Professional Documents
Culture Documents
*A10008375*
*A10008375*
TAG: M96-E334005AM-LP-1 DESCRIPTION: PROPANE REGENERATION AIR COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008376*
*A10008376*
TAG: M96-E334005AMJB-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER JB(E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008377*
*A10008377*
TAG: M96-E334005AMLCS-C1-1 DESCRIPTION: PROPANE REGENERATION AIR COOLER LCS (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008380*
*A10008380*
TAG: M96-E334005AMLES-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER EMER. STOP(E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008379*
*A10008379*
TAG: M96-E334005AMVSW-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER VS (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008378*
*A10008378*
TAG: M96-E334005AMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER VSR (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008419*
*A10008419*
TAG: M96-E334009AM-LP-1 DESCRIPTION: BUTANE REGENERATION AIR COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008420*
*A10008420*
TAG: M96-E334009AMJB-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER JB(E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008421*
*A10008421*
TAG: M96-E334009AMLCS-C1-1 DESCRIPTION: BUTANE REGENERATION AIR COOLER LCS (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008424*
*A10008424*
TAG: M96-E334009AMLES-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER EMRG.STOP(E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008423*
*A10008423*
TAG: M96-E334009AMVSW-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER VS (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008422*
*A10008422*
TAG: M96-E334009AMVSWR-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER VSR (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008381*
*A10008381*
TAG: M96-E334012AM-LP-1 DESCRIPTION: PROPANE REGENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008382*
*A10008382*
TAG: M96-E334012AMJB-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER JB (E-334-012-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008383*
*A10008383*
TAG: M96-E334012AMLCS-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER LCS E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10007253*
*A10007253*
TAG: M96-E334012AMLES-C1-1 DESCRIPTION: PROPANE REGEN.HOT GAS COOLER EMER.STOP(E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008385*
*A10008385*
TAG: M96-E334012AMVSW-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VS (E-334-012-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008384*
*A10008384*
TAG: M96-E334012AMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VSR E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008399*
*A10008399*
TAG: M96-E334012BM-LP-1 DESCRIPTION: PROPANE REGENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008400*
*A10008400*
TAG: M96-E334012BMJB-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER JB (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008401*
*A10008401*
TAG: M96-E334012BMLCS-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER LCS E-334-012-B
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10007718*
*A10007718*
TAG: M96-E334012BMLES-C1-1 DESCRIPTION: PROPANE REGEN.HOT GAS COOLER EMER.STOP(E-334-012-B
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008403*
*A10008403*
TAG: M96-E334012BMVSW-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VS (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008402*
*A10008402*
TAG: M96-E334012BMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VSR (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008425*
*A10008425*
TAG: M96-E334013AM-LP-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008426*
*A10008426*
TAG: M96-E334013AMJB-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER JB(E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008427*
*A10008427*
TAG: M96-E334013AMLCS-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER LCS (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10009069*
*A10009069*
TAG: M96-E334013AMLES-C1-1 DESCRIPTION: BUTANE GEN. HOT GAS COOLER EMER.STOP(E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008429*
*A10008429*
TAG: M96-E334013AMVSW-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VS (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008428*
*A10008428*
TAG: M96-E334013AMVSWR-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VSR (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008441*
*A10008441*
TAG: M96-E334013BM-LP-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008442*
*A10008442*
TAG: M96-E334013BMJB-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER JB(E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008443*
*A10008443*
TAG: M96-E334013BMLCS-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER LCS (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10009073*
*A10009073*
TAG: M96-E334013BMLES-C1-1 DESCRIPTION: BUTANE GEN.HOT GAS COOLER EMER.STOP(E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008445*
*A10008445*
TAG: M96-E334013BMVSW-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VS (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224
*A10008444*
*A10008444*
TAG: M96-E334013BMVSWR-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VSR (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO
TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION
CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr
CORES
CONTINUITY
SCREEN
EARTH
ARMr
TEST VOLTS
No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :
Signature
Name
Designation
Date
TPX09, Rev.0
SHEET 1 OF 1