QUESTION NO: 1
The Assets application is configured so that under certain conditions, for example if the Asset
status is Decommissioned, the Spare Parts tab will not be visible. What is needed to complete the
task of hiding the Spare Parts tab?
Answer: B
Explanation:
QUESTION NO: 2
What is used to compare the estimate versus actual cost for a job?
Answer: C
Explanation:
QUESTION NO: 3
Which option enables a direct IBM Maximo Asset Management to Cognos integration without a
need to purchase additional Cognos licenses?
Answer: C
Explanation:
QUESTION NO: 4
When determining a customer’s inventory issues, what are two factors that should be considered?
(Choose two.)
A. labels
B. access
C. shelving
D. shrinkage
E. replenishment
Answer: D,E
Explanation:
QUESTION NO: 5
What are three key components that are part of IBM SmartCloud Control Desk? (Choose three.)
A. Calibration
B. Service Catalog
C. IT Asset Management
D. Assignment Scheduler
E. Service Request Manager
F. IBM for Healthcare Solution
Answer: B,C,E
Explanation:
QUESTION NO: 6
Which item describes the basic concept of Total Productive Maintenance which is a maintenance
methodology that a customer may subscribe to?
QUESTION NO: 7
In what way is the user interface (UI) that the Automation Scripting application uses different from
all other IBM Maximo Asset Management applications?
Answer: D
Explanation:
QUESTION NO: 8
A. Labor
B. Repair
C. Vendor
D. Operating
Answer: D
Explanation:
QUESTION NO: 9
What is a factor when determining the number of concurrent users for sizing an environment?
Answer: B
QUESTION NO: 10
PMs are generating automatically and the schedule needs to be changed for a single PM. What is
the best way to achieve this?
Answer: D
Explanation:
QUESTION NO: 11
To prepare for detailed Reliability’ Centered Maintenance (RCM) analysis, important decisions
need to be made regarding the way equipment is classified from the main system to subsystem
and within unit levels. This must be done in a way that is consistent with the existing maintenance
strategy, tasks, routines, and levels of unit replacement. Which features and functions enable the
classification and navigation through this structure?
Answer: A
Explanation:
QUESTION NO: 12
What is the default reporting solution for IBM Maximo Asset Management as shipped with the
product?
A. Crystal Reporting
B. IBM Tivoli Common Reporting
Answer: D
Explanation:
QUESTION NO: 13
What is already managed in a freshly installed IBM Maximo Asset Management solution with
minimal data set up?
Answer: B
Explanation:
QUESTION NO: 14
A customer would like to monitor meter readings on certain assets and have the system
automatically generate work orders. They would like to configure upper and lower limits for specific
meters and define different tasks when each limit is reached. Which functionally in IBM Maximo
Asset Management will meet this business requirement?
A. Flow Control
B. Condition Monitoring
C. Integration Framework
D. Preventive Maintenance
Answer: B
Explanation:
QUESTION NO: 15
What are two business areas or processes that are supported by the IBM Maximo Asset
Management solution? (Choose two.)
Answer: D,E
Explanation:
QUESTION NO: 16
Preventive maintenance tasks can be created for which three types of records in IBM Maximo
Asset Management? (Choose three.)
A. Tool
B. Item
C. Route
D. Asset
E. Location
F. Work Order
Answer: C,D,E
Explanation:
QUESTION NO: 17
A. using Tivoli process automation engine (TPAE) to create users and control authorization
B. using third-party applications to create, authenticate, and authorize users
C. using TPAE to create users and using LDAP source to importsecurelygroups
D. using the LDAP application to create users and using TPAE to authenticate users
Answer: A
Explanation:
QUESTION NO: 18
Which function has the ability’ to integrate with external applications through Web Services?
Answer: A
Explanation:
QUESTION NO: 19
Integrating with external systems occurs using many methods such as employing JMS queues,
using Web services, and application import and export functionality’. What best describes the
difference between using JMS queues versus the Interactions (Web services) application?
Answer: B
Explanation:
QUESTION NO: 20
A. asset control
B. asset display
C. assetvisibility
D. asset automation
Answer: C
Explanation:
QUESTION NO: 21
What is a clear indicator that more than one organization is required to be created at the customer
A. multiple startcenters
B. more than 5,000 users
C. more than one production environment
D. requirementformorethan one base currency
Answer: D
Explanation:
QUESTION NO: 22
A. Asset
B. Material
C. Inventory
D. Standard Tool
Answer: B
Explanation:
QUESTION NO: 23
A customer has indicated that anybody in the company is able to complete a paper-based
requisition but there are problems with these requisitions going missing from the supervisor’s
desk. Which function can be used in IBM Maximo Asset Management to electronically submit
requisitions in a wizard-like fashion without a lot of user training?
A. Purchase Orders
B. Desktop Requisitions
C. Purchase Requisitions
D. Requestfor Quotations
Answer: B
Explanation:
QUESTION NO: 24
A. Releases
B. Purchase Orders
C. Purchase Contracts
D. Purchase Requisitions
Answer: C
Explanation:
QUESTION NO: 25
What are two correct statements regarding the use of sites? (Choose two)
Answer: C,E
Explanation:
QUESTION NO: 26
Answer: B
Explanation:
Which two key capabilities are essential for executing an effective gap-fit analysis? (Choose two.)
Answer: C,D
Explanation:
QUESTION NO: 28
Which feature makes it possible for the same PMto be configured to generate work orders with
different tasks over time?
A. Master PM
B. Route Stops
C. PM Hierarchy
D. Job Plan Sequences
Answer: D
Explanation:
QUESTION NO: 29
What are two commonly used techniques for business process modeling? (Choose two.)
Answer: A,D
Explanation:
QUESTION NO: 30
Answer: D
Explanation:
QUESTION NO: 31
Capitalizing on the power of an object structure, multiple database objects and attribute fields can
be exported using the application’s filter and/or query?
A. Result Sets
C’R Application Export
B. Query By Example
C. Query-based Reporting
Answer: B
Explanation:
QUESTION NO: 32
Which IBM Tivoli Asset Management product enables an organization to accomplish facility
planning and increase facility utilization?
A. IBM TRIRIGA
B. IBM SmartCloud Control Desk
C. IBM Tivoli IT Asset Management
D. IBM Tivoli Service Automation Manager
Answer: A
QUESTION NO: 33
Which type of contract defines an agreement to maintain one or more assets with an outside
provider?
A. Price Contract
B. Blanket Contract
C. Warrantst Contract
D. LaborRate Contract
Answer: C
Explanation:
QUESTION NO: 34
A customer requirement is to have a script execute at the time when the user clicks the Save
button. Which launch point would be recommended to the user to create?
Answer: B
Explanation:
QUESTION NO: 35
What is the typical first step in a business process oriented gap-fit analysis?
Answer: A
QUESTION NO: 36
A. Inventory
B. Storerooms
C. Item Master
D. Service Items
E. Inventory Usage
Answer: A,E
Explanation:
QUESTION NO: 37
A. Meters
B. Asset Templates
C. Work OrderTracking
D. Preventive Maintenance
Answer: C
Explanation:
QUESTION NO: 38
Answer: A
Explanation:
QUESTION NO: 39
Which industry solution based on IBM Maximo Asset Management provides the ability to record
and manage smart meters?
Answer: A
Explanation:
QUESTION NO: 40
When creating a new PM, where are detailed task steps defined?
A. on the route
B. inajobplan
C. inthePMplans
D. onthemasterPM
Answer: B
Explanation:
QUESTION NO: 41
Which feature/function enables a customer to create a library of recurring work that contains all the
tasks that various departments would need to perform?
A. Routes
B. Job Plans
C. Work Plan
Answer: B
Explanation:
QUESTION NO: 42
A client maintains trains for the government and is required to record each axle configuration
including the wheel positions and their respective measurements. Which industry solution meets
these requirements?
Answer: B
Explanation:
QUESTION NO: 43
What are two factors that may increase implementation time? (Choose two.)
Answer: A,E
Explanation:
QUESTION NO: 44
A customer wants to periodically export purchase order records to their external accounting
system. This target system requires the data in XML format. Which IBM Maximo Asset
Management integration option is recommended for this requirement?
Answer: C
Explanation:
QUESTION NO: 45
Which feature may be associated with a service level agreement to track metrics and critical
performance variables over time?
A. Meters
B. Calendars
C. Notifications
D. Key Performance Indicators
Answer: D
Explanation:
QUESTION NO: 46
New to IBM Maximo Asset Management V7.5 is the ability to import and export records from
certain applications. How is it determined which applications use this functionality?
Answer: A
Explanation:
QUESTION NO: 47
Which two statements are true about the Application Designer? (Choose two.)
Answer: B,D
Explanation:
QUESTION NO: 48
Which IBM Tivoli product enables a customer to understand their costs and track, allocate, and
invoice by department?
Answer: D
Explanation:
QUESTION NO: 49
In order to create an internal purchase order (PO), what must be true about the P0?
Answer: D
Explanation:
QUESTION NO: 50
Across IBM Maximo Asset Management implementations, what is least likely to be implemented at
the completion of the project (go-live date)?
Answer: C
Explanation:
QUESTION NO: 51
Upon changing the status of an Inventory Usage record, if the available quantity’ of an item cannot
satisfy the current request, what will be displayed?
Answer: A
Explanation:
QUESTION NO: 52
Answer: D
Explanation:
QUESTION NO: 53
Answer: D
Explanation:
QUESTION NO: 54
A. ldenti1i the capabilities of the software product and relate these capabilities to the executable
high-level business process steps.
B. Compare the current system with potential new standard software systems, and document and
analyze the gaps between these systems.
C. Identify all gaps between the current and future business processes, and document the steps to
resolve the differences between these processes.
D. Compare the to-be business processes with the reference processes from the standard
software system, and document and analyze the differences.
Answer: D
Explanation:
QUESTION NO: 55
What are two work types that can be specified on a work order? (Choose two.)
A. Job Plan
B. Inspection
C. Calibration
D. Routine Maintenance
E. Emergency Maintenance
Answer: C,E
Explanation:
QUESTION NO: 56
Which function allows the designation of a primary user for a given asset?
Answer: D
Explanation:
QUESTION NO: 57
What is the benefit of using the Business Intelligence Reporting Tool (BIRT) with IBM Maximo
Asset Management (Maximo), compared to other reporting options?
Answer: A
Explanation:
QUESTION NO: 58
Answer: C
Explanation:
QUESTION NO: 59
Which add-on to IBM Maximo Asset Management allows customers to visually organize work and
forecasted PM5 in a Gantt chart view taking into consideration work constraints and
dependencies, and automatically applying a critical path method which users can manage?
Answer: A
Explanation:
QUESTION NO: 60
Answer: D
Explanation:
QUESTION NO: 61
Workflow, notifications, and escalations fit into which area of IBM’s approach to asset
management?
A. control
B. visibility
C. reporting
D. automation
Answer: D
Explanation:
QUESTION NO: 62
Which item in the IBM Maximo Asset Management application is best described as keeping track
of routine inspections and jobs including step-by-step instructions or checklists, lists of materials
required, and other pertinent details?
Answer: C
Explanation:
QUESTION NO: 63
Answer: D
Explanation:
QUESTION NO: 64
Which statement correctly describes warrants! recovery in IBM Maximo Asset Managementfor
Transportation?
Answer: B
Explanation:
QUESTION NO: 65
Which step is required to automate the process of creating work orders from PM5?
Answer: A
Explanation:
QUESTION NO: 66
Which values can be included in the calculation of the next PM due date?
A. routesandplans
B. plans and schedules
C. elapsedtimeandroutes
D. meters and elapsed time
Answer: D
Explanation:
QUESTION NO: 67
When updating a database table, Admin mode must be turned on, changes configured, and Admin
mode turned off, all while creating a back up of database tables. Why is this added functionality
required instead of only saving changes?
A. Changing the database tables requires a user with Administrative rights and the need to invoke
an Admin mode.
B. When changing the database, the changes are stored in secondary tables and do not take
effect until the database is configured.
C. Admin mode is necessary because all other users must sign out of IBM Maximo in order to
make changes to the Maximo database.
D. Admin mode is necessary because the e-signature is enabled for database configuration by
default in the administrative security group.
Answer: B
Explanation:
Master preventive maintenance records can be created for which record type in IBM Maximo
Asset Management?
A. Items
B. Locations
C. Work Orders
D. Assets anditems
Answer: A
Explanation:
QUESTION NO: 69
Using only the basic PM features, how many PMs are needed to schedule maintenance for 10
assets on different schedules?
A. 1
B. 2
C. 10
D. 11
Answer: C
Explanation:
QUESTION NO: 70
A. Assets
B. Domains
C. Specifications
D. Classifications
Answer: B
Explanation:
A. copythe contract
B. undo the contract
C. revise the contract
D. completethe contract
Answer: C
Explanation:
QUESTION NO: 72
Which application is used to receive quantities of multiple item numbers that have been
transferred in a single transaction?
A. Receiving
B. Inventory Usage
C. Shipment Receiving
D. Issues andTransfers
Answer: C
Explanation:
Topic 2, Volume B
QUESTION NO: 73
A. A forecast of work
B. The detailed actuals
C. Predicts an asset failure
D. A template for a work order
Answer: D
Explanation:
Which IBM Maximo Asset Management component would be best suited for periodically exporting
data to an external system?
A. Migration Manager
B. Automation Scripting
C. Integration Framework
D. Application Import/Export
Answer: C
Explanation:
QUESTION NO: 75
Which IBM Tivoli product automates license tracking in order to meet compliance requirements?
Answer: B
Explanation:
QUESTION NO: 76
Which application provides asynchronous processing of outbound JMS messages that do not
require a response from the external system?
A. Publish Channels
B. Enterprise Services
C. Invocation Channels
D. Web Service Interactions
Answer: A
Explanation:
Using workflows in the process of an asset purchase aligns with which IBM approach to asset
management?
A. Control
B. Visibility
C. Automation
D. Procurement
Answer: C
Explanation:
QUESTION NO: 78
How does IBM Maximo Asset Management address the Sarbanes-Oxley question: ¡°Do you have
an accurate inventory of all your physical assets?
Answer: C
Explanation:
QUESTION NO: 79
A. Control
B. Recycle
C. Visibility
D. Automation
Answer: A
Explanation:
Which type of contract represents an agreement to spend a predetermined amount with a vendor
over a period of time?
A. Price Contract
B. Blanket Contract
C. Warranty Contract
D. Labor Rate Contract
Answer: B
Explanation:
QUESTION NO: 81
A customer wants to create a repeatable and structured work order approval process. They
require the maintenance supervisor to review and approve any work order for assets in their
PRODUCTIONLINE location. What is a solution for this requirement?
Answer: B
Explanation:
QUESTION NO: 82
A. Start Centers
B. Migration Manager
C. Automation Scripting
D. Database Configuration
Answer: C
Explanation:
What are two IBM solutions for asset management in the field? (Choose two.)
Answer: C,E
Explanation:
QUESTION NO: 84
Answer: B
Explanation:
QUESTION NO: 85
What is an argument for using the labor functionality of IBM Maximo Asset Management?
Answer: B
Explanation:
QUESTION NO: 86
Preventive maintenance tasks can be created for which three record types in IBM Maximo Asset
Management? (Choose three.)
A. Items
B. Assets
C. Routes
D. Locations
E. Stocked Tools
F. Non-rotating Items
Answer: B,C,D
Explanation:
QUESTION NO: 87
Which add-on solution provides integrated map information when processing a work order?
Answer: D
Explanation:
QUESTION NO: 88
An architecture is being created for a trucking company that is largely an AIX shop (preferred
standard) and also Linux, with very little Windows administration expertise except that their
executive sponsor previously worked for Microsoft. Most of their users interact with custom Web
applications running on the Web hosting environment as far as interacting with IT business
applications. The AIX environment is capable of handling the maximum number of JVMs per host
including overhead and operating system (OS) by a safe margin when considering supported
memory. The total disk space on the system is sufficient given IBM recommended minimums.
Answer: C
Explanation:
QUESTION NO: 89
One key benefit of IBM Maximo Asset Management is that it provides a way to retain and exploit
asset management records. Why is this important?
Answer: D
Explanation:
QUESTION NO: 90
A. In the PM
B. In the job plan
C. In the work order
D. In the Master PM
Answer: C
Explanation:
QUESTION NO: 91
Answer: D
Explanation:
QUESTION NO: 92
A. Inventory
B. Item Master
C. Service Items
D. Inventory Usage
Answer: A
Explanation:
QUESTION NO: 93
It is discovered that although a client has a storeroom, they do not maintain the stock levels or
condition of the parts because this is done by a third party. Which type of inventory will need to be
set up in IBM Maximo Asset Management?
A. Kitted stock
B. Outside stock
C. Managed stock
D. Consignment stock
Answer: D
QUESTION NO: 94
In which scenario can an invoice be approved without a purchase order or contract reference?
Answer: D
Explanation:
QUESTION NO: 95
Which default reporting tool allows an IBM Maximo Asset Management user to access reports
from within Maximo applications?
A. Crystal Reports
B. Cognos Reporting
C. Tivoli Common Reporting
D. Business Intelligence Reporting Tool
Answer: D
Explanation:
QUESTION NO: 96
A. Asset control
B. Asset visibility
C. Asset automation
D. Asset maintenance
Answer: A
Explanation:
QUESTION NO: 97
IBM Maximo Asset Management for Nuclear Power helps organizations adhere to a process of
qualifying materials and services provided by vendors. Which statement is true regarding the
activities impacted by this benefit?
Answer: D
Explanation:
QUESTION NO: 98
A customer says their ERP solution alone is sufficient to manage their assets. Which statement is
true?
A. An asset-intensive company who has an ERP solution is at minor risk in only using the ERP
modules for asset management.
B. Organizations that manage mission critical asset infrastructures will rely primarily on ERP
systems because government regulations require it.
C. An asset-intensive company that experiences a severe safety incident can easily have a
problem measured in the hundreds of millions of dollars.
D. The larger the number of assets a company has, the less risk that exists around these assets
because a loss of a single asset is not very significant.
Answer: C
Explanation:
QUESTION NO: 99
A customer requires end users to import comma separated value (csv) format files into IBM
Maximo Asset Management. They want to only expose specific fields for security reasons. Which
Maximo functionality meets this requirement?
Answer: B
Explanation:
Answer: C
Explanation:
What is the name of the agreed upon level of service specified in a service level agreement?
A. Goal
B. Action
C. Promise
D. Commitment
Answer: D
Explanation:
A client has been using IBM Maximo Asset Management for over 5 years and has been producing
over 300.000 work orders annually. They are finding that performance has been dropping and they
want to remove some data while keeping it accessible for reporting. Which add-on solution is able
to do this?
Answer: D
Explanation:
Answer: A
Explanation:
What is the purpose of the Collections application in the Migration Manager module?
Answer: C
Explanation:
A customer is having problems where assets are coming into the storeroom after being
refurbished but the maintenance department cannot see the quantity available. Which type of
asset would make this possible?
Answer: A
Explanation:
When evaluating the customer network it is determined that a significant division of users exists
across WAN links. Which design approach can help alleviate perceived performance problems?
Answer: A
Explanation:
In which two applications can inventory issue costs be configured? (Choose two.)
A. Inventory
B. Item Master
C. Organizations
D. Inventory Usage
E. Cost Management
Answer: A,C
Explanation:
Answer: D
Explanation:
A. Inventory
B. Relationships
C. Quick Reporting
D. Work OrderTracking
E. Preventive Maintenance
Answer: C,D
Explanation:
Which application should be used to update the asset type for ten different existing assets in a
single transaction?
A. Assets
B. Equipment
C. Classifications
D. Asset Templates
Answer: D
Explanation:
Which IBM Tivoli product transforms raw IT data into business information for cost allocation that
spans business units, cost centers, applications, and users?
Answer: D
Explanation:
Service level agreements are associated with other objects in the system. Which objects are
typically associated?
A. Route, Ticket
B. Locations, PM
C. Asset Contract
D. Person, Job Plan
Answer: C
Explanation:
Which reporting option enables database updates from a report within IBM Maximo Asset
Management?
A. Cognos Reporting
B. Tivoli Common Reporting
C. Open Database Platform Reporting
D. Business Intelligence Reporting Tool
Answer: D
Explanation:
Answer: A
Explanation:
Answer: B
Explanation:
What is a benefit of using the Business Intelligence Reporting Tool (BIRT) compared to other
reporting options?
A. Only BIRT provides an embedded report designer, while other reporting options all use an
external report design utility.
B. Only BIRT provides built-in standard reports and the report design files can be a base for
modified and custom reports.
C. Built-in standard reports are available for both BIRT and Cognos, but only BIRT reports can be
modified through the Maximo User Interface.
D. Built-in standard reports are available for both BIRT and Cognos, but only BIRT reports can be
executed through the Maximo User Interface.
Answer: B
Explanation:
A. 1
B. 2
C. 10
D. 11
Answer: A
Explanation:
What are two Work Types that can be specified on a work order? (Choose two.)
A. Job Plan
B. Annual Maintenance
C. Location Maintenance
D. Corrective Maintenance
E. Preventive Maintenance
Answer: D,E
Explanation:
What is the use of an enterprise process framework when describing a customer’s business
process?
Answer: D
Explanation:
In which two applications can tax exempt status be selected? (Choose two.)
A. Tools
B. Inventory
C. Item Master
D. Stocked Tools
E. Inventory Usage
Answer: A,C
Explanation:
Answer: C
Explanation:
Which inventory costing option would be used if the items are utilized in the order in which they
are received?
A. LEO
B. FIFO
C. LILO
D. FILO
Answer: B
Explanation:
Which feature/function enables a manager to quickly assess the overall performance of assets?
Answer: A
Explanation:
In what way does IT asset management in IBM SmartCloud Control Desk differ from IBM Maximo
Asset Management?
Answer: A
Explanation:
A. Cost type
B. Order unit
C. Issue unit
D. Default bin
Answer: C
Explanation:
A customer would like to monitor meter readings on certain assets and have the system
automatically generate work orders. They would like to configure upper and lower limits for specific
meters and define different tasks when each limit is reached. Which functionally in IBM Maximo
Asset Management will meet this business requirement?
A. Custom Workflow
B. Condition Monitoring
C. Automation Scripting
D. Preventive Maintenance
Answer: B
Explanation:
In which application are pre-determined descriptions set up and used with similar types of assets?
A. Equipment
B. Relationships
C. Specifications
D. Classifications
Answer: D
Explanation:
Which option is a clear distinction between using Automation Scripting versus Java development
when customizing IBM Maximo Asset Management (Maximo) objects?
Answer: C
Explanation:
Which two statements are true concerning the Database Configuration application? (Choose two.)
Answer: B,D
Explanation:
A customer has many assets that they would like to record and create master preventive
maintenance records for in IBM Maximo Asset Management (Maximo). Which type of record,
when purchasing, would create these assets in Maximo?
A. Rotating Items
B. Rotating Assets
C. Non-rotating Items
D. Non-rotating Assets
Answer: A
Explanation:
Which two options are available to export data from IBM Maximo Asset Management if a company
wants to analyze Maximo data using Microsoft Excel? (Choose two.)
Answer: B,C
Explanation:
Which feature or function in Tivoli process automation engine enables the efficient processing of
inbound e-mails?
A. E-mail Listener
B. Ticket Templates
C. Organizational Service Request Options
D. Organizational Service Level Agreement Options
Answer: A
Explanation:
Master preventive maintenance records can be created for which type of record in IBM Maximo
Asset Management?
A. Items
B. Routes
C. Work Orders
D. Non-rotating Assets
Answer: A
Explanation:
A trucking company employs a small IT shop but is heavily information-driven. The IBM Maximo
Asset Management (Maximo) implementation will drive the business using a help desk (opening
These facts have been gathered using interviews from the customer sponsor:
- There will be 20 (maximum) help desk operators with an open Maximo application screen at all
times.
- The company has IBM WebSphere applications driving their commerce systems today.
- There will be 70 (maximum) mechanics reviewing any given asset record at one time, all using
an Internet Explorer browser.
- There are 6,200 employees at the company.
- There will be 10 (maximum) finance department members who will print an estimated 20,000
pages of BIRT reports each month.
- There will be 2,000 integration transactions per hour.
When working to produce an architecture for the trucking company, which two factors should be
taken into consideration for sizing the environment? (Choose two.)
Answer: B,D
Explanation:
A. Work Schedule
B. Meter Readings
C. Job Plan Priority
D. Route Sequence
Answer: B
Explanation:
Answer: B
Explanation:
Which step is necessary to automate the process of creating work orders for PMs?
Answer: D
Explanation:
Answer: B
Explanation:
What two key business benefits does the PM function provide for the client? (Choose two.)
Answer: A,D
Explanation:
If PM5 are generating automatically and the schedule needs to be stopped for a single active PM,
which step is appropriate?
Answer: C
Explanation:
Answer: A
Explanation:
Using the Application Designer, a button has been created on the Self-service Request
application. When clicking that button a script will run a certain event that invokes a Web
interaction from an external system. Automation Scripting must be used to customize the behavior
Answer: A
Explanation:
Answer: A
Explanation:
Work, parts, or services have been executed against contracts even though they have expired or
renewed. What is used by IBM Maximo Asset Management to allow enough time for the contracts
team to be notified?
Answer: D