You are on page 1of 3

S.

No Doc No Latest Revision


8 3-MS-340-5-TR/GLSPKW-5015 B2

3-MS-340-5-TR/GLSPKW-5007 B2
16
17 3-MS-340-5-TR/GLSPKW-5009 A3

3-MS-340-5-TR/GLSPKW-5005 B1
21
27 3-MS-340-5-TR/GLSPKW-5001 C1
94 3-MS-340-5-TR/GLSPKW-5002 B1
Description TR Approval AMEC Approval
Method Statement for Erection of Heavy Valves 6705 T 6808 T

Method Statement for Fabrication and Erection of Piping Works in V-333-002 and 003 3998 T 4028 T

Method Statement for Crane Terex 250 Ton Assembly and Load Test 3940 T 3957 T
Method Statement for Dismantling of Piping Connections From Equipments for
3894 T 3904 T
Repairing Work of Equipment Foundations Affected by Heavy Rain
Method Statement for Fabrication and Erection of Piping Works 3540 T 3592 T
Method Statement for Cement Lined Piping Works 0779 T 0888 T
Status Disc Status
A1 Piping

A1 Piping

A1 Piping

A1 Piping

A1 Piping
A1 Piping