Consolidated List of Civil, Structural, Technological structures , Roads & Piles - 2.

0 MTPY Iron Ore Pelletization Plant , NMDC, Nagarnar


INP - P2004-G-A00-BOQ-000, R0 NOT FINAL for DISCUSSION Purpose ONLY

REBARING
EXCAVATION BACK FILLING PILES ( DIA) PCC IN M3 RCC IN M3 Shuttering Qty
KG/ M3
FLOORING IN M3 SHEETING IN M2
BRICK
PILE DEPTH STRUCTURA TECHNOLOGICAL
Sl. No. DOCUMENT NO. BUILDING / UNIT WORK IN TILES IN M2 STRUCTRES
M L IN MT
M3 DECK PLATE
POWDER
BOULDER CLR. COATED COATED Waterproofing (m2)
M3 M3 500 600 900 1000 M 7.5 M10 M15 M20 M20C M25 M35 Conventional Slipform Fe 500 SOILING
RCC M25C M20C & FRP
FOR RCC
CORRUGATED roof
FLOOR
AL.

1 INP-P2004-G-A02-BOQ-00034A SLURRY TANK 250 150 56 6.5 20 50 30 305 Reqd 135 35 60 255

2 INP-P2004-G-A02-BOQ-00034B SLURRY PUMP HOUSE 720 450 25 16 370 Reqd 125 45 45 140 30 10 418

3 INP-P2004-G-A02-BOQ-00034C FILTRATE TANK & PUMP HOUSE 3000 1800 20 132 1425 Reqd 130 35 35 80 42 10 315

4 INP-P2004-G-A02-BOQ-00035 R1 FILTRATION BUILDING 4000 2200 265 6.5 270 150 4240 Reqd 140 300 300 165 1200 450 7500 Not Reuired

5 INP-P2004-G-A02-BOQ-00036 R1 FILTER CAKE STORAGE SHED 1500 900 252 5.5 400 45 1642 Reqd 125 800 800 200 12 8000
6 INP-P2004-G-A02-BOQ-00036 R1 COKE BREEZE SHED 950 760 108 6.5 180 20 335 Reqd 125 180 180 35 120 12 3000
7 INP-P2004-G-A02-BOQ-00036 R1 BENTONITE SHED 525 420 60 6.5 50 10 195 Reqd 125 100 100 25 75 6 1600
8 INP-P2004-G-A03-BOQ-00037 R1 ADDTIVE MILL BUILDING 2750 1560 4 164 5.5 80 145 65 1800 Reqd 130 150 150 85 310 1550 57 4600 190
9 INP-P2004-G-A05-BOQ-00038 MIXING & BALLING BUILDING 3650 2200 4 275 5.5 140 134 4347 Reqd 140 280 280 460 1008 1200 310.5 6500
10 INP-P2004-G-A07-BOQ-00039 INDURATION BUILDING 6250 3750 48 220 4.5 180 150 90 2470 Reqd 135 350 350 2200 1336.5 10000 1300
11 INP-P2004-G-A09-BOQ-00040A PROCESS GAS DUCTS 1710 855 64 50 4.5 70 40 230 Reqd 130 330 600
12 INP-P2004-G-A09-BOQ-00040B PROCESS GAS ESP 350 175 180 4.5 60 35 25 300 Reqd 130 81 81
13 INP-P2004-G-A09-BOQ-00040C PROCESS GAS FANS 1710 300 60 4.5 60 740 Reqd 135 45

14 INP-P2004-G-A09-BOQ-00040D PROCESS GAS CHIMNEY 325 130 65 4.5 20 10 870 Reqd Reqd 135 15

15 INP-P2004-G-A09-BOQ-00040E DEDUSTING SYSTEM 400 200 32 4 4 3.5 12 18 8 180 Reqd 130 25 25 116
16 INP-P2004-G-A08-BOQ-00041 HEARTH LAYER SEGREGRATION BUILDING 1000 600 72 3 20 35 15 470 Reqd 125 36 36 200 59 1100
17 INP-P2004-G-A00-BOQ-00047A PRODUCT STORAGE BUILDING 500 250 24 32 3 20 24 20 305 Reqd 125 40 40 250 435 2500
18 INP-P2004-G-A00-BOQ-00047B TRUCK LOADING STATION 230 100 24 5.5 10 18 8 162 Reqd 125 20 20 120 180 1100
19 INP-P2004-G-A00-BOQ-00047C FINES BUILDING 150 75 16 3 3 6 3 53 Reqd 125 6 6 55 25 400
6 14 5.5 Reqd
20 INP-P2004-G-A00-BOQ-00047D JUNCTION HOUSES 1 -12 1400 700 35 46 35 487 130 75 75 350 15 2200 620
6 14 3 Reqd
240 5.5 Reqd
21 INP-P2004-G-A00-BOQ-00047E STACKER CUM RECLAIMER 13000 7500 320 4.5 300 80 720 Reqd 130 600 400
240 3.5 Reqd
22 INP-P2004-G-A00-BOQ-00047F CONVEYORS GALLERY 3000 1500 165 82 1050 Reqd 130 1275 15980
23 INP-P2004-G-A00-BOQ-00048 PIPE & CABLE GALLERY 4500 2250 150 50 850 Reqd 130 550 6100
24 INP-P2004-G-A14-BOQ-00046 FURNACE OIL, LDO STORAGE TANK & PUMP HOUSE 2500 1250 52 6.50 13 25 75 85 150 Reqd 130 16 16 320 15 102.5 150
25 INP-P2004-G-A13-BOQ-00042 COMPRESSED AIR STATION 230 150 15 15 60 Reqd 125 30 30 15 45 500

26 INP-P2004-G-A12-BOQ-00044 MAIN WATER PUMP HOUSE, SOFT WATER & COOLING TOWER 3840 2300 55 145 1940 Reqd 135 105 105 165 110 15 750

27 INP-P2004-G-A12-BOQ-00043 RAW WATER TREATMENT PUMP HOUSE 1215 975 12 50 504 Reqd 130 25 25 50 36 5 190

28 INP-P2004-G-A15-BOQ-00045 FIRE WATER PUMP HOUSE 515 300 6 27 420 Reqd 130 12 12 30 5 120

29 INP-P2004-G-A00-BOQ-00049 ROADS & DRAINS WBM 20785 905 327 1247 Reqd

30 INP-P2004-G-A00-BOQ-00049 ROADS & DRAINS RCC RIGID 21230 335 1257 3750 Reqd

31 INP-P2004-G-A00-BOQ-00051 CANTEEN 1500 750 30 30 560 Reqd 130 60 40 90 800 8 490

32 INP-P2004-G-A00-BOQ-00051 OCCUPATIONAL HEALTH CENTER 1500 750 30 30 420 Reqd 130 60 40 46 400 4 490
33 INP-P2004-G-A00-BOQ-00051 WORKERS REST ROOM -1 800 400 22 20 340 Reqd 130 45 30 42 300 4 375
34 INP-P2004-G-A00-BOQ-00051 WORKERS REST ROOM -2 800 400 22 20 340 Reqd 130 45 30 42 300 4 375
35 INP-P2004-G-A00-BOQ-00051B ROAD WEIGH BRIDGE 200 100 16 3 1.5 10 8 25 Reqd 120 2.5 16 16 3
36 INP-P2004-G-A00-BOQ-00050C CENTRAL LABORATARY 800 400 22 15 250 Reqd 130 45 30 130 300 3 390
37 INP-P2004-G-A00-BOQ-00050A HT SWGR ( MRSS) 2300 1150 45 40 770 Reqd 130 90 90 110 600 5 715
38 INP-P2004-G-A00-BOQ-00050A DIESEL GENERATOR DG 650 325 8 12 140 Reqd 130 16 16 25 110 2
39 INP-P2004-G-A00-BOQ-00050A FO ECR 650 325 8 12 190 Reqd 130 16 16 42 110 3 155
40 INP-P2004-G-A00-BOQ-00050A ESP ECR 1050 525 20 20 370 Reqd 130 40 40 75 300 3 365
41 INP-P2004-G-A00-BOQ-00050A HLSB ECR 1050 525 20 20 370 Reqd 130 40 40 75 300 3 365
42 INP-P2004-G-A00-BOQ-00051D AREA REPAIR SHOP 150 75 48 3.5 30 10 85 Reqd 125 65 65 72 90 750 NA
43 INP-P2004-G-A00-BOQ-00051D CENTRAL STORES 100 50 32 5.5 20 6 55 Reqd 125 42 42 135 80 350 NA
44 INP-P2004-G-A00-BOQ-00051E COVERED PARKING SHED -1 15 7 35 8 Reqd 75 75 5 600
Consolidated List of Civil, Structural, Technological structures , Roads & Piles - 2.0 MTPY Iron Ore Pelletization Plant , NMDC, Nagarnar
INP - P2004-G-A00-BOQ-000, R0 NOT FINAL for DISCUSSION Purpose ONLY

REBARING
EXCAVATION BACK FILLING PILES ( DIA) PCC IN M3 RCC IN M3 Shuttering Qty
KG/ M3
FLOORING IN M3 SHEETING IN M2
BRICK
PILE DEPTH STRUCTURA TECHNOLOGICAL
Sl. No. DOCUMENT NO. BUILDING / UNIT WORK IN TILES IN M2 STRUCTRES
M L IN MT
M3 DECK PLATE
POWDER
BOULDER CLR. COATED COATED Waterproofing (m2)
M3 M3 500 600 900 1000 M 7.5 M10 M15 M20 M20C M25 M35 Conventional Slipform Fe 500 SOILING
RCC M25C M20C & FRP
FOR RCC
CORRUGATED roof
FLOOR
AL.

45 INP-P2004-G-A00-BOQ-00051E COVERED PARKING SHED -2 15 7 35 8 Reqd 75 75 5 600

46 INP-P2004-G-A00-BOQ-00050B CCR 225 112 28 4.5 18 10 198 Reqd 120 36 36 475 480 50 72 260

47 Kitchen Eqpt
Furniture
Landscpaing

TOTAL 113990 39701 716 1201 814 368 3197.5 2096 737 10 580 32367 4620 4098.5 3206 570 2945 6752 9422 3521.5 69780 2182 3600
oads & Piles - 2.0 MTPY Iron Ore Pelletization Plant , NMDC, Nagarnar
Finsihing Schedule Date: 04 Aug 2020

REMARKS

Flooring (m2) Painting m2 False Ceiling M2 Door +Shutter Window Refractory Lining

SLURRY TANK

Covred in Column U & Y 738 Not Required 2 +1 9

Covred in Column U & Y 600 Not Required 2+ 1 8

Covred in Column Y 720 145 2+ 1 10

GROUND HOPPER
GROUND HOPPER
GROUND HOPPER
ADDTIVE STORAGE BINS
FC, GRD,ADD, SURGE BINS
HL BIN, IND FURNACE STR.
LINTEL TANK
PROCESS GAS DUCT

Approximately Total 400 T


as per Mecon Spec. Fireclay
Bricks in lower
segment (IS: 6, Type-2), Acid
Resistant Bricks in upper
segment (4860 Class-II)

DEDUSTING DUCTS,STACK

PRODUCT BIN
PRODUCT BIN
FINES BIN

TRANSFER CHUTES

SLEEPERS -800 NOS.


CR 80 52-TON

Covred in Column U 210 Not Required 1+ 1 6 FO& LDO tanks

Covred Column U & Y 1204 Not Required 2+1 15

Covered Column U & Y 180 Not Required 2+1 8

Covered Column U & Y 260 Not Required 1+1 4


CHIP CARPET , FOR
AGGREGRATES REFER
DETAILED BOQ
CHIP CARPET , FOR
AGGREGRATES REFER
DETAILED BOQ

Covered COLUMN Y Not required


Shall be Shall be
Shall be
CoveredCOLUMN Y 400 calculated calculated
calculated as
as per GA as per GA
per GA provided
CoveredCOLUMN Y Not required provided provided
CoveredCOLUMN Y Not required

Covered in COLUMN Y Shall be 240 Shall be calculated as


calculated as
Covered in COLUMN Y per GA provided
per GA provided Not required

Covered in Column U & Y 50


Covered in Column U & Y 145 Shall be Shall be
Shall be
calculated calculated
Covered in Column U & Y calculated as 145
as per GA as per GA
per GA provided
Covered in Column U & Y NOT Required provided provided

Covered in Column U & Y NOT Required


FRP
oads & Piles - 2.0 MTPY Iron Ore Pelletization Plant , NMDC, Nagarnar
Finsihing Schedule Date: 04 Aug 2020

REMARKS

Flooring (m2) Painting m2 False Ceiling M2 Door +Shutter Window Refractory Lining

FRP

Shall be
Shall be calculated as
Covered in Column U & Y calculated as 480
per GA provided
per GA provided

You might also like