Professional Documents
Culture Documents
Perhitungan Pelat Balok Kolom Struktur
Perhitungan Pelat Balok Kolom Struktur
Momen ultimit plat injak arah melintang jembatan : TUMPUAN Mu- LAPANGAN Mu+
DL 0.36 t/m2 0.36 t/m2
LL 0.6 t/m2 0.6 t/m2
qu 1.392 1.392
lebar pelat 2 m 2
6.223 kNm 2.796 kNm
PEMBESIAN PLAT
Mutu beton k 300 f'c 24.9 Mpa 24.9 Mpa
Mutu baja U u-400 fy 390 Mpa 390 Mpa
Tebal slab beton, h = 150 mm h 150 mm 150 mm
Jarak tulangan terhadap sisi luar beton, d' = 35 mm d' 30 mm 30 mm
Modulus elastis baja Es 200000 200000
Faktor bentuk distribusi tegangan beton β1 0.85 0.85
ρb = β1* 0.85 * fc’/ fy * 600 / ( 600 + 0.028 0.028
Rmax = 0.75 * ρb * fy * [1 – ½*0.75* ρb * fy / ( 0.85 * fc’ 7.124 7.124
Faktor reduksi kekuatan lentur φ 0.8 0.8
Faktor reduksi kekuatan geser φ 0.6 0.6
Momen rencana ultimit Mu 6.223 kNm 2.796 kNm
Tebal efektif slab beton 120 mm 120 mm
Ditinjau slab beton selebar 1 m b 1000 mm 1000 mm
Momen nominal rencana Mn = Mu / φ 7.779 kNm 3.495 kNm
Faktor tahanan momen 0.540 0.243
Rn < Rmax (OK)
As' 4D 16 As' 4D 16
As' = 803.84 mm2 As' = 803.84 mm2
ds selimut beton s= 40 mm
x
2 jarak antar tulangan x= 60 mm
ds = 70 mm
d ds' = 40 mm
d= 430 mm
x
ds'
1
x
ds 2
x
As' 4D 16 As' 4D 16
As' = 803.84 mm2 As' = 803.84 mm2
ds selimut beton s= 40 mm
x
2 jarak antar tulangan x= 60 mm
ds = 70 mm
d ds' = 40 mm
d= 430 mm
x
ds'
1
x
ds 2
x
Rasio tulangan 1 %
b= 400 mm
h= 400 mm
d' = 40 mm
Es = 200000 Mpa = 200 kN/mm2
f'c = 25.38 Mpa = 0.02538 kN/mm2
fy = 390.00 Mpa = 0.39 kN/mm2
εy = fy / Es = 0.00195
Ast = ρ*b*h = 1600 mm2
A1 = A2 = Ast/2 = 800
Rasio tulangan 2 %
b= 400 mm
h= 400 mm
d' = 40 mm
Es = 200000 Mpa = 200 kN/mm2
f'c = 25.38 Mpa = 0.02538 kN/mm2
fy = 390 Mpa = 0.39 kN/mm2
εy = fy / Es = 0.00195
Ast = ρ*b*h = 3200 mm2
A1 = A2 = Ast/2 = 1600
Rasio tulangan 3 %
b= 400 mm
h= 400 mm
d' = 40 mm
Es = 200000 Mpa = 200 kN/mm2
f'c = 25.38 Mpa = 0.02538 kN/mm2
fy = 390 Mpa = 0.39 kN/mm2
εy = fy / Es = 0.00195
Ast = ρ*b*h = 4800 mm2
A1 = A2 = Ast/2 = 2400
Rasio tulangan 4 %
b= 400 mm
h= 400 mm
d' = 40 mm
Es = 200000 Mpa = 200 kN/mm2
f'c = 25.38 Mpa = 0.02538 kN/mm2
fy = 390 Mpa = 0.39 kN/mm2
εy = fy / Es = 0.00195
Ast = ρ*b*h = 6400 mm2
A1 = A2 = Ast/2 = 3200
Rasio tulangan 5 %
b= 400 mm
h= 400 mm
d' = 40 mm
Es = 200000 Mpa = 200 kN/mm2
f'c = 25.38 Mpa = 0.02538 kN/mm2
fy = 390 Mpa = 0.39 kN/mm2
εy = fy / Es = 0.00195
Ast = ρ*b*h = 8000 mm2
A1 = A2 = Ast/2 = 4000
4500
4000
1%
3500
2%
3000 3%
4%
2500 5%
permanent
2000 comb 1
1500
1000
500
0
0 100 200 300 400 500 600