CS Code: _3-MS-340-3-TR/GLSPKW-5069_CS

CS Version : 0
TECHNICAL COMMENT SHEET
Company Status Table
A1- APPROVED R1- REVIEWED
Company: KUWAIT NATIONAL PETROLEUM COMPANY (KNPC) TR Project No.: 08595 A2- APPROVED WITH COMMENTS R2- REVIEWED WITH COMMENTS
Contractor: TECNICAS REUNIDAS, SA (TR) Project: GAS TRAIN 5. PROJECT AT MAA REFINERY A3- NOT APPROVED R3- NOT REVIEWED

Transmittal 8595-KTS-TR-AMEC-GT5- 06932


METHOD STATEMENT FOR CRANE TEREX 140 Action Code (*)
Document Title:
TON ASSEMBLY AND LOAD TEST
TR Transmittal Date 05-08-2019
A- ACCEPTED

Document No. 3-MS-340-3-TR-GLSPKW-5069 Company response Transmittal # B- NON-CONCUR


Company response Transmittal Date DD/MM/YY

Originator Faisal Khan DATE: 28-May-19


Status: Company Status Reviewed Mauro Bignotti DATE: 28-May-19

A
A1 A3
R 2
R R
1 2 3

Page /
No. Rev. # COMPANY COMMENT CONTRACTOR RESPONSE COMPANY COUNTER RESPONSE FINAL AGREEMENT
Section

Grey line Contractor response or answer agreed between Contractor and Contractor Counter Response or answer agreed between
Action Code Action Code Final Agreement. Only complete when meeting or further discussion required. Make
0 between To be filled by Company and returned in xls format. Subcontractor (if any). If comment accepted, introduce date in Initials Action Code (*) Contractor and Subcontractor (if any). If agreement, include date in CLOSED DATE
(*) (*) reference to minutes of meeting / official communication.
revisions "CLOSED DATE". "CLOSED DATE", if not, "CLOSED DATE" remains blank

Management of Add:Final Approval shall be obtained from the Company prior carrying
1 A A Incorporated
Change out the activity

Boom collapsed plan to be attached with exclusion zone to


2 A 16/Sec 11.7 indicate which construction/operational areas are affected by the A Incorporated
potential boom collapse

Contractor shall attached the TPI Proof load test reports for Lifting
3 A TPI Certificate A Noted. Activity completed
gears and tackles to be used as per company SWP.

KNPC GT5
Separate sign off form shall be supplied for Waiver for Safety
4 A Lift Planning A Noted. Activity completed
Factor less than 125%.
Matrix Reqt.

Sheet 1 of 1