flexural
Length In Width In Depth In Breaking Load Flexural Strength
S.No Strength Remark (If Any )
(mm) (mm) (mm) in (KN) (N/mm2)
(N/mm2)
1 500 100 100 2.950 1.180
2 500 100 100 2.610 1.044 1.113
3 500 100 100 2.790 1.116
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
Remarks ::- 1.Avg.residual UCS strength 3.69 Mpa , which is not less than 20 % of 28 days UCS Strength.
2. Maximum Allowable Weight Loss - 14 % (6.18% < 14 %), Hence OK.
14.00
13.50
13.00
12.50
DURABILITY TEST GRAPH
12.00
11.50 SAMPLE -2 WEIGHT LOSS AS PER IRC-SP 89 (PART-II)-2018
11.00 %
10.50
10.00
CUMULATIVE SAMPLE-1
9.50 WEIGHT LOSS %
9.00 SAMPLE-1 WEIGHT LOSS
8.50
%
8.00
7.50 CUMULATIVE SAMPLE-2
SPECIMEN WEIGHT LOSS %
NUMBER OF CYCLE.
UPGRADATION OF ROADS UNDER [FULL DEAPTH RECLAMATION(FDR)]
PRADHANMANTRI GRAM SADAK YOZNA