AREA : DAMAC HILLS, DUBAI, U.A.

E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SUM M ARY CONSULTANT :M/s. LACASA

CIRCUIT / SP / RATING - PVC / Length ECC MAX. DEMAND PROPOSED TYPE & NO. OF
CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE LOAD ACTUAL Kwh METERS
DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL DIVERSITY MDL
CONNECTED
1 - PH 3 - PH 3 - PH LV /HV Remarks
NO. LOAD
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw FACTOR (1) (2) (3) CT (4)

INCOMER TP 2500 65 BY DEWA 2x1C 95 1426.39 1312.90 1281.86 4021.14

OUT GOING :

1 MDB-1 4P 2500 ACB(SET@0.85) 65 BY DEWA 2X1C 150 488.36 442.77 428.73 1359.85 0.80 1087.88 1359.85 226 1

2 MDB-2 4P 2500 ACB(SET@0.85) 65 BY DEWA 2X1C 150 490.21 429.71 429.87 1349.79 0.80 1079.83 1349.79 264 1

3 MDB-3 4P 1600 ACB(SET@0.85) 65 BY DEWA 2X1C 150 447.83 440.42 423.26 1311.50 0.73 799.35 1096.50 20 1

1426.39 1312.90 1281.86 4021.14 2967.06 3806.14 510 3 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD (KW) = 4021.14 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 1 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

M DB-1 CONSULTANT :M/s. LACASA LOCATION: LV ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER -1 4P 2500 65 BY DEWA 2x1C 95 488.36 442.77 428.73 1359.85 1 2400/5A CT METER

PROVISION FOR MOBILE GENERATOR


INCOMER -2 4P 2500 65 BY GENERATOR SUPPLIER WITH ELECTRICAL AND MECHANICAL
INTERLOCK
OUT GOING :

1 BUS BAR RISER-1 (2500A TPN + E Bus Riser) 488.36 442.77 428.73 1359.85 226

2 CAPACITOR BANK-1 TP 800 50 XLPE/SWA/PVC 2x4C 300 1x1C 300 300 KVAR CAPACITOR BANK

488.36 442.77 428.73 1359.85 226 1 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

DEMAND FACTOR ………………… 0.80 MAX. DEMAND 1087.88 TOTAL CONNECTED LOAD (KW) = 1359.85 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 2 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
6765410 AT DAMAC HILLS, DUBAI, U.A.E PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C.


PROJECT REF : 518
BUSBAR-1 FED FROM M DB-1 CONSULTANT :M/s. LACASA

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER TP (2500A TPN + E Bus Riser) 488.36 442.77 428.73 1359.85

OUT GOING :

1 SMDB-16F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

2 SMDB-17F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

3 SMDB-18F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

4 SMDB-19F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

5 SMDB-20F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

6 SMDB-21F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

7 SMDB-22F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

8 SMDB-23F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

9 SMDB-24F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

10 SMDB-25F TP 200 TAP OFF 50 XLPE/SWA/PVC 4C 95 1C 50 36.51 36.51 29.20 102.21 14

11 SMDB-26F TP 200 TAP OFF 50 XLPE/SWA/PVC 4C 95 1C 50 36.51 36.51 29.20 102.21 14

12 SMDB-RF TP 300 TAP OFF 50 XLPE/SWA/PVC 4C 185 1C 95 47.69 47.47 47.91 143.08

488.36 442.77 428.73 1359.85 226 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD (KW) = 1359.85 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 3 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

M DB-2 CONSULTANT :M/s. LACASA LOCATION: LV ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER-1 4P 2500 65 BY DEWA 2x1C 95 490.21 429.71 429.87 1349.79 1 2400/5A CT METER

PROVISION FOR MOBILE GENERATOR


INCOMER -2 4P 2500 65 BY GENERATOR SUPPLIER WITH ELECTRICAL AND MECHANICAL
INTERLOCK
OUT GOING :

1 BUS BAR RISER-2 (2500A TPN + E Bus Riser) 490.21 429.71 429.87 1349.79 264
2 CAPACITOR BANK-2 TP 800 50 XLPE/SWA/PVC 2x4C 300 1x1C 300 300 KVAR CAPACITOR BANK

490.21 429.71 429.87 1349.79 264 1 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

DEMAND FACTOR ………………… 0.80 MAX. DEMAND 1079.83 TOTAL CONNECTED LOAD (KW) = 1349.79 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 4 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
6765410 AT DAMAC HILLS, DUBAI, U.A.E PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C.


PROJECT REF : 518
BUSBAR-2 FED FROM M DB-2 CONSULTANT :M/s. LACASA

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER TP (2500A TPN + E Bus Riser) 490.21 429.71 429.87 1349.79

OUT GOING :

1 SMDB-4F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

2 SMDB-5F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

3 SMDB-6F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

4 SMDB-7F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

5 SMDB-8F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

6 SMDB-9F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

7 SMDB-10F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

8 SMDB-11F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

9 SMDB-12F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

10 SMDB-13F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

11 SMDB-14F TP 225 TAP OFF 50 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22

12 SMDB-15F TP 250 TAP OFF 50 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22

490.21 429.71 429.87 1349.79 264 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD (KW) = 1349.79 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 5 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

M DB-3 CONSULTANT :M/s. LACASA LOCATION: LV ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER-1 4P 1600 65 BY DEWA 2x1C 95 447.83 440.42 423.26 1311.50 1 1600/5A CT METER

PROVISION FOR MOBILE GENERATOR


INCOMER -2 4P 1600 65 BY GENERATOR SUPPLIER WITH ELECTRICAL AND MECHANICAL
INTERLOCK
OUT GOING :

1 SMDB-GF TP 400 50 XLPE/SWA/PVC 4C 300 1C 150 59.22 58.37 54.78 172.37


2 MCC-GF-CHWP TP 300 50 XLPE/SWA/PVC 4C 185 1C 95 47.73 39.13 38.63 125.50
100mA ELR +
3 CP-FIRE PUMP TP 630 50 XLPE/SWA/PVC 2x4C 185 2x1C 95 71.67 71.67 71.67 215.00
SHUNTRIP+ALARM
4 SMDB-3F TP 300 50 XLPE/SWA/PVC 4C 185 1C 95 47.09 42.15 42.18 131.43 20
5 SMDB-3F-GYM. TP 100 50 XLPE/SWA/PVC 4C 35 1C 16 14.00 14.00 14.00 42.00
6 DB-SS SP 40 50 XLPE/SWA/PVC 3C 10 1.50 1.50
7 MDB-E/ATS TP 1200 50 XLPE/SWA/PVC 4x4C 240 4x1C 120 208.11 215.09 200.49 623.70 550KVA GENERATOR
8 CAPACITOR BANK-3 TP 800 50 XLPE/SWA/PVC 2x4C 300 1x1C 300 310 KVAR CAPACITOR BANK

447.83 440.42 423.26 1311.50 20 1 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW :

TOTAL CONNECTED LOAD (KW)= 1311.50

FIRE PUMP (STANDBY LOAD) (KW)= 215.00

DEMAND FACTOR ………………… 0.729 MAX. DEMAND 799.35 ACTUAL CONNECTED LOAD (KW)= 1096.50 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 6 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

M DB-E FED FROM ATS / M DB-3 / GENERATOR CONSULTANT :M/s. LACASA LOCATION: LV ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)

INCOMER (NON AUTO) TP 1200 50 FIRE RATED 4x4C 240 4x1C 120 208.11 215.09 200.49 623.70

OUT GOING :

1 ESMDB-GF TP 400 50 FIRE RATED 4C 300 1C 150 59.80 59.80 59.80 179.40
2 EDB-GF TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.10 4.22 4.76 13.08
3 EDB-GF-1 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 7.43 7.93 7.13 22.50
4 EDB-3F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.46 2.76 1.78 7.00
5 EDB-6F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.42 2.66 1.92 7.00
6 EDB-9F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.72 3.16 1.92 7.80
7 EDB-12F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.42 2.66 1.92 7.00
8 ESMDB-P1 TP 80 50 FIRE RATED 4C 25 1C 16 11.50 11.36 10.74 33.60
9 ESMDB-P2 TP 80 50 FIRE RATED 4C 25 1C 16 11.44 11.32 10.62 33.38
10 ESMDB-13F TP 100 50 FIRE RATED 4C 35 1C 16 14.08 15.24 11.48 40.80
11 ESMDB-RF TP 200 50 FIRE RATED 4C 120 1C 70 29.74 27.98 28.42 86.14
12 ESMDB-LIFT-RF TP 400 50 FIRE RATED 4C 300 1C 150 60.00 66.00 60.00 186.00

208.11 215.09 200.49 623.70 TOTAL


TOTAL CONNECTED LOAD PER PHASE IN KW:

DEMAND FACTOR ………………… 0.85 MAX. DEMAND 530.15 TOTAL CONNECTED LOAD (KW) = 623.70 Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 7 of 7
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-GF FED FROM MDB-3 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 400 35 XLPE/SWA/PVC 4C 300 1C 150 59.22 58.37 54.78 172.37
OUT GOING :
1 DB-GF TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 5.73 4.82 4.30 14.85
2 DB-GF-1 TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 6.80 3.60 4.80 15.20
3 DB-P1-1 TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.81 4.78 4.92 14.51
4 DB-P1-2 TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.36 1.80 2.02 6.18
5 DB-P2-1 TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.42 4.57 4.99 13.98
6 DB-P2-2 TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 3.10 1.80 1.75 6.65
7 CP-IRRIGATION PUMP TP 20 25 XLPE/SWA/PVC 4C 6 1C 6 2.00 2.00 2.00 6.00 30mA ELCB
8 DB-LANDSCAPE SP 40 25 XLPE/SWA/PVC 3C 10 5.00 5.00
9 CP-WATER FEATURE PUMP TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 3.33 3.33 3.33 10.00 30mA ELCB
10 CP-SWIMMING POOL @ PODIUM-2 TP 200 25 XLPE/SWA/PVC 4C 95 1C 50 26.67 26.67 26.67 80.00 100mA ELCB

59.22 58.37 54.78 172.37


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 172.37 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 1 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : MCC-GF-CHWP FED FROM MDB-3 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 300 35 XLPE/SWA/PVC 4C 185 1C 95 47.73 39.13 38.63 125.50
OUT GOING :
1 SP-01 (DUTY) TP 80 25 XLPE/SWA/PVC 4C 25 1C 16 12.43 12.43 12.43 37.30 100mA ELCB+VFD
2 SP-02 (DUTY) TP 80 25 XLPE/SWA/PVC 4C 25 1C 16 12.43 12.43 12.43 37.30 100mA ELCB+VFD
3 SP-03 (STANDBY ) TP 80 25 XLPE/SWA/PVC 4C 25 1C 16 12.43 12.43 12.43 37.30 100mA ELCB+VFD
4 PRESSURIZATION UNIT TP 20 25 XLPE/SWA/PVC 4C 4 1C 4 1.33 1.33 1.33 4.00 100mA ELCB
5 CHEMICAL DOSING SYSTEM SP 20 25 XLPE/SWA/PVC 3C 4 0.50 0.50 100mA ELCB
6 DB-ETS SP 63 25 XLPE/SWA/PVC 3C 16 9.10 9.10

47.73 39.13 38.63 125.50


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 125.50 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 2 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-3F FED FROM MDB-3 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 3RD FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 300 35 XLPE/SWA/PVC 4C 185 1C 95 47.09 42.15 42.18 131.43 20

OUT GOING :

1 DB-3F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 6.00 6.06 6.01 18.07


2 LPG VAPORIZER TP 20 25 XLPE/SWA/PVC 4C 6 1C 6 1.67 1.67 1.67 5.00 100mA ELCB
3 FP-LS-1 (FP-LANDSCAPE-1) SP 40 25 XLPE/SWA/PVC 3C 10 5.00 5.00
4 FP-LS-2 (FP-LANDSCAPE-1) SP 40 25 XLPE/SWA/PVC 3C 10 5.00 5.00
5 DB-1B-R1 (DB-301) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R2 (DB-302) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R3 (DB-303) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R4 (DB-304) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R5 (DB-305) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R6 (DB-306) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R7 (DB-307) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R8 (DB-308) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R9 (DB-309) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R10 (DB-310) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R11 (DB-311) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R12 (DB-312) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R13 (DB-313) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R14 (DB-314) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R15 (DB-315) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1

Page 3 of 15
20 DB-1B-R16 (DB-316) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R17 (DB-317) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R20 (DB-320) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-1B-R21 (DB-321) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
24 DB-1B-R22 (DB-322) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1

47.09 42.15 42.18 131.43 20


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 131.43 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 4 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-3F-GYM. FED FROM MDB-3 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 3RD FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 100 35 XLPE/SWA/PVC 4C 35 1C 16 14.00 14.00 14.00 42.00

OUT GOING :

1 DB-GYM.-3F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 3.33 3.33 3.33 10.00


2 SAUNA TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 30mA ELCB
3 STEAM TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 30mA ELCB
4 SAUNA TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 30mA ELCB
5 STEAM TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 30mA ELCB

14.00 14.00 14.00 42.00


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 42.00 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 5 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-4F(TYP.)* (*SMDB-4F,SMDB-5F, SMDB-


7F,SMDB-8F,SMDB-10F,SMDB-11F,SMDB-13F, SMDB-14F, SMDB-
CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 4TH & 5TH FLOOR
16F,SMDB-17F,SMDB-19F,SMDB-20F,SMDB-22F,SMDB-23FARE
TYPICAL) FED FROM BUSBAR-2

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 225 35 XLPE/SWA/PVC 4C 120 1C 70 39.34 34.43 34.43 108.20 22
OUT GOING :

1 DB-1B-R1 (DB-401) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-402) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-403) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-404) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-405) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-406) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-407) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-408) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-409) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-410) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-411) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-412) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-413) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-414) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-415) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-416) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-417) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-418) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-419) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-420) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-421) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-422) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1

39.34 34.43 34.43 108.20 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 108.20 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 6 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-6F FED FROM BUSBAR-2 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 6TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-601) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-602) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-603) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-604) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-605) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-606) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-607) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-608) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-609) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-610) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-611) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-612) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-613) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-614) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-615) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-616) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-617) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-618) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-619) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-620) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-621) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-622) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-6F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 7 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-9F FED FROM BUSBAR-2 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 9TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-901) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-902) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-903) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-904) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-905) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-906) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-907) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-908) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-909) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-910) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-911) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-912) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-913) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-914) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-915) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-916) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-917) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-918) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-919) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-920) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-921) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-922) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-9F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 8 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-12F FED FROM BUSBAR-2 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 12TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-1201) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-1202) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-1203) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-1204) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-1205) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-1206) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-1207) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-1208) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-1209) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-1210) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-1211) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-1212) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-1213) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-1214) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-1215) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-1216) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-1217 SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-1218) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-1219) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-1220) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-1221) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-1222) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-12F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 9 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-15F FED FROM BUSBAR-2 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 15TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-1501) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-1502) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-1503) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-1504) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-1505) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-1506) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-1507) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-1508) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-1509) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-1510) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-1511) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-1512) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-1513) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-1514) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-1515) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-1516) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-1517) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-1518) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-1519) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-1520) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-1521) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-1522) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-15F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 10 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-18F FED FROM BUSBAR-2 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 18TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-1801) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-1802) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-1803) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-1804) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-1805) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-1806) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-1807) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-1808) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-1809) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-1810) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-1811) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-1812) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-1813) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-1814) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-1815) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-1816) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-1807) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-1818) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-1819) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-1820) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-1821) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-1822) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-18F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 11 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-21F FED FROM BUSBAR-1 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 21ST FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-2101) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-2102) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-2103) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-2104) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-2105) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-2106) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-2107) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-2108) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-2109) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-2110) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-2111) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-2112) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-2113) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-2114) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-2115) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-2116) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-2117) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-2118) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-2119) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-2120) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-2121) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-2122) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-21F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 12 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-24F FED FROM BUSBAR-1 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 24TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm
2
Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 250 35 XLPE/SWA/PVC 4C 150 1C 95 43.86 38.58 38.62 121.06 22
OUT GOING :

1 DB-1B-R1 (DB-2401) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1


2 DB-1B-R2 (DB-2402) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
3 DB-1B-R3 (DB-2403) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
4 DB-1B-R4 (DB-2404) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
5 DB-1B-R5 (DB-2405) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
6 DB-1B-R6 (DB-2406) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
7 DB-1B-R7 (DB-2407) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
8 DB-1B-R8 (DB-2408) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
9 DB-1B-R9 (DB-2409) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
10 DB-1B-R10 (DB-2410) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
11 DB-1B-R11 (DB-2411) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
12 DB-1B-R12 (DB-2412) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
13 DB-1B-R13 (DB-2413) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
14 DB-1B-R14 (DB-2414) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
15 DB-1B-R15 (DB-2415) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
16 DB-1B-R16 (DB-2416) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
17 DB-1B-R17 (DB-2407) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
18 DB-1B-R18 (DB-2408) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
19 DB-1B-R19 (DB-2409) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
20 DB-1B-R20 (DB-2410) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
21 DB-1B-R21 (DB-2411) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
22 DB-1B-R22 (DB-2422) SP 40 25 PVC 2x1C 10 1C 10 4.92 4.92 1
23 DB-24F TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.52 4.15 4.19 12.86

43.86 38.58 38.62 121.06 22


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 121.06 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 13 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-25F(TYP.)* (*SMDB-25F,SMDB-26F


CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 25TH & 26th FLOOR
ARE TYPICAL) FED FROM BUSBAR-1

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 200 35 XLPE/SWA/PVC 4C 95 1C 50 36.51 36.51 29.20 102.21 14

OUT GOING :

1 DB-2B-R1 (DB-2501) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1


2 DB-2B-R2 (DB-2502) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
3 DB-2B-R3 (DB-2503) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
4 DB-2B-R4 (DB-2504) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
5 DB-2B-R5 (DB-2505) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
6 DB-2B-R6 (DB-2506) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
7 DB-2B-R7 (DB-2507) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
8 DB-2B-R8 (DB-2508) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
9 DB-2B-R9 (DB-2509) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
10 DB-2B-R10 (DB-2510) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
11 DB-2B-R11 (DB-2511) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
12 DB-2B-R12 (DB-2512) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
13 DB-2B-R13 (DB-2513) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1
14 DB-2B-R14 (DB-2514) SP 63 25 PVC 2x1C 25 1C 16 7.30 7.30 1

36.51 36.51 29.20 102.21 14


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 102.21 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 14 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : SMDB-RF FED FROM BUSBAR-1 CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - ROOF

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 300 35 XLPE/SWA/PVC 4C 185 1C 95 47.69 47.47 47.91 143.08

OUT GOING :

1 DB-RF TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 3.16 2.94 3.38 9.48


100mA ELR+SHUNT
2 CP-FAHU-01 TP 200 25 XLPE/SWA/PVC 4C 95 1C 50 24.67 24.67 24.67 74.00
TRIP
100mA ELR+SHUNT
3 CP-FAHU-02 TP 160 25 XLPE/SWA/PVC 4C 70 1C 35 19.67 19.67 19.67 59.00
TRIP
4 CP-GEF-1 @ UPPER ROOF TP 20 25 XLPE/SWA/PVC 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELCB
5 CP-GREF-1 @ UPPER ROOF TP 20 25 XLPE/SWA/PVC 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELCB

47.69 47.47 47.91 143.08


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 143.08 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 15 of 15
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-GF FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - GROUND FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


SR. CABLE SIZE CONNECTED LOAD - Kw
FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 400 35 XLPE/SWA/PVC 4C 300 1C 150 59.80 59.80 59.80 179.40
OUT GOING :

1 TELEPHONE ROOM-Du. TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 100mA ELCB


2 TELEPHONE ROOM-ETISALAT TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.67 2.67 2.67 8.00 100mA ELCB
3 GSM ROOM @ 10TH FLOOR TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB
4 GSM ROOM @ 10TH FLOOR TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB
5 CP-CPEF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
6 CP-CPEF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
7 CP-CPMF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
8 CP-CPMF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
9 CP-CPEF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
10 CP-CPEF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
11 CP-CPMF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
12 CP-CPMF-1 TP 40 25 FIRE RATED 4C 10 1C 10 4.83 4.83 4.83 14.50 100mA ELS+ALARM
13 CP-WATER TRANSFER PUMP- TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 7.47 7.47 7.47 22.40 30mA ELCB
1
14 CP-JOCKY PUMP TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.33 4.33 4.33 13.00 100mA ELS+ALARM

59.80 59.80 59.80 179.40


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 179.40 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 1 of 6
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-P1 FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - PODIUM-1

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 80 35 XLPE/SWA/PVC 4C 25 1C 16 11.50 11.36 10.74 33.60

OUT GOING :

1 JEF-P1-1 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

2 JEF-P1-2 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

3 JEF-P1-3 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


4 JEF-P1-4 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

5 JEF-P1-5 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

6 JEF-P1-6 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


7 JEF-P1-7 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
8 JEF-P1-8 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

9 JEF-P1-9 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

10 JEF-P1-10 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


11 JEF-P1-11 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

12 JEF-P1-12 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

13 JEF-P1-13 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

14 JEF-P1-14 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


15 JEF-P1-15 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

16 JEF-P1-16 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

17 JEF-P1-17 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


18 JEF-P1-18 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS

19 EDB-P1 TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.50 2.36 1.74 6.60

11.50 11.36 10.74 33.60


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 33.60 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 2 of 6
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-P2 FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - PODIUM-2

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


SR. CABLE SIZE CONNECTED LOAD - Kw
FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 80 35 XLPE/SWA/PVC 4C 25 1C 16 11.44 11.32 10.62 33.38
OUT GOING :

1 JEF-P2-1 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS


2 JEF-P2-2 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
3 JEF-P2-3 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
4 JEF-P2-4 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
5 JEF-P2-5 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
6 JEF-P2-6 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
7 JEF-P2-7 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
8 JEF-P2-8 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
9 JEF-P2-9 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
10 JEF-P2-10 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
11 JEF-P2-11 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
12 JEF-P2-12 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
13 JEF-P2-13 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
14 JEF-P2-14 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
15 JEF-P2-15 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
16 JEF-P2-16 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
17 JEF-P2-17 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
18 JEF-P2-18 SP 20 25 FIRE RATED 4C 6 1C 6 1.50 1.50 100mA ELS
19 EDB-P2 TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.44 2.32 1.62 6.38

11.44 11.32 10.62 33.38


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 33.38 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 3 of 6
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-13F FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - 13TH FLOOR

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 100 35 XLPE/SWA/PVC 4C 35 1C 16 14.08 15.24 11.48 40.80

OUT GOING :

1 EDB-15F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.42 2.76 1.82 7.00


2 EDB-18F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.82 3.06 1.92 7.80
3 EDB-21F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.42 2.66 1.92 7.00

4 EDB-24F TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.42 2.76 1.82 7.00

5 GSM ROOM @ 20TH FLOOR TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB

6 GSM ROOM @ 20TH FLOOR TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB

14.08 15.24 11.48 40.80


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 40.80 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 4 of 6
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-RF FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - ROOF

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
2 2 2
ISOL Ka PVC 1C MM MM ( Mtrs.) mm Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 200 35 FIRE RATED 4C 120 1C 70 29.74 27.98 28.42 86.14
OUT GOING :
1 EDB-RF TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 4.21 2.45 2.89 9.54
2 GSM ROOM TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB
3 GSM ROOM TP 32 25 XLPE/SWA/PVC 4C 10 1C 10 2.00 2.00 2.00 6.00 100mA ELCB
4 SEF-1 TP 20 25 FIRE RATED 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELS+ALARM
5 SEF-2 TP 20 25 FIRE RATED 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELS+ALARM
6 LPF-2 (PROVISION) TP 32 25 FIRE RATED 4C 6 1C 6 3.00 3.00 3.00 9.00 100mA ELS+ALARM
7 MAF-1 TP 20 25 FIRE RATED 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELS+ALARM
8 MAF-2 TP 20 25 FIRE RATED 4C 4 1C 4 0.10 0.10 0.10 0.30 100mA ELS+ALARM
10 CP-BOOSTER PUMPS TP 32 25 XLPE/SWA/PVC 4C 6 1C 6 1.00 1.00 1.00 3.00 30mA ELCB
11 WINDOW CLEANING EQUIPMENT TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 3.33 3.33 3.33 10.00 100mA ELCB
12 WINDOW CLEANING EQUIPMENT TP 40 25 XLPE/SWA/PVC 4C 10 1C 10 3.33 3.33 3.33 10.00 100mA ELCB
13 SPF-1 @UPPER ROOF TP 40 25 FIRE RATED 4C 10 1C 10 3.73 3.73 3.73 11.20 100mA ELS+ALARM
14 SPF-2 @ UPPER ROOF TP 40 25 FIRE RATED 4C 10 1C 10 3.73 3.73 3.73 11.20 100mA ELS+ALARM
15 LPF-1 @ UPPER ROOF (PROVISION TP 32 25 FIRE RATED 4C 6 1C 6 3.00 3.00 3.00 9.00 100mA ELS+ALARM

29.74 27.98 28.42 86.14


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 86.14 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 5 of 6
AREA : DAMAC HILLS, DUBAI, U.A.E
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER
DETAILS OF CONNECTED LOAD/MAX. DEMAND & Kwh METERING
ON PLOT NO. 6765410 AT DAMAC HILLS, DUBAI, U.A.E
PLOT NO- 6765410

PLANNED COMPLETION DATE . CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. PROJECT REF : 518

SMDB REF : ESMDB-LIFT-RF FED FROM MDB-E CONSULTANT :M/s. LACASA LOCATION: ELECTRICAL ROOM - ROOF

CIRCUIT / SP / RATING - PVC / Length ECC PROPOSED TYPE & NO. OF


CABLE SIZE CONNECTED LOAD - Kw
SR. FEEDER TP AMPS FAULT XLPE of SIZE Kwh METERS
Remarks
NO. DB NO. F/S MCCB ACB DUTY SWA / 2/4X 2 / 3/ 4C Cable 1C R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH LV /HV
ISOL Ka PVC 1C MM2 MM2 ( Mtrs.) mm2 Kw Kw Kw Kw (1) (2) (3) CT (4)
INCOMER (NON AUTO) TP 400 35 FIRE RATED 4C 300 1C 150 60.00 66.00 60.00 186.00

OUT GOING :

1 CP-LIFT-PL-01 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 9.67 9.67 9.67 29.00 300mA ELR+SHUNT TRIP


100mA DP ELCB (ISOLATOR
2 LIFT-PL-01 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)
3 CP-LIFT-PL-02 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 9.67 9.67 9.67 29.00 300mA ELR+SHUNT TRIP
100mA DP ELCB (ISOLATOR
4 LIFT-PL-02 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)
5 CP-LIFT-PL-03 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 9.67 9.67 9.67 29.00 300mA ELR+SHUNT TRIP
100mA DP ELCB (ISOLATOR
6 LIFT-PL-03 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)
7 CP-LIFT-PL-04 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 9.67 9.67 9.67 29.00 300mA ELR+SHUNT TRIP
100mA DP ELCB (ISOLATOR
8 LIFT-PL-04 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)
9 CP-LIFT-PL-05 TP 63 25 XLPE/SWA/PVC 4C 16 1C 16 9.67 9.67 9.67 29.00 300mA ELR+SHUNT TRIP
100mA DP ELCB (ISOLATOR
10 LIFT-PL-05 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)
11 CP-LIFT-FL-01 TP 80 25 XLPE/SWA/PVC 4C 25 1C 16 11.67 11.67 11.67 35.00 300mA ELR+SHUNT TRIP
100mA DP ELCB (ISOLATOR
12 LIFT-FL-01 SP 20 25 XLPE/SWA/PVC 3C 6 1.00 1.00
FOR LIFT CONTROL)

60.00 66.00 60.00 186.00


TOTAL CONNECTED LOAD PER PHASE(KW) :
TOTAL

DEMAND FACTOR ………………… MAX. DEMAND TOTAL CONNECTED LOAD ( KW ) = 186.00 KW Total Build-up area ………

CONSULTANT: M/S. LACASA ARCHITECTS & ENGINEERING CONSULTANTS.. TEL. 04-4475444 FAX. 04-4473434

Type of Meter ( Rating of Incomer ) : ( 1 ) Upto 60A ( 2 ) Upto 100A ( 3 ) 125 - 160 A ( 4 ) LV CT …2500./…5 A / HV CT …………………/ ……….A
( 1 Phase ) ( 3 Phase ) / NO.

Page 6 of 6
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
HILLS, DUBAI, U.A.E

D.B.NO : DB-LANDSCAPE CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- LV Room - Ground Floor

FED FROM: SMDB-GF CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 LANDSCAPE LIGHTING 27 3 81 V/A LCP
2P
100mA 2 C2 10 2.5 2.5 LANDSCAPE LIGHTING 6 23 138 V/A LCP
40A
SP ISO. 40A, 3 C3 10 2.5 2.5 LANDSCAPE LIGHTING 17 3 51 V/A LCP
2P
100mA 4 C4 10 2.5 2.5 LANDSCAPE LIGHTING 13 6 78 V/A LCP

40A, 5 C5 10 2.5 2.5 LANDSCAPE LIGHTING 13 6 78 V/A LCP


2P
100mA 6 C6 10 2.5 2.5 LANDSCAPE LIGHTING 11,3,8 4,3,1 61 V/A LCP

40A, 7 C7 10 2.5 2.5 LANDSCAPE LIGHTING 8 23 184 V/A LCP


2P
100mA 8 C8 10 2.5 2.5 LANDSCAPE LIGHTING 5,10 3,3 45 V/A LCP

40A, 9 C9 20 SPARE 1200


2P
100mA 10 C10 20 SPARE 1084
40A, 11 C11 20 LANDSCAPE POWER( PROVISION) 1000
2P
30mA 12 C12 20 LANDSCAPE POWER( PROVISION) 1000

Total : 5000
CABLE SIZE : 3C 10mm2 XLPE/SWA/PVC
Total Load - 5.00 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
HILLS, DUBAI, U.A.E

D.B.NO : DB-SS CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Transformer Room - Ground Floor

FED FROM: MDB CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 TRANSFORMER ROOM 6 100 600
2P
100mA 2 C2 10 SPARE 600
40A
SP ISO. 40A, 3 C3 20 SPARE 1000
2P
30mA 4 C4 20 4 4 TRANSFORMER ROOM 3 200 600

Total : 2800
CABLE SIZE : 3C 10mm2 XLPE/SWA/PVC
Total Load - 2.80 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-GF CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: SMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 DRIVEWAY 11 60 660 VIA LCP
2 Y1 10 2.5 2.5 DRIVEWAY 11 60 660 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 DRIVEWAY 7 60 420 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 DRIVEWAY 9 60 540 VIA LCP
5 Y2 10 2.5 2.5 DRIVEWAY 5 50 250 VIA LCP
6 B2 10 2.5 2.5 ENTRANCE LOBBY 13 20 260 SENSOR+LCP
7 R3 10 2.5 2.5 RAMP 12 60 720 VIA LCP
8 Y3 10 2.5 2.5 PARKING 3 60 180 VIA LCP
40A, 9 B3 SPACE
4P
100mA 10 R4 10 2.5 2.5 GARBAGE ROOM 9 60 540
11 Y4 10 2.5 2.5 SERVICE PASSAGE 7 60 420
12 B4 10 2.5 2.5 BICYCLE AREA 8 60 480 VIA LCP
13 R5 10 2.5 2.5 SECURITY ROOM 5,1 60, 20 200
14 Y5 10 2.5 2.5 PARKING 12 60 720 VIA LCP
40A, 15 B5 10 2.5 2.5 PARKING 3 60 180 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 PARKING 11 60 660 VIA LCP
17 Y6 10 SPARE 540
18 B6 10 2.5 2.5 PARKING 9 60 540 VIA LCP
19 R7 10 SPARE 280
20 Y7 10 SPARE 280
40A, 21 B7 10 SPARE 420
4P
100mA 22 R8 10 SPARE 840
23 Y8 10 2.5 2.5 PARKING 6 60 360 VIA LCP
24 B8 10 SPARE 500
25 R9 10 2.5 2.5 PARKING 9 60 540 VIA LCP
26 Y9 10 2.5 2.5 PARKING 11 60 660 VIA LCP
40A, 27 B9 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 28 R10 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
29 Y10 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
30 B10 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750

Total : 5730 4820 4300


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 14.85 KW

Page 3 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-GF-1 CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: SMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 20 4 4 FCU-LOBBY 1 200 200
2 Y1 20 4 4 FCU-SECURITY ROOM 1 200 200
40A 40A, 3 B1 20 4 4 FCU-LIFT LOBBY 1 200 200
TP 4P
100mA 4 R2 20 4 4 FCU-DRIVEWAY 1 200 200
ISO.
5 Y2 20 4 4 FCU-DRIVEWAY 1 200 200
6 B2 20 4 4 FCU-PARKING 1 200 200
7 R3 20 4 4 FCU-DRIVEWAY 1 200 200
8 Y3 20 4 4 FCU-DRIVEWAY 1 200 200
40A, 9 B3 20 SPARE 200
4P
100mA 10 R4 20 SPARE 200
11 Y4 20 4 4 FCU-SERVICE PASSAGE 1 200 200
12 B4 20 4 4 FCU-BULK STORAGE 1 200 200
13 R5 20 4 4 FCU-GARBAGE ROOM 1 200 200
14 Y5 20 4 4 FCU-WATER FEATURE ROOM 1 200 200
40A, 15 B5 20 4 4 FCU-IRRIGATION PUMP ROOM 1 200 200
4P
100mA 16 R6 20 4 4 FCU-PARKING 1 200 200
17 Y6 20 4 4 FCU-PUMP ROOM 1 200 200
18 B6 20 SPARE 200

40A, 19 R7 20 4 4 CU-TELE. ROOM 1 3000 3000


4P 20 Y7 SPACE
100mA
21 B7 SPACE
22 R8 32 4 4 PARKING 7 200 1400 RING
23 Y8 20 4 4 PARKING 4 200 800
40A, 24 B8 32 4 4 PARKING 5 200 1000 RING
4P
30mA 25 R9 20 SPARE 400
26 Y9 20 SPARE 400
27 B9 20 4 4 SECURITY ROOM 1 1200 1200
28 R10 20 SPARE 600
29 Y10 20 4 4 GARBAGE ROOM & BULK STORAGE 3 200 600
40A, 30 B10 20 4 4 IRRIGATION & BULK STORAGE 4 200 800
4P
30mA 31 R11 20 4 4 C .P DIESEL PUMP 1 200 200
32 Y11 20 4 4 ENTANCE LOBBY 3 200 600
33 B11 20 4 4 LV ROOM 3 200 600

Total : 6800 3600 4800


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 15.20 KW

Page 4 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-GF CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: ESMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 DRIVEWAY 11 60 660 VIA LCP
2 Y1 10 2.5 2.5 DRIVEWAY 11 60 660 VIA LCP
40A, 3 B1 10 2.5 2.5 DRIVEWAY 7 60 420 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 DRIVEWAY 8 60 480 VIA LCP
5 Y2 10 2.5 2.5 DRIVEWAY 6 60 360 VIA LCP
6 B2 10 2.5 2.5 ENTRANCE 16 20 320 SENSOR+LCP
7 R3 10 2.5 2.5 RAMP 12 60 720 VIA LCP
8 Y3 10 2.5 2.5 FIRECOMMAND/CONTROL ROOM 9 60 540
40A, 9 B3 10 2.5 2.5 LIFT FL-01 13 20 260
4P
100mA 10 R4 10 2.5 2.5 STAIR-3 6 20 120 PB+TIMER
11 Y4 10 SPARE 200
12 B4 10 2.5 2.5 GENERATOR ROOM 5 60 300
13 R5 10 2.5 2.5 ELEC. ROOM 1 60 60
14 Y5 10 2.5 2.5 MAIN TEL. ROOM 2 60 120
40A, 15 B5 10 2.5 2.5 L.V ROOM 6 60 360
4P
100mA 16 R6 10 2.5 2.5 FIRE EXIT CORRIDOR 3 60 180
17 Y6 10 2.5 2.5 ELEC. ROOM 1 60 60
18 B6 10 2.5 2.5 PUMP ROOM 8 60 480
19 R7 10 2.5 2.5 FIRE MAN LIFT LOBBY 2 20 40
20 Y7 10 2.5 2.5 IRRIGATION PUMP 5 60 300
40A 40A, 21 B7 10 SPARE 800
TP 4P
ISO. 100mA 22 R8 10 2.5 2.5 STAIR-2 6 20 120 PB+TIMER
23 Y8 10 2.5 2.5 STAIR-4 6 20 120 PB+TIMER
24 B8 10 2.5 2.5 STAIR-2 9 20 180 PB+TIMER

Page 5 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-GF CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: ESMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
25 R9 10 2.5 2.5 SHAFT LIFT(BESDIE LIFT-PL4) 9 20 180
26 Y9 10 SPARE 680
40A, 27 B9 10 2.5 2.5 LIFT PL-04 14 20 280
4P
100mA 28 R10 10 2.5 2.5 LIFT- PL-05 14 20 280
29 Y10 SPACE
30 B10 SPACE
31 R11 10 2.5 2.5 SHAFT LIFT(BESDIE STAIR-1) 9 20 180
32 Y11 10 SPARE 300
40A, 33 B11 10 2.5 2.5 LIFT-PL-01 14 20 280
4P
100mA 34 R12 10 2.5 2.5 LIFT-PL-02 14 20 280
35 Y12 10 2.5 2.5 LIFT-PL-03 14 20 280
36 B12 10 2.5 2.5 LIFT-PL-05 14 20 280

40A, 37 R13 20 4 4 CP-BREF (CENTRAL BATTERY ROOM) 300 300


4P 38 Y13 20 4 4 CP-CR-MF (FIRE COMMAND CENTER) 100 100
30mA
39 B13 20 4 4 CP-CREF (FIRE COMMAND CENTER) 300 300

40A, 40 R14 500


4P 41 Y14 20 4 4 CP-WATER TRANSFER PUMP-1A 1500 500
30mA
42 B14 500

Total : 4100 4220 4760


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 13.08 KW

Page 6 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-GF-1 CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: ESMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 32 4 4 PUMP ROOM 7 200 1400 RING
2 Y1 20 4 4 ELE. ROOM & PUMP ROOM 3 200 600
40A, 3 B1 20 4 4 TEL ROOM 2 200 400
4P
30mA 4 R2 20 4 4 TEL ROOM 2 200 400
5 Y2 20 4 4 CONTROL ROOM 2 200 400 PA
6 B2 20 4 4 CONTROL ROOM 4 200 200
7 R3 20 4 4 CONTROL ROOM 2 200 200 CCTV
8 Y3 20 4 4 CONTROL ROOM 2 200 400 ACS
40A, 9 B3 20 4 4 FIRE COMMAND CENTRE 1 300 300 FACP
4P
30mA 10 R4 20 4 4 FIRE COMMAND CENTRE 2 200 200 24x7 SYS
11 Y4 20 4 4 CONTROL ROOM 4 200 800
12 B4 20 4 4 CONTROL ROOM 1 200 200 BMS
13 R5 32 4 4 CONTROL ROOM 6 200 200 RING
14 Y5 20 4 4 FIRE COMMAND CENTRE 2 200 400
40A, 15 B5 20 4 4 FIRE COMMAND CENTRE 2 200 400
4P
30mA 16 R6 20 4 4 GATE BARRIER 500 500
17 Y6 20 4 4 GATE BARRIER 500 500
18 B6 20 4 4 CCTV CAMERA 5 100 500
19 R7 20 4 4 CONT.RM & FIRE COMMAND (MSFD) 4 100 400
20 Y7 20 4 4 LV ROOM (MSFD) 2 100 200
63A 40A, 21 B7 20 4 4 CCTV CAMERA & ACS 10 100 1000
TP 4P
ISO. 30mA 22 R8 20 4 4 CCTV CAMERA 8 100 800
23 Y8 20 4 4 CCTV CAMERA & ACS 2 100 200
24 B8 20 4 4 CCTV CAMERA 2 100 200
25 R9 20 4 4 ENTRANCE LOBBY 3 200 600
26 Y9 20 4 4 CENTRAL BATTERY ROOM 4 200 800
40A, 27 B9 20 4 4 CENTRAL BATTERY ROOM 500 500 ISOLATOR
4P
30mA 28 R10 20 4 4 TEL .ROOM 3 100 300
29 Y10 20 4 4 ETS PUMP ROOM 5 200 1000
30 B10 20 4 4 CCTV CAMERA 5 100 500

Page 7 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-GF-1 CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - GROUND FLOOR
FED FROM: ESMDB-GF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 31 R11 20 4 4 LIFT PIT 1 200 200


4P 32 Y11 20 4 4 LIFT PIT 2 200 400
30mA
33 B11 20 4 4 LIFT PIT 3 200 600

40A, 34 R12 1666.7


4P 35 Y12 20 6 6 UPS FOR CCTV 5000 1666.7 TP ISOLATOR
30mA
36 B12 1666.7

40A, 37 R13 166.67


4P 38 Y13 20 4 4 CP-FPRMF (PUMP ROOM) 500 166.67
30mA
39 B13 166.67

40A, 40 R14 20 4 4 TEL ROOM 2 200 400


4P 41 Y14 20 4 4 TEL ROOM 2 200 400
30mA
42 B14 20 4 4 CP-FPREF (PUMP ROOM) 500 500 SP ISOLATOR

Total : 7433 7933 7133


2 2
CABLE SIZE : 4C 16mm XLPE/SWA/PVC + 1C 16mm , ECC
Total Load - 22.50 KW

Page 8 of 10
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
HILLS, DUBAI, U.A.E

D.B.NO : DB-ETS CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ETS Room - Ground Floor

FED FROM: MCC-GF-CHWP CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 ETS ROOM 9 60 540
2P
100mA 2 C2 10 2.5 2.5 ETS ROOM 6 60 360
40A, 3 C3 20 4 4 FCU 1 200 200
2P
100mA 4 C4 20 4 4 FCU 1 200 200

40A,
2P 5 C5 20 4 4 CU 3000 3000 UVR+T+CONT.
100mA

63A 40A,
SP ISO. 2P 6 C6 20 4 4 CU 3000 3000 UVR+T+CONT.
100mA
40A, 7 C7 20 SPARE 800
2P
30mA 8 C8 32 4 4 ETS ROOM 5 200 1000 RING

Total : 9100
2
CABLE SIZE : 3C 16mm XLPE/SWA/PVC
Total Load - 9.10 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
HILLS, DUBAI, U.A.E

D.B.NO : DB-SS CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Transformer Room - Ground Floor

FED FROM: MDB CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 TRANSFORMER ROOM 6 100 600
2P
100mA 2 C2 10 SPARE 600
40A
SP ISO. 40A, 3 C3 20 SPARE 1000
2P
30mA 4 C4 20 4 4 TRANSFORMER ROOM 3 200 600

Total : 2800
CABLE SIZE : 3C 10mm2 XLPE/SWA/PVC
Total Load - 2.80 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF:518
HILLS, DUBAI, U.A.E

D.B.NO : DB-P1-1 (FED FOR 1st PODIUM & 2nd PODIUM FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 1st Podium
FED FROM: SMDB-P1 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 RAMP-1ST PODIUM 8 60 480 Via LCP
2 Y1 10 2.5 2.5 RAMP-1ST PODIUM 11 60 660 Via LCP
40A, B1 Via LCP
3 10 2.5 2.5 RAMP-1ST PODIUM 9 60 540
4P
100mA 4 R2 10 2.5 2.5 DRIVEWAY-1ST PODIUM 11 60 660 Via LCP
5 Y2 10 2.5 2.5 DRIVEWAY-1ST PODIUM 9 60 540 Via LCP
6 B2 10 2.5 2.5 PARKING-1ST PODIUM 12 60 720 Via LCP
7 R3 10 2.5 2.5 DRIVEWAY-1ST PODIUM 6 60 360 Via LCP
8 Y3 10 2.5 2.5 DRIVEWAY-1ST PODIUM 9 60 540 Via LCP
40A, B3 Via LCP
9 10 2.5 2.5 DRIVEWAY-1ST PODIUM 7 60 420
4P
100mA 10 R4 10 2.5 2.5 LIFT LOBBY-1ST FLOOR 2 20 270 Via LCP
11 Y4 10 2.5 2.5 PASSAGE-1STPODIUM 2,1 60,20 140
12 B4 10 2.5 2.5 PARKING 6 60 360 Via LCP
13 R5 10 2.5 2.5 PARKING-1ST PODIUM 9 60 540 Via LCP
14 Y5 10 2.5 2.5 PARKING 10 60 600 Via LCP
40A 40A, B5 Via LCP
15 10 2.5 2.5 PARKING 11 60 660
TP 4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
ISO.
17 Y6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
18 B6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
19 R7 20 4 4 FCU-LIFT LOBBY 1 200 200
20 Y7 20 4 4 FCU-DRIVEWAY 1 200 200
40A, B7
21 20 4 4 FCU-LIFT LOBBY 1 200 200
4P
100mA 22 R8 20 4 4 FCU-PARKING 1 200 200
23 Y8 20 4 4 FCU-DRIVEWAY 1 200 200
24 B8 20 SPARE 320
25 R9 20 4 4 PARKING 4 200 800
26 Y9 32 4 4 PARKING & LIFT LOBBY 7 200 1400 RING
40A, B9 RING
27 32 4 4 PARKING & LIFT LOBBY 6 200 1200
4P
30mA 28 R10 20 SPARE 800
29 Y10 SPACE
30 B10 SPACE

Total : 4810 4780 4920


CABLE SIZE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2, ECC
Total Load - 14.51 KW

Page 1 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC HILLS,
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
DUBAI, U.A.E
D.B.NO : EDB-P1 (FED FOR 1st PODIUM ) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 1st Podium
FED FROM: ESMDB-P1 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 RAMP-1ST PODIUM 8 60 480 Via LCP
2 Y1 10 2.5 2.5 RAMP-1ST PODIUM 11 60 660 Via LCP
40A, 3 B1 10 2.5 2.5 RAMP-1ST PODIUM 10 60 600 Via LCP
4P
100mA 4 R2 10 2.5 2.5 DRIVEWAY 12 60 720 Via LCP
5 Y2 10 2.5 2.5 DRIVEWAY 9 60 540 Via LCP
6 B2 10 SPARE 100 Via LCP
7 R3 10 2.5 2.5 DRIVEWAY 11 60 660 Via LCP
8 Y3 10 2.5 2.5 DRIVEWAY 9 60 540
40A,
9 B3 10 2.5 2.5 DRIVEWAY 7 60 420 Via LCP
4P
100mA 10 R4 10 2.5 2.5 LIFT LOBBY 2 20 40 Via LCP
11 Y4 10 2.5 2.5 ELECTRICAL ROOM 2 60 120
12 B4 10 2.5 2.5 FIREMEN LIFT LOBBY 2 60 120 Via LCP
13 R5 20 4 4 ELEC. AND TEL. ROOM 2 200 400
14 Y5 20 4 4 CCTV CAMERA & ACS 4 100 400
32A 40A,
15 B5 20 4 4 CCTV CAMERA & ACS 4 100 400
TP 4P
ISO. 30mA 16 R6 20 4 4 CCTV CAMERA & ACS 2 100 200
17 Y6 20 4 4 CCTV CAMERA 1 100 100
18 B6 20 4 4 CCTV CAMERA 3 1 100 100

. Total : 2500 2360 1740


CABLE SIZE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2, ECC
Total Load - 6.60 KW

Page 2 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF:518
HILLS, DUBAI, U.A.E

D.B.NO : DB-P1-2 (FED FOR 1st PODIUM & 2nd PODIUM FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Cabi. - 1st Podium
FED FROM: SMDB-P1 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 PARKING 1ST PODIUM 9 60 540 Via LCP
2 Y1 10 2.5 2.5 PARKING-1ST FLOOR 9 60 540 Via LCP
40A, B1 Via LCP
3 10 2.5 2.5 PARKING-1ST FLOOR 9 60 540
4P
100mA 4 R2 10 2.5 2.5 DRIVEWAY-1ST PODIUM 11 60 660 Via LCP
5 Y2 10 SPARE 260
6 B2 10 2.5 2.5 PARKING-1ST PODIUM 13 60 780 Via LCP
7 R3 10 2.5 2.5 DRIVEWAY-1ST PODIUM 11 60 660 Via LCP
8 Y3 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
40A 40A,
9 B3 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
TP 4P
100mA 10 R4 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
ISO.
11 Y4 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
12 B4 10 SPARE 200

Total : 2360 1800 2020


CABLE SIZE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2, ECC
Total Load - 6.18 KW

Page 3 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF:518
HILLS, DUBAI, U.A.E

D.B.NO : DB-P2-1 (FED FOR 1st PODIUM & 2nd PODIUM FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 2nd Podium
FED FROM: SMDB-P2 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 PARKING 4 60 240 Via LCP
2 Y1 10 2.5 2.5 DRIVE WAY 11 60 660 Via LCP
40A, B1
3 10 2.5 2.5 STORE 4 60 240
4P
100mA 4 R2 10 2.5 2.5 DRIVEWAY 8 60 480 Via LCP
5 Y2 10 2.5 2.5 DRIVEWAY 7 60 420 Via LCP
6 B2 10 2.5 2.5 PARKING 8 60 480 Via LCP
7 R3 10 SPARE 200
8 Y3 10 2.5 2.5 DRIVEWAY 10 60 600 Via LCP
40A, B3 Via LCP
9 10 2.5 2.5 PARKING 12 60 720
4P
100mA 10 R4 10 2.5 2.5 LIFT LOBBY 2 20 270 Via LCP
11 Y4 10 2.5 2.5 PASSAGE- 2ND PODIUM 2,1 60,20 140
12 B4 10 2.5 2.5 PARKING 10 60 600 Via LCP
13 R5 10 2.5 2.5 PARKING 8 60 480 Via LCP
14 Y5 10 SPARE 200
63A 40A, B5 Via LCP
15 10 2.5 2.5 PARKING 10 60 600
TP 4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
ISO.
17 Y6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
18 B6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
19 R7 20 4 4 FCU-LIFT LOBBY 1 200 200
20 Y7 20 4 4 FCU-DRIVEWAY 1 200 200
40A, 21 B7 20 4 4 FCU-LIFT LOBBY 1 200 200
4P
100mA 22 R8 20 4 4 FCU-PARKING 1 200 200
23 Y8 20 4 4 FCU-DRIVEWAY 1 200 200
24 B8 20 4 4 FCU-PARKING 1 200 200
25 R9 20 4 4 PARKING 4 200 800
26 Y9 32 4 4 PARKING & LIFT LOBBY 7 200 1400 RING
40A, B9 RING
27 32 4 4 PARKING & LIFT LOBBY 6 200 1200
4P
30mA 28 R10 20 SPARE 800
29 Y10 SPACE
30 B10 SPACE

Total : 4420 4570 4990


CABLE SIZE : 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2, ECC
Total Load - 13.98 KW

Page 4 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF:518
HILLS, DUBAI, U.A.E

D.B.NO : DB-P2-1 (FED FOR 1st PODIUM & 2nd PODIUM FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 2nd Podium
FED FROM: SMDB-P2 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B

Page 5 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC HILLS, DUBAI,
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
U.A.E
D.B.NO : EDB-P2 (FED FOR 2nd PODIUM ) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 2nd Podium
FED FROM: ESMDB-P2 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 DRIVEWAY 10 60 600 Via LCP
2 Y1 10 2.5 2.5 DRIVEWAY 6 60 360 Via LCP
40A, 3 B1 10 2.5 2.5 DRIVEWAY 7 60 420 Via LCP
4P
4 R2 10 2.5 2.5 DRIVEWAY 8 60 480 Via LCP
100mA
5 Y2 10 2.5 2.5 DRIVE WAY 9 60 540 Via LCP
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 DRIVEWAY 8 60 480 Via LCP
8 Y3 10 2.5 2.5 DRIVEWAY 10 60 600
40A,
9 B3 10 2.5 2.5 POOL PUMP ROOM 3 60 180
4P
100mA 10 R4 10 2.5 2.5 LIFT LOBBY 2 20 40 Via LCP
11 Y4 10 2.5 2.5 ELECTRICAL ROOM- 2ND PODIUM 2 60 120
12 B4 10 2.5 2.5 FIREMEN LIFT LOBBY-1ST PODIUM 2 60 120 Via LCP
13 R5 10 2.5 2.5 PUMP ROOM PROVISION 4 60 240
14 Y5 10 2.5 2.5 SPARE 200
40A,
15 B5 10 2.5 2.5 SPARE 200
4P
100mA 16 R6 SPACE
17 Y6 SPACE
40A
18 B6 SPACE
TP
ISO. 13 R5 20 4 4 ELEC. AND TEL. ROOM 2 200 400
14 Y5 20 4 4 CCTV CAMERA & ACS 4 100 400
40A, 15 B5 20 4 4 CCTV CAMERA & ACS 4 100 400
4P
16 R6 20 4 4 CCTV CAMERA & ACS 2 100 200
30mA
17 Y6 20 4 4 CCTV CAMERA 1 100 100
18 B6 20 4 4 CCTV CAMERA 3 1 100 100

. Total : 2440 2320 1620


CABLE SIZE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2, ECC

Page 6 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC HILLS, DUBAI,
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
U.A.E
D.B.NO : EDB-P2 (FED FOR 2nd PODIUM ) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Room - 2nd Podium
FED FROM: ESMDB-P2 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
Total Load - 6.38 KW

Page 7 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF:518
HILLS, DUBAI, U.A.E

D.B.NO : DB-P2-2 (FED FOR 1st PODIUM & 2nd PODIUM FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Ele. Cabi. -2nd Podium
FED FROM: SMDB-P2 CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg 16A Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm S/O Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 DRIVEWAY 10 60 600 Via LCP
2 Y1 10 2.5 2.5 DRIVE WAY 6 60 360 Via LCP
40A, B1 Via LCP
3 10 2.5 2.5 DRIVE WAY 7 60 420
4P
100mA 4 R2 10 2.5 2.5 PARKING 9 60 540 Via LCP
5 Y2 10 SPARE 100
6 B2 10 2.5 2.5 PARKING 8 60 480 Via LCP
7 R3 10 2.5 2.5 PARKING 8 60 480 Via LCP
8 Y3 10 2.5 2.5 PARKING 8 60 480 Via LCP
40A, B3
9 10 SPARE 200
4P
100mA 10 R4 10 2.5 2.5 PARKING 8 60 480 Via LCP
11 Y4 10 2.5 2.5 PARKING 6 60 360
32A B4
12 10 SPARE 150
TP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
ISO.
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
40A, B5
15 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 500
17 Y6 SPACE
18 B6 SPACE

Total : 3100 1800 1750


CABLE SIZE : 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2, ECC
Total Load - 6.65 KW

Page 8 of 8
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
DAMAC HILLS, DUBAI, U.A.E

D.B.NO : FP-LS-1 CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Landscape - 3rd Floor

FED FROM: SMDB-3F CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 LANDSCAPE LIGHTING 8,3,8 4,3,1 49 V/A PHOTOCELL +TIMER
2P
100mA 2 C2 10 2.5 2.5 LANDSCAPE LIGHTING 7 40 280 V/A PHOTOCELL +TIMER
40A, 3 C3 10 2.5 2.5 LANDSCAPE LIGHTING 5 23 115 V/A PHOTOCELL +TIMER
2P
100mA 4 C4 10 2.5 2.5 LANDSCAPE LIGHTING 8 40 320 V/A PHOTOCELL +TIMER

40A, 5 C5 10 2.5 2.5 LANDSCAPE LIGHTING 3,17,9 3,4,1 72 V/A PHOTOCELL +TIMER
40A 2P
SP ISO. 100mA 6 C6 10 2.5 2.5 LANDSCAPE LIGHTING 23 6 138 V/A PHOTOCELL +TIMER

40A, 7 C7 10 SPARE 1026


2P
100mA 8 C8 10 SPARE 1000

40A, 9 C9 20 4 4 LANDSCAPE POWER 5 200 1000


2P
30mA 10 C10 20 SPARE 1000

Total : 5000
CABLE SIZE : 3C 10mm2 XLPE/SWA/PVC
Total Load - 5.00 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF: 518
DAMAC HILLS, DUBAI, U.A.E

D.B.NO : FP-LS-2 CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- Landscape - 3rd Floor

FED FROM: SMDB-3F CONSULTANT : M/s. LACASA


Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A Coo Spl F.C.U. SPU Watts Circuit in Watts Remarks
W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A, 1 C1 10 2.5 2.5 LANDSCAPE LIGHTING 29,6 4,3 134 V/A PHOTOCELL +TIMER
2P
100mA 2 C2 10 2.5 2.5 LANDSCAPE LIGHTING 19,8 3,4 89 V/A PHOTOCELL +TIMER
40A, 3 C3 10 2.5 2.5 LANDSCAPE LIGHTING 7 23 161 V/A PHOTOCELL +TIMER
2P
100mA 4 C4 10 2.5 2.5 BASKETBALL AREA 4 57 228 V/A PHOTOCELL +TIMER

40A, 5 C5 10 2.5 2.5 LANDSCAPE LIGHTING 4,5,11 1,3,4 63 V/A PHOTOCELL +TIMER
40A 2P
SP ISO. 100mA 6 C6 10 SPARE 1125

40A, 7 C7 20 4 4 LANDSCAPE POWER 4 200 800


2P
30mA 8 C8 20 4 4 LANDSCAPE POWER 4 200 800

40A, 9 C9 20 4 4 LANDSCAPE POWER 3 200 600


2P
30mA 10 C10 20 SPARE 1000

Total : 5000
CABLE SIZE : 3C 10mm2 XLPE/SWA/PVC
Total Load - 5.00 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-3F (FED FOR 3F FLOOR,4TH,5TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 3RD FLOOR
FED FROM: SMDB-3F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-3RD F.L 12 20 240 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-3RD F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-3RD F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-3RD,4TH,5TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-3RD,4TH,5TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-4TH F.L 8 20 160 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-4TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-4TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-5TH F.L 8 20 160 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-5TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-5TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 FEMALE CHANGING -3RD F.L 9,4 20,10 220
14 Y5 10 2.5 2.5 MALE CHANGING- 3RD F.L 12 20 240
40A, 15 B5 10 SPARE 200
4P
100mA 16 R6 10 2.5 2.5 FEMALE CHANGING -3RD F.L 12 20 240
17 Y6 10 2.5 2.5 MALE CHANGING- 3RD F.L 11,5 20,10 270
18 B6 10 2.5 2.5 GYM ROOM 16 20 320
19 R7 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
20 Y7 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 21 B7 10 PROVISION FOR FACADE LIGHT 750
4P
100mA 22 R8 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
23 Y8 10 SPARE 200
24 B8 10 SPARE 200

Page 3 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-3F (FED FOR 3F FLOOR,4TH,5TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 3RD FLOOR
FED FROM: SMDB-3F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
25 R9 20 4 4 FCU-CORRIDOR-3RD F.L 1 200 200
26 Y9 20 4 4 FCU-CORRIDOR-3RD F.L 1 200 200
40A, 27 B9 20 4 4 FCU-CORRIDOR-3RD F.L 1 200 200
4P
100mA 28 R10 20 4 4 FCU-CORRIDOR-4TH F.L 1 200 200
29 Y10 20 4 4 FCU-CORRIDOR-4TH F.L 1 200 200
30 B10 20 4 4 FCU-CORRIDOR-4TH F.L 1 200 200
31 R11 20 4 4 FCU-CORRIDOR-5TH F.L 1 200 200
32 Y11 20 4 4 FCU-CORRIDOR-5TH F.L 1 200 200
40A, 33 B11 20 4 4 FCU-CORRIDOR-5TH F.L 1 200 200
4P
100mA 34 R12 20 4 4 FCU-CORRIDOR-3RD F.L 1 200 200
35 Y12 20 4 4 FCU-TOI/CHANGING ROOM(M)-3RD F.L 1 200 200
36 B12 20 4 4 FCU-TOI/CHANGING ROOM(F)-3RD F.L 1 200 200
37 R13 20 4 4 CORRIDOR-3RD F.L 4 200 800
38 Y13 20 4 4 CORRIDOR-3RD F.L 4 200 800
40A, 39 B13 20 4 4 TOI/CHANGING ROOM(F)-3RD F.L 1 1500 1500
4P
30mA 40 R14 20 4 4 TOI/CHANGING ROOM(M)-3RD F.L 1 1500 1500
41 Y14 20 4 4 CORRIDOR-4TH F.L 4 200 800
42 B14 20 4 4 CORRIDOR-4TH F.L 4 200 800
43 R15 20 SPARE 200
44 Y15 20 4 4 CORRIDOR-5TH F.L 4 200 800
40A, 45 B15 20 4 4 CORRIDOR-5TH F.L 4 200 800
4P
30mA 46 R16 SPACE
47 Y16 20 SPARE 800
48 B16 20 SPARE 200
Total : 6000 6060 6010
2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 18.07 KW

Page 4 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-3F (FED FOR 3RD FLOOR,4TH,5TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 3RD FLOOR
FED FROM: ESMDB-3F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-3RD F.L 11 20 220 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-3RD F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-3RD F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-3RD F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. ROOM 3RD 4TH,5TH F.L 6 60 360
6 B2 10 SPARE 300
7 R3 10 2.5 2.5 CORRIDOR-4TH F.L 8 20 160 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-4TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-4TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-4TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-5TH F.L 8 20 160 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-5TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-5TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-5TH F.L 2 20 40 VIA LCP
17 Y6 10 SPARE 200
18 B6 10 2.5 2.5 SHAFT LIGHT(BESIDE STAIR-2) 8 20 160

Page 5 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-3F (FED FOR 3RD FLOOR,4TH,5TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 3RD FLOOR
FED FROM: ESMDB-3F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-3RD 4TH,5TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-3RD 4TH,5TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-3RD F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-3RD F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-3RD F.L 3 100 300
24 B8 20 4 4 CCTV CAMERA-3RD F.L 2 100 200
25 R9 20 4 4 FOR ACS-3RD F.L 1 100 100
26 Y9 20 4 4 MSD-4TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-4TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-4TH F.L 3 100 300
29 Y10 20 4 4 MSD-5TH F.L 2 50 100
30 B10 20 4 4 MSD-5TH F.L 2 50 100
31 R11 20 4 4 CCTV CAMERA-5TH F.L 3 100 300
32 Y11 20 4 4 CCTV CAMERA-3RD F.L 1 100 100
40A, 33 B11 20 4 4 CCTV CAMERA-3RD F.L 1 100 100
4P
30mA 31 R12 20 SPARE 200
32 Y12 20 SPARE 200
33 B12 20 4 4 SUBSTATION FOR EM .& EXIT LIGHT-3RD F.L 1 300 300

Total : 2460 2760 1780


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 6 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-6F (FED FOR 6TH FLOOR,7TH,8TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 6TH FLOOR
FED FROM: SMDB-6F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-6TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-6TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-6TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-6TH,7TH,8TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-6TH,7TH,8TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-7TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-7TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-7TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-8TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-8TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-8TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-6TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-6TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-6TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-7TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-7TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-7TH F.L 1 200 200

Page 7 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-6F (FED FOR 6TH FLOOR,7TH,8TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 6TH FLOOR
FED FROM: SMDB-6F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-8TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-8TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-8TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-6TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-6TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-7TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-7TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-8TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-8TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 8 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-6F (FED FOR 6TH FLOOR,7TH,8TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 6TH FLOOR
FED FROM: ESMDB-6F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-6TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-6TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-6TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-6TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. ROOM 6TH, 7TH,8TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-7TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-7TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-7TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-7TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-8TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-8TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-8TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-8TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 9 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-6F (FED FOR 6TH FLOOR,7TH,8TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 6TH FLOOR
FED FROM: ESMDB-6F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-6TH, 7TH,8TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-6TH, 7TH,8TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-6TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-6TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-6TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-7TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-7TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-7TH F.L 3 100 300
29 Y10 20 4 4 MSD-8TH F.L 2 50 100
30 B10 20 4 4 MSD-8TH F.L 2 50 100

40A, 31 R11 20 4 4 CCTV CAMERA-8TH F.L 3 100 300


4P 32 Y11 20 SPARE 200
30mA
33 B11 20 SPARE 800

Total : 2420 2660 1920


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 10 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-9F (FED FOR 9TH FLOOR,10TH,11TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 9TH FLOOR
FED FROM: SMDB-9F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-9TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-9TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-9TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-9TH,10TH,11TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-9TH,10TH,11TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-10TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-10TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-10TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-11TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-11TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-11TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-9TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-9TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-9TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-10TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-10TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-10TH F.L 1 200 200

Page 11 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-9F (FED FOR 9TH FLOOR,10TH,11TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 9TH FLOOR
FED FROM: SMDB-9F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-11TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-11TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-11TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-9TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-9TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-10TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-10TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-11TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-11TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 12 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-9F (FED FOR 9TH FLOOR,10TH,11TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 9TH FLOOR
FED FROM: ESMDB-9F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-9TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-9TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-9TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-9TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. ROOM 9TH, 10TH,11TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-10TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-10TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-10TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-10TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-11TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-11TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-11TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-11TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 13 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-9F (FED FOR 9TH FLOOR,10TH,11TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 9TH FLOOR
FED FROM: ESMDB-9F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-9TH, 10TH,11TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-9TH, 10TH,11TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-9TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-9TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-9TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 100
26 Y9 20 4 4 MSD-10TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-10TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-10TH F.L 3 100 300
29 Y10 20 4 4 MSD-11TH F.L 2 50 100
30 B10 20 4 4 MSD-11TH F.L 2 50 100
31 R11 20 4 4 CCTV CAMERA-11TH F.L 3 100 300
32 Y11 20 4 4 SUBSTATION FOR EM .& EXIT LIGHT-6TH F.L 1 300 300
40A, 33 B11 20 4 4 GSM ROOM-10TH F.L 2 200 400
4P
30mA 34 R12 20 4 4 GSM ROOM-10TH F.L 2 200 400
35 Y12 20 4 4 GSM ROOM-10TH F.L 2 200 400
36 B12 20 4 4 GSM ROOM-10TH F.L 2 200 400

Total : 2720 3160 1920


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.80 KW

Page 14 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-12F (FED FOR 12TH FLOOR,13TH,14TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 12TH FLOOR
FED FROM: SMDB-12F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-12TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-12TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-12TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-12TH,13TH,14TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-12TH,13TH,14TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-13TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-13TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-13TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-14TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-14TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-14TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-12TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-12TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-12TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-13TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-13TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-13TH F.L 1 200 200

Page 15 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-12F (FED FOR 12TH FLOOR,13TH,14TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 12TH FLOOR
FED FROM: SMDB-12F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-14TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-14TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-14TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-12TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-12TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-13TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-13TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-14TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-14TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 16 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-12F (FED FOR 12TH FLOOR,13TH,14TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 12TH FLOOR
FED FROM: ESMDB-12F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-12TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-12TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-12TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-12TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. ROOM 12TH, 13TH,14TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-13TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-13TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-13TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-13TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-14TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-14TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-14TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-14TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 17 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-12F (FED FOR 12TH FLOOR,13TH,14TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 12TH FLOOR
FED FROM: ESMDB-12F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-12TH, 13TH,14TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-12TH, 13TH,14TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-12TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-12TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-12TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-13TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-13TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-13TH F.L 3 100 300
29 Y10 20 4 4 MSD-14TH F.L 2 50 100
30 B10 20 4 4 MSD-14TH F.L 2 50 100

40A, 31 R11 20 4 4 CCTV CAMERA-14TH F.L 3 100 300


4P 32 Y11 20 SPARE 200
30mA
33 B11 20 SPARE 800

Total : 2420 2660 1920


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 18 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-15F (FED FOR 15TH FLOOR,16TH,17TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 15TH FLOOR
FED FROM: SMDB-15F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-15TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-15TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-15TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-15TH,16TH,17TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-15TH,16TH,17TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-16TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-16TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-16TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-17TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-17TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-17TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-15TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-15TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-15TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-16TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-16TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-16TH F.L 1 200 200

Page 19 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-15F (FED FOR 15TH FLOOR,16TH,17TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 15TH FLOOR
FED FROM: SMDB-15F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-17TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-17TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-17TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-15TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-15TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-16TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-16TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-17TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-17TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 20 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-15F (FED FOR 15TH FLOOR,16TH,17TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 15TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-15TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-15TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-15TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-15TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. R.M 15TH, 16TH,17TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-16TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-16TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-16TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-16TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-17TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-17TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-17TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-17TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 21 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-15F (FED FOR 15TH FLOOR,16TH,17TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 15TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-15TH, 16TH,17TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-15TH, 16TH,17TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-15TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-15TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-15TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-16TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-16TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-16TH F.L 3 100 300
29 Y10 20 4 4 MSD-17TH F.L 2 50 100
30 B10 20 4 4 MSD-17TH F.L 2 50 100

40A, 31 R11 20 4 4 CCTV CAMERA-17TH F.L 3 100 300


4P 32 Y11 20 4 4 SUBSTATION FOR EM .& EXIT LIGHT-17TH F.L 1 300 300
30mA
33 B11 20 SPARE 700

Total : 2420 2760 1820


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 22 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-18F (FED FOR 18TH FLOOR,19TH,20TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 18TH FLOOR
FED FROM: SMDB-18F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-18TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-18TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-18TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-18TH,19TH,20TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-18TH,19TH,20TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-19TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-19TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-19TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-20TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-20TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-20TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-18TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-18TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-18TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-19TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-19TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-19TH F.L 1 200 200

Page 23 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-18F (FED FOR 18TH FLOOR,19TH,20TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 18TH FLOOR
FED FROM: SMDB-18F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-20TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-20TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-20TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-18TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-18TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-19TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-19TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-20TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-20TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 24 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-18F (FED FOR 18TH FLOOR,19TH,20TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 18TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-18TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-18TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-18TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-18TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. R.M 18TH, 19TH,20TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-19TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-19TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-19TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-19TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-20TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-20TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-20TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-20TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 25 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-18F (FED FOR 18TH FLOOR,19TH,20TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 18TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-18TH, 19TH,20TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-18TH, 19TH,20TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-18TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-18TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-18TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-19TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-19TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-19TH F.L 3 100 300
29 Y10 20 4 4 MSD-20TH F.L 2 50 100
30 B10 20 4 4 MSD-20TH F.L 2 50 100
31 R11 20 4 4 CCTV CAMERA-20TH F.L 3 100 300
32 Y11 20 SPARE 200
40A, 33 B11 20 4 4 GSM ROOM-20TH F.L 2 200 400
4P
30mA 34 R12 20 4 4 GSM ROOM-20TH F.L 2 200 400
35 Y12 20 4 4 GSM ROOM-20TH F.L 2 200 400
36 B12 20 4 4 GSM ROOM-20TH F.L 2 200 400

Total : 2820 3060 1920


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.80 KW

Page 26 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-21F (FED FOR 21TH FLOOR,22TH,23TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 21TH FLOOR
FED FROM: SMDB-21F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-21TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-21TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-21TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-21TH,22TH,23TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-21TH,22TH,23TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-22TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-22TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-22TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-23TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-23TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-23TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-21TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-21TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-21TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-22TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-22TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-22TH F.L 1 200 200

Page 27 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-21F (FED FOR 21TH FLOOR,22TH,23TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 21TH FLOOR
FED FROM: SMDB-21F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-23TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-23TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-23TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-21TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-21TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-22TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-22TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-23TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-23TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 28 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-21F (FED FOR 21TH FLOOR,22TH,23TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 21TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-21TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-21TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-21TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-21TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. R.M 21TH, 22TH,23TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-22TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-22TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-22TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-22TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-23TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-23TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-23TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-23TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 29 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-21F (FED FOR 21TH FLOOR,22TH,23TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 21TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-21TH, 22TH,23TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-21TH, 22TH,23TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-21TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-21TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-21TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-22TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-22TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-22TH F.L 3 100 300
29 Y10 20 4 4 MSD-23TH F.L 2 50 100
30 B10 20 4 4 MSD-23TH F.L 2 50 100

40A, 31 R11 20 4 4 CCTV CAMERA-23TH F.L 3 100 300


4P 32 Y11 20 SPARE 200
30mA
33 B11 20 SPARE 800

Total : 2420 2660 1920


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 30 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-24F (FED FOR 24TH FLOOR,25TH,26TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 24TH FLOOR
FED FROM: SMDB-24F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 CORRIDOR-24TH F.L 8 20 160 VIA LCP
2 Y1 10 2.5 2.5 CORRIDOR-24TH F.L 7 20 140 VIA LCP
40A 40A, 3 B1 10 2.5 2.5 LIFT LOBBY-24TH F.L 4 20 80 VIA LCP
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 PASSAGE,G.RM-24TH,25TH,26TH F.L 9 20 180
5 Y2 10 2.5 2.5 W.M.R ROOM-24TH,25TH,26TH F.L 3 60 180
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-25TH F.L 12 20 240 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-25TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-25TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 CORRIDOR-26TH F.L 12 20 240 VIA LCP
11 Y4 10 2.5 2.5 CORRIDOR-26TH F.L 7 20 140 VIA LCP
12 B4 10 2.5 2.5 LIFT LOBBY-26TH F.L 4 20 80 VIA LCP
13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
40A, 15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
4P
100mA 16 R6 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
17 Y6 SPACE
18 B6 SPACE
19 R7 20 4 4 FCU-CORRIDOR-24TH F.L 1 200 200
20 Y7 20 4 4 FCU-CORRIDOR-24TH F.L 1 200 200
40A, 21 B7 20 4 4 FCU-CORRIDOR-24TH F.L 1 200 200
4P
100mA 22 R8 20 4 4 FCU-CORRIDOR-25TH F.L 1 200 200
23 Y8 20 4 4 FCU-CORRIDOR-25TH F.L 1 200 200
24 B8 20 4 4 FCU-CORRIDOR-25TH F.L 1 200 200

Page 31 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-24F (FED FOR 24TH FLOOR,25TH,26TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 24TH FLOOR
FED FROM: SMDB-24F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B

40A, 25 R9 20 4 4 FCU-CORRIDOR-26TH F.L 1 200 200


4P 26 Y9 20 4 4 FCU-CORRIDOR-26TH F.L 1 200 200
100mA
27 B9 20 4 4 FCU-CORRIDOR-26TH F.L 1 200 200

40A, 28 R10 20 4 4 CORRIDOR-24TH F.L 4 200 800


4P 29 Y10 20 4 4 CORRIDOR-24TH F.L 4 200 800
30mA
30 B10 20 4 4 CORRIDOR-25TH F.L 4 200 800
31 R11 20 4 4 CORRIDOR-25TH F.L 4 200 800
32 Y11 20 4 4 CORRIDOR-26TH F.L 4 200 800
40A, 33 B11 20 4 4 CORRIDOR-26TH F.L 4 200 800
4P
30mA 34 R12 SPACE
35 Y12 20 SPARE 600
36 B12 20 SPARE 800

Total : 4520 4150 4190


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 12.86 KW

Page 32 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-24F (FED FOR 24TH FLOOR,25TH,26TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 24TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
32A 1 R1 10 2.5 2.5 CORRIDOR-24TH F.L 8 20 160 VIA LCP
TP
2 Y1 10 2.5 2.5 CORRIDOR-24TH F.L 7 20 140 VIA LCP
ISO.
40A, 3 B1 10 2.5 2.5 LIFT LOBBY-24TH F.L 4 20 80 VIA LCP
4P
100mA 4 R2 10 2.5 2.5 FIREMEN LIFT LOBBY-24TH F.L 2 20 40 VIA LCP
5 Y2 10 2.5 2.5 ELEC,TELE. R.M 24TH, 25TH,26TH F.L 6 60 360
6 B2 10 SPARE 200
7 R3 10 2.5 2.5 CORRIDOR-25TH F.L 11 20 220 VIA LCP
8 Y3 10 2.5 2.5 CORRIDOR-25TH F.L 7 20 140 VIA LCP
40A, 9 B3 10 2.5 2.5 LIFT LOBBY-25TH F.L 4 20 80 VIA LCP
4P
100mA 10 R4 10 2.5 2.5 FIREMEN LIFT LOBBY-25TH F.L 2 20 40 VIA LCP
11 Y4 10 2.5 2.5 STAIR-1 9 20 180 PB+LCP
12 B4 10 2.5 2.5 STAIR-2 9 20 180 PB+LCP
13 R5 10 2.5 2.5 CORRIDOR-26TH F.L 11 20 220 VIA LCP
14 Y5 10 2.5 2.5 CORRIDOR-26TH F.L 7 20 140 VIA LCP
40A, 15 B5 10 2.5 2.5 LIFT LOBBY-26TH F.L 4 20 80 VIA LCP
4P
100mA 16 R6 10 2.5 2.5 FIREMEN LIFT LOBBY-26TH F.L 2 20 40 VIA LCP
17 Y6 SPARE 200
18 B6 SPACE

Page 33 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT DAMAC
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
HILLS, DUBAI, U.A.E
D.B.NO : EDB-24F (FED FOR 24TH FLOOR,25TH,26TH FLOOR) CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - 24TH FLOOR
FED FROM: ESMDB-13F CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
19 R7 20 4 4 ELEC. ROOM-24TH, 25TH,26TH F.L 4 200 800
20 Y7 20 4 4 TEL. ROOM-24TH, 25TH,26TH F.L 4 200 800
40A, 21 B7 20 4 4 MSD-24TH F.L 2 50 100
4P
30mA 22 R8 20 4 4 MSD-24TH F.L 2 50 100
23 Y8 20 4 4 CCTV CAMERA-24TH F.L 3 100 300
24 B8 20 SPARE 200
25 R9 20 SPARE 200
26 Y9 20 4 4 MSD-25TH F.L 2 50 100
40A, 27 B9 20 4 4 MSD-25TH F.L 2 50 100
4P
30mA 28 R10 20 4 4 CCTV CAMERA-25TH F.L 3 100 300
29 Y10 20 4 4 MSD-26TH F.L 2 50 100
30 B10 20 4 4 MSD-26TH F.L 2 50 100

40A, 31 R11 20 4 4 CCTV CAMERA-26TH F.L 3 100 300


4P 32 Y11 20 4 4 SUBSTATION FOR EM .& EXIT LIGHT-24TH F.L 1 300 300
30mA
33 B11 20 SPARE 700

Total : 2420 2760 1820


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 7.00 KW

Page 34 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : DB-RF CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - ROOF FLOOR
FED FROM: SMDB-RF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 ROOF LIGHT 9 20 180
2 Y1 10 2.5 2.5 ROOF LIGHT 5 20 100
40A 40A, 3 B1 10 2.5 2.5 ROOF LIGHT 5 20 100
TP 4P
100mA 4 R2 10 2.5 2.5 UPPER ROOF 2 20 40
ISO.
5 Y2 10 2.5 2.5 ROOF LIGHT 5 20 100
6 B2 10 SPARE 280
7 R3 10 2.5 2.5 UPPER ROOF 2 20 40
8 Y3 10 2.5 2.5 UPPER ROOF 2 20 40
40A, 9 B3 10 SPARE 300
4P
100mA 10 R4 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
11 Y4 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
12 B4 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750

40A, 13 R5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750


4P 14 Y5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
100mA
15 B5 10 2.5 2.5 PROVISION FOR FACADE LIGHT 750
16 R6 20 4 4 FCU-ROOF DECK 1 200 200
17 Y6 20 4 4 FCU-ROOF DECK 1 200 200
40A, 18 B6 20 4 4 FCU-SERVICE CORRIODR 1 200 200
4P
100mA 19 R7 20 4 4 FCU-LIFT MACHINE ROOM 1 200 200
20 Y7 20 SPARE 200
21 B7 20 SPARE 200

40A, 22 R8 32 4 4 ROOF DECK & LIFT MACHINE ROOM 5 200 1000 RING
4P 23 Y8 20 4 4 ROOF DECK 4 200 800
30mA
24 B8 20 SPARE 800

Total : 3160 2940 3380


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 9.48 KW

Page 35 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT
LOAD DISTRIBUTION SCHEDULE PROJECT REF : 518
DAMAC HILLS, DUBAI, U.A.E
D.B.NO : EDB-RF CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- ELE. ROOM - ROOF FLOOR
FED FROM: ESMDB-RF CONSULTANT : M/s. LACASA
Rating Rating Cir. MCB CCT ECC Load
of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Load per
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 15A W.H W.M H/D SPU Spl FCU CU Watts Circuit in Watts Remarks
Amps Sq.mm Sq.mm Fan S/O S/O S/O O/L A/C AC AC Each R Y B
1 R1 10 2.5 2.5 GSM ROOM 3 60 180
2 Y1 10 2.5 2.5 STAIR-2 3 20 60
40A 40A, 3 B1 10 2.5 2.5 ROOF LIGHT 7 60 420
TP 4P
ISO. 100mA 4 R2 10 2.5 2.5 STAIR-1 3 20 60
5 Y2 10 2.5 2.5 LIFT MACHINE LIGHT 2 60 120
6 B2 10 SPARE 200
7 R3 20 4 4 GSM ROOM 2 200 400
8 Y3 20 4 4 ELECTRICAL ROOM 1 200 200
40A, 9 B3 20 4 4 GSM ROOM 2 100 200
4P
30mA 10 R4 20 4 4 GSM ROOM 2 200 400
11 Y4 20 4 4 GSM ROOM 2 200 400
12 B4 20 4 4 GSM ROOM 2 200 400
13 R5 20 4 4 CP-AIR CRAFT WARNING LIGHT 1500 1500 20A SP Isolator
40A,
14 Y5 SPACE
30mA
15 B5 SPACE
13 R6 1666.7
40A,
14 Y6 20 6 6 SIGNAGE DAMAC (LOGO) 5000 1667 20A TP Isolator
30mA
15 B6 1666.7

Total : 4207 2447 2887


2 2
CABLE SIZE : 4C 10mm XLPE/SWA/PVC + 1C 10mm , ECC
Total Load - 9.54 KW

Page 36 of 36
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 AT PROJECT REF: Sheet No. :- 1 OF 1
LOAD DISTRIBUTION SCHEDULE
DAMAC HILLS, DUBAI, U.A.E
518
D.B.NO : DB -1B CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- 1 BED ROOM APARTMENT
FED FROM: SMDB-TYP. CONSULTANT : M/s. LACASA

Rating Rating Cir. MCB CCT ECC Load Load per


of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Circuit in
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 13A Coo Spl F.C.U. SPU Watts Watts Remarks
Twin W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A,2P 1 C1 BED RM, BATH 1,1,1 45, 8, 15 68
10 2.5 2.5
100mA
ELCB 2 C2 10 2.5 2.5 LIVING/DINING,KIT., BALCONY 1,2,1 1 45,15,100 190
40A,2P 3 C3 SPACE
100mA
ELCB 4 C4 20 4 4 FCU-1 1 200 200
40A,2P 7 C7 20 4 4 ONU UNIT 1 200 200
30mA
ELCB 8 C8 32 4 4 BED ROOM,LIVING/ DINING 3 2 200,400 1400 RING

40A,2P SPU O/L for Gas igniter & Gas


9 C9 20 4 4 KITCHEN 2 30 60
30mA detector
40A ELCB 10 C10 20 4 4 KITCHEN 1 1 200,400,30 600
SP
ISO. 40A,2P 11 C11 20 4 4 KITCHEN (WASHING MACHINE) 1 1000 1000
30mA
ELCB 12 C12 20 4 4 BATH (WATER HEATER) 1 1200 1200

Total Upto This Page : 4918


CABLE SIZE : 2x1C 10 Sq.mm CU/PVC +
1C 10 Sq.mm As ECC Total Load - 4.92 KW
PROJECT : PROPOSED G+2P+24 STOREY RESIDENTIAL TOWER ON PLOT NO.6765410 PROJECT REF: Sheet No. :- 1 OF 1
LOAD DISTRIBUTION SCHEDULE
AT DAMAC HILLS, DUBAI, U.A.E
518
D.B.NO : DB -2B CLIENT : DAMAC CRESCENT PROPERTIES L.L.C. LOC. OF DB. :- 2 BED ROOM APARTMENT
FED FROM: SMDB-TYP. CONSULTANT : M/s. LACASA

Rating Rating Cir. MCB CCT ECC Load Load per


of of Sl. Ref Rating Wire Wire Room / Area CONNECTED LOAD / POINTS in Circuit in
Incomer ELCB No. No. in Size Size Ltg Hood Ex. Sh. 13A 13A Coo Spl F.C.U. SPU Watts Watts Remarks
Twin W.H W.M D/W
Amps Sq.mm Sq.mm Fan S/O S/O S/O ker A/C AC O/L Each C
40A,2P 1 C1 LIVING/DINING,KIT.,ENT+Bed -2 2,5,1 1 45, 15,8,100 273
10 2.5 2.5
100mA
ELCB 2 C2 10 2.5 2.5 M.BED RM,BATH 1,1,1 45,15,8 68
40A,2P 3 C3 20 4 4 FCU-2 1 150 150
100mA
ELCB 4 C4 20 4 4 FCU-1 1 150 150
40A,2P 5 C5 20 4 4 BATH(WATER HEATER) 1 1200 1200
30mA
63A ELCB 6 C6 20 4 4 BATH(WATER HEATER) 1 1200 1200
SP 40A,2P 7 C7 20 4 4 ONU UNIT 1 200 200
ISO. 30mA
ELCB 8 C8 20 4 4 M.BED ROOM-1 2 1 200,400 800
40A,2P 9 C9 32 4 4 LIVING/ DINING+KITCHEN 3 2 200,400 1400 Ring
30mA
ELCB 10 C10 20 4 4 BEDROOM-2 2 1 200,400 800
40A,2P SPU O/L for Gas igniter & Gas
11 C11 20 4 4 KITCHEN 2 30 60
30mA detector
ELCB 12 C12 20 4 4 KITCHEN (WASHING MACHINE) 1 1000 1000
Total Upto This Page : 7301
CABLE SIZE : 2x1C 25 Sq.mm CU/PVC +
1C 16 Sq.mm As ECC Total Load - 7.30 KW