ELECTRICAL WORKING DRAWING
OF
SEVEN STORIED RESIDENTIAL
APARTMENT BUILDING
UNNAMED
AT
Plot No. - 538, Block - E,
Bashundhara R/A, Vatara, Dhaka.
CONSULTANT:
C
arch ompose
ARCHITECTS PLANNERS
ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR.
ARCHITECT:
Md. Shafiqul Islam
B. Arch.
ELECTRICAL ENGINEER :
Engr. Rakibul Islam
B. Sc. Engr. (Elec.)
AMIEB
ELECTRICAL LEGEND
SYMBOL LEGEND DESCRIPTION SYMBOL LEGEND DESCRIPTION CABLE NOTATION IMPORTANT NOTE
EM Enegy Meter P 10A/13A 3 Pin Socket Bottom at 9" From F.F. C1 = 1- C, 2X1.5 mm2 (BYA) Cable 01. 1/2" Ø uPVC pipe may be use only
C2 = 1- C, 4X1.5 mm2 (BYA) Cable where C1 or C2 or C3 or C6,C1.
Main Distribution Board C3
MP 10A/13A MultiPin Socket Bottom at 9" From F.F. = 1- C, 6X1.5 mm2 (BYA) Cable
C4 02. 3/4" Ø uPVC pipe will be used for
QA 15A/16A 3 Pin Socket For AC = 1- C, 8X1.5 mm2 (BYA) Cable
Sub Distribution Board for Common Service C6 C4 or C7 or C7,C1 or C7,C2 or C11,C6
= 1- C, 2X2.5 mm2 (BYA) Cable or C11,C7 or C6,C2 or C6,C3 or C8 or
+1x1.5 (re) mm2 E.C.C C14 cables are shown.
R 5A/10A 2 Pin Socket Bottom at 9" From F.F. C7 = 1- C, 4X2.5 mm2 (BYA) Cable
+2x1.5 (re) mm2 E.C.C
QG 15A/16A 3 Pin Socket For Geyser C8 = 1- C, 6X2.5 mm2 (BYA) Cable 03. All sockets will be with switch.
+3x1.5 (re) mm2 E.C.C 04. 2 pin or 3 pin sockets (P) in kitchen
BP Calling Bell Push C11 = 1- C, 2X4.0 mm2 (BYA) Cable will be at 9" above from the kitchen
table or as instructed.
CB Calling Bell Buzzer +1x2.5 (re) mm2 E.C.C
05. 3 pin socket (QA) for window type A/C
TV TV Cable Outlet will be close to the A/C location at same
level from the finished floor or as
instructed.
H Chandelier Light
NOTE 1 : ALL Cables are Stranded (rm.) 06. Water heater in bath room will be
SP Spot Light 3" Dia & 3.5" Depth NOTE 2 : F.F = Finished Floor. above False ceiling nearer to cat Door
or as instructed. The three pin socket
TMDF Telephone Main Distribution Box (QG) for the water heater will be close to
DCMDF Dish Cable Main Distribution Frame the heater and the DP switch (DPG)
TMJB Telephone Main Junction Box will be beside the bathroom switch
board or as instructed.
DCMJB Dish Cable Main Junction Box
07. 3 pin socket (QG) for water heater in
1/2" or 3/4" Ø uPVC Conduit for Light & Fan through kitchen will be close to the water
R.C.C Slab / Wall. heater but at 5'-6'' above from finished
floor level or as instructed.
1/2" or 3/4" Ø uPVC Conduit for Light & Fan through
R.C.C Slab / Wall.
1/2" or 3/4" Ø uPVC Conduit for Socket through
R.C.C Slab / Wall.
U/G Conduit / Floor Concealed Conduit for Electric Line
3/4" Ø uPVC Conduit for Intercom through R.C.C Slab / Wall.
3/4" Ø uPVC Conduit for Telephone Cable through Slab/ Wall
3/4" Ø uPVC Conduit For TV Cable through R.C.C Slab / Wall
Earthing
WF L.A Lightning Arrestor
PROJECT : DRAWING TITLE :
ADDRESS : Plot No - 538, Block-E, Md. Shafiqul Islam Engr. Rakibul Islam Electrical Legend
B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
Bashundhara R/A, Vatara, Dhaka. AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR. SHEET NO : E-01 DATE : 05 / 02 / 2021
LOBBY
6'-0"X6'-6"
GUARD POST
LIFT
CARETAKER 5'-8"X5'-8"
ROOM
3-Ø & 1-Ø Energy Meter
STAIR
14'-7"X8'-4"
GENERATOR
10" Brick wall Up to 1st
Landing for MDB,
SDB-Gen, Energy Meter
Box Installation Work. UP
TOILET
COOKING
3'-0"
5" Brick wall for TV,
E TEL. distribution box
N S Ground Floor Roof Electrical Fixtures Layout Plan
W
DRAWING TITLE :
PROJECT : UNNAMED
ADDRESS : Plot No. - 538, Block - E,
Md. Shafiqul Islam Engr. Rakibul Islam
Bashundhara R/A, Vatara, Dhaka. B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR. DATE : 05 / 02 / 2021
LOBBY
6'-0"X6'-6"
GUARD POST
LIFT
C6
CARETAKER 5'-8"X5'-8"
ROOM
3-Ø & 1-Ø Energy Meter
STAIR
14'-7"X8'-4"
GENERATOR
10" Brick wall Up to 1st
Landing for MDB,
SDB-Gen, Energy Meter
Box Installation Work. UP
TOILET
COOKING
3'-0"
5" Brick wall for TV,
E TEL. distribution box
N S Ground Floor Roof Electrical Fixtures Layout Plan
W
DRAWING TITLE :
PROJECT : UNNAMED
ADDRESS : Plot No. - 538, Block - E,
Md. Shafiqul Islam Engr. Rakibul Islam
Bashundhara R/A, Vatara, Dhaka. B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR. DATE : 05 / 02 / 2021
OUT DOOR
VER.
UNIT
LIVING
16'-0"X16'-6"
SP.AC.
BATH
7'-6"X4'-6"
BED-3
12'-2"X11'-6"
BATH
4'-3"X7'-0"
OUT DOOR
SP.AC.
UNIT
DINNER WAGON
BED-2
11'-0"X13'-2"
VER.
LOBBY DINING
6'-0"X6'-6" 15'-9"X11'-8"
LIFT
5'-8"X5'-8"
VER.
OUT DOOR
SP.AC.
DRESS
REF
UNIT
KITCHEN
12'-0"X7'-6"
DF
STAIR
14'-7"X8'-4"
UP BATH BED-1
4'-0"X6'-3"
10'-6"X14'-0"
D/W
S.TOI.
R for Kitchen Hood at 6" distance P for Gas Oven at 10" above from Finished K.VER
4'-0"X3'-0"
from Oven area & at 6'-0" Height Floor & 6" distance from Side Wall of Gas 8'-0"X3'-6"
from Finished Floor. Burner. 3"Ø PVC pipe distance will be 12"
from the same Location.
E
N S Typical Floor Roof Electrical Fixtures Layout Plan
W
DRAWING TITLE :
PROJECT : UNNAMED
ADDRESS : Plot No. - 538, Block - E,
Md. Shafiqul Islam Engr. Rakibul Islam
Bashundhara R/A, Vatara, Dhaka. B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR. DATE : 05 / 02 / 2021
OUT DOOR
VER.
UNIT
LIVING
16'-0"X16'-6"
SP.AC.
BATH
7'-6"X4'-6"
BED-3
12'-2"X11'-6"
BATH
4'-3"X7'-0"
OUT DOOR
SP.AC.
UNIT
DINNER WAGON
BED-2
11'-0"X13'-2"
VER.
DINING
LOBBY 15'-9"X11'-8"
6'-0"X6'-6"
LIFT
5'-8"X5'-8"
VER.
OUT DOOR
SP.AC.
DRESS
REF
UNIT
STAIR
14'-7"X8'-4"
KITCHEN
12'-0"X7'-6"
DF
UP BATH BED-1
4'-0"X6'-3"
10'-6"X14'-0"
D/W
S.TOI.
R for Kitchen Hood at 6" distance P for Gas Oven at 10" above from Finished K.VER
4'-0"X3'-0"
from Oven area & at 6'-0" Height Floor & 6" distance from Side Wall of Gas 8'-0"X3'-6"
from Finished Floor. Burner. 3"Ø PVC pipe distance will be 12"
from the same Location.
E
N S Typical Floor Roof Electrical Fixtures Layout Plan
W
DRAWING TITLE :
PROJECT : UNNAMED
ADDRESS : Plot No. - 538, Block - E,
Md. Shafiqul Islam Engr. Rakibul Islam
Bashundhara R/A, Vatara, Dhaka. B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR. DATE : 05 / 02 / 2021
LIFT
MACHINE ROOM
5'-8" x 12'-6"
STAIR
14'-7"X8'-4"
E
N S Roof Top Electrical Fixtures Layout Plan
W
DRAWING TITLE :
PROJECT : UNNAMED
ADDRESS : Plot No. - 538, Block - E,
Md. Shafiqul Islam Engr. Rakibul Islam & Lightning Arrestor System.
Bashundhara R/A, Vatara, Dhaka. B. Arch. B. Sc. Engr. (Elec.) ARCHITECTS PLANNERS
AMIEB ENGINEERS INTERIOR DESIGNER
HOUSE# 38/9/A, POLASHNOGOR,MIRPUR.
DATE : 05 / 02 / 2021