Load Schedule VILLA
Load Schedule VILLA
Ensure that F/S does allow TOTAL CONNECTED LOAD PER PHASE 30.01 31.07 31.04 92.12
replacement of fuse rated
higher than specified for the
TOTAL CONNECTED LOAD (KW) 92.12 KW
circuit cable MAXIMUM DEMAND @.85DF 78.30
PROVIDE CT METER ABOVE MAX DEMAND
PROPOSED SUMMARY OF MDB-1
DETAILS OF CONNECTED LOAD PLOT NO. 6317174
Ensure that F/S does allow TOTAL CONNECTED LOAD PER PHASE 30.01 31.07 31.04 92.12
replacement of fuse rated
higher than specified for the
TOTAL CONNECTED LOAD (KW) 92.12 KW
circuit cable MAXIMUM DEMAND @.85DF 78.30
PROVIDE CT METER ABOVE MAX DEMAND
PROJECT: B+G+1+R VILLA LOAD DISTRIBUTION SCHEDULE for D/B
FED FROM : MDB-1 LOCATION: BASEMENT FLOOR
DB BF
Load Per
Rating CCT ECT Re-mark
SEC NO:
SEC 3
100ma
ELCB,
40 A
100ma
ELCB,
40 A
23 Y8 20 SPARE 500
24 B8 20 SPARE 400
25 R9 750
SEC 6
100ma
ELCB,
40 A
100ma
ELCB,
40 A
100ma
ELCB,
40 A
ELCB,
30ma
40 A
ELCB,
30ma
40 A
ELCB,
30ma
40 A
100ma
ELCB,
40 A
100ma
ELCB,
40 A
100ma
ELCB,
W/O 13A
40 A
100ma
ELCB,
40 A
ELCB,
30ma
40 A
23 Y8 20 SPARE 200
24 B8 20 4.0 4.0 COLD WATER CIR PUMP 1 500 500
25 R9 20 4.0 4.0 FAC 4A 1 220 220
SEC 6
100ma
ELCB,
40 A
100ma
ELCB,
40 A
ELCB,
30ma
40 A
100ma
ELCB,
40 A
100ma
ELCB,
40 A