Name OF Road & Pkg No: T04-Patan Bazar to Saraidih Chhatarpur PWD Road,
Pkg-JH-P3-22-23-PAL-02-FDR, Dist-Palamu, Jharkhand
Pkg No.: JH17ACPL05
It is hereby declared that tests reported in this document have been done by the following NABL accredited lab.
Further, the tests have been done in presence of our representative. Mr. Abhinav Prakash
ISO/IEC 17025:2017
''General Requirements for the Competence of Testing &
Calibration Laboratories''
for its facilities at
3/6, UPSIDC, SITE-II, AJANTA COMPOUND, GHAZIABAD, UTTAR PRADESH, INDIA
in the field of
TESTING
Certificate Number: TC-8144
Issue Date: 09/08/2022 Valid Until: 08/08/2024
This certificate remains valid for the Scope of Accreditation as specified in the annexure subject to continued
satisfactory compliance to the above standard & the relevant requirements of NABL.
(To see the scope of accreditation of this laboratory, you may also visit NABL website www.nabl-india.org)
N. Venkateswaran
Chief Executive Officer
DESIGN MIX FINAL REPORT ON
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
Name of Project
Construction and 5- year Maintenance of Road Under Full Depth
Reclamation/ In-Situ Stabilization with Cement and
Additive of Pkg. JH-P3-22-23-PAL-02-FDR
Name of PIU
Executive Engineer, PIU,RED, Palamu
SUBMITTED TO:
M/s Sildiliya Construction
December- 2023
SUBMITTED BY:
Ml/Cum 100
2 ANT STABILIZER --
% 0.00487
PROPERTIES
Specifications
a) 7 Days 4.89
Mpa 4.5- 7.0
b) 28 Days 5.84
as per
Morth Table
4 Gradation IS:2386-(Part - I) obtained
No.400-4
data
as per
5 Flexural Strength IRC SP : 89-2018-II N/mm2 1.152
obtained data
6 Durability IRC SP : 89-2018-II
Not less than
Avg. Residual UCS 20 % of 28
i Mpa 3.69
Strength after 12 cycles days UCS
Strength.
ii Avg. Total Weight loss % 6.24 Max 14
as per
7 Rate of spray cement Kg/Sqm 20.518
obtained data
as per
8 Cement Kg/Cum 82.073
obtained data
UPGRADATION OF ROADS UNDER [FULL DEAPTH RECLAMATION(FDR)]
PRADHANMANTRI GRAM SADAK YOZNA
Road Name : Road Name : T04-Patan Bazar to Saraidih Chhatarpur PWD Road, JH-P3-22-23-PAL-02-FDR ,
Dist-Palamu, Jharkhand
PROJECT DESCRIPTION
Sample
Chainage Total Crust
Road Width Pit Size WBM (G1) Soft Rock /
S.No as per DPR WBM/GSB Thickness
(m) (m) BT (mm) / Boulder Stone/Murr
(km) (mm) (mm)
(mm) um (mm)
1 1+470 3 1x1x0.400 40 130 0 200 370
2 1+800 3 1x1x0.400 40 130 0 200 370
3 2+300 3 1x1x0.400 20 100 0 280 400
4 2+750 3 1x1x0.400 20 110 0 140 270
5 3+350 3 1x1x0.400 20 170 0 210 400
6 3+800 3 1x1x0.400 20 150 0 230 400
7 4+300 3 1x1x0.400 20 140 150 90 400
8 4+800 3 1x1x0.400 20 140 140 100 400
9 5+450 3 1x1x0.400 20 110 0 90 220
10 5+900 3 1x1x0.400 20 120 100 100 340
11 6+450 3 1x1x0.400 0 0 0 100 100
12 6+850 3 1x1x0.400 0 0 0 100 100
13 7+600 3 1x1x0.400 20 0 110 100 230
14 7+900 3 1x1x0.400 0 0 110 100 210
15 8+500 3 1x1x0.400 0 70 0 330 400
16 8+800 3 1x1x0.400 0 70 0 330 400
17 9+450 3 1x1x0.400 20 100 0 120 240
18 9+850 3 1x1x0.400 0 100 120 80 300
19 10+400 3 1x1x0.400 0 40 90 240 370
20 10+800 3 1x1x0.400 20 100 0 280 400
21 11+350 3 1x1x0.400 0 50 100 300 450
22 11+620 3 1x1x0.400 0 80 0 220 300
23 12+420 3 1x1x0.400 0 0 100 240 340
Existing Crust Detail
Existing Width Road (m) 3 m
Proposed Width FDR (m) 3.9 m
Existing Crust mm ( 1mx 1 m)
BT- 20 mm
Granular Material (WBM/GSB) 110 mm
Total Crust (mm) 130 mm
Existing Crust ( %) ( 1mx 1 m)
BT 15%
Granular Material 85%
Note:
The JMF has done on the base of average crust of total road and the crust shall be added at low crust
portion accordingly
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
TABLE MORTH&H-400-4
Result lower limit upper limit
120.00
100.00
% PASSING
80.00
60.00
40.00
20.00
0.00
0.01 0.1 1 10 100
SIEVE SIZE (MM)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
TABLE MORTH&H-400-4
Result lower limit upper limit
120.00
100.00
% PASSING
80.00
60.00
40.00
20.00
0.00
0.01 0.1 1 10 100
SIEVE SIZE (MM)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
TABLE MORTH&H-400-4
Result lower limit upper limit
120.00
100.00
% PASSING
80.00
60.00
40.00
20.00
0.00
0.01 0.1 1 10 100
SIEVE SIZE (MM)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
10.00
Cement vs UCS strength
9.00
7 DAYS UCS STRENGTH
8.00
7.00
6.00
(MPA)
5.00
4.00
3.00
2.00
1.00
0.00
0 1 2 3 4 5 6 7 8
CEMENT (%)
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
ad name- T04-Patan Bazar to Saraidih Chhatarpur PWD Road, JH-P3-22-23-PAL-02-FDR , Dist-Palamu, Jharkhand Pkg. No.: JH17ACPL0
FLEXURAL STRENGTH OF FDR MATERIAL MIX (As Per IRC:SP:89-(Part-II)
Sample Id :- Date of Sampling :-
Road name- T04-Patan Bazar to Saraidih Chhatarpur PWD
Source :- Date of Casting :- 18-10-2023
Road, JH-P3-22-23-PAL-02-FDR ,
Road name- T04-Patan Bazar to Saraidih Chhatarpur PWD
Location :- Date of Testing :- 15-11-2023
Road, JH-P3-22-23-PAL-02-FDR ,
Material
Combined Material and 4% Cement With ANT Stabilizer
Description :-
Mold Size 100 MM x 100 MM X 500 MM
Avg flexural
Length In Width In Depth In Breaking Load Flexural Strength
S.No Strength Remark (If Any )
(mm) (mm) (mm) in (KN) (N/mm2)
(N/mm2)
1 500 100 100 2.910 1.164
2 500 100 100 2.680 1.072 1.152
3 500 100 100 3.050 1.220
UPGRADATION OF ROAD UNDER [ FULL DEPTH RECLAMATION (FDR)]
PRADHAN MANTRI GRAM SADAK YOZNA
Road name- T04-Patan Bazar to Saraidih Chhatarpur PWD Road, JH-P3-22-23-PAL-02-FDR , Dist-Palamu, Jharkhand
DURABILITY WETTING AND DRYING (As Per IRC:SP:89-(Part-II)
Sample Id :- 0 Date of Sampling :-
Source :- Road name- T04-Patan Bazar to Saraidih Chhatarpur PWD Road, JH-P3-22-23- Date of Casting :- 18-10-2023
Location :- PAL-02-FDR , Dist-Palamu, Jharkhand Date of Testing :- 12-12-2023
Material Description :- Combined Material and 4% Cement With ANT Stabilizer
Sample :-1 Sample :-2
Initial Weight :- 5870 gm 5870 gm Initial Weight :- 5840 5840 gm
Cycle No:- Weight % Loss Cum. % Loss Cycle No:- Weight % Loss Cum. % Loss
1 58.00 0.99 0.99 1 55.00 0.94 0.94
2 54.00 0.92 1.91 2 52.00 0.89 1.83
3 48.00 0.82 2.73 3 48.00 0.82 2.65
4 43.00 0.73 3.46 4 42.00 0.72 3.37
5 36.00 0.61 4.07 5 37.00 0.63 4.01
6 32.00 0.55 4.62 6 33.00 0.57 4.57
7 27.00 0.46 5.08 7 28.00 0.48 5.05
8 21.00 0.36 5.43 8 22.00 0.38 5.43
9 14.00 0.24 5.67 9 18.00 0.31 5.74
10 12.00 0.20 5.88 10 15.00 0.26 5.99
11 10.00 0.17 6.05 11 11.00 0.19 6.18
12 8.00 0.14 6.18 12 7.00 0.12 6.30
Total Weight loss % 6.18 Total Weight loss % 6.30
Remarks ::- 1.Avg.residual UCS strength 3.69 Mpa , which is not less than 20 % of 28 days UCS Strength.
2. Maximum Allowable Weight Loss - 14 % (6.24% < 14 %), Hence OK.
14.00
13.50
13.00
12.50
DURABILITY TEST GRAPH
12.00
11.50 SAMPLE -2 WEIGHT LOSS % AS PER IRC-SP 89 (PART-II)-2018
11.00
10.50
10.00
CUMULATIVE SAMPLE-1
9.50 WEIGHT LOSS %
9.00 SAMPLE-1 WEIGHT LOSS %
8.50
8.00
7.50 CUMULATIVE SAMPLE-2
SPECIMEN WEIGHT LOSS %
NUMBER OF CYCLE.
UPGRADATION OF ROADS UNDER [FULL DEAPTH RECLAMATION(FDR)]
PRADHANMANTRI GRAM SADAK YOZNA
5.0
Laboratory Photographs
Sampling Photographs
Sampling Photographs
Sampling Photographs
Sampling Photographs
Sampling Photographs
Sampling Photographs