You are on page 1of 36

EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY

CONTRACT NO: CA/CSPD/0116


ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008375*
*A10008375*
TAG: M96-E334005AM-LP-1 DESCRIPTION: PROPANE REGENERATION AIR COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-005-A-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008376*
*A10008376*
TAG: M96-E334005AMJB-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER JB(E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-005-A-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008377*
*A10008377*
TAG: M96-E334005AMLCS-C1-1 DESCRIPTION: PROPANE REGENERATION AIR COOLER LCS (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-005-A-M-JB TO: E-334-005-A-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008380*
*A10008380*
TAG: M96-E334005AMLES-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER EMER. STOP(E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-005-A-M-JB TO: E-334-005-A-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008379*
*A10008379*
TAG: M96-E334005AMVSW-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER VS (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-005-A-M-JB TO: E-334-005-A-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008378*
*A10008378*
TAG: M96-E334005AMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. AIR COOLER VSR (E-334-005-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-005-A-M-JB TO: E-334-005-A-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008419*
*A10008419*
TAG: M96-E334009AM-LP-1 DESCRIPTION: BUTANE REGENERATION AIR COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-009-A-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008420*
*A10008420*
TAG: M96-E334009AMJB-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER JB(E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-009-A-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008421*
*A10008421*
TAG: M96-E334009AMLCS-C1-1 DESCRIPTION: BUTANE REGENERATION AIR COOLER LCS (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-009-A-M-JB TO: E-334-009-A-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008424*
*A10008424*
TAG: M96-E334009AMLES-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER EMRG.STOP(E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-009-A-M-JB TO: E-334-009-A-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008423*
*A10008423*
TAG: M96-E334009AMVSW-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER VS (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-009-A-M-JB TO: E-334-009-A-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008422*
*A10008422*
TAG: M96-E334009AMVSWR-C1-1 DESCRIPTION: BUTANE REGEN. AIR COOLER VSR (E-334-009-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-009-A-M-JB TO: E-334-009-A-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008381*
*A10008381*
TAG: M96-E334012AM-LP-1 DESCRIPTION: PROPANE REGENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-012-A-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008382*
*A10008382*
TAG: M96-E334012AMJB-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER JB (E-334-012-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-012-A-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008383*
*A10008383*
TAG: M96-E334012AMLCS-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER LCS E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-A-M-JB TO: E-334-012-A-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10007253*
*A10007253*
TAG: M96-E334012AMLES-C1-1 DESCRIPTION: PROPANE REGEN.HOT GAS COOLER EMER.STOP(E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-A-M-JB TO: E-334-012-A-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008385*
*A10008385*
TAG: M96-E334012AMVSW-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VS (E-334-012-A)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-A-M-JB TO: E-334-012-A-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008384*
*A10008384*
TAG: M96-E334012AMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VSR E-334-012-A
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-A-M-JB TO: E-334-012-A-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008399*
*A10008399*
TAG: M96-E334012BM-LP-1 DESCRIPTION: PROPANE REGENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201B TO: E-334-012-B-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008400*
*A10008400*
TAG: M96-E334012BMJB-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER JB (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201B TO: E-334-012-B-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008401*
*A10008401*
TAG: M96-E334012BMLCS-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER LCS E-334-012-B
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-B-M-JB TO: E-334-012-B-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10007718*
*A10007718*
TAG: M96-E334012BMLES-C1-1 DESCRIPTION: PROPANE REGEN.HOT GAS COOLER EMER.STOP(E-334-012-B
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-B-M-JB TO: E-334-012-B-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008403*
*A10008403*
TAG: M96-E334012BMVSW-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VS (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-B-M-JB TO: E-334-012-B-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008402*
*A10008402*
TAG: M96-E334012BMVSWR-C1-1 DESCRIPTION: PROPANE REGEN. HOT GAS COOLER VSR (E-334-012-B)
SUB-SYSTEM: 4P01-002 - PROPANE REGENERATION USER GROUP: HEISCO

FROM: E-334-012-B-M-JB TO: E-334-012-B-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008425*
*A10008425*
TAG: M96-E334013AM-LP-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-013-A-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008426*
*A10008426*
TAG: M96-E334013AMJB-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER JB(E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201A TO: E-334-013-A-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008427*
*A10008427*
TAG: M96-E334013AMLCS-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER LCS (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-A-M-JB TO: E-334-013-A-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10009069*
*A10009069*
TAG: M96-E334013AMLES-C1-1 DESCRIPTION: BUTANE GEN. HOT GAS COOLER EMER.STOP(E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-A-M-JB TO: E-334-013-A-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008429*
*A10008429*
TAG: M96-E334013AMVSW-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VS (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-A-M-JB TO: E-334-013-A-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008428*
*A10008428*
TAG: M96-E334013AMVSWR-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VSR (E-334-013-A)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-A-M-JB TO: E-334-013-A-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008441*
*A10008441*
TAG: M96-E334013BM-LP-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201B TO: E-334-013-B-M

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008442*
*A10008442*
TAG: M96-E334013BMJB-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER JB(E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: M96-MCC-337-201B TO: E-334-013-B-M-JB

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008443*
*A10008443*
TAG: M96-E334013BMLCS-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER LCS (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-B-M-JB TO: E-334-013-B-M-LCS

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10009073*
*A10009073*
TAG: M96-E334013BMLES-C1-1 DESCRIPTION: BUTANE GEN.HOT GAS COOLER EMER.STOP(E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-B-M-JB TO: E-334-013-B-M-LES

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008445*
*A10008445*
TAG: M96-E334013BMVSW-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VS (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-B-M-JB TO: E-334-013-B-M-VSW

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date

TPX09, Rev.0
SHEET 1 OF 1
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY
CONTRACT NO: CA/CSPD/0116
ELECTRICAL TEST SHEET
TPX09 - LV POWER CABLE CHECKS,CONTINUITY & INSULATION TEST
APPLICABLE QMS: PRJ-QMS 9C-03-5223/5224

*A10008444*
*A10008444*
TAG: M96-E334013BMVSWR-C1-1 DESCRIPTION: BUTANE GENERATION HOT GAS COOLER VSR (E-334-013-B)
SUB-SYSTEM: 4P01-005 - BUTANE REGENERATION USER GROUP: HEISCO

FROM: E-334-013-B-M-JB TO: E-334-013-B-M-VSWR

ITEM CHECK LIST RESULT


1 Check cable labelling is in accordance with specification.
2 Check cable for any installation damage.
3 Check cable is routed in accordance with cable layout drawings.
4 Check cable is adequately supported and fixed to rack
5 Check cable tray/conduit is in accordance with project specification and layout drawings.
6 Check bending radius is within the specified limits.
7 Check glands and earthing are in accordance with specification.
8 Check cable physical integrity, cable schedule and core marking.
N.A. Not applicable. P_ Punch item (categorized PA, PB, PC) to be recorded in the punch list register. No further work required.

TEST RESULTS (TEST ALL CORES AND RECORD LOWEST VALUE) RESULT
Upstream connection according cable schedule
Downstream connection according cable schedule
Cross section according cable schedule
CORE to EARTH
INSULATION

CORE to CORE
CORE to SCREEN
CORE to ARMr
SCREEN to EARTH
SCREEN to ARMr

CORES
CONTINUITY

SCREEN
EARTH
ARMr
TEST VOLTS

TEST EQUIPMENT CALIBRATION REFERENCE


TYPE & MODEL SERIAL No. RANGE CERTIFICATION TRACE No. ISSUE DATE DUE DATE

No te: if there are NO ADDITIONA L REM A RKS enter NONE, initials and date. If there are remarks, reaso n to be written in "REM A RKS" sectio n and, where applicable, raised as an
exceptio n o r o utstanding issue as part o f the system hando ver/punchlist.
Remarks :

SUBCONTRACTOR CONTRACTOR COMPANY

Signature

Name
Designation
Date