You are on page 1of 48
prosect: SAINT GOBAIN 40TH FLOOR, TIFFANY TOWER, JUMEIRAH LAKE TOWER, DUBAI U.A.E. Consultant Designed By: bY sc onaRiose MIDDLE EAST INTERIORS LLC. ANNA I MINAI eee ae eee N| TEL verte ests, PARSSTT bast Main Contractor besa CAMBRIDGE, “MEP Contractor : ALEX & COLDWELL LLG. % x TABLE OF CONTENTS ie DESCRIPTION ‘SAEETNO. ew DESCRIPTION SHEET NO. 1._| GENERAL DRAWINGS v._| MEP BRAWiNGS 1_| CAMBRIOGE COVER PAGE CEPO6D- Aa "BUSTING LIGHTING LAYOUT (CeBPOGD- E00 2| TABLE OF CONTENTS ‘0C-DP060- 888 "PROPOSED LIGHTING LAYOUT "EXISTING POWER LAYOUT z “| PROPOSED POWER LAYOUT | ARCHITECTURAL DRAWINGS PROPOSED POWER TRUNKING LAYOUT 4) PARTITION DETAILS Ti | SECTIONS ELEVATIONS 1 | ELEVATION anb SECTION ‘Ce0P DGD 205 Ww_| Fear peTans 1 [-vpteat. GLAss DOOR & PARTITIONS BETAIIS | G&-DPO60- 305 ROPOSED HVAC PIPING VOUT 2 PSU WALL PARTITIONS e-or060- 302 HEAT LOAD CALGILATION 3 | TWPCAL FLOOR DETALS {C-DPO60- 300 NISTING WATER SUPPLY LAUT ROPOSED DRAINAGE LAYOUT ceroso- P01 7a MEP GENERAL OFTALS {Ce-o50- GD109 & A sna 8 oto La, Taste oF CONTENTS: ‘TABLE OF CONTENTS [ecomnwe [0 KEY PLAN a ‘EXISTING FLOOR PLAN | EEE so 10, a 8 PROPOSED PARTITION LAYOUT chon 24 0EC 208 LAVOUT-OPTION FURNITURE LAYOUT Pome 8 / 10 [aoa Saas iaattr) ante) (enn) (ost (GzbUea) (i099) 05 (120 2m) om Se ee Gun cme 6 ee Om eee (7 ga rorsep renee > otal aa 4 PROPOSED REFLECTED CEILING LAYOUT . al f= Bln FINISH LAY EMERGENCY ROUTES LAYOUT fe Se as : 3 ELEVATION ure as Seo DETAIL PLAN foeal] 5 ‘SCALE cr EE DETAIL SECTION (as xen awn wT nce at ELEVATION ( 2 i TYPICAL GLASS DOOR AND PARTITION DETAILS SECTION ( 3 Deane arrou SCALE 16M. 4 TSE aw 8 = G a oreSuN WL a PE te S| ' — | DETAIL SECTION am SAE 70m oo 3 \ <= g DETAIL SECTION | is ‘SCALE 110M. 4 a DETAIL SECTION carat a ie F Sea 7 _# em eset os - ee on ee ae DETAIL SECTION flees ‘SCALE 120m, — = GYPSUM WA PARTITION DETAILS TYPICAL THRESHOLD CONNECTION IN TWO DIFFERENT FINISHES. FLOOR DETAIL (FD-1 SCALE Tem. Ya TaD ess TYPICAL CONNECTION FOR ‘TWO DIFFERENT FINISHES @GLASS PARTITION FLOOR DETAIL (FD-3) TYPICAL FLOOR DETAILS TYPICAL CONNECTION FOR ‘TWO DIFFERENT FINISHES @ GLASS DOOR AREA FLOOR DETAIL (FD-2) SCALE Tem. (fear roe roy i | ‘TYPICAL THRESHOLD CONNECTION ‘AT DOOR AREA, FLOOR DETAIL (FD-4) ‘SCALE Tem | afoverce TYPICAL FLOOR DETALS % © © LIGHTING LAYOUT FXISTING LIGHTING uavour: EXISTING sYOUT ie = Le Sejed te Dew ARRAS, PROPOSED LIGHTING LAYOUT pls =e 30th FLOOR PLAN POWER & LC LAYOUT PICA For an TO 4st FLOOR) ? Subject Ae DEN AM, PROPOSED FOWERLNTOUT Selealst = ‘PROPOSED POWER TRUNKING LAYOUT ‘PROPOSED DATA [AVOUT as [on] Nore: 1, SUBJECT TO DEWA APPROVAL, pasting 0B LOAD SCHEDULE EXISTING DS LOAD SCHEDULE = ewe _ [eeu io [PO NoTE: 1, SUBJECT TO DEWA APPROVAL. | EXISTING DB LoAD scHEDULE NOTE: 1. SUBJECT TO DEWA APPROVAL. EXISTING DB LOAD SCHEDULE NoTE: 1Salecr To Dawa sepRovA. oe OEE | esrine bs oxo scHeoue = al SSS Eres [8 JECT TO DEWA APPROVAL. 2. BASE BUILD PROVISION NO TO BE EXCEED, PROPOSED DB LOAD SCHEDULE 1, SUBJECT TO DEWA APPROVAL. 2. BASE BUILD PROVISION NO TO =e a 3 a — a a cea tl dennis aie PROPOSED DB LOAD SCHEDULE 22 COLEULL LLA, LOAD SCHEDULE ——f 9 eaneemrccemmrse | ‘EXISTING SPRINKLER LAYOUT nore 1 NEW sna sit 10 CONNECIED 10 ROWED SURO, PROPOSED SPRINKLER LAYOUT [ce-oPoeo-101 o NOTE: O oe [SW omni SYSTEM TO CONNECTED 10 PROVIDED STUB OU CAMBRIDGH ‘SPRINKLER COVERAGE LAYOUT TS TERR EEE | EXISTING FIRE ALARM LAVOUT AL 8 CONE CALA, EXISTING FIRE ALARM See Pon [Se [econ ‘0 ‘PROPOSED FIRE ALARM LAYOUT NUR & COLON, Bt.8, [EXISTING EMERGENCY LgHT LAYOUT = =e | PROPOSED EMERGENCY LIGHT LAYOUT Nore: {SUBJECT TO CONCORDIA APPROVAL ) == 2. WORKS TO BE COORDINATED HATH MTS, R \ oroseo Fe ce ‘PROPOSED VOICE EVACUATION LAYOUT a . ie a a E 1 ct Saal Se os aie be : Ly Ait 5 Eo z itte a if 14 oe t \ } 7-2 leu Sl, | ® a 5 U : el mr | t aH & % s * : a+ 4a] "7, : oe i ; ior aT 2 ' # fe iia 8 ro a et e i a ese at i hiauigeite F We fe ay * | PROPOSED HVAC LAYOUT i ff ff (ate i tf tl i ie qi f i i EAT LOAD CALCULATION |sreanane 7-9 92m ‘ir Byte icing Barmary Tor FOUR ‘Zone Bizing Summary for FOU-2T Sass ote et tons ae ol gsc Bi Sad ss =H FR ==Hes . = Becssai 4: See Geeeaaaecas, ESS stat tne a = 4s nt oe Sey Fase z ak = eS sar rar os {HEAT LOAD CALCULATION Tir Bata ing Boman Tr Ona SS5EE ‘SesbaageE 5 ra = 8 # SE a eg tee = = a e t & fee} (Eh y fealelssleieale ft ne == HEAT LOAD CALCULATION EP GENERAL DETAILS =I EXISTING WATER SUPPLY LAYOUT Customer Service Team nore $'Stesecr To CONCORDIA APPROVAL. | | YY “N€anteen ut (Ou | ro i eS cs ProPosED water suppuy SystEM tavour Seo en PRE | PROPOSED WATER SUPPLY LAYOUT eo hee Sarena ccorvenp ior |e ‘5000 Ts 7550 7380+ so wot = Het Het : = : Ee = aan a ee f ; a oH "EXISTING DRAINAGE josecr To CONCORDIA your EXISTING [DRAINAGE LAYOUT ee ie ra [conc o Customer Service Team I i ‘PROPOSED DRAINAGE LAYOUT Purchasing Team |__4¢ { | I LE. ~ ‘tw DEC 20H ‘Canteen \ ‘SC-DP050-P 201

You might also like