Professional Documents
Culture Documents
AVAILABLE
DESCRIPTION OF SUPPORT SUPPORT WORKING (IN GOOD
SL. NO ( MAKE AND CAPACITY
EQUIPMENT / WORK / NOT AVAILBLE) CONDITIONS/NOT GOOD)
EB POWER AVAILABLE
10 (IF LESS THAN 15/20 KW 15KW
COST INVOLVED TO INCREASE
POWER ALLOCATION)
POWER RELATED
EARTH
TOTAL
ADDITIONAL TOOS
P-READY KIT
OTHER DETAILS
1 TOTAL NOS TECHNCIANS AVAILABLE 4
2 HOW MANY ARE MRF TRAINED TECHINCIANS 3
ARE THEY FOLLOWING THE SOP AND SERVICE
3
PROCEDURES PROPERLY YES
4 ARE THEY FILLING NEW JOB CARD YES
T&S MACHINERY C
list the serious complaints
1 WA
2 WB
3 SL
4 SL
5 SL
6 WB
7 WA
ghlighted cells to be filled by FSE All Blue highlighted cells to be filled by TCG
S REPORT note : Very important document to be filled with atmost care
NO OF WA (AVG) / MONTH
WA GOOD
WB GOOD
SL GOOD
ANY CRACK ? :
AT PRESENT WA WORKING
WITHOUT PROBLEM
WA WB SL
YES YES
YES
YES
YES
YES
10
10 CARS
KUMAR GUPTA
ONTHS
WA
WB
SL
INAUGURATION DATE DATE DIFF
03.02.16
E&C DATE
03.02.16
160
50000
70 LAKHS
200
180
400
MACHINERY MAINTENANCE
BREIF ON MAINTENANCE
TARGET CONDITION ( ANY CRACK OR SCRACTH)
ANY SCRATCH ? :
NO
MACHINE
WORKING WORKING
2 WHEELER MOBILE
JACK ANY OTHER
READING SITE
N E : 1V
YB : 411