You are on page 1of 311

(63 Districts Updated final& approbed by Steering Committee, GOI, on 23.12.

2009)

Integrated Watershed Management Programme


(I.W.M.P)
IN

Uttar Pradesh

Perspective and Strategic Plan


2009-2027

Department Of Land Development and Water Resources


Government of U.P.
List of Contents
(Updated)

CHAPTER SUBJECT Page No.


Integrated Watershed Management Programme (IWMP) at a Glance. 6 - 7
Perspective and Strategic Plan (SPSP) for IWMP of Uttar Pradesh.
1 Introduction: An overview of State. 8 - 18
2 Agro Climatic Zones- Features 19 - 36
3 Demography & Land Distribution 37 - 47
4 Land Use Pattern 48 - 67
5 Trends in Agriculture & Food productivity 68 - 97
6 Implementation of Watershed Programmes in the state at present 98 - 116
7 Strategy for implementation of IWMP 117 – 139
8 Livelihood Concerns. 140 – 143
9 Institutional Arrangement 144 – 153
10 Capacity Building. 154 – 171
11 Monitoring and Evaluation 172 – 175
12 Expected Outcomes. 176 -304
Appendix-I G.O. of State Level Nodal Agency (SLNA) 305-307

2
List of Tables
Table No. SUBJECT Page No.
Table - SPSP-1 Districtwise State Profile 12-15
Table – 1.2.1 Production & Productivity of Crops in U.P. 16
Table – 1.3.3 Classification of Problematic Area in U.P. 18
Table – 2.01 List of Districts in different economic regions of U.P. 19
Table – SPSP-2 Details of Agro Climatic Zone in the State 20-21
Table - SPSP-3 Districtwise Annual Rainfall in different Years in U.P. 24-27
Table – 2.3.1 Area Under Major Crops 33-34
Table - SPSP-4 Details of Drought and Flood affected Districts, Blocks and Villages 36
Table – 3.1.1 Comparative Population Status (Census 2001) 37
Table – 3.1.2 Distribution of Population of U.P. by working Status (2001) 38-39
Table – 3.2 Population Below Poverty Line on the Basis of URP Consumption in U.P. 40
Table – 3.3 Labour force, Work force, Employment & Unemployment in U.P. 41
Table – 3.4 Select Socio- Economic Development indicators for U.P. and the major States of 42
India
Table – 3.5 Numbers of marginal and small farmers & distribution of land 43
Table - SPSP-5 Details of Districtwise land holding pattern in U.P. 44-46
Table - SPSP-6 Share of Agriculture Sector to State Income/ National at Current Prices and Tottal 47
Work Force in the State and India.
Table - SPSP-7 Sectoral Composition of Net State Domestic Product (NSDP) in U.P. 47
Table – 4.1 Land Use Patern in U.P. 48
Table – 4.2 Area under Various Land Holding Groups 49
Table - SPSP-8 Land Use Status in U.P. 50-53
Table – 4.3.1 Sourcewise irrigated area in U.P. 53

3
Table No. SUBJECT Page No.
Table - SPSP-10 Districtwise & Sourcewise Irrigated Area in U.P. 54-57
Table – 4.3.2 Categirization of Districts According to Slab of Extent of Irrigation 58
Table - SPSP-9 Irrigation Status 59-62
Table – 4.3.3 Crop Seasonwise Irrigation Status 62
Table - SPSP-11 Details of Common Property Resources in U.P. 64-67
Table -5.1 Contribution of U.P. in Food Basket of Country 68
Table – 5.2.1 Zonewise Productivity of Food Grains 69
Table – 5.2.2 Zonewise Productivity of Pulses 70
Table - 5.2.3 Zonewise Productivity of Oilseeds 71
Table - SPSP-12 Districtwise Cropped Area, Production of Major Crops 72-86
Table – 5.2.4 Gap between Potential and Actual yield 87-88
Table – 5.2.5 Comparative Production and Productivity of some Major Crops with some other 89-91
States
Table – 5.3 Percentage Expenditure on Agriculture & Allied Sector over Plan period in U.P. 91
Table – 5.4 Agriculture and Allied Sectors Growth Rate in Plan Periods 92
Table – 5.5 Fertilizer Consumption in U.P. 93
Table – 5.6 Cropswise seed Replacement Rate in U.P. 94
Table - SPSP-13 Comparative average yield of Major Crops of the State and India during Triennia 97
1972-73 to 1974-75 and 1992-93 to 1994-95
Table - SPSP-14 Status of Districtwise Area covered under the Watershed Programme. 102-105
Table - SPSP-15 Details regarding the Watershed Projects sanctioned by DoLR in U.P. 106
Table - SPSP-16 Details of the Watershed Projects implemented in the State with the Financial 107
Assistance other than DoLR.
Table - SPSP-17 Details of Pending UCs 108
Table - SPSP-18(A) Details of Unspent Balance – DPAP 108-112

4
Table No. SUBJECT Page No.
Table - SPSP-18(B) Details of Unspent Balance –IWDP 113-116
Table - SPSP-19 Planwise Phasing of Physical & Financial Targets of IWMP for next 18 years 122-124
Table - SPSP-20 Yearwise Phasing of Physical & Financial Targets of IWMP for remaining period of 125-128
XI Plan
Table - SPSP-21 Details of Districtwise and categorywise area proposed tobe taken up under IWMP 129-136
during next 3 years i.e. upto 11th Five Year Plan.
Table – 7.2.2 Component/ Institution wise Budget Allocation During the Remaining Periods of 137
11th Plan
Table - SPSP-22 Details of Convergence of IWMP with other Schemes 138
Table - SPSP-24(A) Details of Livelihoods Expected tobe Created for Landless People 142
Table - SPSP-25(B) Details of other Livelihoods Created for Farmers 143
Table - SPSP-26 Details of SLNA 151
Table - SPSP-27 Details of SLNA 151
Table - SPSP-28 Details of Functionaries in the SLNA’s 152
Table - SPSP-29 Details of Functionaries in the SLNA’s 153
Table – 10.1 Training Action Plan of U.P. for Watershed Development Programme 167
Table - SPSP-31 List of Training Institutes Identified for Capacity Building at State Level 169-171
Table - SPSP-33 List of Institutes Identified for M & E at State level. 174-175
Table – 12.1 Abstract of Expected Outcomes 177-178
Table - SPSP-34 Districtwise details of Expected Outcomes 179-304

5
A- Integrated Watershed Management Programme (IWMP) at a Glance –
The new approach to watershed development provides a paradigm shift in the traditional approach where the role of the government is
changed from that of governance to facilitation. It envisages a bottom-up approach whereby the user's group themselves decide their work
programme.
The basic objective of this scheme is integrated watershed development based on village/ micro watershed plans. The highlights of the
scheme are:-
 Development of clusters of micro watersheds in a holistic manner rather than piecemeal treatment in sporadic patches.
 Decentralisation of decision-making process by involving local panchayati raj institutions, NGOs, government departments and the
watershed community at the grassroots level. The people are given actual decision-making powers in terms of project implementation
and fund disbursal.
 A three-tier approach addresses hilly/ forest regions, intermediate tier or slopes and lastly, plains and flat areas.
 The scheme promotes locally available low cost technology.
 The scheme also aims at creating rural employment opportunities.
Objectives
 Harvesting every drop of rainwater for purposes of irrigation, plantations including horticulture and floriculture, pasture development,
fisheries, etc., to create sustainable sources of income for the village community as well as for drinking water supplies.
 Ensuring overall development of rural areas through the Gram Panchayats and creating regular sources of income for the Panchayats
from rainwater harvesting and management.
 Employment generation, poverty alleviation, community empowerment and development of human and other economic resources of the
rural areas.
 Mitigating the adverse effects of extreme climatic conditions such as drought and desertification on crops, human and livestock
population for the overall improvement of rural areas.
 Restoring the ecological balance by harnessing, conserving and developing natural resources, i.e. land, water and vegetative cover
especially plantations.
 Encouraging the village community towards sustained community action for the operation and maintenance of assets and further
development of the potential of the natural resources in the watershed.
 Promoting use of simple, easy and affordable technological solutions and institutional arrangements that make use of, and build upon,
local technical knowledge and available materials.

6
Project implementation and Institutional Arrangement
The Watershed programmes are implemented by the "District Rural Development Agency'' through Village Watershed Committees
(VWC). A Project Implementing Agency (PIA), which may be a government department/ autonomous institute/intermediary panchayat or an
NGO, is assigned a cluster of micro watershed. The PIA forms a multidisciplinary ' Watershed Development Team' which provides technical
assistance to VWC in the planning and implementation of the programme. The women and rural area labourers of the area covered by the
watersheds are also organized into ' self-help groups.' The user groups are the beginning point as well as the end point for Watershed Development
Programmes. Their initiative is crucial to the success of the programme and they are the ultimate beneficiaries. The State Land Development and
Water Resources Department will coordinate amongst various government departments, Agricultural universities, NGOs etc., and monitor review
and evaluate the watershed development programmes. Community participation is an important aspect of watershed development programme.
Capacity Building and Training
Successful implementation of projects, understanding various aspects of the programme, skill up-gradation, sustainability of projects,
confidence building and planning implementation and monitoring of the watershed programme are the objectives of capacity building and training
exercise. Prior sensitization and orientation training on Watershed Project Management would be imparted to all concerned functionaries and
elected representatives at the district, block and village level before they assume their responsibilities. Training of self –help groups in groups
management and various income generating activities and user groups for resource management forms an important component of the overall
programme.
Monitoring and Evaluation
The Gram Sabha and Gram Panchayat are responsible for day to day monitoring at village level. At the district level it is essential to
review the progress of each PIA on the monthly basis. Likewise PIA may review the progress of each micro watershed before participating in the
district-level meeting. Village-level groups may undertake weelky meetings to review progress. This approach helps in achieving a steady
progress and also timely resolution of bottlenecks in implementation. PIAs are expected to have specific MIS system and by use of computer
networks online monitoring will be ensured.
Concurrent evaluation will be done by internal process. External agencies having expertise in watershed evaluation will be engaged for
midterm evaluation of the project activities and its outcome. This will be used for midterm correction based on the recommendation of the
evaluating agency. Critical assessment is to be done of the relevance of technological content, involvement of people in the programme, equity for
poor and women, facilitation of group action in addition to physical and financial progress alongwith the outcomes of the project activities in terms
of increase in production, productivity, cropping intensity and income of the beneficiaries. This midterm evaluation will help to assess whether the
project is on track and to carry out midterm corrections if required.
A post project evaluation will be done after completion of the project activities to assess the impact of the project on the watershed.
This will preferably be done by outside agency for getting independent assessment.

7
Chapter – I
1.0 Introduction: An overview of State -
Uttar Pradesh occupies an important place in the polity and economy of the country. The economy of U.P. is predominately
agrarian. The performance of agriculture and allied activities such as horticulture, animal husbandry, dairying & fisheries is critical in
determining the growth rate of the State. Extending between 250-310 N latitude and 770-840 E longitude, Uttar Pradesh is the fifth largest
State of India after Rajasthan, Maharashtra, Madhya Pradesh and Andhra Pradesh in area. For administrative purposes, the state is divided
into 18 divisions and 71 districts. There are 303 sub divisions, 313 Tehsils, 11 Municipal Corporation, 689 Cities, 820 community
development blocks, 52,000 Gram Sabha, 1,07,452 revenue villages, out of which 97,941 are inhabitant and 9,511 uninhabitant in the
state. Districts & Tahsils of the State are shown in Map 1.0.1 & Map 1.0.2

Though planned efforts since Independence yielded positive outcomes for the state economy in terms of development of social,
economic and industrial infrastructure and many other dimensions, it is still the 10th poorest state in the country. Heavy population
pressure is often mentioned as one of the key reasons of widespread poverty in the state.
Total geographical area of the state is 24,170 thousand hectare (which is 7.33% of total area of India) out of which 16,573
thousand hectare is under cultivation. Gross cropped area is 25,414 thousand ha with the cropping intensity of 153%. In Uttar Pradesh
size of holding is around 0.83 ha and per capita land area is 0.14 ha, which is less than a half of the national average of 0.32 ha. Uttar
Pradesh is largest producer of wheat, potato, sugarcane and milk whereas third largest producer of rice. Agriculture still constitutes the
backbone of the state economy, more so, because it provides livelihood to about two-third population of the state. The state is endowed
with ample alluvial soil along with diverse agro-climatic profile which can support the cultivation of variety of crops. Due to large
cultivated area, its share in national agricultural production is quite impressive but low crop productivity has hindered the realisation of
ultimate potential

(i) Physical Features


Being a border state of India, Uttar Pradesh’s northern frontiers adjoin Nepal which earlier extended upto Tibet before the creation of
Uttaranchal whose Shivalik ranges near Tibet Border. UP’s boundaries touch Haryana, Delhi and Rajasthan in the west, Madhaya
Pradesh in the south and Bihar in the east. In geo-physical terms, the Shivalik range of the Himalayas in the north, the river Yamuna and
the Vindhyas in the west, south-west and the south and the Gandak river in the east demarcate the terrain called Uttar Pradesh as it is.
topographically, U.P. consisted of Terai-Bhabhar, plains and the southern plateau, Terai-Bhabhar.
8
Map- 1.0.1 – Administrtive Units (Districts) of the state

9
Map- 1.0.2 - Tahsils of the State

10
(ii) Terai Bhabhar Region
The thin strip of land running from Saharanpur in the west to Deoria in the east is known as Bhabhar and Terai. The Bhabhar area
in Saharanpur, Bijnor and Pilibhit districts skirts round the Shivalik hills. Torrential streams and rivers desending the mountaineous
slopes slow down here, leaving behind boulders brought from the upper reaches of the Himalayan hills. Some 34 Kilometers in width in
the west, the tract goes on getting narrower in its march towards the east. Smaller streams seem to get lost in the thick mass of boulders
but reappear some distance away, moving slowly and depositing a thin layer of soil which converts itself into a marshy patch called the
Terai.
The Terai area, which runs through parts of Saharanpur, Bijnor, Rampur, Barelly, Pilibhit, Lakhimpur Kheri, Bahraich, Gonda,
Basti, Siddarthnagar, Gorakhpur, Mahrajganj and Deoria districts was once a belt, some 80 to 90 kilometers wide , covered with forests
and tall, dense grasses. In the recent years, however, owing to the land acquisition programme of the State Government the Terai belt has
shrunk considerably, Wheat, rice and sugar cane are the main crops grown in Terai together with jute in certain stretches.
Outside the Terai and Bhabhar belt, the plains are fertile and flat save certain trans-Yamuna portions in Agra and Mathura districts
where ravines and red stone hillocks abound on the eastern end of the Arawali range.
Irrigated by Ganga, Yamuna and their tributaries, the plains slope in two formations- from north to south in the west and west
north to south east in the east, yielding two major crops a year i.e. rice in Kharif & wheat in Rabi Season.
(iii) Southern Hills and Plateau
The rivers Yamuna and the Ganga demarcate the northern boundaries of the southern plateau of the State which comprises
the district of Lalitpur, Jhansi, Jalaun, Hamirpur, Mahoba, Chitrakoot and Banda as well as the Karchhana and Meja tehsils of the
Allahabad district besides Chakia tehsil in Varanasi district. Geologically, these regions which were formed probably in the pre-cambrian
period reach upto an average height of 300 meters above the sea level. In a few places they rise to 450 meters, peaking to around 600
meters in the Kaimur and Sonbhadra hills that run to the north of the river Sone. The Vindhya hills in the Karwi tehsil of the Banda
district slope towards north east. The rivers Betwa and Ken which pass through Bundelkhand join the Yamuna. The region receives
scanty rainfall which, coupled with severe heat, accounts for the stunted growth of flora and scarce availability of winges fauna. Jowar,
Gram and Wheat are the main crops of the area. To mitigate the situation steps have been taken, in the past few years, to construct
reservoirs for irrigation and drinking purposes.

11
1.1 - Districts wise State Profile is given in Table – SPSP – 1
Table SPSP 1: State Profile
1 2 3 4 5 6 7
Sl. Name of No. of Total Total Geogr. Population (As per the 2001 Census)
No District Blocks no. of no. of Area Male Female Total % of BPL
villages Gram SC ST Others SC ST Others SC ST Others to total
Panch- population
ayats
1 Saharanpur 11 1606 782 368900 338440 279 1214603 290910 219 1052412 629350 498 2267015 17.03
2 Muzaffar Nagar 14 1025 687 400800 257135 42 1636655 221189 45 1428296 478324 87 3064951 8.75
3 Bijnor 11 2989 959 456100 348650 1279 1301979 307156 1148 1171407 655806 2427 2473386 16.87
4 Moradabad 13 1800 960 371800 324631 162 1707509 279622 142 1498917 604253 304 3206426 11.07
5 Rampur 6 1155 580 236700 137704 237 885834 119661 121 780182 257365 358 1666016 24.46
6 J.P. Nagar 6 1124 484 224900 137571 14 657643 121286 10 582544 258857 24 1240187 18.43
7 Meerut 12 674 460 259000 296882 112 1304584 255810 124 1139849 552692 236 2444433 3.02
8 Bagapat 6 315 237 132100 69389 27 560661 58424 21 475469 127813 48 1036130 5.60
9 Ghaziabad 8 560 405 114800 319934 112 1448996 273846 95 1247603 593780 207 2696599 2.70
10 G.B.Nagar 4 422 243 144200 105830 214 546775 90192 184 458835 196022 398 1005610 8.74
11 Bulandshahr 16 1197 889 435200 315015 103 1235208 273668 85 1089043 588683 188 2324251 8.62
12 Aligarh 12 1210 853 365000 340763 126 1266513 293507 104 1091273 634270 230 2357786 10.41
13 Hathras 7 672 430 184000 181283 43 537604 155456 26 461619 336739 69 999223 14.36
14 Mathura 10 880 479 334000 219514 114 907884 187086 117 759801 406600 231 1667685 11.64
15 Agra 15 938 636 402700 427324 454 1533504 361070 412 1297672 788394 866 2831176 10.80
16 Firozabad 9 814 523 236100 209651 104 898913 177396 89 766805 387047 193 1665718 8.55
17 Etah 15 1610 898 444600 259626 16 1249557 219039 14 1062158 478665 30 2311715 14.08

12
1 2 3 4 5 6 7
Sl. Name of No. of Total Total Geogr. Population (As per the 2001 Census)
No District Blocks no. of no. of Area Male Female Total % of BPL
villages Gram to total
Panch- population
ayats
18 Mainpuri 9 854 503 276000 166886 368 692680 141504 342 594938 308390 710 1287618 35.08
19 Badaun 18 2081 1069 516800 284722 53 1381894 239962 53 1162742 524684 106 2544636 8.97
20 Bareilly 15 2070 1008 412000 246091 205 1687823 211680 170 1472620 457771 375 3160443 18.45
21 Pilibhit 7 1349 599 349900 133828 938 741602 116667 855 651293 250495 1793 1392895 32.93
22 Shahjahanpur 15 2425 922 457500 245812 48 1137548 205680 49 958718 451492 97 2096266 42.95
23 Kheri 15 1859 995 768000 437094 19353 1257461 383265 18596 1091463 820359 37949 2348924 47.67
24 Sitapur 19 2348 1329 574300 619501 191 1321682 534125 176 1143986 1153626 367 2465668 45.40
25 Hardoi 19 2070 1101 598600 581638 106 1260954 484210 97 1071301 1065848 203 2332255 65.21
26 Unnao 16 1794 954 455800 432367 521 989621 394888 436 882491 827255 957 1872112 52.90
27 Lucknow 8 835 511 252800 410227 1527 1520563 366275 1341 1347901 776502 2868 2868464 18.14
28 Raebareli 21 1773 965 460900 435161 927 1036142 421588 875 977642 856749 1802 2013784 47.84
29 Farrukhabad 7 1007 512 218100 140497 479 708824 117583 432 602593 258080 911 1311417 30.25
30 Kannauj 8 752 441 209300 138808 23 605339 117230 24 527499 256038 47 1132838 29.65
31 Etawah 8 692 420 231100 170172 12 550565 143298 4 474820 313470 16 1025385 38.92
32 Auraiya 7 841 441 201500 178101 45 457616 148687 23 395521 326788 68 853137 38.33
33 Kanpur Dehat 10 1031 612 302100 211051 186 633102 177368 196 541433 388419 382 1174535 56.99
34 Kanpur Nagar 10 1003 557 315500 369288 1078 1876850 316321 973 1603489 685609 2051 3480339 16.54
35 Jalaun 9 1151 564 456500 214871 68 571702 178436 72 489303 393307 140 1061005 37.02

13
1 2 3 4 5 6 7
Sl. Name of No. of Total Total Geogr. Population (As per the 2001 Census)
No District Blocks no. of no. of Area Male Female Total % of BPL
villages Gram to total
Panch- population
ayats
36 Jhansi 8 949 437 502400 261606 566 670646 228357 504 583252 489963 1070 1253898 21.48
37 Lalitpur 6 778 340 503900 128821 2 390590 114967 0 343354 243788 2 733944 26.75
38 Hamirpur 7 648 314 428200 129427 93 434281 108475 73 371375 237902 166 805656 35.60
39 Mahoba 4 500 247 288400 97674 32 281985 84940 33 243783 182614 65 525768 18.17
40 Banda 8 718 437 446000 172542 26 653976 147684 28 563078 320226 54 1217054 34.37
41 Chitrakoot 5 630 330 316400 106811 1 302366 95028 0 262019 201839 1 564385 50.93
42 Fatehpur 13 1522 788 415200 304463 242 914897 273607 225 814950 578070 467 1729847 38.37
43 Pratapgarh 17 2219 1105 371700 295359 77 1067512 305684 82 1062460 601043 159 2129972 47.22
44 Kausambi 8 868 440 178000 244354 47 437889 222499 39 388326 466853 86 826215 69.35
45 Allahabad 20 3064 1425 548200 561115 2337 2062996 503982 1936 1803739 1065097 4273 3866735 21.35
46 Barabanki 17 1842 1139 440200 380469 235 1036217 338428 221 918011 718897 456 1954228 54.05
47 Faizabad 9 1272 592 234100 241212 88 836172 230627 102 780727 471839 190 1616899 28.47
48 Ambedkar Nagar 9 1780 805 235000 248385 82 776486 246990 61 754872 495375 143 1531358 61.27
49 Sultanpur 23 2531 1262 443600 362641 235 1260943 352656 231 1238126 715297 466 2499069 46.61
50 Bahraich 14 1226 903 442000 184717 4220 1086414 158030 4338 943353 342747 8558 2029767 78.42
51 Shrawasti 5 704 334 245800 117325 2422 512169 99027 2334 443114 216352 4756 955283 47.75
52 Balrampur 9 1021 667 334900 121676 10130 756133 105077 9217 680117 226753 19347 1436250 31.21
53 Gonda 16 1821 1054 400300 227851 104 1223146 205640 78 1108767 433491 182 2331913 32.16
54 Siddharth Nagar 14 2532 1015 289500 173869 125 873171 163442 103 829375 337311 228 1702546 39.51

14
1 2 3 4 5 6 7
Sl. Name of No. of Total Total Geogr. Population (As per the 2001 Census)
No District Blocks no. of no. of Area Male Female Total % of BPL
villages Gram to total
Panch- population
ayats
55 Basti 14 3351 1047 268800 224685 122 850958 210397 113 798539 435082 235 1649497 41.69
56 Sant Kabir Nagar 9 1727 648 164600 152516 161 566788 148386 146 552229 300902 307 1119017 37.26
57 Maharajganj 12 1258 777 295200 217875 1342 905073 206315 1222 842051 424190 2564 1747124 25.83
58 Gorakhpur 19 3327 1233 332100 421449 472 1501276 409621 426 1436212 831070 898 2937488 18.52
59 Kushi Nagar 14 1641 956 290600 266320 199 1207118 257829 220 1161510 524149 419 2368628 37.09
60 Deoria 16 2161 1017 253800 246895 270 1107858 246449 263 1110915 493344 533 2218773 5.14
61 Azamgarh 22 4106 1617 405400 497014 359 1453042 516787 341 1472373 1013801 700 2925415 34.00
62 Mau 9 1622 596 171300 211599 202 721722 210078 227 710169 421677 429 1431891 37.68
63 Ballia 17 2360 833 298100 233722 136 1179916 220925 137 1126784 454647 273 2306700 46.52
64 Jaunpur 21 3386 1514 403800 426592 200 1515111 431291 176 1538309 857883 376 3053420 40.42
65 Ghazipur 16 3364 1050 337700 330028 149 1206964 319482 133 1180826 649510 282 2387790 40.45
66 Chandauli 9 1638 620 254100 208061 131 646931 191113 122 596893 399174 253 1243824 40.67
67 Varanasi 8 1327 702 153500 228734 422 1420031 206811 347 1282326 435545 769 2702357 14.50
Sant Ravidas
68 Nagar 6 1224 489 101500 154402 123 551472 138345 102 509261 292747 225 1060733 12.43
69 Mirzapur 12 1985 758 452100 298714 667 815868 267446 635 732712 566160 1302 1548580 51.47
70 Sonbhadra 8 1424 501 678846 318458 249 452190 295039 244 397339 613497 493 849529 57.09
Total
820 107452 52000 24170446 18502838 55834 69006697 16645539 52129 61934884 35148377 107963 130941581 29.85
(Uttar Pradesh)

SOURCE;Staitstical Abstract 2008, U.P. Economics&Statistical Division State Planning Institute U.P.
15
1.2. Economic Development
1.2.1 PRODUCTION AND PRODUCTIVITY OF DIFFERENT CROPS:
Uttar Pradesh is a largest food grain producing State in India producing about 20% of the country's total food grain production. In
2006-07 contribution of Uttar Pradesh was 41.20 million tonnes in the national food grain production of 217.3 million tones. By the end
of year 2009 food grain production in the state is expected to be at the level of 49.71 million tonnes. However, the state is also
characterized by extreme dependence on agriculture. About 80% of the population in U.P. live in the rural areas. It is rich in national
resources (land and water) but has a high population density and declining soil fertility. Agriculture accounts for about 32% of GSDP.
The State accounts for about 17 percent of all-India foodgrain area and 21 percent of production. Main crop of the State is Cereal
and Pulses, Oilseeds are also grown in some area with low productivity. Relatively larger share in production is obviously attributed to
higher foodgrain yield in the state (Table – 1.2.1)
Table- 1.2.1 - Production & productivity of Crops in U.P.
Crop Production lakh tons Yield (qtl per ha) Contribution of State %
India Uttar Pradesh U.P.
Total food grain 2086 404.10 - 19.37
Rice 917.90 111.30 19.96 12.13
Wheat 693.50 240.70 26.27 34.71
Sorghum 76.30 2.40 10.65 3.15
Pearl millet 76.80 12.50 14.34 16.28
Maize 147.10 10.50 12.95 7.14
Total pulses 133.80 22.30 - 16.67
Chickpea 56.00 6.60 8.93 11.79
Pigeon pea 27.40 3.80 9.87 13.87
Lentil 9.90 5.00 7.25 50.15
Total oilseed 252.90 9.40 - 3.72
Ground nut 79.90 0.90 8.51 1.13
Rapeseed 81.30 9.10 11.49 11.19
Sunflower 14.40 0.20 16.26 8.39
Sugarcane 2811.70 1254.70 582.01 44.62
Potato 239.10 99.90 224.32 41.78
Source - State Annual Plan

16
In case of Rice and Wheat, its share in area as well as production is around 14 and 35 percent respectively due to comparable yield
levels. The state has about 1/4th of the total area under coarse cereals but its share in production is around 1/10th due to much low Maize
yield. With better yield, the state produces about 18 percent of total production of Pulses with only 12-13 percent area. It makes the
highest contribution in production of Lentil followed by Pigeon pea and Gram. In country’s total stock of Oilseeds the State’s
contribution is limited to just 5-6 percent due to small area under these crops in spite of comparable yield rates. However, State’s
contribution in total production of Rapeseed & Mustard is higher (17-19 percent). The State is most important producer of Sugarcane and
accounts for about 40 percent of total production in the country. Larger area under Sugarcane more than compensates for lower yield.
1.3 Role of watershed management in the State – Importance of watershed programme for the State,
historical background of watershed development in the State, current status, expected outcomes, etc.
1.3.1 - Rain Water Harvesting
U.P. has diverse agro climatic zones which almost different from another. For example eastern plain is being presumed as water
logged area whereas Bundelkhand is well known for their drought prone climatic property. A concept of rain water harvesting is to
conserve and collect the rain water of rainy season in a water body for their multipurpose use i.e. for live stock, human needs and farm
sector. A scheme has been launched for Bundelkhand region to minimize the adversity of drought in this region. Through this scheme
Drip and Sprinkler irrigation system has been provided to the farmers at subsidized rate. Judicious use of rain water demonstration is
being made as a component of this scheme for the purpose of its popularization amongst the farming community.
1.3.2 Natural Resource Management
Land is a basic natural resource on which development of human with other living beings along with water and plants are going on
from the beginning of the creation. Inadequate management of natural resource affected bio diversity, agriculture productivity and
ecological balance. It is necessary to implement on priority basis, Soil and Water Conservation programmes in problematic areas, to
ensure planned development and to achieve required production of food grains, fodder and bio fuel. Schemes implemented also provide
local employment to the agriculture labourers, small and marginal farmers.
Non scientific use of land creates numerous problems like land degradation, ravine and water logging.Some of the adverse impact
reflected on agriculture production and productivity are as under:-
 Agra, Kanpur, Allahabad, Jhansi and Chitakoot Dham region are severely affected by ravine/land eroding problem.
 Aligarh. Etah, Etawah, Aurrya, Mainpuri, Farrukhabad, Kannauj, Kanpur Dehat, Unnao, Hardoi, Lucknow, Raibarely,
Sultanpur, Pratapgarh, Allahabad, Fatehpur, Jaunpur, Ajamgarh, Mau and Balia are mostly affected by USAR problem. Crop
productivity is very low due to alkaline problem in the land of these regions.

17
 An area of is 3.40 lakh ha. in the Agra and Mathura district are affected from saline under ground water. Seed germination and
crop health are affected from salinity of water.
 Diversion of river flow of the state’s main rivers like Ganga, Ghaghra, Ram Ganga and Gandak creates problem of land erosion
on river bank. Flood is another major problem in these areas.
 Improper management of drainage system creates water logging problems. Unplanned development also creates the problem of
water logging.
1.3.3 - Present Status of Land Resource
The major river of the state is Ganga, Yamuna, Ghaghra and Sone. Problematic area of watershed is situated along these rivers.
 Total Reported Area (Lakh ha.) 241.70
 Total Problematic Area (Lakh ha.) 120.44
Table 1.3.3 Classification of Problematic Area (Lakh ha.) in U.P
Type of Problem Total Area Treated Area (Up to March, 09) Balance Area
Degraded and Problematic land
A Agriculture Land 60.66 49.36 11.30
B Non Agriculture Land 12.87 5.66 7.21
Total 73.53 55.02 18.51
Special Problematic Land
A Ravine Land 12.30 8.72 3.58
B Usar and Alkaline Land 11.51 6.18 5.33
C Diara and Khadar Land 15.00 1.72 13.28
D Water Logged Land 8.10 2.97 5.13
Total 46.91 19.59 27.32
Grand Total 120.44 74.61 45.83
Source – State Annual Plan 2009-10 & State Agriculture Directorate.

18
Chapter 2
2.0 Agro-climatic zones (Features)
State is divided into four economic regions i.e. Western Region, Central Region, Eastern Region & Bundelkhand Region as given in
Table – 2.01 and also divided into 9 agro-climatic zones, namely, Bhabhar & Tarai, Western Plain, Central-Western Plain, South-
Western Plain, Central Plain, Bundelkhand, North-Eastern Plain, Eastern Plain, and Vindhyan region. The State is also divided into four
economic regions, viz., Western, Eastern, Central and Bundelkhand. The western region comprises of 27 districts and the eastern region
27 districts. Ten districts constitute the central region whereas the bundelkhand region has only 7 districts. Details of the agroclimatic
zones are given in Table SPSP-2

Table – 2.01 LIST OF DISTRICTS IN DIFFERENT ECONOMIC REGIONS OF UTTAR PRADESH


Region Districts
Western Region Agra, Mainpuri, Firozabad, Aligarh, Kanshiramnagar, Bareilly, Badaun, Bulandshar, Etah, Etawah, Farrukhabad,
Mathura, Meerut, Ghaziabad, Muradabad, Pilibhit, Rampur, Muzaffarnagar, Saharanpur, Bijnor, Shahjhanpur, Begpath,
Gautam Buddha Nagar, Hathras, J.B. Nagar, Kannauj, Auriya.

Central Region Barabanki, Fatehpur, Hardoi, Kanpur Nagar, Kanpur Dehat, Khiri, Lucknow, Raibareilly, Sitapur, Unnao.

Eastern Region Allahabad, Kaushambi, Azamgarh, Maunath Bhanjan, Ballia, Bahraich, Basti. Siddharthnagar, Deoria, Faizabad,
Ghazipur, Gonda, Gorakhpur, Mahrajganj, Jaunpur, Mirzapur, Sonbhadra, Pratapgarh, Sultanpur. Varanasi, Balrampur.
Shravasti, Chandauli, Sant Ravidas Nagar, Kushinagar, Sant Kabir Nagar, Ambedkarnagar.

Bundelkhand Region Jhansi, Jalaun, Hamirpur, Mohabba, Banda, Chtrakut, Lalitpur.

19
Table SPSP 2: DETAILS OF AGRO CLIMATIC ZONE IN THE STATE
Average
Agrocli Total
SL. Annual
matic Geographical Districts Soil Type Temperature (C') Major Crops
NO Rainfall
Zone Area in ha
(mm)
Area in
Minimum Maximum Name
Ha.
Saharanpur (58%), Muzaffarnagar Rice 509818
Alluvial least to
(10%), Bijnaur (79%),
Bhabhar medium phosphorus
Moradabad(21%), Rampur(40%),
1 andTarai 1847319 medium to high 1400 5.5 38.4 Wheat 608051
Bareilly(19%), Pilibhit(75%),
zone potashium and highly
Shahjahanpur(6%), Khiri(39%)
carbonised matter. Sugarcane 458965
Bahraich (47%), Shravasti (71%)
Saharanpur(42%), Alluvial PH value Rice 159651
Western
Muzaffarnagar(90%), Meerut, Bagpat, mormal to sodic and
2 Plain 1637424 795 1.50 43.3 Wheat 611658
Gaziabad, Gautam Budh Nagar, carbonic matter from
zone
Budandshahar least to medium. Sugarcane 606439
Mid Allmost allunial normal Rice 480409
Bareilly (81%), Badaun, Pilibhit
westren to slight sodic and Wheat 830800
3 1697125 (25%), Moradabad(79%), J.P.Nagar, 1032 4.5 45.4
Plain contanin's medium
Rampur(60%), Bijnour(21%) Sugarcane 306878
zone corbonic matters
South Rice 219531
westren Agra, Firozabad, Aligarh, Hathras,
4 2234222 Alluvial & arawali. 662 4.0 47.0 Wheat 1134853
semi arid Mathura, Mainpuri, Etah
zone Sugarcane 26088
Shahjahanpur(94%), Kanpur nagar, Rice 1335506
Allunial, PH normal to
Kanpurdehat, Etawa, Auraiya,
Central sodic and containing
Farrukhabad, Kannauj, Lucknow, Wheat 2252146
5 plain 5647307 carbonic matter from 863 5.5 45.0
Unnao, Raebareli, Hardoi,
zone least to medium
Kheri(61%), Sitapur, Fatehpur, Sugarcane 377355
quantity
Allahabad(58%) & Kaushmbi

20
Average
Agrocli Total
SL. Annual
matic Geographical Districts Soil Type Temperature (C') Major Crops
NO Rainfall
Zone Area in ha
(mm)
Area in
Minimum Maximum Name
Ha.
Rice 74009
Bundel
Lalitpur, Jhansi, Jalaun, Hamirpur, Rakar, Parwa, Kabar Wheat 692895
6 khand 2961006 867 3.0 47.8
Mahoba, Banda and Chitrakut and Maar
zone Sugarcane 10511
Gorakhpur, Maharajganj, Deoria, Rice 1288605
North
Kushinagar, Basti, Sant Kabir Nagar, Wheat 1297030
eastren
7 2955485 Siddharthnagar,Gonda, Alluvial, calcarius. 1240 4.9 44.2
plain
Baharaich(63%), Balrampur and Sugarcane 282901
zone
Shrawasti(29%)
Azamgarh, Mau, Ballia, Pratapgarh, Rice 1546424
Eastren Faizabad, Ambedkar Nagar,
Alluvial, sodic and Wheat 1718672
8 plain 3808718 Barabanki, Sultanpur,Varanasi, 803 5.7 41.4
Diarasoil
zone Chandauli, Jaunpur, Ghazipur and
Sugarcane 117038
Sant Ravidas Nagar(86%)
Rice 222102
Kali, Bhari red granules
Vindhyan Allahabad(42%), Sant Ravidas
9 1381840 and llunial soil in plane 1134 5.0 45.2 Wheat 243416
zone Nagar(14%), Mirzapur and Sonbhadra
area
Sugarcane 2475
Total 24170446

21
2.1 Climate and Rainfall
2.1.1 – Climate -
Uttar Pradesh lies in the warm temperate zone and remains hot during the summer month. In the Terai area the climate is both hot
and humid while in the southern plateau the heat is simply over-powering with not a grain of humidity. Summer Temperatures shoot upto
43 degree celcius in the summer months of April, May and June. Torrid, scorching winds blow throughout the plains of U.P. generally. In
the winter the weather temperature oscillates between 12.5 and 17.5 degree celcius. The year has three seasons – winter from October to
Febraury, summer from March to June and thereafter monsoon lasting roughly from July to September. Agra and Jhansi are the hottest
districts with bareilly being the least, comparatively speaking.
2.1.2 - The Ganga and Yamuna are the two principal rivers of the State. Their flow is determined by the Himalayas in the north and by
the Vindhyas in the south. The Ganga originates from the Gangotri glacier, which is now, Uttaranchal state and enters Uttar Pradesh
through Saharanpur district. As it enters U.P., the Ganga gradually shifts its course eastward from the south and is joined by several
tributaries on both of its banks. Ramganga, Gomti, Ghaghra, Kali, Sharda, Rapti and Gandak are the important tributaries which joins
into the Ganga on the left bank, while on the right it is joned by the yamuna and other major tributaries like Chambal, Sind, Betwa and
Ken besides Sone and Tons. Significantly, all the left bank tributaries of the Ganga except the Gomti (which originates in Pilibhit
district) have their source in the Himalayas and right bank tributaries in the Vindhyas and Satpura range, Several small rivers like Mosi,
Sai, Kalyani, Chandraprabha, karamnasha, Rihand, Belan and dhasan merge with the Ganga or the Yamuna at some place or the other. At
Allahabad the Ganga and Yamuna themselves merge together – their confluence called the Sangam, the holiest of the holiest place for
Hindu Communities.
The Yamuna tributaries viz. Chambal, (the largest of all) Sind, Betwa and Ken together release more than half of the water brought
by the Vindhyan rivers into the Ganga. The source of the Chambal is the Vindhya hills and it is joined further by smaller rivers. The two
major rivers that join the Ganga from the south are the tons and Sone of which the latter is bigger. It originates from the Satpura hills with
its source close to that of Narmada and Mahanadi rivers. The rivers of U.P. originating from the Himalayas are generally full of water all
the year round while those from the Vindhyas dry up during the summer. The reason that the water doesn’t decrease in the Himalayan
rivers is the melting of the snow during the summer. Another reason is that rains are more copious in the Himalayas than the Vindhyas.
However, due to diversion of water of rivers Ganga, Yamuna, Sharda, Ramganga, for irrigation purposes, the ultimate flow of water in
river ganges goes on reducing as it flows downwards. Drainage & river basins are shown in Map- 2.1.2.

22
Map- 2.1.2 Drainage & River Basins

23
2.1.3 – Rainfall –
The state receives its major share of rainfall from mid-June to mid-September from the monsoon clouds of the Bay of Bengal. In
the winter, north-westernly cyclones bring showers, averaging between 60 and 100 centimeters to areas in the north western district of
the state. The annual rainfall in the eastern part of the U.P. averages between 100 to 120 centimeters though parts to the west of Jaunpur
district receive much less rainfall. Monsoon lasts in U.P. from June to September, covering about 83 per centage of the total rainfall while
winter rains cover the remaining 17 per cent. District wise figure of rainfall are given in Table- SPSP- 3 & Annual Rainfall is depicted in
Map - 2.1.3

Table SPSP -3 Districtwise Annual Rainfall in different Years in U.P.

S.
Names of Districts
Average Rainfall in mm
No.
2004 2005 2006 2007 Average
1 Saharanpur 1077 1185 424 562 812
2 Muzaffar Nagar 767 1159 467 418 703
3 Bijnor 1284 1130 772 890 1019
4 Moradabad 1047 926 156 438 642
5 Rampur 1141 DNR 190 527 619
6 J.P. Nagar 1179 1273 905 967 1081
7 Meerut 956 665 344 353 580
8 Bagpat 662 544 625 548 595
9 Gaziabad 1187 702 347 279 629
10 G.B.Nagar 452 1051 85 251 460
11 Bulandshahar 524 458 365 239 397
12 Aligarh 620 517 229 368 434
13 Hathras 606 714 328 237 471

24
S.
Names of Districts
Average Rainfall in mm
No.
2004 2005 2006 2007 Average
14 Mathura 383 504 265 332 371
15 Agra 441 434 201 242 330
16 Firozabad 602 704 361 334 500
17 Etah 446 324 396 336 376
18 Mainpuri 746 707 656 393 626
19 Badaun 819 882 576 518 699
20 Bareily 949 884 558 616 752
21 Pilibhit 941 749 257 466 603
22 Shahjahanpur 1104 726 681 755 817
23 Lakhimpur Khiri 1633 1000 772 863 1067
24 Sitapur 1678 724 881 885 1042
25 Hardoi 988 665 495 468 654
26 Unnao 910 587 125 604 557
27 Lucknow 1770 432 533 344 770
28 Raebareli 245 191 140 180 189
29 Farrukhabad 1026 666 519 359 643
30 Kannauj 570 82 342 337 333
31 Etawah 427 282 229 170 277
32 Auraiya 139 83 212 259 173
33 Kanpur Dehat 480 396 241 197 329
34 Kanpur Nagar 584 183 282 324 343
35 Jalaun 876 842 92 271 520

25
S.
Names of Districts
Average Rainfall in mm
No.
2004 2005 2006 2007 Average
36 Jhansi 800 545 328 360 508
37 Lalitpur 1042 952 542 443 745
38 Hamirpur 915 784 438 466 651
39 Mhoba 421 448 443 366 420
40 Banda 826 704 411 303 561
41 Chitrakut 1368 789 539 306 751
42 Fatehpur 931 643 365 555 624
43 Pratapgarh 494 444 518 380 459
44 Kaushambi 922 362 279 332 474
45 Allahabad 733 716 761 642 713
46 Barabanki 1242 943 368 497 763
47 Faizabad 1330 911 118 324 671
48 Ambedkar Nagar 1377 1254 214 362 802
49 Sultanpur 751 576 420 551 575
50 Bahraich 1253 1084 567 681 896
51 Shravasti 455 1079 787 671 748
52 Balrampur 1086 499 655 974 804
53 Gonda 1061 1209 436 640 837
54 Siddharth Nagar 874 844 561 781 765
55 Basti 879 729 279 678 641
56 Sant Kabir Nahar 1245 1376 907 1446 1244
57 Mahrajganj 1199 750 549 1084 896

26
S.
Names of Districts
Average Rainfall in mm
No.
2004 2005 2006 2007 Average
58 Gorakhpur 1205 1111 641 1052 1002
59 Kushinagar 523 DNR 355 525 468
60 Deoria 1138 900 681 1112 958
61 Azamgarh 814 767 490 644 679
62 Mau 1076 1192 749 1306 1081
63 Ballia 719 552 319 323 478
64 Jaunpur 452 745 360 244 450
65 Ghazipur 588 749 220 633 548
66 Chandauli 691 722 515 552 620
67 Varanasi 567 737 243 377 481
68 Sant Ravidas Nagar 903 983 316 295 624
69 Mirzapur 1046 950 309 293 650
70 Sonbhadra 766 599 519 265 537

SOURCE; Staitstical Abstract 2008, U.P. Economics&Statistical Division State Planning Institute U.P.

27
Map – 2.1.3 Annual Rainfall

28
2.2 Soils & Forest
2.2.1 – Soils & Forest
In the western districts of Uttar Pradesh viz. Saharanpur, Meerut, Muzaffarnagar, Bijnor, Moradabad, Pilibhit and Bareilly, the soil
is typically the same. It is, generally, deep brown and loamy in some places, also mixed with sand. The soil is shallow, gravely and full of
stones – being generally acidic. In the western plains (Saharanpur, Meerut and Muzaffarnagar) the soil is deeper and fertile. Further east-
wards (Bareilly, Moradabad, Bijnor and Pilibhit) the soil gets to be loamy, Still further down the Pilibhit district, some of the soil become
acidic while the rest shows some alkaline properties. The soil in the central regions comprising Lakhimpur Kheri, Sitapur, Lucknow,
Barabanki, Hardoi, Kanpur and Azamgarh districts is loamy and sandy loms.
In the eastern part of the state, the districts of Gorakhpur, Basti, Mahrajganj, Siddarthnagar and Gonda contain two varieties of the
soil, which are locally known as ‘Bhat’ and ‘banjar’. The alluvial soil is called ‘dhuh’. The one described as ‘mant’ is loamy sandy-
calcareous, comparatively. The soil in the north western district of the state contains less of phosphate. The district of Jaunpur, Azamgarh
and Mau are found to be lacking in potash and the drier areas are known as ‘usar’ and ‘reh’ . The soil of Aligarh, Mainpuri, Kanpur, Etah,
Etawah, Sitapur, Unnao, Raibareilly and Lucknow is salt affected and known as ‘usar’ and ‘reh’ soils.
Mixed red and black soil is found in the Jhansi division of the state and the districts of Mirzapur and Sonebhadra as well as the
karchhana and Meja tehsils of Allahabad besides Chakia and Varanasi district. Black soil is sticky, calcareous and fertile. It expands as it
soaks moisture and contracts on drying up. In the upper plateau of these districts the soil is red and is of two kinds – ‘parwa’ and ‘rackar’
‘parwa’ is light sandy or sandy-loam while ‘rackar’ is alkaline. Soils of U.P. are depicted in Map – 2.2.1

29
Map – 2.2.1 – Soils

30
2.2.2 – Forest & Natural Vegetation –
Before the formation of Uttaranchal, the geographical spread of U.p. was 2,94,411 square kilometres of which 33,994
square kilometres (that is 11.54 per cent) were covered with forests. Now with an area of 23,243 square kilometres
transferred to Uttaranchal, Uttar Pradesh has been left with a forest cover of only 10,751 square kilometres. Thus , the forest
cover of U.P. has been reduced to a paltry 7 percent of its total geographical expanse. However, only 4.46 percent is under
dense forest.
The existing plant life in Uttar Pradesh can be classified into three categories : (i) wet tropical deciduous forests (ii)
dry tropical deciduous forests and (iii) tropical thorny forests.
Wet tropical forests are situated in areas which receive an annual rainfall of 100 to 150 centimeters, a special feature
of which is that deciduous trees of uneven shapes and sizes are to be found in elevated areas while the low- lying areas have
a significant presence of bamboo, creepers and climbers as also cane together with green bushes. The trees that grow chiefly
in these forests are : sal, plum, goolar, palash, mahua, amla, dhak, jamun etc.
Dry deciduous forests are to be generally found in the plains of almost the whole of central and western regions of the
state. Bushes and grasses grow here in abundance because of sun light travelling right upto the ground level. Large tracts of
land have, however, been cleared for agricultural purposes in these forests where sal, fig, palash and teak besides trees such
as neem, peepal, mango, jamun, mahua and acacia grow nearby rivers or in places containing moisture.
Thorny forests abound, mostly, in the south western parts of the State where rainfall is scanty (40 to 60 cms.
Annually). Long stretches of land are covered with thorny bushes and stunted trees, mainly, acacia and other fruit-bearing
prickly plants. The land appears to be carpeted, temporarily, by short grass during the monsoon. Altogether, this part of the
state is a permanent open dry woodland in which a variety of trees grow, yielding resin and gum. Forest & natural vegetation
are depicted in Map – 2.2.2

31
Map – 2.2.2 Forest & Natural Vegetation

32
2..3 AREA UNDER MAJOR CROPS:
Cropping pattern of Uttar Pradesh with reference to the agricultural year 2007-08 is presented in Table 2.3.1

Table 2.3.1 – Area under Major crops


Crop Area in lakh ha
Kharif crops
Rice 55.80
Maize 8.10
Pearl millet 8.79
Sorghum 2.12
Black gram 4.38
Green gram 0.31
Sesame 1.53
Ground nut 0.99
Soybean 0.05
Sugarcane 21.60
Cotton 0.04
Pigeon pea 3.80
Other 0.17
Rabi crops
Wheat 91.60
Barley 1.55
Maize 0.04
Chickpea 7.40
Pea 3.20
Lentil 5.07
Rapeseed 7.90
Linseed 0.30
Potato 4.45
Tobacco 0.24
33
Crop Area in lakh ha
Onion 0.09
Zaid crops
Green gram 0.34
Black gram 0.53
Sunflower 0.12
Onion 0.11
Tobacco 0.01
Source – Agriculture Statistics of U.P. – 2005-06 & 2006-07
The cropping pattern as presented in the table 2.3.1 reflects that foodgrains dominate the state agriculture. About 4/5th of the gross
cropped area is occupied by foodgrains as compared to the national level share of 38 percent. Within foodgrains, cereals and pulses
occupy 70 and 11 percent of the total cropped area, respectively. While major cereals (Rice and Wheat) are sown in 60 percent of the
area, coarse cereals are cultivated in about 10 percent area. Maize and Pearl millet (bajra) are the most important coarse cereal
accounting for 3/4th of the total area under coarse cereals.
Non-foodgrain crops of the State, which comprise of oilseeds, vegetables, fruits, spices, flowers, sugarcane, cotton, tobacco and
others, are sown in about 20 percent area. Sugarcane is the main non-foodgrain and commercial crop of the State which is cultivated in
about 8 percent of the gross cropped area. Oilseeds grown in about 3.28 percent area include sesame, rapeseed & mustard, linseed,
groundnut, soybean, sunflower.

2.3.2 – Vegitables, Fruits, Spices & Flowers –


Various vegetables are cultivated in the State but main crops are Potato, Onion, Brinjal, Cabbage, Cauliflower, Okra, Green peas, and
Tomato. Vegetable crops together occupy just 3 percent area. Main fruits of Uttar Pradesh include Mango and Guava,. However, Citrus,
Papaya and Litchi are also grown in a small area. Spices and flowers are grown on very small scale, viz., 0.16 and 0.29 percent,
respectively. Main spices include Fenugreek, Coriander, Turmeric, Chilly, Ginger, Garlic and Fennel. Flowers that are cultivated in the
State are Rose (cut and loose), Gladioli, Marigold, Tube rose, and Jasmine.

34
2.4 –Floods and Droughts in the State

The State faces flood situation mostly in the northern and eastern parts in the catchments of River Ghaghra and Ganga. Around
73.06 lac ha. is flood-prone and the districts affected are 31 with 154 blocks and 18958 villages. In certain areas every year flood situation
arises whereas in some areas it is once in two to three years.

At regards drought situation, the Southern part of the State i.e. areas of Bundelkhand and Vindhyan region comprising of eight
districts are facing drought situation almost for 3 years in a period of five years. Incidentally, these districts are having less than fifty
percent areas under irrigation. Naturally for improving the production and productivity from these areas and ensure sustainability in
production, watershed development activity is the key solution. The present project will address to these areas on priority basis and
efforts will be made to cover the entire areas left out for treatment in these districts. There is good potential for improving the production
and productivity throught watershed development activities which will improve the economic status of the people and also help in
mitigating the ill effects of drought.

Details of drought and flood affected districts and villages are given in Table SPSP-4.

35
Table SPSP 4: Details of drought and flood affected districts, blocks and villages in the
State during last 10 years * (MIS Table-M(SP)6)
1 2 3 4 5 6 7
N0. of Periodicity
the N0. of Any other Not
Sl.No Name of the District Particulars Block Villages Annual (pl.specify) affected

Saharanpur, Muzaffar Nagar, Rampur, Mathura,


Badaun, Pilibhit, Shahjahanpur, Lakhimpur Khiri,
Sitapur, Unnao, Raebareli, Fatehpur, Barabanki, Alternate after
1 Faizabad, Ambedkar Nagar, Sultanpur, Bahraich, Flood ( 31 ) 154 18958 & every 2-3
Shravasti, Balrampur, Gonda, Siddharth Nagar, Basti, Years
Sant Kabir Nahar, Mahrajganj, Gorakhpur, Kushinagar,
Deoria, Mau, Ballia, Jaunpur, Varanasi

Alternate after
Sonbhadra, Mirzapur, Chitrakut, Banda, Hamirpur, Lalitpur,
2 Drought ( 10 ) 72 8668 & every 2-3
Jhansi, Jalaun, Kanpur Dehat,
Years

36
Chapter 3
Demography and land distribution
3.1. ECONOMIC CLASSIFICATION OF POPULATION
Uttar Pradesh is the largest populated state of India, having 1662 lakh population as per 2001 census, against 16.2% of India’s population.
From economic view point, the population is divided into main workers, marginal workers, and non-workers. People who worked for major
part of the reference year are characterised as main workers and those worked for lesser duration are termed as marginal workers. Persons who
did not work at all during the reference year are known as non-workers. The Census is the main source of such classification of population.
Comparative population with India & Economic classification of state’s population as per the Census 2001 is given in Table 3.1.1 & 3.1.2
Table 3.1.1: Comparative population Status ( Census 2001)

Year Population Density


(Lakh) (Population per Sq. K.m.)
Uttar Pradesh India Uttar Pradesh India
1901 486 2384 165 77
1911 482 2521 164 82
1921 467 2513 159 81
1931 498 2790 169 90
1941 565 3187 192 103
1951 632 3611 215 117
1961 738 4392 251 142
1971 883 5482 300 177
1981 1109 6833 377 216
1991 1320* 8463 548* 267
2001 1662* 10287+ 690* 325
* Excluding Uttrakhand + Amended
Source :- Indian Census - 2001

37
Table 3.1.2: Distribution of population of Uttar Pradesh by working status (2001)
(In thousand)
Particulars Total Rural Urban
Population Persons 1661.98 1316.58 345.40
Males 875.65 691.57 184.08
Females 786.33 625.01 161.32
Main workers Persons 393.38 312.43 80.95
Males 343.38 269.75 73.63
Females 49.99 42.68 7.32
Marginal workers (Total) Persons 146.46 134.33 12.13
Males 66.43 57.96 8.48
Females 80.03 76.38 3.65
Marginal workers (seeking/available for work) Persons 31.73 27.58 4.15
Males 24.94 21.28 3.65
Females 6.79 6.29 0.50
Non-workers (Total) Persons 1122.14 869.82 252.32
Males 465.84 363.87 101.97
Females 656.30 505.96 150.35
Non-workers (seeking/ available for work) Persons 50.84 30.95 19.89
Males 30.31 18.54 11.77
Females 20.53 12.41 8.12
Total workers Persons 539.84 446.76 93.08
Males 409.82 327.71 82.11
Females 130.02 119.05 10.97
(Percentages)
Percentage of Main Workers in population Persons 23.67 23.73 23.44
Males 39.21 39.01 40.00
Females 6.36 6.83 4.54
Percentage of Marginal Workers in population Persons 8.81 10.20 3.51
Males 7.59 8.38 4.60
Females 10.18 12.22 2.26

38
Particulars Total Rural Urban
Percentage of Non-workers in population Persons 67.52 66.07 73.05
Males 53.20 52.61 55.39
Females 83.46 80.95 93.20
Percentage of Main workers in total workers Persons 72.87 69.93 86.97
Males 83.79 82.31 89.68
Females 38.45 35.85 66.70
Percentage of Marginal workers in total workers Persons 27.13 30.07 13.03
Males 16.21 17.69 10.32
Females 61.55 64.15 33.30
Source: Directorate of Census Operations, Uttar Pradesh

3.2 Poverty levels People living below the Poverty Line, Uttar Pradesh
National sample survey (NSS) rounds with population based designs are (2004-05)
used to form the basis for computation of poverty statistics. The latest 35.0
such round was 61st round in 2004-05. The calculations are done using 32.9
32.5 31.1
uniform recall period (URP) and mixed recall period (MRP). URP 30.7
considers consumption expenditures for goods and services for a 30.0
27.8
reference period of one month (more precisely last 30 days) while as 27.5 25.9
25.5
MRP considers expenditures of five non-frequently consumed items
25.0
(clothing, footwear, education, medical-institutional and consumer
durables) for last 365 days whiles as rest for last 30 days. Using state 22.5
sample data of NSS 61st round, poverty for Uttar Pradesh is computed at 20.0
a level of 31.1 percent based on URP. The poverty rates for rural and Rural Urban Uttar Pradesh
urban areas of the state are found to be 30.7 and 32.9 percent respectively URP MRP

Source: Computed based on state sample of NSS 61st round

39
Estimated average annual income for a household
Attached graph present the estimates of income (through
consumption) if on the basis of per capita expenditure declared by the 35000
Planning Commission, GoI to qualify in order to cross the poverty

Average household income (Rs.)


28996
30000
line. This calculation is based for the household with an imaginary 25546
25000
size of 5 members residing in household. As is clear from the chart 21950
19884
that Rs. 19884 was needed for an ideal family in rural UP in 2001-02 20000

which rose to Rs. 21950. Similarly average desired income to become 15000
above poverty line is estimated to be Rs. 28996 in 2004-05 in
10000
comparison to Rs. 25546 in 2001-02 in urban UP.
5000

0
2001-02 2004-05

Rural Urban

Last broad data compatible for poverty calculations were generated in 55th round (1999-2000), but with a limitation of
comparability due change in reference periods. In that case, for the reasons of comparison data generated in 50th round (1993-94) are
being presented below to track the progress in the poverty decline.

Table 3.2 : Population below Poverty Line on the basis of URP consumption in UP
Year Rounds Percentage from the total population
Rural Urban Total
th
1993-1994 50 42.28 35.39 40.85
2004-2005 61st (State Sample) 30.74 32.88 31.13

40
The above data reveals the poverty decline between the year 1993-94 to People living below the Poverty Line, Regions
of Uttar Pradesh (2004-05)
2004-05 in percentage of population below poverty line was 1.05, 0.23 and 0.88 at
50.0
rural, urban and state level respectively.

41.7
45.0

38.3
38.0
Uttar Pradesh, largest state (population wise) of India hosts over 18 crore of 40.0

32.9

31.1
population, comprises of various heterogeneous regions/ zones. To understand and

30.9
30.7

30.6
35.0

28.4
27.8

27.3

26.3
30.0
target the poverty, it is essential to see the relevant statistics at the sub-state levels.

24.7
25.0

19.0
Adjoining chart presents the poverty levels computed from state sample of NSS for

16.8
20.0
four regions of Uttar Pradesh. 15.0
Chart present poverty incidence (based on URP consumption) for four regions 10.0

of UP by rural and urban areas. In the rural areas highest incidence of poverty is 5.0
0.0
computed to be 38 percent for the Eastern region while as Bundelkhand figure with Rural Urban Total
least incidence of 16.8 percent. Likewise in Urban areas similar ordering is Western Central Eastern Bundelkhand Uttar Pradesh
observed as far as incidence of poverty is concerned.
3.3 EMPLOYMENT, UNDER-EMPLOYMENT AND UNEMPLOYMENT
On the basis of Census 2001 results for Uttar Pradesh, the magnitude of labour force, work force, employment, underemployment and
unemployment is presented in Table 3.3.
Table 3.3 : Labour force, work force, employment & unemployment in Uttar Pradesh
SN Particulars Total Rural Urban
1 Labour Force Participation Rate (%) Persons 35.54 36.28 32.71
Males 50.26 50.07 51.00
Females 19.15 21.03 11.83
2 Work Force Participation Rate (%) Persons 32.48 33.93 26.95
Males 46.80 47.39 44.61
Females 16.54 19.05 6.80
3 Full Employment (%) Persons 66.60 65.40 71.66
Males 78.02 77.91 78.43
(Percentage of main workers in labour force) Females 33.21 32.46 38.33
4 Underemployment (%) Persons 5.37 5.77 3.68
Males 5.67 6.15 3.89
(Percentage of marginal workers seeking work in labour force) Females 4.51 4.79 2.62

41
5 Unemployment (%) (Percentage of Non-workers seeking work in labour force) Persons 8.61 6.48 17.61
Males 6.89 5.35 12.54
Females 13.63 9.44 42.53
Source: from Census 2001

3.4 SOCIO-ECONOMIC CONDITION OF THE FARMERS OF UP


Uttar Pradesh is 10th poorest state in the country and is characterized as one of the slow growing developing region mainly due to low
per capita income, some other aspects also assign to its poverty. State per capita income was US$ 238 p.a. in 2005-06 while the national per
capita income stood at US$ 450 in the same period. In terms of rural poverty it is the 12th and in regards to urban poverty the 4th poorest state.
About 35% population (30 to 50 million) is living below poverty in both rural and urban areas, though condition in urban areas is little better.
Heavy pressure of population on the land and power crisis restricts industrial growth in the state as a result scope of other means of livelihood
is not open out in Table 3.4 selected socio economic development indicators for U.P. and the major states of India as given.
Table – 3.4 Select Socio- Economic Development indicators for U.P. and the major States of India
States IMR Life- Literacy Rate Sex Ra;tion Per Capita (NSDR % Persons below Poverty
Expectancy Total Female 0 to 6 years (Rs.) Line
2005 2003 2001 2001 2001 2003-04 2004-05
Andhra Pradesh 57 63.7 61.11 51.17 978 21372 15.8
Assam 68 58.0 64.28 56.03 932 12821 19.7
Bihar 61 61.0 47.53 33.57 921 7319 41.4
Gujrat 54 63.5 69.97 58.6 921 26672 16.8
Haryana 60 65.4 68.59 56.31 861 29504 14.0
Karnataka 50 54.6 67.04 57.45 964 21238 25.0
Kerla 14 73.6 90.92 87.86 1058 13722 15
Madhya Pradesh 76 57.1 64.11 50.28 920 14784 38.3
Maharashtra 36 66.4 77.27 67.51 922 13732 30.8
Orissa 75 58.7 63.61 50.97 972 12645 46.4
Punjab 44 68.6 69.95 63.55 874 28607 8.4
Rajasthan 68 61.3 61.03 44.34 922 15738 22.1
Tamil Nadu 37 65.4 73.47 64.55 986 23358 22.5
Uttar Pradesh 73 59.3 57.36 42.98 898 11534 32.8
Rank of U.P. (13) (12) (14) (14) (13) (14) (12)

42
West Bengal 38 61.1 69.22 60.22 934 20548 24.7
India 58 62.7 65.38 54.16 933 20936 27.5

About 67% of the population is rural and dependent on agricultural production for their livelihood with farm income accounting
for more than 20% of the income of rural households. Growth in agriculture sector of UP has been 2.10% in 2002-07 as compared to
national growth 1.1% and it is expected to grow faster in coming years because of inception of two ambitious programme i) National
Food Security Mission and ii) Support to State Extension Programme for Extension Reform. Nevertheless, the share of agriculture in the
GDP of UP has been declining from about 33% in 1999-2000 to 26% in 2007-08 which is alarming in a state where about 65%
population’s livelihood is agriculture.
One of the major causes of poor growth in agriculture sector is lack of market network for high profitable crops, number of
intermediaries exist in market channels who share greater part of income.
3.5 - Land Reform measure & Operational land holding in the State under different categories and income -
FARMERS PROFILE AND SIZE OF HOLDINGS IN UTTAR PRADESH
Rising population and divisions in families is directly correlated to fragmentation of holdings. Consequently size of holdings are
continuously becoming smaller. During last one decade average size of holding has come down from 0.97 ha to 0.83 ha as a result
numbers of marginal and small farmers are increasing every year. Marginal farmers are those who cannot meet out their annual food
requirement from lands they own and in Uttar Pradesh 76.88% farmers are categorized in this class. Number of marginal and small
farmers and distribution of land is shown in the Table 3.5
Table 3.5
Category Area in lac. ha. Number in lac. Average Size of
holding in ha
Marginal farmer 66.48 (36.97%) 166.59 (76.88%) 0.40
(less than one ha)
Small farmers (between one and two ha) 43.66 (24.28%) 31.37 (14.25%) 1.41
Semi medium (2 to 4 ha) 39.05 (21.71%) 14.27 (6.58%) 2.74
Medium (4 to 10 ha) 25.80(14.35%) 4.63(2.14%) 5.57
Large (more than 10 ha) 4.84 (2.69%) 0.32 (0.15%) 15.07
Total 179.83 216.68 0.83

43
Detail of district wise Land holding in the state is given in Table SPSP-5
Table-SPSP 5: Details of District-wise land holding pattern in the State * (MIS Table-M(SP)9)
1 2 3 4 5 6 7 8 9
Type of Farmer/No. of households (Operational) Land holding (ha)
S. i) Large ii)Small iii)Marginal iv)Landless Sub-total No. of BPL
No. Names of Districts households Irrigated Rainfed Total
1 Saharanpur 39368 40808 140004 66181 286361 97096 255465 19372 274837
2 Muzaffar Nagar 45667 51984 197093 14 294758 58513 323474 2913 326387
3 Bijnor 47771 61693 207847 85300 402611 110395 310080 25751 335831
4 Moradabad 41622 68133 348032 59501 517288 92857 268572 47624 316196
5 Rampur 23534 40405 135564 40809 240312 84416 186905 6802 193707
6 J.P. Nagar 23198 34325 121368 14365 193256 57106 113904 58104 172008
7 Meerut 25799 42871 123779 17386 209835 19543 190173 8880 199053
8 Bagpat 15936 19929 77073 106 113044 11996 106728 3653 110381
9 Gaziabad 19300 29622 127867 12141 188930 20976 131112 13572 144684
10 G.B.Nagar 25709 14088 76423 12298 128518 21050 74685 7100 81785
11 Bulandshahar 38368 52856 198556 34596 324376 46066 259263 38305 297568
12 Aligarh 42913 57240 167437 33152 300742 58088 288114 12751 300865
13 Hathras 19406 28243 106148 19854 173651 37101 147633 589 148222
14 Mathura 39095 32949 68139 24728 164911 42290 260177 9316 269493
15 Agra 39914 51823 161052 26647 279436 71088 249982 33381 283363
16 Firozabad 23594 36104 116877 18637 195212 41264 174530 7583 182113
17 Etah 33754 74451 299049 10052 417306 92071 312494 18031 330525
18 Mainpuri 18840 43629 219039 29007 310515 118199 182634 1504 184138
19 Badaun 47570 83062 384193 64257 579082 163932 385133 28914 414047
20 Bareily 36854 68297 343346 81454 529951 152992 312421 16868 329289
21 Pilibhit 30143 41579 130614 38957 241293 112869 214306 21034 235340
22 Shahjahanpur 42558 65774 278965 38205 425502 181413 321566 26136 347702
23 Lakhimpur Khiri 52598 98555 413936 125514 690603 317547 395645 90290 485935
24 Sitapur 44884 87909 453637 76055 662485 348592 375915 62137 438052

44
1 2 3 4 5 6 7 8 9
Type of Farmer/No. of households Land holding (ha)
S. i) Large ii)Small iii)Marginal iv)Landless Sub-total No. of BPL
No. Names of Districts households Irrigated Rainfed Total
25 Hardoi 41048 78951 464825 64080 648904 352986 363743 57789 421532
26 Unnao 29202 62796 349155 65600 506753 283272 278436 23730 302166
27 Lucknow 12967 32999 195985 27081 269032 134809 133237 12170 145407
28 Raebareli 27986 52745 334731 94220 509682 316948 248384 23348 271732
29 Farrukhabad 15755 37968 176344 60762 290829 95932 126677 21368 148045
30 Kannauj 12455 25814 203279 21093 262641 75218 128542 14313 142855
31 Etawah 21369 29570 139857 31165 221961 103978 122252 23175 145427
32 Auraiya 15062 28353 145752 28280 217447 99783 122912 20931 143843
33 Kanpur Dehat 23378 42770 188406 63242 317796 183532 164232 59749 223981
34 Kanpur Nagar 27672 36066 174899 28495 267132 133243 134666 55195 189861
35 Jalaun 49361 47051 147999 21080 265491 102962 229427 113248 342675
36 Jhansi 55386 56993 133521 21611 267511 71962 180097 125750 305847
37 Lalitpur 43475 59982 74099 2483 180039 55215 243446 26827 270273
38 Hamirpur 46590 51200 90241 32203 220234 80834 103674 187111 290785
39 Mhoba 36727 33398 69514 18248 157887 37109 96518 140577 237095
40 Banda 51384 50021 145474 51326 298205 105663 128097 219640 347737
41 Chitrakut 24040 77466 82891 22787 207184 78047 44958 127266 172224
42 Fatehpur 37293 61659 297449 53968 450369 138304 187848 105118 292966
43 Pratapgarh 27640 41149 411192 101293 581274 257907 195191 27170 222361
44 Kaushambi 13036 24263 163410 36635 237344 149471 92180 41568 133748
45 Allahabad 38969 61711 432436 13977 547093 279542 240522 75126 315648
46 Barabanki 21828 50346 349954 162179 584307 314363 252401 39700 292101
47 Faizabad 16171 31855 258119 30013 336158 140752 117866 14861 132727
48 Ambedkar Nagar 9769 27057 269150 120058 426034 195919 158279 9356 167635
49 Sultanpur 19924 49659 509070 84553 663206 299713 233309 50342 283651

45
1 2 3 4 5 6 7 8 9
Type of Farmer/No. of households Land holding (ha)
S. i) Large ii)Small iii)Marginal iv)Landless Sub-total No. of BPL
No. Names of Districts households Irrigated Rainfed Total
50 Bahraich 36537 70114 348676 46309 501636 310724 167324 157538 324862
51 Shravasti 12509 24097 139824 16964 193394 93614 53709 78168 131877
52 Balrampur 25272 43614 207084 30836 306806 94789 73462 139117 212579
53 Gonda 24287 50433 409397 42200 526317 222383 263672 30311 293983
54 Siddharth Nagar 17065 47387 305975 53074 423501 151438 188549 47053 235602
55 Basti 15549 35095 258993 43661 353298 166565 149041 60689 209730
56 Sant Kabir Nahar 9699 22005 186510 59855 278069 138999 100220 21710 121930
57 Mahrajganj 17276 37823 335284 21548 411931 117638 168793 32974 201767
58 Gorakhpur 19705 43050 402611 100807 566173 206223 205520 44976 250496
59 Kushinagar 13994 34357 372538 28180 449069 282522 167532 57696 225228
60 Deoria 15617 33505 323410 8420 380952 131101 172387 22973 195360
61 Azamgarh 25190 52263 485887 27172 590512 216733 283651 19265 302916
62 Mau 10319 20408 162753 43573 237053 116424 115064 9389 124453
63 Ballia 22008 35773 287080 69867 414728 181771 172981 48190 221171
64 Jaunpur 18442 48863 587420 30430 685155 222730 243408 35677 279085
65 Ghazipur 23071 43396 331320 71731 469518 215132 214391 39922 254313
66 Chandauli 12240 17376 168639 40577 238832 135893 124452 10889 135341
67 Varanasi 5511 15396 173033 39802 233742 91043 80006 15836 95842
68 Sant Ravidas Nagar 4180 11529 163545 0 179254 51352 55984 14002 69986
69 Mirzapur 25477 42909 198765 118520 385671 213658 113159 77567 190726
70 Sonbhadra 31397 29486 106369 5005 172257 150728 32041 120311 152352
TOTAL 1922227 3137050 16658903 3084179 24802359 9956384 13313151 3260291 16573442
Source :Source for Column 6 & 8 is BPL Census of U.P.Department of Rural DevelopmentGovt. U.P. Others column's source is
Source of data – Board of Revenue U.P. 2001 Census.

46
Table SPSP 6: Share of Agriculture Sector to State Income/National Income at Current Prices and Total Work Force in the State and
India
1 2 3
Percentage share of Agriculture* in NSDP@ figure Percentage share of Agriculture in Total Workforce
Year State All India State All India
1980-81 49.9 36.3 74.5 66.5
1990-91 41.4 29.9 72.8 64.8
2000-01 35 22.6 65.9 58.2
*Agriculture & Animal Hasbandry
Source of data - Economics and Statistics Division, U.P.
@
NSDP: Net State Domestic Product

Table SPSP 7: Sectoral Composition of Net State Domestic Product (NSDP) in State.( At current prices)
Rs. in Crores
At 1970-71 prices At 1980-81 prices At 1980-81 prices At 1999-2000 prices
Sector 1970-71 1980-81 1990-91 2000-01
Agriculture and allied Sectors 2564.78 7329.55 21076.68 60662.6
(Primary Sector)
Industrial Sector (Secondary 635.58 2147.53 10299.16 29091.72
Sector)
Service Sector (Tertiary Sector) 1056.14 4537.74 18120.4 72014.48

Source of data - Economics and Statistics Division, U.P.

47
Chapter 4
4.0 Land Use Pattern
4.1 LAND USE PATTERN & HOLDING :
The state has a total reported geographical area of about 24170 thousand hectares out of which 16573 thousand hectares are under
cultivation (Table 4.1). More than half (8635 thousand hectares) of the cultivated area is sown more than once. Gross cropped area is
25414 hectares in the state. The state shares in total geographical area, net sown area and gross cropped area of the country are 7, 12 and
14 percent, respectively. Per capita land area of the state is 0.14 hectare as compared to 0.33 hectare for the country as a whole. Thus, the
state has to support more people with lesser land.
Table 4.1 - LAND USE PATERN IN U.P.
(For the Year 2006-07)
Particulars Area (lakh ha)
Reporting area for Land utilization 241.70
Forest 16.57
Barren Unculturable Land 5.07
Land under non agriculture use 27.29
Culturable waste 4.39
Pasture 0.64
Miscellaneous trees etc 3.73
Current fallow 12.85
Other fallow 5.42
Net Area sown 165.73 *
Area sown more than one time 88.41
Gross cropped area 254.14
Cropping intensity 153.34
Kharif 118.52
Rabi 126.51
Zaid 8.69
* - Net sown area for year 2008-09 is reported by State Agriculture Directorate as 166.33 lac. ha.
Source – State Annual Plan 2009-10

48
4.2 Holdings
As per 2000-01 Agriculture Census there is predominance of marginal and small farmer in the State, which is 76.9 % and 14.6% of the
total holding respectively. However, this group of small and marginal farmers own 61.2% of the total land area. Average size of holding
is only 0.83 ha. per farmer. However, average size of holding of marginal farmers is only 0.40 ha.
The trend of number of holdings in the State of Uttar Pradesh since 1970-71 till 1995-96 censuses is given in the following Table- 4.2

Table- 4.2 - Area under Various Land Holding Groups


(In Percentage)
Category 1970-71 1980-81 1985-86 1990-91 1995-96 2000-01
1. Marginal 21.1 25.7 28.29 31.43 33.75 36.97
2. Small 20.8 22.6 23.32 24.41 23.85 24.28
3. Semi-Medium 25.0 24.6 24.44 23.38 23.27 21.71
4. Medium 23.2 21.0 19.14 16.92 15.87 14.35
5. Large 9.9 6.1 4.81 3.86 3.26 2.69
Source – State Annual Plan 2009-10

As a matter of fact there is an increase in the number of marginal farmers by 59% during the above period. Incidentally the
percentage of marginal holdings in the state is 76.9 which are highest in the country.

49
District wise details are given in the Table – SPSP - 8
Table-SPSP 8: Land Use status in the State (average of preceding 5 years)* (Area in 000 Ha.)
1 2 3 4 5 6 7 8 9 10 11 12 13
S. Districts Reporting All type Land put Total Perm- Land Current Other Net sown Net area Net irrig- Gross
No. Area for Forest under rainfed anent under fallow fallow area sown ated area cropped
Land Area NonAgril area pastu- miscellan- more area
Utilization use res eous tree than
(2006-07) crops and once
groves
1 Saharanpur 363.791 33.229 48.586 19.372 0.169 1.352 2.639 1.823 274.837 130.195 255.465 405.032
2 Muzaffar Nagar 421.473 27.060 49.998 2.913 0.411 2.414 5.641 2.580 326.387 146.054 323.474 472.441
3 Bijnor 464.578 54.898 54.206 25.751 0.462 2.976 4.550 3.400 335.831 92.154 310.08 427.985
4 Moradabad 375.979 0.064 41.994 47.624 0.425 2.396 7.634 2.506 316.196 240.618 268.572 556.814
5 Rampur 235.726 6.611 26.725 6.802 0.004 1.129 1.461 0.638 193.707 172.869 186.905 366.576
6 J.P. Nagar 216.846 21.001 16.665 58.104 0.196 0.333 3.015 1.720 172.008 88.393 113.904 260.401
7 Meerut 273.005 21.314 39.232 8.880 0.372 2.016 2.842 2.489 199.053 104.817 190.173 303.870
8 Bagapat 134.994 1.525 15.818 3.653 0.082 0.074 1.829 0.952 110.381 64.891 106.728 175.272
9 Ghaziabad 206.934 3.542 38.813 13.572 0.077 0.185 8.161 4.211 144.684 81.887 131.112 226.571
10 G.B.Nagar 125.399 1.999 23.950 7.100 0.503 0.473 2.856 7.904 81.785 47.013 74.685 128.798
11 Bulandshahr 364.974 7.795 40.107 38.305 0.942 0.915 4.777 1.073 297.568 210.099 259.263 507.667
12 Aligarh 371.287 2.577 37.754 12.751 1.729 0.334 8.922 5.765 300.865 215.754 288.114 516.619
13 Hathras 180.043 2.100 18.016 0.589 0.988 0.378 2.500 2.581 148.222 87.639 147.633 235.861
14 Mathura 330.384 1.596 37.081 9.316 1.333 1.044 6.541 3.067 269.493 121.762 260.177 391.255
15 Agra 398.970 34.255 38.747 33.381 0.890 10.089 18.687 5.615 283.363 126.637 249.982 410.000
16 Firozabad 241.180 8.611 24.436 7.583 0.624 1.100 7.009 7.496 182.113 106.959 174.53 289.072
17 Etah 439.635 3.058 44.433 18.031 0.517 1.131 13.843 17.084 330.525 211.788 312.494 542.313
18 Mainpuri 272.723 1.775 19.188 1.504 1.353 1.615 24.302 16.507 184.138 180.050 182.634 364.188
19 Badaun 520.079 6.902 47.375 28.914 0.259 6.540 18.053 11.276 414.047 285.875 385.133 699.922

50
20 Bareilly 406.915 0.285 51.042 16.868 0.315 2.509 11.300 3.200 329.289 202.464 312.421 531.753

51
1 2 3 4 5 6 7 8 9 10 11 12 13
S. Districts Reporting All type Land put Total Perm- Land Current Other Net sown Net area Net irrig- Gross
No. Area for Forest under rainfed anent under fallow fallow area sown ated area cropped
Land Area NonAgril area pastu- miscellan- more area
Utilization use res eous tree than
(2006-07) crops and once
groves
21 Pilibhit 378.315 80.010 41.484 21.034 0.274 4.742 4.125 2.305 235.340 159.992 214.306 395.332
22 Shahjahanpur 437.477 10.499 40.171 26.136 0.971 3.927 16.295 7.278 347.702 257.210 321.566 604.912
23 Kheri 772.339 164.848 77.218 90.290 0.944 5.480 27.244 4.186 485.935 219.817 395.645 705.752
24 Sitapur 573.846 5.805 63.657 62.137 0.627 5.255 36.285 12.031 438.052 208.321 375.915 646.373
25 Hardoi 598.782 8.951 51.571 57.789 4.808 13.109 44.668 25.468 421.532 247.992 363.743 669.524
26 Unnao 460.279 16.930 52.787 23.730 3.292 3.174 31.254 26.626 302.166 166.821 278.436 468.987
27 Lucknow 253.304 13.082 46.158 12.170 3.205 2.070 7.678 21.461 145.407 72.113 133.237 217.520
28 Raebareli 456.416 5.717 60.893 23.348 3.952 22.603 34.697 25.538 271.732 137.667 248.384 409.399
29 Farrukhabad 219.911 5.908 25.872 21.368 0.609 3.378 23.633 4.150 148.045 67.787 126.677 215.832
30 Kannauj 208.973 8.024 18.792 14.313 2.087 2.859 14.687 7.174 142.855 79.280 128.542 222.135
31 Etawah 240.265 30.140 23.884 23.175 0.609 0.682 16.305 5.001 145.427 96.011 122.252 241.438
32 Auraiya 206.126 10.283 19.890 20.931 1.292 0.680 12.083 5.781 143.843 91.589 122.912 235.432
33 Kanpur Dehat 314.984 5.797 26.843 59.749 0.376 4.514 16.434 15.306 223.981 93.148 164.232 317.129
34 Kanpur Nagar 301.326 5.656 39.025 55.195 3.659 3.146 26.773 6.712 189.861 82.227 134.666 272.088
35 Jalaun 454.434 28.177 37.532 113.248 0.136 1.638 24.489 6.389 342.675 94.245 229.427 436.920
36 Jhansi 501.327 34.378 42.285 125.750 0.685 0.982 62.207 7.549 305.847 126.583 180.097 432.430
37 Lalitpur 509.791 76.160 40.730 26.827 2.773 0.683 27.635 14.819 270.273 107.075 243.446 377.348
38 Hamirpur 390.179 23.520 30.703 187.111 0.432 0.713 26.699 3.555 290.785 33.274 103.674 324.059
39 Mahoba 327.429 16.213 38.123 140.577 0.493 0.355 11.391 4.314 237.095 40.749 96.518 277.844
40 Banda 438.949 5.421 29.431 219.640 0.389 1.227 16.890 14.873 347.737 62.627 128.097 410.364
41 Chitrakoot 338.897 59.731 29.335 127.266 0.048 26.343 13.481 5.207 172.224 14.700 44.958 186.924

52
1 2 3 4 5 6 7 8 9 10 11 12 13
S. Districts Reporting All type Land put Total Perm- Land Current Other Net sown Net area Net irrig- Gross
No. Area for Forest under rainfed anent under fallow fallow area sown ated area cropped
Land Area NonAgril area pastu- miscellan- more area
Utilization use res eous tree than
(2006-07) crops and once
groves
42 Fatehpur 422.126 5.208 47.985 105.118 2.507 6.340 30.345 15.242 292.966 114.727 187.848 407.693
43 Pratapgarh 361.577 0.569 39.750 27.170 0.654 15.691 52.499 13.411 222.361 75.767 195.191 298.128
44 Kausambi 185.504 0.234 22.058 41.568 0.531 4.503 7.132 4.878 133.748 42.113 92.18 175.861
45 Allahabad 557.012 21.455 77.988 75.162 1.652 9.821 76.060 25.359 315.684 184.347 240.522 500.031
46 Barabanki 442.763 6.298 60.936 39.700 1.900 9.755 43.718 14.283 292.101 241.163 252.401 533.264
47 Faizabad 206.090 1.116 31.600 14.861 1.693 8.769 15.290 9.325 132.727 80.349 117.866 213.076
48 Ambedkar Nagar 236.103 0.270 38.223 9.356 0.583 4.498 10.892 5.926 167.635 114.903 158.279 282.538
49 Sultanpur 439.676 2.057 53.087 50.342 2.419 7.287 47.853 18.973 283.651 150.235 233.309 433.886
50 Bahraich 486.062 67.727 56.280 157.538 0.512 6.145 18.737 5.998 324.862 176.418 167.324 501.280
51 Shrawasti 192.887 34.353 20.704 78.168 0.066 1.347 2.821 0.808 131.877 54.705 53.709 186.582
52 Balrampur 324.697 58.940 33.092 139.117 0.235 5.410 6.189 2.715 212.579 101.251 73.462 313.830
53 Gonda 401.021 12.933 51.988 30.311 1.311 8.437 14.797 6.308 293.983 147.152 263.672 441.135
54 Siddharth Nagar 297.814 3.708 35.292 47.053 0.533 3.273 11.625 2.253 235.602 158.302 188.549 393.904
55 Basti 277.039 4.093 38.311 60.689 0.504 6.648 5.493 3.808 209.73 91.153 149.041 300.883
56 Sant Kabir Nagar 174.810 4.364 27.505 21.710 0.122 5.055 8.109 3.226 121.93 86.457 100.220 208.387
57 Maharajganj 290.548 49.988 30.805 32.974 0.197 0.250 4.311 1.474 201.767 162.177 168.793 363.944
58 Gorakhpur 335.164 6.031 44.692 44.976 0.200 2.894 18.017 6.445 250.496 131.177 205.520 381.673
59 Kushi Nagar 291.466 0.817 51.049 57.696 0.329 3.789 2.795 1.177 225.228 116.994 167.532 342.222
60 Deoria 249.376 0.261 31.982 22.973 0.076 3.323 12.354 2.559 195.36 123.776 172.387 319.136
61 Azamgarh 424.058 0.110 59.344 19.265 1.395 6.759 32.368 7.902 302.916 212.289 283.651 515.205
62 Mau 171.624 0.560 22.771 9.389 0.185 3.519 13.659 2.444 124.453 83.037 115.064 207.490

53
1 2 3 4 5 6 7 8 9 10 11 12 13
S. Districts Reporting All type Land put Total Perm- Land Current Other Net sown Net area Net irrig- Gross
No. Area for Forest under rainfed anent under fallow fallow area sown ated area cropped
Land Area NonAgril area pastu- miscellan- more area
Utilization use res eous tree than
(2006-07) crops and once
groves
63 Ballia 299.265 0.000 44.362 48.190 0.140 6.063 12.776 4.333 221.171 130.512 172.981 351.683
64 Jaunpur 399.713 0.063 45.452 35.677 1.356 4.807 33.481 20.508 279.085 175.852 243.408 454.937
65 Ghazipur 333.214 0.121 48.655 39.922 0.816 3.384 15.667 3.616 254.313 161.130 214.391 415.443
66 Chandauli 253.338 77.400 25.351 10.889 0.037 1.201 7.965 2.022 135.341 126.045 124.452 261.386
67 Varanasi 152.678 0.000 25.556 15.836 0.010 2.996 20.846 2.264 95.842 62.546 80.006 158.388
68 Sant Ravidas Nagar 103.045 0.056 16.614 14.002 0.289 0.676 8.186 4.274 69.986 27.659 55.984 97.645
69 Mirzapur 452.508 109.236 48.390 77.567 0.514 29.664 41.311 8.965 190.726 91.253 113.159 281.979
70 Sonbhadra 680.961 333.608 48.931 120.311 0.242 53.755 57.800 14.203 152.352 40.483 32.041 192.835
Total (Uttar Pradesh) 24170.403 1657.023 2729.303 3260.327 64.320 372.622 1284.611 542.309 16573.478 8841.118 13313.151 25414.596
SOURCE;Statistical Dairy/Abstract 2008, U.P.
4.3 Irrigated areas
4.3.1 SOURCE OF IRRIGATION AND IRRIGATED AREA
The total irrigated area of state is 133.13 lac. ha. The source wise Irrigation status of the state as indicated in the Table-4.3.1 shows
that canal irrigation is 19.63%, State Tube well irrigation is 2.80% and Private tube wells have maximum share of irrigation that is 68.57%.
Table - 4.3.1 – Source wise irrigated area in U.P. (In lac.. ha.)
Irrigation Source Area Percentage (NAS) Percentage (Irrigated)
Net Area Sown 165.74
1 Canal 26.13 15.77 19.63
2 State Tube-wells 3.73 2.25 2.80
3 Private Tube-wells 91.29 55.08 68.57
4 Other Sources 11.98 7.22 9.00
Net Irrigated Area 133.13 (80.32%)
Source – Annual Plan – 2009-10
54
Details of source – wise irrigated area is shown in Table – SPSP- 10
Table-SPSP 10: Source-wise Area Irrigated (Area in 000 ha.)
1 1 2 3 4 5 6 7 8
SL.NO. Districts Canal Tanks Open wells Bore wells Lift irrigation Others (Pl. specify) Total
(Area) No Area No Area No Area No Area No Area No Area
1 Saharanpur 42.665 N.A 0.008 N.A N.A 565 212.744 N.A N.A N.A 0.048 565 255.465
2 Muzaffar Nagar 75.211 N.A 0.000 N.A N.A 512 248.253 N.A N.A N.A 0.010 512 323.474
3 Bijnor 13.806 N.A 0.000 N.A N.A 636 296.274 N.A N.A N.A 0.000 636 310.08
4 Moradabad 16.088 N.A 0.095 N.A N.A 1171 242.380 N.A N.A N.A 10.009 1171 268.572
5 Rampur 1.431 N.A 0.000 N.A N.A 828 184.723 N.A N.A N.A 0.751 828 186.905
6 J.P. Nagar 0.000 N.A 0.000 N.A N.A 397 113.697 N.A N.A N.A 0.207 397 113.904
7 Meerut 34.540 N.A 0.000 N.A N.A 339 155.492 N.A N.A N.A 0.141 339 190.173
8 Bagpat 2.412 N.A 0.000 N.A N.A 384 104.305 N.A N.A N.A 0.011 384 106.728
9 Gaziabad 20.771 N.A 0.000 N.A N.A 201 110.341 N.A N.A N.A 0.000 201 131.112
10 G.B.Nagar 15.306 N.A 0.000 N.A N.A 113 58.675 N.A N.A N.A 0.704 113 74.685
11 Bulandshahar 31.280 N.A 0.419 N.A N.A 493 227.564 N.A N.A N.A 0.000 493 259.263
12 Aligarh 33.324 N.A 0.000 N.A N.A 599 254.789 N.A N.A N.A 0.000 599 288.113
13 Hathras 12.777 N.A 0.000 N.A N.A 125 134.856 N.A N.A N.A 0.000 125 147.633
14 Mathura 108.104 N.A 0.000 N.A N.A 37 152.073 N.A N.A N.A 0.000 37 260.177
15 Agra 30.930 N.A 0.577 N.A N.A 849 218.316 N.A N.A N.A 0.159 849 249.982
16 Firozabad 17.517 N.A 0.000 N.A N.A 445 156.825 N.A N.A N.A 0.188 445 174.53
17 Etah 32.248 N.A 0.000 N.A N.A 598 274.077 N.A N.A N.A 6.169 598 312.494
18 Mainpuri 40.101 N.A 0.020 N.A N.A 330 142.513 N.A N.A N.A 0.000 330 182.634
19 Badaun 0.060 N.A 0.000 N.A N.A 1382 380.967 N.A N.A N.A 4.106 1382 385.133

55
1 1 2 3 4 5 6 7 8
SL.NO. Districts Canal Tanks Open wells Bore wells Lift irrigation Others (Pl. specify) Total
(Area) No Area No Area No Area No Area No Area No Area
20 Bareily 32.463 N.A 1.205 N.A N.A 1018 274.392 N.A N.A N.A 4.361 1018 312.421
21 Pilibhit 51.644 N.A 0.167 N.A N.A 132 161.396 N.A N.A N.A 1.099 132 214.306
22 Shahjahanpur 12.400 N.A 0.075 N.A N.A 461 309.091 N.A N.A N.A 0.000 461 321.566
23 Lakhimpur Khiri 21.211 N.A 0.035 N.A N.A 720 374.355 N.A N.A N.A 0.044 720 395.645
24 Sitapur 23.141 N.A 0.300 N.A N.A 697 351.687 N.A N.A N.A 0.787 697 375.915
25 Hardoi 63.128 N.A 0.959 N.A N.A 600 299.648 N.A N.A N.A 0.008 600 363.743
26 Unnao 67.279 N.A 0.742 N.A N.A 199 210.092 N.A N.A N.A 0.323 199 278.436
27 Lucknow 26.820 N.A 0.342 N.A N.A 623 105.731 N.A N.A N.A 0.344 623 133.237
28 Raebareli 107.151 N.A 10.610 N.A N.A 389 130.622 N.A N.A N.A 0.001 389 248.384
29 Farrukhabad 2.071 N.A 0.005 N.A N.A 393 124.601 N.A N.A N.A 0.000 393 126.677
30 Kannauj 15.107 N.A 0.056 N.A N.A 345 113.379 N.A N.A N.A 0.000 345 128.542
31 Etawah 60.089 N.A 0.113 N.A N.A 437 62.041 N.A N.A N.A 0.009 437 122.252
32 Auraiya 54.644 N.A 0.236 N.A N.A 375 68.031 N.A N.A N.A 0.000 375 122.911
33 Kanpur Dehat 67.090 N.A 0.117 N.A N.A 1528 97.015 N.A N.A N.A 0.010 1528 164.232
34 Kanpur Nagar 29.706 N.A 0.275 N.A N.A 2100 103.776 N.A N.A N.A 0.909 2100 134.666
35 Jalaun 168.556 N.A 0.711 N.A N.A 2114 55.324 N.A N.A N.A 4.837 2114 229.428
36 Jhansi 81.823 N.A 7.043 N.A N.A 614 87.770 N.A N.A N.A 3.461 614 180.097
37 Lalitpur 86.027 N.A 41.551 N.A N.A 954 108.440 N.A N.A N.A 7.424 954 243.442
38 Hamirpur 22.162 N.A 4.646 N.A N.A 1380 76.840 N.A N.A N.A 0.026 1380 103.674
39 Mhoba 20.313 N.A 9.717 N.A N.A 183 61.601 N.A N.A N.A 4.887 183 96.518
40 Banda 54.882 N.A 4.341 N.A N.A 1399 68.108 N.A N.A N.A 0.766 1399 128.097

56
1 1 2 3 4 5 6 7 8
SL.NO. Districts Canal Tanks Open wells Bore wells Lift irrigation Others (Pl. specify) Total
(Area) No Area No Area No Area No Area No Area No Area
41 Chitrakut 11.391 N.A 6.565 N.A N.A 381 26.846 N.A N.A N.A 0.156 381 44.958
42 Fatehpur 37.464 N.A 0.323 N.A N.A 1099 149.842 N.A N.A N.A 0.219 1099 187.848
43 Pratapgarh 78.093 N.A 0.000 N.A N.A 74 117.084 N.A N.A N.A 0.014 74 195.191
44 Kaushambi 15.844 N.A 0.006 N.A N.A 845 76.251 N.A N.A N.A 0.079 845 92.18
45 Allahabad 107.350 N.A 3.832 N.A N.A 1644 128.964 N.A N.A N.A 0.376 1644 240.522
46 Barabanki 82.746 N.A 0.010 N.A N.A 287 169.617 N.A N.A N.A 0.028 287 252.401
47 Faizabad 24.225 N.A 0.027 N.A N.A 488 93.614 N.A N.A N.A 0.000 488 117.866
48 Ambedkar Nagar 25.188 N.A 0.048 N.A N.A 396 133.012 N.A N.A N.A 0.000 396 158.248
49 Sultanpur 62.887 N.A 0.075 N.A N.A 767 170.347 N.A N.A N.A 0.000 767 233.309
50 Bahraich 6.200 N.A 0.117 N.A N.A 492 161.007 N.A N.A N.A 0.000 492 167.324
51 Shravasti 0.000 N.A 0.080 N.A N.A 133 53.629 N.A N.A N.A 0.000 133 53.709
52 Balrampur 4.241 N.A 1.491 N.A N.A 381 65.424 N.A N.A N.A 2.306 381 73.462
53 Gonda 1.181 N.A 12.800 N.A N.A 443 249.013 N.A N.A N.A 0.678 443 263.672
54 Siddharth Nagar 9.332 N.A 15.922 N.A N.A 360 163.295 N.A N.A N.A 0.000 360 188.549
55 Basti 0.432 N.A 11.919 N.A N.A 540 136.690 N.A N.A N.A 0.000 540 149.041
56 Sant Kabir Nahar 2.441 N.A 0.567 N.A N.A 499 96.993 N.A N.A N.A 0.219 499 100.22
57 Mahrajganj 33.583 N.A 1.455 N.A N.A 271 133.723 N.A N.A N.A 0.032 271 168.793
58 Gorakhpur 6.884 N.A 1.405 N.A N.A 1018 196.975 N.A N.A N.A 0.256 1018 205.52
59 Kushinagar 51.602 N.A 0.069 N.A N.A 144 114.699 N.A N.A N.A 1.162 144 167.532
60 Deoria 18.325 N.A 0.000 N.A N.A 868 154.042 N.A N.A N.A 0.020 868 172.387
61 Azamgarh 55.172 N.A 1.131 N.A N.A 400 227.384 N.A N.A N.A 0.000 400 283.687

57
1 1 2 3 4 5 6 7 8
SL.NO. Districts Canal Tanks Open wells Bore wells Lift irrigation Others (Pl. specify) Total
(Area) No Area No Area No Area No Area No Area No Area
62 Mau 12.918 N.A 0.036 N.A N.A 289 102.110 N.A N.A N.A 0.000 289 115.064
63 Ballia 22.461 N.A 0.000 N.A N.A 749 150.520 N.A N.A N.A 0.000 749 172.981
64 Jaunpur 65.683 N.A 0.014 N.A N.A 512 177.711 N.A N.A N.A 0.000 512 243.408
65 Ghazipur 50.714 N.A 0.002 N.A N.A 802 163.675 N.A N.A N.A 0.000 802 214.391
66 Chandauli 113.536 N.A 0.010 N.A N.A 277 10.527 N.A N.A N.A 0.379 277 124.452
67 Varanasi 10.058 N.A 0.004 N.A N.A 1009 69.937 N.A N.A N.A 0.007 1009 80.006
68 Sant Ravidas Nagar 8.927 N.A 0.000 N.A N.A 561 47.057 N.A N.A N.A 0.000 561 55.984
69 Mirzapur 69.590 N.A 6.233 N.A N.A 593 34.103 N.A N.A N.A 3.233 593 113.159
70 Sonbhadra 28.919 N.A 0.660 N.A N.A 73 1.693 N.A N.A N.A 0.769 73 32.041
GRAND TOTAL 2613.665 149.166 43060 10488.588 61.732 43060 13313.151
The development of irrigation resources in the state is comparatively slow as compared to adjoining state such as Bihar, Madhya
Pradesh etc. The trend of growth of irrigation in U.P. and other state of the country is shown in the Table 4.3.1 (1) :-
Table 4.3.1 (1) - Comparative Growth of Irrigation Facilities
Name of State Year Growth (% per annum)
1990-91 2002-03
1. India 33.3 40.01 1.54
2. Uttar Pradesh 60.9 73.70 1.60
3. Tamil Nadu 42.5 50.33 1.41
4. Punjab 92.7 95.01 0.21
5. Harayana 72.7 85.77 1.39
6.Maharashtra 11.3 16.90 3.41
7. Madhya Pradesh 22.1 30.95 2.86
8. Bihar 44.5 60.47 2.59
The above table shows that during 1990-91 to 2002-03, the Irrigation facilities have grown at the rate of 1.54 % annually on all
India bases. In Uttar Pradesh the pace of growth has been registered higher than the national average which is 1.60% annually.
58
4.3.2 District wise Status of Irrigation
The state average of irrigated area is 79% but there is wide variation in districts. The districts wise irrigated area varies from 29%
to 100%.The districts have been categorized in different slabs indicating the extent of irrigation are shown in Table- 4.3.2

Table – 4.3.2 – Categirization of districts according to slab of extent of irrigation.


Slab N0. Name of Districts
1 90 % 22 Saharanpur, Muzaffarnagar, Meerut, Bag pat, Gaziabad, Aligarh, Hathrus (100%) , Mathura,
and above Firozabad, Mainpuri, Etah, Bareilly, Badaun, Shahjahanpur, Pilibihit, Moradabad, Kannauj,
Ajamgarh, Lucknow, Faizabad, Ambedkernagar, Chandauli.

2 80-90 % 23 Bulandsahar, Bijnor, J.B. Fulenagar, Rampur, Farrukhabad, Etawa, Auraiya, Pratapgarh,
Varanasi, Gazipur, Jaunpur, S. Rabidasnagar, Mau, Gorakhpur, Maharajganj, Deoria, S.
Kabirnagar, Unnao, Raibareilly, Sitapur, Hardoi, Sultanpur, Barabanki.

3 70-80 % 9 G.Budhnagar, Kanpur Dehat, Allahabad, Lalitpur, Balia, Khushinagar, Khiri, Gonda.
4 60-70 % 6 Kanpur Nagar, Fetehpur, Kaushmbi, Jhansi, Basti, Siddharthnagar.
5 50-60 % 2 Jalaun, Mirzapur,
6 Less than 50 % 8 Mahoba, Banda, Chitrkoot (29%), Hamirpur, Sonbhadra, Balrampur, Baharaich, Shravasti.

59
Details of district wise status of irrigation are given in the Table SPSP- 9
Table - SPSP -9 - Irrigation Status (Area in 000 ha.)
Gross Net
S. Net Cultivated Net Irrigated Gross Irrigated Rainfed
No.
Names of Districts Cultivated Irrigated
Area Area Area
Area % Area % of net Cultivated Area
1 Saharanpur 274.837 405.032 255.465 368.501 92.95 19.372 7.05
2 Muzaffar Nagar 326.387 472.441 323.474 468.146 99.11 2.913 0.89
3 Bijnor 335.831 427.985 310.08 378.455 92.33 25.751 7.67
4 Moradabad 316.196 556.814 268.572 489.057 84.94 47.624 15.06
5 Rampur 193.707 366.576 186.905 350.599 96.49 6.802 3.51
6 J.P. Nagar 172.008 260.401 113.904 225.303 66.22 58.104 33.78
7 Meerut 199.053 303.87 190.173 303.852 95.54 8.880 4.46
8 Bagpat 110.381 175.272 106.728 175.269 96.69 3.653 3.31
9 Gaziabad 144.684 226.571 131.112 226.492 90.62 13.572 9.38
10 G.B.Nagar 81.785 128.798 74.685 128.798 91.32 7.100 8.68
11 Bulandshahar 297.568 507.667 259.263 507.667 87.13 38.305 12.87
12 Aligarh 300.865 516.619 288.114 431.547 95.76 12.751 4.24
13 Hathras 148.222 235.861 147.633 195.113 99.60 0.589 0.40
14 Mathura 269.493 391.255 260.177 322.936 96.54 9.316 3.46
15 Agra 283.363 410 249.982 266.157 88.22 33.381 11.78
16 Firozabad 182.113 289.072 174.53 215.325 95.84 7.583 4.16
17 Etah 330.525 542.313 312.494 463.302 94.54 18.031 5.46
18 Mainpuri 184.138 364.188 182.634 350.761 99.18 1.504 0.82

60
Gross Net
S. Net Cultivated Net Irrigated Gross Irrigated Rainfed
No.
Names of Districts Cultivated Irrigated
Area Area Area
Area % Area % of net Cultivated Area
19 Badaun 414.047 699.922 385.133 510.253 93.02 28.914 6.98
20 Bareily 329.289 531.753 312.421 487.276 94.88 16.868 5.12
21 Pilibhit 235.340 395.332 214.306 381.042 91.06 21.034 8.94
22 Shahjahanpur 347.702 604.912 321.566 547.428 92.48 26.136 7.52
23 Lakhimpur Khiri 485.935 705.752 395.645 560.034 81.42 90.290 18.58
24 Sitapur 438.052 646.373 375.915 516.922 85.82 62.137 14.18
25 Hardoi 421.532 669.524 363.743 544.644 86.29 57.789 13.71
26 Unnao 302.166 468.987 278.436 370.206 92.15 23.730 7.85
27 Lucknow 145.407 217.52 133.237 187.416 91.63 12.170 8.37
28 Raebareli 271.732 409.399 248.384 349.523 91.41 23.348 8.59
29 Farrukhabad 148.045 215.832 126.677 170.905 85.57 21.368 14.43
30 Kannauj 142.855 222.135 128.542 172.773 89.98 14.313 10.02
31 Etawah 145.427 241.438 122.252 182.026 84.06 23.175 15.94
32 Auraiya 143.843 235.432 122.912 183.165 85.45 20.931 14.55
33 Kanpur Dehat 223.981 317.129 164.232 211.804 73.32 59.749 26.68
34 Kanpur Nagar 189.861 272.088 134.666 183.645 70.93 55.195 29.07
35 Jalaun 342.675 436.92 229.427 247.931 66.95 113.248 33.05
36 Jhansi 305.847 432.43 180.097 185.301 58.88 125.750 41.12
37 Lalitpur 270.273 377.348 243.446 244.822 90.07 26.827 9.93
38 Hamirpur 290.785 324.059 103.674 105.632 35.65 187.111 64.35
61
Gross Net
S. Net Cultivated Net Irrigated Gross Irrigated Rainfed
No.
Names of Districts Cultivated Irrigated
Area Area Area
Area % Area % of net Cultivated Area
39 Mhoba 237.095 277.844 96.518 97.329 40.71 140.577 59.29
40 Banda 347.737 410.364 128.097 155.289 36.84 219.640 63.16
41 Chitrakut 172.224 186.924 44.958 47.725 26.10 127.266 73.90
42 Fatehpur 292.966 407.693 187.848 265.232 64.12 105.118 35.88
43 Pratapgarh 222.361 298.128 195.191 262.5 87.78 27.170 12.22
44 Kaushambi 133.748 175.861 92.18 119.593 68.92 41.568 31.08
45 Allahabad 315.648 500.031 240.522 392.142 76.20 75.126 23.80
46 Barabanki 292.101 533.264 252.401 453.825 86.41 39.700 13.59
47 Faizabad 132.727 213.076 117.866 190.162 88.80 14.861 11.20
48 Ambedkar Nagar 167.635 282.538 158.279 269.095 94.42 9.356 5.58
49 Sultanpur 283.651 433.886 233.309 364.295 82.25 50.342 17.75
50 Bahraich 324.862 501.28 167.324 188.693 51.51 157.538 48.49
51 Shravasti 131.877 186.582 53.709 59.029 40.73 78.168 59.27
52 Balrampur 212.579 313.83 73.462 121.562 34.56 139.117 65.44
53 Gonda 293.983 441.135 263.672 303.586 89.69 30.311 10.31
54 Siddharth Nagar 235.602 393.904 188.549 191.054 80.03 47.053 19.97
55 Basti 209.73 300.883 149.041 204.346 71.06 60.689 28.94
56 Sant Kabir Nahar 121.93 208.387 100.220 107.24 82.19 21.710 17.81
57 Mahrajganj 201.767 363.944 168.793 180.446 83.66 32.974 16.34
58 Gorakhpur 250.496 381.673 205.520 236.372 82.05 44.976 17.95
62
Gross Net Rainfed
S. Net Cultivated Net Irrigated Gross Irrigated
No.
Names of Districts Cultivated Irrigated
Area Area Area Area % of net Cultivated Area
Area %
59 Kushinagar 225.228 342.222 167.532 264.019 74.38 57.696 25.62
60 Deoria 195.36 319.136 172.387 240.978 88.24 22.973 11.76
61 Azamgarh 302.916 515.205 283.651 477.543 93.64 19.265 6.36
62 Mau 124.453 207.49 115.064 188.685 92.46 9.389 7.54
63 Ballia 221.171 351.683 172.981 257.731 78.21 48.190 21.79
64 Jaunpur 279.085 454.937 243.408 372.099 87.22 35.677 12.78
65 Ghazipur 254.313 415.443 214.391 349.108 84.30 39.922 15.70
66 Chandauli 135.341 261.386 124.452 227.681 91.95 10.889 8.05
67 Varanasi 95.842 158.388 80.006 133.778 83.48 15.836 16.52
68 Sant Ravidas Nagar 69.986 97.645 55.984 77.37 79.99 14.002 20.01
69 Mirzapur 190.726 281.979 113.159 168.343 59.33 77.567 40.67
70 Sonbhadra 152.352 192.835 32.041 40.858 21.03 120.311 78.97
Total 16573.442 25414.596 13313.151 19217.736 80.33 3260.291 19.67
SOURCE;Staitstical Abstract , U.P. Economics&Statistical Division State Planning Institute U.P.
During the Kharif season only 62.28% of the area sown is being irrigated where as 87.45% during Rabi. The contribution of irrigation during
summer is 85.96%.
Crop Season-wise Irrigation Status is given in Table – 4.3.3
Table – 4.3.3 - Crop Season-wise Irrigation Status (000 ha.)
Crop Season Gross Sown Area Gross Irrigated Area Percentage (%)
1 Kharif 11895 7408 62.28
2 Rabi 12651 11063 87.45
3 Zaid 869 747 85.96
Total 25415 19218 75.62

63
4.4. Common Property Resources (CPR):

The details of the common property resources (CPR's) districtwise has been given in Table SPSP-11. These include the following
categories of CPR. Catagoriwise area in the state as a whole is as under:

(Area in 000 hect. )

1- Waste land/Degraded lands. 876.81


2- Pastures 64.320
3- Orchards and
4- Village Woodlot 372.82
5- Forest 1656.32
6- Village ponds/Tanks. 149.17
7- Community Building N.A.
8- Weekly Markets No.
9- Permanent Markets No. 598
10- Temples/Places
of Worship Nos. 265270
11- Others to be specified.

The details of ownerships of the above catagory of CPRs are not available. However, the area under forest is mainly with the forest
department, village tanks are normally owned by Gram Panchayat's and in some cases individuals also own the tanks. The details about
the ownership will be prepared for each selected watersheds at the time of prepration of DPR's .

64
Table-SPSP 11: Details of Common Property Resources in the State *(MIS Table-M(SP)10)
1 2 3 4 5
CPR Particulars(Area in 000 ha.) Total Area (ha)
Area available for
(viii)
(xi) Area owned/ In possession of treatment (ha)
(iii) (vii) Weekly
(i) (x)
S. Names of Orchards (vi) Com Markets Any Pvt Govt. Any
Wastela Temples/ Othe
No. Districts (ii) & Village munit & (ix) Pvt. Govt. other . (spec other
nd/ (v) Forest Places of rs PR PR
Pastures (iv) Ponds/ y Permane pers (Specify (Pl. per ify (Pl.
degrade worship (Pl. I I
Village Tanks Buildi nt ons deptt.) Specif son deptt. Speci
d land (no) speci
Woodlot ngs markets y) s ) fy)
fy)
(No.)
1 Saharanpur 2.253 0.169 1.352 33.229 0.008 N.A. 14 4252
Muzaffar 0.000 14
2 Nagar 5.283 0.411 2.414 27.060 N.A. 4130
3 Bijnor 7.415 0.462 2.976 54.898 0.000 N.A. 16 3724
4 Moradabad 4.353 0.425 2.396 0.064 0.095 N.A. 8 4916
5 Rampur 1.253 0.004 1.129 6.611 0.000 N.A. 7 2950
6 J.P. Nagar 1.435 0.196 0.333 21.001 0.000 N.A. 6 1862
7 Meerut 5.018 0.372 2.016 21.314 0.000 N.A. 6 3020
8 Bagapat 2.145 0.082 0.074 1.525 0.000 N.A. 6 1248
9 Ghaziabad 3.490 0.077 0.185 3.542 0.000 N.A. 6 2820
10 G.B.Nagar 3.452 0.503 0.473 1.999 0.000 N.A. 6 1273
11 Bulandshahr 6.910 0.942 0.915 7.795 0.419 N.A. 14 4522
12 Aligarh 7.485 1.729 0.334 2.577 0.000 N.A. 8 5215
13 Hathras 3.171 0.988 0.378 2.100 0.000 N.A. 8 2989
14 Mathura 7.900 1.333 1.044 1.596 0.000 N.A. 11 3599
15 Agra 13.399 0.890 10.089 34.255 0.577 N.A. 18 5461
16 Firozabad 4.710 0.624 1.100 8.611 0.000 N.A. 6 2923
17 Etah 24.698 0.517 1.131 3.058 0.000 N.A. 17 3595
18 Mainpuri 10.435 1.353 1.615 1.775 0.020 N.A. 8 2292
19 Badaun 12.039 0.259 6.540 6.902 0.000 N.A. 14 4054
65
CPR Particulars(Area in 000 ha.) Total Area (ha)
Area available for
(viii)
(xi) Area owned/ In possession of treatment (ha)
(iii) (vii) Weekly
(i) (x)
S. Names of Orchards (vi) Com Markets Any Pvt Govt. Any
Wastela Temples/ Othe
No. Districts (ii) & Village munit & (ix) Pvt. Govt. other . (spec other
nd/ (v) Forest Places of rs PR PR
Pastures (iv) Ponds/ y Permane pers (Specify (Pl. per ify (Pl.
degrade worship (Pl. I I
Village Tanks Buildi nt ons deptt.) Specif son deptt. Speci
d land (no) speci
Woodlot ngs markets y) s ) fy)
fy)
(No.)
20 Bareilly 4.503 0.315 2.509 0.285 1.205 N.A. 15 4824
21 Pilibhit 8.278 0.274 4.742 80.010 0.167 N.A. 11 2076
22 Shahjahanpur 8.573 0.971 3.927 10.499 0.075 N.A. 12 2894
23 Kheri 9.384 0.944 5.480 164.848 0.035 N.A. 18 3591
24 Sitapur 12.222 0.627 5.255 5.805 0.300 N.A. 12 5638
25 Hardoi 31.972 4.808 13.109 8.951 0.959 N.A. 15 4176
26 Unnao 18.437 3.292 3.174 16.230 0.742 N.A. 7 5773
27 Lucknow 11.844 3.205 2.070 13.082 0.342 N.A. 8 5274
28 Raebareli 42.590 3.952 22.603 5.717 10.610 N.A. 16 7738
29 Farrukhabad 6.965 0.609 3.378 5.908 0.005 N.A. 7 2638
30 Kannauj 11.630 2.087 2.859 8.024 0.056 N.A. 11 2475
31 Etawah 8.854 0.809 0.682 30.140 0.113 N.A. 5 2329
32 Auraiya 7.071 1.292 0.680 10.283 0.236 N.A. 10 2388
33 Kanpur Dehat 9.148 0.376 4.514 5.797 0.117 N.A. 9 3378
34 Kanpur Nagar 16.512 3.659 3.146 5.656 0.275 N.A. 9 4850
35 Jalaun 3.603 0.136 1.638 28.177 0.711 N.A. 11 3438
36 Jhansi 17.389 0.685 0.982 34.378 7.043 N.A. 12 4048
37 Lalitpur 65.212 0.773 0.683 76.160 41.551 N.A. 5 2489
38 Hamirpur 5.670 0.432 0.713 23.520 4.646 N.A. 9 2211
39 Mahoba 11.585 0.493 0.355 16.213 9.717 N.A. 7 2213
40 Banda 13.200 0.389 1.227 5.421 4.341 N.A. 8 3091

66
CPR Particulars(Area in 000 ha.) Total Area (ha)
Area available for
(viii)
(xi) Area owned/ In possession of treatment (ha)
(iii) (vii) Weekly
(i) (x)
S. Names of Orchards (vi) Com Markets Any Pvt Govt. Any
Wastela Temples/ Othe
No. Districts (ii) & Village munit & (ix) Pvt. Govt. other . (spec other
nd/ (v) Forest Places of rs PR PR
Pastures (iv) Ponds/ y Permane pers (Specify (Pl. per ify (Pl.
degrade worship (Pl. I I
Village Tanks Buildi nt ons deptt.) Specif son deptt. Speci
d land (no) speci
Woodlot ngs markets y) s ) fy)
fy)
(No.)
41 Chitrakoot 36.746 0.048 26.343 59.731 6.565 N.A. 4 1322
42 Fatehpur 19.629 2.507 6.340 5.208 0.323 N.A. 11 4979
43 Pratapgarh 23.743 0.654 15.891 0.569 0.000 N.A. 7 6062
44 Kausambi 9.024 0.531 4.503 0.234 0.006 N.A. 3 2075
45 Allahabad 23.836 1.652 9.821 21.455 3.832 N.A. 19 8478
46 Barabanki 21.180 1.900 9.755 6.298 0.010 N.A. 8 4953
47 Faizabad 13.684 1.693 8.769 1.116 0.027 N.A. 3 3684
Ambedkar
48 Nagar 9.443 0.583 4.498 0.270 0.048 N.A. 6 2884
49 Sultanpur 19.431 2.419 7.287 2.057 0.075 N.A. 3 5453
50 Bahraich 8.770 0.512 6.145 67.727 0.117 N.A. 8 4323
51 Shrawasti 1.907 0.066 1.347 34.353 0.080 N.A. 1 2385
52 Balrampur 7.671 0.235 5.410 58.940 1.491 N.A. 4 3434
53 Gonda 17.735 1.311 8.437 12.934 12.800 N.A. 4 4003
Siddharth
54 Nagar 6.672 0.533 3.273 3.708 15.922 N.A. 9 3548
55 Basti 11.598 0.504 6.648 4.093 11.919 N.A. 3 3283
Sant Kabir
56 Nagar 7.805 0.122 5.055 4.364 0.567 N.A. 2 2248
57 Maharajganj 0.954 0.197 0.250 49.988 1.455 N.A. 12 2642
58 Gorakhpur 5.472 0.200 2.894 6.031 1.405 N.A. 8 4969
59 Kushi Nagar 5.893 0.329 3.789 0.817 0.069 N.A. 2 2771
60 Deoria 5.249 0.076 3.323 0.261 0.000 N.A. 7 3399
67
CPR Particulars(Area in 000 ha.) Total Area (ha)
Area available for
(viii)
(xi) Area owned/ In possession of treatment (ha)
(iii) (vii) Weekly
(i) (x)
S. Names of Orchards (vi) Com Markets Any Pvt Govt. Any
Wastela Temples/ Othe
No. Districts (ii) & Village munit & (ix) Pvt. Govt. other . (spec other
nd/ (v) Forest Places of rs PR PR
Pastures (iv) Ponds/ y Permane pers (Specify (Pl. per ify (Pl.
degrade worship (Pl. I I
Village Tanks Buildi nt ons deptt.) Specif son deptt. Speci
d land (no) speci
Woodlot ngs markets y) s ) fy)
fy)
(No.)
61 Azamgarh 14.521 1.395 6.759 0.110 1.131 N.A. 5 5953
62 Mau 5.999 0.185 3.519 0.560 0.036 N.A. 5 3005
63 Ballia 7.701 0.140 6.063 0.000 0.000 N.A. 10 5106
64 Jaunpur 14.155 1.356 4.807 0.063 0.014 N.A. 12 7778
65 Ghazipur 7.799 0.816 3.384 0.121 0.002 N.A. 11 5918
66 Chandauli 2.429 0.037 1.201 77.400 0.010 N.A. 5 3520
67 Varanasi 6.020 0.010 2.996 0.000 0.004 N.A. 6 5358
Sant Ravidas
68 Nagar 1.395 0.289 0.676 0.056 0.000N.A. 3 2662
69 Mirzapur 44.714 0.514 29.664 109.236 6.233 N.A. 3 4959
70 Sonbhadra 64.155 0.242 53.755 333.608 0.660 N.A. 4 1739
Total 876.816 64.320 372.822 1656.324 149.166 N.A. 598 265270
SOURCE;Statistical Dairy/ Abstract 2008 , U.P.

68
Chapter 5
5.0 Trends in Agriculture and Food Productivity
5.1 - Uttar Pradesh is the largest producer of wheat in the country contributing about 33% of the national production whereas U.P. is the
second largest producer of rice, which accounts for about 12% of the national production. In Uttar Pradesh 2.7% of holdings is of more
than 4 hectares and accounts for 19.2% of total area. While about 75.4% of the marginal holdings accounts for 33.7% of the total area
which clearly reflects severe inequities in the ownership of land holdings.
Despite all odds the state contributes 33% wheat, 38% sugarcane and 38% potato produced in the country.The contribution of U.P.
to national basket of agricultural produce in respect of major crops is given in Table 5.1
Table 5.1 Contribution of U.P. in Food Basket of Country
Name of Crops Production in Lakh tonnes during 2006-07 Contribution of U.P. %
India U.P.
Total Food grain 2172.8 412.0 18.97
Rice 933.6 111.2 11.91
Wheat 758.1 250.3 33.02
Jowar 71.5 2.4 3.36
Bajra 84.2 12.9 15.32
Maize 151.0 11.6 7.68
Total Pulses 142.0 19.8 13.94
Gram 63.3 5.0 7.90
Arhar 23.1 3.0 12.99
Lentil 9.1 4.3 47.25
Total Oilseeds 242.9 10.3 1.03
Groundnut 48.6 0.7 1.44
Rapeseed/Mustard 74.4 9.57 13.40
Sunflower 12.3 0.2 1.63
Sugarcane 3555.2 1339.5 37.68
Potato 220.91 102.48 46.39
Source – State Annual Plan 2009-10

69
5.2 Productivity Status of Agro-Climatic Zones in U.P.
5.2.1 – Food Grains –
The average productivity of food grains is 22.06 Qtl/Ha and in case of cereals, it is 23.94 Qtl/Ha in the state. The food grains
productivity varies in agro-climatic zones from 8.57 Qtl/ha. (in Bundelkhand zone) to 30.04 Qtl/Ha (in Western plain zone). Similarly in
case of cereals it varies from 12.74Qtl/Ha (in Bundelkhand zone) to 30.89 Qtl/Ha (in Western plain zone). The zone wise and crop wise
along with year wise details are presented in Table – 5.2.1 :-

Table – 5.2.1 Zone wise productivity of food grains


(Qtl/ha.)
Zones Food Total Cereals Food grains Total Cereals Food grains Total
grains Cereals
2005-06 2006-07 2007-08
1 Tarai & Bhabhar 23.10 24.28 23.76 24.82 25.30 26.30
2 Western Plain 28.43 29.50 30.49 31.40 30.04 30.89
3 Mid- Western 22.61 23.35 23.73 24.65 24.76 25.26
4 South Western Semi-Dry 25.18 25.77 23.54 24.30 25.97 26.58
5 Mid-Plain/ Central 21.17 22.72 22.23 24.00 22.75 24.35
6 Bundelkhand 11.32 17.25 10.51 16.19 8.57 12.74
7 North Eastern 19.30 20.11 22.20 21.09 22.31 13.21
8 Eastern Plain 20.34 21.38 20.37 21.41 21.60 22.62
9 Vindhyan 13.14 14.23 16.22 17.64 15.68 17.10
Uttar Pradesh 20.31 22.30 20.77 22.90 22.06 23.94

Source – State Annual Plan 2009-10

70
5.2.2 - Pulses
The average productivity of pulses is 7.31 Qtl/Ha, in the state. The pulses productivity varies in agro-climatic zones from 5.31 Qtl/Ha (in
Bundelkhand zone) to 9.37 Qtl/Ha ( in Eastern Plain zone). The zone wise and crop wise along with year wise detail is presented in
Table- 5.2.2

Table – 5.2.2 - Zone wise productivity of Pulses


(Qtl/ha.)
Zones Total Total Pulses Total Pulses
Pulses
2005-6 2006-07 2007-08
1 Tarai & Bhabhar 8.63 7.18 7.77
2 Western Plain 11.85 7.91 7.40
3 Mid- Western Plain 11.70 7.61 8.56
4 South Western Semi-Dry 14.36 7.45 8.69
5 Mid-Plain/ Central 10.56 8.09 8.89
6 Bundelkhand 6.07 6.57 5.31
7 North Eastern Plain 8.78 7.98 8.46
8 Eastern Plain 11.38 8.02 9.37
9 Vindhyan 4.85 7.94 8.23
Uttar Pradesh 11.49 7.25 7.31

Source – State Annual Plan 2009-10

71
5.2.3 - Oilseeds
The average productivity of Oil seed is 9.07 Qtl/ha., in the state. The Oil seeds productivity varies in agro-climatic zones from 2.55
Qtl/ha. ((in Bundelkhand zone) to 14.27 Qtl/ha. ( in South-Western semi dry zone). The zone wise along with year wise detail is
presented in Table – 5.2.3

Table – 5.2.3 – Zone wise productivity of Oilseeds


(Qtl/ha.)
Zones Total Oilseeds Total Oilseeds Total Oilseeds
1 Tarai & Bhabhar 8.56 8.13 7.98
2 Western Plain 11.61 9.69 12.54
3 Mid- Western Plain 11.01 9.26 10.23
4 South Western Semi-Dry 14.17 13.03 14.27
5 Mid-Plain/ Central 8.76 8.02 8.82
6 Bundelkhand 5.02 3.74 2.55
7 North Eastern Plain 9.42 8.26 8.18
8 Eastern Plain 10.40 10.39 10.14
9 Vindhyan 4.10 5.05 3.94
Uttar Pradesh 9.58 8.36 9.07

Source – State Annual Plan 2009-10

72
Districts wise cropped area, production and productivity of major crops is presented in Table SPSP- 12
Table – SPSP – 12 Districts wise cropped area, production and productivity of major crops
1 2 3 4
Sl. Kharif ( RICE) Rabi (WHEAT)
No. Area Area
Names of the Average Yield Total Production Average Yield Total production
Districts (ha) (Qtl) per ha. (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 44585 44548 37 22.58 N.A. 1006610 N.A. 108904 102374 6530 29.39 N.A. 3200930 N.A.
2 Muzaffar Nagar 23479 23424 55 22.36 N.A. 524910 N.A. 121349 120716 633 32.37 N.A. 3928490 N.A.
3 Bijnor 53272 51838 1434 25.83 N.A. 1375900 N.A. 109462 103726 5736 29.52 N.A. 3231140 N.A.
4 Moradabad 132537 132536 1 20.94 N.A. 2774780 N.A. 193910 193910 0 30.3 N.A. 5876260 N.A.
5 Rampur 144714 144714 0 20.98 N.A. 3036260 N.A. 141245 141244 1 32.26 N.A. 4556350 N.A.
6 J.P. Nagar 25892 25818 74 20.59 N.A. 533190 N.A. 92659 92659 0 31.45 N.A. 2914200 N.A.
7 Meerut 12403 12403 0 25.09 N.A. 311140 N.A. 77429 77429 0 37.21 N.A. 2881250 N.A.
8 Bagpat 2601 2601 0 26.08 N.A. 67830 N.A. 55797 55797 0 40.27 N.A. 2247050 N.A.
9 Gaziabad 20110 20110 0 22.86 N.A. 459710 N.A. 72005 72005 0 40.05 N.A. 2883500 N.A.
10 G.B.Nagar 25914 25914 0 19.84 N.A. 514050 N.A. 62067 62067 0 29.83 N.A. 1789150 N.A.
11 Bulandshahar 58766 58766 0 22.24 N.A. 1307080 N.A. 189406 189406 0 37.72 N.A. 7143460 N.A.
12 Aligarh 47676 47543 133 20.59 N.A. 981790 N.A. 219466 219466 0 28.57 N.A. 6269810 N.A.
13 Hathras 11070 11063 7 19.10 N.A. 211430 N.A. 90039 90039 0 28.24 N.A. 2542400 N.A.
14 Mathura 39121 39121 0 21.53 N.A. 842410 N.A. 192250 192250 0 28.14 N.A. 5410420 N.A.
15 Agra 1414 1255 159 18.97 N.A. 26820 N.A. 137440 137431 9 27.58 N.A. 3790640 N.A.
16 Firozabad 16076 15329 747 29.4 N.A. 472590 N.A. 104497 104497 0 29.32 N.A. 3063850 N.A.
17 Etah 37381 36882 499 21.65 N.A. 809480 N.A. 228088 228088 0 28.34 N.A. 6463540 N.A.
18 Mainpuri 66793 66739 54 25.23 N.A. 1685430 N.A. 163073 163073 0 29.73 N.A. 4848800 N.A.
19 Badaun 85441 85150 291 18.39 N.A. 1571450 N.A. 292513 292476 37 30.05 N.A. 8789820 N.A.
20 Bareily 158734 158530 204 17.87 N.A. 2836080 N.A. 183324 183256 68 28.44 N.A. 5214190 N.A.
21 Pilibhit 151127 150142 985 24.12 N.A. 3645450 N.A. 144850 144522 328 33.37 N.A. 4833640 N.A.
22 Shahjahanpur 216736 216669 67 22.07 N.A. 4782370 N.A. 249180 249169 11 34.58 N.A. 8615960 N.A.
23 Lakhimpur Khiri 185440 162071 23369 20.39 N.A. 3781510 N.A. 192605 180891 11714 30.12 N.A. 5801860 N.A.
24 Sitapur 142704 133793 8911 16.2 N.A. 2311790 N.A. 202272 200466 1806 27.36 N.A. 5534220 N.A.
25 Hardoi 157467 156627 840 20.32 N.A. 3199540 N.A. 309290 309218 72 30.04 N.A. 9291870 N.A.
26 Unnao 89997 89805 192 14.53 N.A. 1307700 N.A. 227359 227254 105 28.62 N.A. 6508050 N.A.
27 Lucknow 51757 51679 78 19.23 N.A. 995390 N.A. 84365 84349 16 26.77 N.A. 2258350 N.A.
73
1 2 3 4
Sl. Kharif ( RICE) Rabi (WHEAT)
No. Area Area
Names of the Average Yield Total Production Average Yield Total production
Districts (ha) (Qtl) per ha. (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
28 Raebareli 130835 130784 51 18.3 N.A. 2393630 N.A. 182636 182572 64 23.41 N.A. 4276410 N.A.
29 Farrukhabad 15539 14994 545 22.77 N.A. 353800 N.A. 70971 70739 232 32.6 N.A. 2314000 N.A.
30 Kannauj 17750 16804 946 24.08 N.A. 427440 N.A. 73169 73159 10 34.9 N.A. 2553430 N.A.
31 Etawah 47766 47766 0 26.78 N.A. 1279120 N.A. 93690 93316 374 32.77 N.A. 3070090 N.A.
32 Auraiya 48726 48722 4 27.68 N.A. 1348940 N.A. 96504 96415 89 31.37 N.A. 3027740 N.A.
33 Kanpur Dehat 53981 53971 10 19.1 N.A. 1031230 N.A. 118606 118535 71 35.05 N.A. 4157190 N.A.
34 Kanpur Nagar 39883 39272 611 16.63 N.A. 663400 N.A. 101125 100598 527 30 N.A. 3033920 N.A.
35 Jalaun 559 378 181 8.68 N.A. 4850 N.A. 144698 144156 542 28.2 N.A. 4079900 N.A.
36 Jhansi 1517 653 864 12.62 N.A. 19150 N.A. 123696 115996 7700 23.69 N.A. 2930250 N.A.
37 Lalitpur 3709 6 3703 7.11 N.A. 26380 N.A. 100875 98613 2262 18.58 N.A. 1874130 N.A.
38 Hamirpur 196 91 105 7.85 N.A. 1540 N.A. 81608 75368 6240 20.44 N.A. 1667760 N.A.
39 Mhoba 283 1 282 7.85 N.A. 2220 N.A. 58746 40931 17815 13.15 N.A. 772520 N.A.
40 Banda 54923 52830 2093 8.87 N.A. 486920 N.A. 133281 98369 34912 14.65 N.A. 1952880 N.A.
41 Chitrakut 12822 2204 10618 4.72 N.A. 60570 N.A. 49991 42489 7502 12.41 N.A. 620240 N.A.
42 Fatehpur 79463 78923 540 15.96 N.A. 1268350 N.A. 151571 149494 2077 24.97 N.A. 3784540 N.A.
43 Pratapgarh 97020 95812 1208 18.5 N.A. 1794620 N.A. 145598 145591 7 24.44 N.A. 3558460 N.A.
44 Kaushambi 43809 40691 3118 15.2 N.A. 665950 N.A. 65898 65430 468 21.75 N.A. 1433420 N.A.
45 Allahabad 170653 157280 13373 21.19 N.A. 3616940 N.A. 212020 206202 5818 23.32 N.A. 4945270 N.A.
46 Barabanki 188695 180997 7698 20.69 N.A. 3903590 N.A. 166696 163963 2733 29.91 N.A. 4985240 N.A.
47 Faizabad 71940 69549 2391 17.23 N.A. 1239680 N.A. 83594 81637 1957 26.83 N.A. 2242780 N.A.
48 Ambedkar Nagar 114936 114438 498 18.03 N.A. 2072570 N.A. 117190 117125 65 29.62 N.A. 3470900 N.A.
49 Sultanpur 156558 151204 5354 17.84 N.A. 2793470 N.A. 168112 167928 184 27.26 N.A. 4582370 N.A.
50 Bahraich 162483 19552 142931 16.56 N.A. 2690580 N.A. 155936 149232 6704 26.44 N.A. 4123010 N.A.
51 Shravasti 68465 2111 66354 14.73 N.A. 1008410 N.A. 59482 52759 6723 26.25 N.A. 1561460 N.A.
52 Balrampur 105242 21804 83438 18.11 N.A. 1905450 N.A. 82540 59349 23191 23.77 N.A. 1962330 N.A.
53 Gonda 123909 76996 46913 15.59 N.A. 1931400 N.A. 145333 145147 186 27.38 N.A. 3979550 N.A.
54 Siddharth Nagar 179285 0 179285 13.89 N.A. 2491050 N.A. 173043 172979 64 25.05 N.A. 4335390 N.A.
55 Basti 112472 36541 75931 15.01 N.A. 1688630 N.A. 112893 111253 1640 23.75 N.A. 2681770 N.A.
74
1 2 3 4
Sl. Kharif ( RICE) Rabi (WHEAT)
No. Area Area
Names of the Average Yield Total Production Average Yield Total production
Districts (ha) (Qtl) per ha. (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
56 Sant Kabir Nahar 91477 3069 88408 14.07 N.A. 1287440 N.A. 90429 90043 386 24.56 N.A. 2221360 N.A.
57 Mahrajganj 166613 4447 162166 23.08 N.A. 3845600 N.A. 148382 147900 482 27.8 N.A. 4124850 N.A.
58 Gorakhpur 150888 29859 121029 16.93 N.A. 2555220 N.A. 186018 185940 78 25.28 N.A. 4702720 N.A.
59 Kushinagar 122469 108108 14361 22.57 N.A. 2764720 N.A. 112391 110752 1639 28.06 N.A. 3153310 N.A.
60 Deoria 130279 73597 56682 17.1 N.A. 2227800 N.A. 146105 146103 2 25.1 N.A. 3667180 N.A.
61 Azamgarh 214704 200627 14077 14.73 N.A. 3162160 N.A. 229036 228802 234 24.56 N.A. 5624120 N.A.
62 Mau 91158 78853 12305 10.36 N.A. 944170 N.A. 93569 93559 10 24.31 N.A. 2274750 N.A.
63 Ballia 121554 97892 23662 13.34 N.A. 1621840 N.A. 138523 134569 3954 24.73 N.A. 3424990 N.A.
64 Jaunpur 142060 140143 1917 18.46 N.A. 2622170 N.A. 197168 197167 1 26.73 N.A. 5270710 N.A.
65 Ghazipur 152053 149572 2481 19.26 N.A. 2928280 N.A. 168327 167619 708 24.22 N.A. 4076380 N.A.
66 Chandauli 122910 122880 30 25.83 N.A. 3174760 N.A. 101226 101026 200 22.72 N.A. 2300010 N.A.
67 Varanasi 49779 49779 0 15.67 N.A. 780070 N.A. 69339 69263 76 25.33 N.A. 1756400 N.A.
68 Sant Ravidas
Nagar 26810 26736 74 15.59 N.A. 417970 N.A. 46853 46825 28 24.49 N.A. 1147240 N.A.
69 Mirzapur 100982 80794 20188 19.33 N.A. 1951680 N.A. 97499 78743 18756 20.34 N.A. 1983170 N.A.
70 Sonbhadra 45692 15548 30144 9.88 N.A. 297950 N.A. 50309 23015 27294 13.43 N.A. 675570 N.A.
Total U.P. 5836054 4601348 1234706 18.70 N.A. 109124400 N.A. 9389520 9178449 211071 27.72 N.A. 260268910 N.A.

75
1 2 5 6
Sl. MAIZE BAJRA
No. Area Area Total
Names of the
Average Yield Total Average Yield production
Districts
(ha) (Qtl) per ha. Production (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 8304 177 8127 14.13 N.A. 117370 N.A. 1 0 1 14.94 N.A. 10 N.A.
2 Muzaffar Nagar 219 203 16 14.06 N.A. 3080 N.A. 0 0 0 0.00 N.A. 0 N.A.
3 Bijnor 16 10 6 18.75 N.A. 300 N.A. 0 0 0 0.00 N.A. 0 N.A.
4 Moradabad 3089 2621 468 11.06 N.A. 34150 N.A. 36733 98 36635 9.80 N.A. 359900 N.A.
5 Rampur 109 33 76 10.28 N.A. 1120 N.A. 2657 0 2657 14.81 N.A. 39350 N.A.
6 J.P. Nagar 2232 1979 253 10.02 N.A. 22370 N.A. 3303 270 3033 6.87 N.A. 22690 N.A.
7 Meerut 589 589 0 17.33 N.A. 10210 N.A. 26 26 0 13.81 N.A. 360 N.A.
8 Bagpat 45 45 0 18.68 N.A. 840 N.A. 505 505 0 13.81 N.A. 6980 N.A.
9 Gaziabad 2265 2265 0 19.46 N.A. 44080 N.A. 287 287 0 13.81 N.A. 3960 N.A.
10 G.B.Nagar 1305 1305 0 18.68 N.A. 24380 N.A. 2926 2926 0 9.51 N.A. 27820 N.A.
11 Bulandshahar 55639 55639 0 18.67 N.A. 1038560 N.A. 7345 7345 0 15.27 N.A. 112150 N.A.
12 Aligarh 26820 26694 126 15.94 N.A. 427400 N.A. 85974 4937 81037 17.18 N.A. 1476980 N.A.
13 Hathras 3875 3875 0 17.66 N.A. 68440 N.A. 47898 9037 38861 16.06 N.A. 769240 N.A.
14 Mathura 396 356 40 18.71 N.A. 7410 N.A. 40835 589 40246 9.51 N.A. 388350 N.A.
15 Agra 94 77 17 16.36 N.A. 1540 N.A. 107579 384 107195 13.87 N.A. 1492530 N.A.
16 Firozabad 8041 6948 1093 23.37 N.A. 187950 N.A. 65621 2427 63194 18.49 N.A. 1213210 N.A.
17 Etah 58802 54527 4275 19.10 N.A. 1122870 N.A. 78175 12026 66149 18.10 N.A. 1414880 N.A.
18 Mainpuri 53588 52553 1035 20.13 N.A. 1078470 N.A. 17890 6766 11124 19.49 N.A. 348740 N.A.
19 Badaun 9967 1596 8371 18.76 N.A. 167020 N.A. 150302 1056 149246 14.39 N.A. 2162430 N.A.
20 Bareily 351 191 160 15.41 N.A. 5410 N.A. 9813 25 9788 13.09 N.A. 128410 N.A.
21 Pilibhit 335 84 251 16.39 N.A. 5490 N.A. 4 0 4 14.25 N.A. 60 N.A.
22 Shahjahanpur 2691 434 2257 18.49 N.A. 49750 N.A. 3693 248 3445 11.51 N.A. 42510 N.A.
23 Lakhimpur Khiri 8917 1097 7820 10.42 N.A. 92900 N.A. 360 3 357 14.94 N.A. 4340 N.A.
24 Sitapur 16733 213 16520 9.57 N.A. 160080 N.A. 4604 2 4602 0.00 N.A. 34910 N.A.
25 Hardoi 52365 857 51508 13.29 N.A. 695930 N.A. 4473 1 4472 14.94 N.A. 74600 N.A.
26 Unnao 36980 445 36535 9.53 N.A. 352400 N.A. 1479 0 1479 0.00 N.A. 17830 N.A.
76
1 2 5 6
Sl. MAIZE BAJRA
No. Area Area Total
Names of the
Average Yield Total Average Yield production
Districts
(ha) (Qtl) per ha. Production (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
27 Lucknow 2374 175 2199 10.96 N.A. 26010 N.A. 1341 1 1340 9.80 N.A. 16160 N.A.
28 Raebareli 78 3 75 14.49 N.A. 1130 N.A. 1381 0 1381 14.81 N.A. 16650 N.A.
29 Farrukhabad 39611 12773 26838 14.18 N.A. 561590 N.A. 4290 60 4230 9.88 N.A. 54060 N.A.
30 Kannauj 49042 14560 34482 15.74 N.A. 771700 N.A. 2957 457 2500 13.81 N.A. 49420 N.A.
31 Etawah 6164 5313 851 16.67 N.A. 102750 N.A. 39411 1419 37992 13.81 N.A. 676580 N.A.
32 Auraiya 10605 8418 2187 19.34 N.A. 205110 N.A. 30775 3078 27697 13.81 N.A. 537830 N.A.
33 Kanpur Dehat 15821 2445 13376 10.24 N.A. 161960 N.A. 16227 67 16160 9.51 N.A. 254140 N.A.
34 Kanpur Nagar 20639 848 19791 11.13 N.A. 229800 N.A. 984 73 911 15.27 N.A. 16450 N.A.
35 Jalaun 5 0 5 9.06 N.A. 50 N.A. 14391 0 14391 17.18 N.A. 262900 N.A.
36 Jhansi 2249 1 2248 5.32 N.A. 11960 N.A. 102 0 102 16.06 N.A. 1860 N.A.
37 Lalitpur 33201 1 33200 9.31 N.A. 309100 N.A. 0 0 0 9.51 N.A. 0 N.A.
38 Hamirpur 1 0 1 13.34 N.A. 10 N.A. 306 0 306 18.49 N.A. 3480 N.A.
39 Mhoba 9 0 9 13.34 N.A. 120 N.A. 0 0 0 18.10 N.A. 0 N.A.
40 Banda 5 0 5 13.34 N.A. 70 N.A. 2089 0 2089 19.49 N.A. 17450 N.A.
41 Chitrakut 16 1 15 13.13 N.A. 210 N.A. 8492 0 8492 16.00 N.A. 72840 N.A.
42 Fatehpur 430 62 368 13.37 N.A. 5750 N.A. 6677 0 6677 13.09 N.A. 79440 N.A.
43 Pratapgarh 678 75 603 13.33 N.A. 9040 N.A. 10162 0 10162 14.25 N.A. 94830 N.A.
44 Kaushambi 225 119 106 13.38 N.A. 3010 N.A. 10754 3 10751 11.51 N.A. 124000 N.A.
45 Allahabad 131 4 127 13.28 N.A. 1740 N.A. 28243 1 28242 14.24 N.A. 258340 N.A.
46 Barabanki 6943 754 6189 6.65 N.A. 47570 N.A. 926 0 926 15.15 N.A. 14030 N.A.
47 Faizabad 2663 1753 910 13.30 N.A. 35430 N.A. 1 0 1 15.15 N.A. 10 N.A.
48 Ambedkar Nagar 682 314 368 10.95 N.A. 7470 N.A. 40 0 40 15.15 N.A. 610 N.A.
49 Sultanpur 5255 328 4927 12.80 N.A. 67250 N.A. 248 0 248 15.15 N.A. 3760 N.A.
50 Bahraich 84767 2161 82606 10.80 N.A. 915310 N.A. 31 0 31 16.99 N.A. 530 N.A.
51 Shravasti 24499 213 24286 7.00 N.A. 171410 N.A. 15 0 15 16.99 N.A. 250 N.A.
52 Balrampur 8308 274 8034 9.44 N.A. 78460 N.A. 106 0 106 16.99 N.A. 1800 N.A.
53 Gonda 55099 2586 52513 8.52 N.A. 469590 N.A. 1 0 1 16.99 N.A. 20 N.A.
77
1 2 5 6
Sl. MAIZE BAJRA
No. Area Area Total
Names of the
Average Yield Total Average Yield production
Districts
(ha) (Qtl) per ha. Production (Qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
54 Siddharth Nagar 1124 8 1116 13.35 N.A. 15000 N.A. 0 0 0 0.00 N.A. 0 N.A.
55 Basti 3938 523 3415 13.36 N.A. 52620 N.A. 37 0 37 17.62 N.A. 650 N.A.
56 Sant Kabir Nahar 1664 38 1626 13.34 N.A. 22200 N.A. 26 0 26 17.62 N.A. 460 N.A.
57 Mahrajganj 466 351 115 13.41 N.A. 6250 N.A. 0 0 0 0.00 N.A. 0 N.A.
58 Gorakhpur 3935 244 3691 12.27 N.A. 48280 N.A. 90 0 90 15.80 N.A. 1420 N.A.
59 Kushinagar 6091 2993 3098 17.21 N.A. 104840 N.A. 101 2 99 15.80 N.A. 1600 N.A.
60 Deoria 7747 1553 6194 14.95 N.A. 115850 N.A. 176 7 169 15.80 N.A. 2780 N.A.
61 Azamgarh 7587 1171 6416 15.38 N.A. 116690 N.A. 113 14 99 15.56 N.A. 1760 N.A.
62 Mau 497 272 225 11.83 N.A. 5880 N.A. 77 8 69 15.56 N.A. 1190 N.A.
63 Ballia 26470 1369 25101 9.53 N.A. 252130 N.A. 2096 27 2069 15.56 N.A. 32610 N.A.
64 Jaunpur 45549 332 45217 13.20 N.A. 601290 N.A. 5490 0 5490 12.03 N.A. 66040 N.A.
65 Ghazipur 673 71 602 13.21 N.A. 8890 N.A. 14139 0 14139 14.13 N.A. 199810 N.A.
66 Chandauli 96 0 96 16.25 N.A. 1560 N.A. 4927 0 4927 15.60 N.A. 76850 N.A.
67 Varanasi 3004 41 2963 13.20 N.A. 39660 N.A. 4433 0 4433 14.02 N.A. 62140 N.A.
68 Sant Ravidas
Nagar 622 0 622 6.19 N.A. 3850 N.A. 8698 0 8698 9.28 N.A. 80730 N.A.
69 Mirzapur 1949 12 1937 6.61 N.A. 12890 N.A. 9224 0 9224 9.80 N.A. 90390 N.A.
70 Sonbhadra 15241 0 15241 6.15 N.A. 93730 N.A. 371 0 371 10.83 N.A. 3850 N.A.
Total U.P. 849920 276972 572948 13.43 N.A. 11414730 N.A. 902431 54175 848256 14.76 N.A. 13321960 N.A.

78
1 2 7 8
Sl. JOWAR Total Pulses
No. Area Area
Names of the Average Yield per Total Average Yield Total
Districts (ha) ha (qtl) production (qtl) (ha) (Qtl) per ha. Production (Qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 0 0 0 0.00 N.A. 0 N.A. 5990 3938 2052 4.34 N.A. 26000 N.A.
2 Muzaffar Nagar 0 0 0 0.00 N.A. 0 N.A. 4082 4068 14 5.34 N.A. 21790 N.A.
3 Bijnor 0 0 0 0.00 N.A. 0 N.A. 3930 1549 2381 7.82 N.A. 30750 N.A.
4 Moradabad 341 2 339 10.65 N.A. 3630 N.A. 14529 1726 12803 8.41 N.A. 122260 N.A.
5 Rampur 1215 3 1212 10.65 N.A. 12940 N.A. 4560 373 4187 8.02 N.A. 36560 N.A.
6 J.P. Nagar 5 0 5 10.65 N.A. 60 N.A. 3349 947 2402 8.18 N.A. 27410 N.A.
7 Meerut 2 2 0 8.14 N.A. 20 N.A. 2259 2259 0 7.32 N.A. 16530 N.A.
8 Bagpat 92 92 0 8.14 N.A. 750 N.A. 1685 1685 0 7.33 N.A. 12350 N.A.
9 Gaziabad 47 47 0 8.14 N.A. 380 N.A. 3311 3311 0 8.43 N.A. 27900 N.A.
10 G.B.Nagar 3 3 0 8.14 N.A. 20 N.A. 3061 3061 0 13.56 N.A. 41510 N.A.
11 Bulandshahar 93 93 0 8.14 N.A. 760 N.A. 17724 17724 0 7.73 N.A. 136990 N.A.
12 Aligarh 7 7 0 10.56 N.A. 70 N.A. 22177 21307 870 6.47 N.A. 143490 N.A.
13 Hathras 13 12 1 10.56 N.A. 140 N.A. 7841 7779 62 9.01 N.A. 70670 N.A.
14 Mathura 76 5 71 10.56 N.A. 800 N.A. 3985 3333 652 7.19 N.A. 28650 N.A.
15 Agra 59 0 59 10.56 N.A. 630 N.A. 5252 1961 3291 7.63 N.A. 40050 N.A.
16 Firozabad 88 27 61 10.56 N.A. 930 N.A. 5678 4575 1103 6.71 N.A. 38090 N.A.
17 Etah 1 0 1 10.56 N.A. 10 N.A. 16404 14246 2158 8.28 N.A. 135770 N.A.
18 Mainpuri 555 475 80 10.56 N.A. 5860 N.A. 8897 8400 497 6.52 N.A. 58040 N.A.
19 Badaun 708 76 632 10.28 N.A. 7280 N.A. 26922 5814 21108 7.65 N.A. 205970 N.A.
20 Bareily 340 6 334 10.28 N.A. 3490 N.A. 14472 1110 13362 7.37 N.A. 106690 N.A.
21 Pilibhit 3 0 3 10.28 N.A. 30 N.A. 3941 546 3395 5.94 N.A. 23400 N.A.
22 Shahjahanpur 1274 99 1175 10.28 N.A. 13090 N.A. 31917 1738 30179 8.89 N.A. 283650 N.A.
23 Lakhimpur Khiri 192 0 192 9.17 N.A. 1760 N.A. 24371 1147 23224 8.17 N.A. 199160 N.A.
24 Sitapur 5895 0 5895 9.64 N.A. 56810 N.A. 52116 4631 47485 6.50 N.A. 338940 N.A.
25 Hardoi 9420 3 9417 10.74 N.A. 101190 N.A. 37188 6891 30297 6.31 N.A. 234630 N.A.
26 Unnao 5760 1 5759 10.95 N.A. 63070 N.A. 36155 5210 30945 6.25 N.A. 225930 N.A.

79
1 2 7 8
Sl. JOWAR Total Pulses
No. Area Area
Names of the Average Yield per Total Average Yield Total
Districts (ha) ha (qtl) production (qtl) (ha) (Qtl) per ha. Production (Qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
27 Lucknow 3893 1 3892 0.01 N.A. 38960 N.A. 17318 3126 14192 5.94 N.A. 102860 N.A.
28 Raebareli 11230 5 11225 8.38 N.A. 94090 N.A. 40914 5824 35090 6.31 N.A. 258200 N.A.
29 Farrukhabad 1618 165 1453 9.16 N.A. 14810 N.A. 7046 3796 3250 9.12 N.A. 64260 N.A.
30 Kannauj 1166 69 1097 9.16 N.A. 10680 N.A. 8489 5615 2874 9.06 N.A. 76910 N.A.
31 Etawah 144 27 117 9.16 N.A. 1320 N.A. 13502 5258 8244 8.63 N.A. 116550 N.A.
32 Auraiya 1539 102 1437 11.42 N.A. 17580 N.A. 16588 3256 13332 9.23 N.A. 153080 N.A.
33 Kanpur Dehat 15149 7 15142 12.07 N.A. 182440 N.A. 48167 4874 43293 12.02 N.A. 579150 N.A.
34 Kanpur Nagar 13316 104 13212 11.31 N.A. 150590 N.A. 35846 4511 31335 9.90 N.A. 354750 N.A.
35 Jalaun 7949 0 7949 16.77 N.A. 133300 N.A. 172494 69600 102894 8.10 N.A. 1397640 N.A.
36 Jhansi 9200 0 9200 9.68 N.A. 89020 N.A. 155519 55406 100113 6.63 N.A. 1031230 N.A.
37 Lalitpur 1430 0 1430 15.71 N.A. 22460 N.A. 202220 133065 69155 9.57 N.A. 1934560 N.A.
38 Hamirpur 23784 0 23784 5.44 N.A. 129430 N.A. 183638 21561 162077 5.58 N.A. 1024660 N.A.
39 Mhoba 4966 0 4966 8.86 N.A. 43990 N.A. 172001 49180 122821 5.21 N.A. 896470 N.A.
40 Banda 26625 0 26625 7.34 N.A. 195450 N.A. 177672 1572 176100 5.64 N.A. 1002350 N.A.
41 Chitrakut 17714 0 17714 6.29 N.A. 111450 N.A. 84251 1053 83198 4.17 N.A. 351180 N.A.
42 Fatehpur 13840 0 13840 14.09 N.A. 194980 N.A. 91646 2884 88762 8.45 N.A. 774060 N.A.
43 Pratapgarh 3309 0 3309 14.42 N.A. 47730 N.A. 25233 9033 16200 6.56 N.A. 165500 N.A.
44 Kaushambi 6982 6 6976 15.82 N.A. 110470 N.A. 29128 1726 27402 8.46 N.A. 246530 N.A.
45 Allahabad 6183 0 6183 13.76 N.A. 85060 N.A. 51274 7819 43455 8.12 N.A. 416580 N.A.
46 Barabanki 3800 0 3800 11.21 N.A. 42590 N.A. 45625 5115 40510 7.75 N.A. 353690 N.A.
47 Faizabad 2254 0 2254 8.76 N.A. 19740 N.A. 11295 5830 5465 7.46 N.A. 84280 N.A.
48 Ambedkar Nagar 963 0 963 8.76 N.A. 8440 N.A. 12582 7540 5042 7.76 N.A. 97680 N.A.
49 Sultanpur 7690 0 7690 7.57 N.A. 58220 N.A. 40738 13414 27324 8.90 N.A. 362380 N.A.
50 Bahraich 67 0 67 10.71 N.A. 720 N.A. 53582 1066 52516 8.21 N.A. 439670 N.A.
51 Shravasti 78 0 78 10.71 N.A. 830 N.A. 26080 107 25973 5.61 N.A. 146190 N.A.
52 Balrampur 2 0 2 10.71 N.A. 20 N.A. 38794 3572 35222 10.28 N.A. 398800 N.A.
53 Gonda 36 0 36 10.71 N.A. 390 N.A. 24554 7862 16692 7.78 N.A. 190980 N.A.
54 Siddharth Nagar 0 0 0 0.00 N.A. 0 N.A. 13849 7211 6638 7.61 N.A. 105370 N.A.
80
1 2 7 8
Sl. JOWAR Total Pulses
No. Area Area
Names of the Average Yield per Total Average Yield Total
Districts (ha) ha (qtl) production (qtl) (ha) (Qtl) per ha. Production (Qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
55 Basti 22 0 22 11.36 N.A. 250 N.A. 17885 8807 9078 7.65 N.A. 136890 N.A.
56 Sant Kabir Nahar 0 0 0 0.00 N.A. 0 N.A. 8956 4642 4314 7.87 N.A. 70510 N.A.
57 Mahrajganj 0 0 0 0.00 N.A. 0 N.A. 12629 1788 10841 6.57 N.A. 82950 N.A.
58 Gorakhpur 5 0 5 11.45 N.A. 60 N.A. 13383 4252 9131 6.46 N.A. 86490 N.A.
59 Kushinagar 14 0 14 11.45 N.A. 160 N.A. 5574 1736 3838 6.41 N.A. 35710 N.A.
60 Deoria 36 0 36 11.45 N.A. 410 N.A. 10045 2575 7470 6.30 N.A. 63330 N.A.
61 Azamgarh 17 1 16 11.84 N.A. 200 N.A. 21706 10600 11106 6.90 N.A. 149830 N.A.
62 Mau 6 2 4 11.84 N.A. 70 N.A. 6258 3306 2952 7.40 N.A. 46300 N.A.
63 Ballia 1482 4 1478 11.84 N.A. 17550 N.A. 31661 3106 28555 8.16 N.A. 258260 N.A.
64 Jaunpur 3274 4 3270 13.16 N.A. 43090 N.A. 28778 7529 21249 8.35 N.A. 240270 N.A.
65 Ghazipur 3175 0 3175 14.42 N.A. 45780 N.A. 32045 4371 27674 8.79 N.A. 281630 N.A.
66 Chandauli 786 0 786 13.16 N.A. 10340 N.A. 21102 324 20778 6.86 N.A. 144830 N.A.
67 Varanasi 2262 0 2262 13.16 N.A. 29770 N.A. 11955 2794 9161 8.43 N.A. 100840 N.A.
68 Sant Ravidas
Nagar 1423 0 1423 10.74 N.A. 15280 N.A. 6700 1084 5616 8.39 N.A. 56220 N.A.
69 Mirzapur 3495 0 3495 9.95 N.A. 34790 N.A. 39974 614 39360 9.62 N.A. 384660 N.A.
70 Sonbhadra 2642 0 2642 11.91 N.A. 30410 N.A. 38126 156 37970 6.33 N.A. 241210 N.A.
Total U.P. 229755 1450 228305 10.04 N.A. 2306640 N.A. 2468618 627889 1840729 7.35 N.A. 18138670 N.A.

81
1 2 9 10
Sl. Total oilseeds Sugar cane
No. Area Area
Names of the Average Yield Total production Average Yield Total production
Districts (ha) per ha (qtl) (qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 5143 1232 3911 8.86 N.A. 45560 N.A. 139591 138216 1375 631.60 N.A. 88171260 N.A.
2 Muzaffar Nagar 2829 2782 47 10.29 N.A. 29110 N.A. 236561 234206 2355 691.60 N.A. 163605590 N.A.
3 Bijnor 4634 2071 2563 12.00 N.A. 55620 N.A. 206805 198460 8345 621.90 N.A. 128616170 N.A.
4 Moradabad 9135 8363 772 10.27 N.A. 93820 N.A. 73177 73173 4 634.20 N.A. 46411780 N.A.
5 Rampur 5221 4411 810 11.28 N.A. 58910 N.A. 21310 21309 1 610.50 N.A. 13009330 N.A.
6 J.P. Nagar 2650 2638 12 8.91 N.A. 23610 N.A. 74600 74516 84 632.30 N.A. 47168090 N.A.
7 Meerut 3402 3402 0 9.46 N.A. 32190 N.A. 136016 136016 0 693.00 N.A. 94264530 N.A.
8 Bagpat 1114 1114 0 9.46 N.A. 10540 N.A. 75167 75167 0 721.00 N.A. 54210440 N.A.
9 Gaziabad 2345 2345 0 9.46 N.A. 22180 N.A. 64391 64391 0 592.40 N.A. 38142650 N.A.
10 G.B.Nagar 1081 1081 0 9.50 N.A. 10270 N.A. 2502 2502 0 663.20 N.A. 1659300 N.A.
11 Bulandshahar 8169 8169 0 9.52 N.A. 77760 N.A. 56830 56830 0 594.90 N.A. 33809300 N.A.
12 Aligarh 22108 22097 11 11.12 N.A. 245830 N.A. 9653 8918 735 597.00 N.A. 5762450 N.A.
13 Hathras 9135 9102 33 10.43 N.A. 95280 N.A. 468 468 0 534.40 N.A. 250110 N.A.
14 Mathura 44177 43386 791 16.51 N.A. 729300 N.A. 5239 5239 0 442.90 N.A. 2320250 N.A.
15 Agra 66757 53212 13545 12.63 N.A. 843170 N.A. 360 349 11 534.40 N.A. 192400 N.A.
16 Firozabad 12815 10801 2014 11.94 N.A. 153030 N.A. 168 168 0 534.40 N.A. 89780 N.A.
17 Etah 19337 18611 726 10.51 N.A. 203220 N.A. 9600 9155 445 521.70 N.A. 5008130 N.A.
18 Mainpuri 10420 10391 29 12.74 N.A. 132730 N.A. 600 600 0 534.40 N.A. 320660 N.A.
19 Badaun 24124 21344 2780 10.78 N.A. 260170 N.A. 27181 26864 317 633.10 N.A. 17208830 N.A.
20 Bareily 20524 15174 5350 6.54 N.A. 134190 N.A. 91751 90822 929 551.00 N.A. 50554800 N.A.
21 Pilibhit 12299 10109 2190 7.26 N.A. 89350 N.A. 67016 66620 396 630.50 N.A. 42252250 N.A.
22 Shahjahanpur 24691 12710 11981 6.75 N.A. 166560 N.A. 37701 37687 14 569.10 N.A. 21456390 N.A.
23 Lakhimpur Khiri 42760 17735 25025 7.49 N.A. 320350 N.A. 218245 186633 31612 591.00 N.A. 128991520 N.A.
24 Sitapur 28362 13408 14954 6.14 N.A. 174080 N.A. 136924 131762 5162 554.80 N.A. 75959960 N.A.
25 Hardoi 27793 9550 18243 5.94 N.A. 165070 N.A. 37968 37916 52 528.90 N.A. 20080520 N.A.
26 Unnao 21713 10728 10985 6.20 N.A. 134640 N.A. 1405 1404 1 569.30 N.A. 799830 N.A.

82
1 2 9 10
Sl. Total oilseeds Sugar cane
No. Area Area
Names of the Average Yield Total production Average Yield Total production
Districts (ha) per ha (qtl) (qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
27 Lucknow 3837 2329 1508 6.68 N.A. 25630 N.A. 548 538 10 565.90 N.A. 310120 N.A.
28 Raebareli 11184 6212 4972 6.19 N.A. 69280 N.A. 5012 5012 0 364.00 N.A. 1824170 N.A.
29 Farrukhabad 11127 9289 1838 12.33 N.A. 137220 N.A. 7668 7429 239 619.40 N.A. 4749560 N.A.
30 Kannauj 14785 12030 2755 11.28 N.A. 166740 N.A. 373 373 0 544.60 N.A. 203150 N.A.
31 Etawah 16308 7584 8724 12.03 N.A. 196210 N.A. 656 656 0 544.60 N.A. 357290 N.A.
32 Auraiya 14897 10512 4385 10.09 N.A. 150330 N.A. 957 957 0 544.60 N.A. 521220 N.A.
33 Kanpur Dehat 24478 16816 7662 9.30 N.A. 227640 N.A. 2742 2742 0 451.10 N.A. 1236860 N.A.
34 Kanpur Nagar 18558 11370 7188 9.02 N.A. 167350 N.A. 3981 3775 206 465.00 N.A. 1851160 N.A.
35 Jalaun 57322 2874 54448 1.88 N.A. 107960 N.A. 2497 2486 11 404.40 N.A. 1009760 N.A.
36 Jhansi 126478 2649 123829 3.16 N.A. 399630 N.A. 99 79 20 404.40 N.A. 40040 N.A.
37 Lalitpur 24235 2900 21335 5.66 N.A. 137170 N.A. 169 169 0 404.40 N.A. 68340 N.A.
38 Hamirpur 19683 2177 17506 2.76 N.A. 54340 N.A. 3995 3987 8 420.40 N.A. 1679670 N.A.
39 Mhoba 28950 1098 27852 3.37 N.A. 97480 N.A. 2572 2572 0 420.40 N.A. 1081360 N.A.
40 Banda 6993 39 6954 3.21 N.A. 22420 N.A. 824 820 4 420.40 N.A. 346440 N.A.
41 Chitrakut 4076 109 3967 2.57 N.A. 10460 N.A. 355 353 2 420.40 N.A. 149260 N.A.
42 Fatehpur 21263 7270 13993 4.80 N.A. 102130 N.A. 8682 8682 0 477.40 N.A. 4144950 N.A.
43 Pratapgarh 2099 1135 964 4.87 N.A. 10220 N.A. 886 886 0 398.20 N.A. 352790 N.A.
44 Kaushambi 4301 884 3417 4.38 N.A. 18820 N.A. 1451 1451 0 398.20 N.A. 577760 N.A.
45 Allahabad 2325 165 2160 4.23 N.A. 9830 N.A. 723 723 0 398.20 N.A. 287890 N.A.
46 Barabanki 11113 9122 1991 12.07 N.A. 134150 N.A. 18394 14698 3696 565.90 N.A. 10409530 N.A.
47 Faizabad 3364 3252 112 12.63 N.A. 42490 N.A. 18233 17186 1047 416.00 N.A. 7584930 N.A.
48 Ambedkar Nagar 3533 3507 26 12.61 N.A. 44550 N.A. 11678 11653 25 416.00 N.A. 4858050 N.A.
49 Sultanpur 4436 3320 1116 11.51 N.A. 51060 N.A. 10252 10251 1 542.60 N.A. 5562330 N.A.
50 Bahraich 8841 1935 6906 7.94 N.A. 70200 N.A. 22023 8527 13496 591.20 N.A. 13020880 N.A.
51 Shravasti 2510 146 2364 8.22 N.A. 20640 N.A. 2332 2329 3 591.20 N.A. 1378770 N.A.
52 Balrampur 17294 7321 9973 9.75 N.A. 168700 N.A. 56320 26829 29491 547.20 N.A. 30816050 N.A.
53 Gonda 8074 6861 1213 9.22 N.A. 74460 N.A. 65241 55565 9676 458.80 N.A. 29935180 N.A.
54 Siddharth Nagar 4832 4665 167 10.03 N.A. 48470 N.A. 2454 2393 61 531.20 N.A. 1303470 N.A.
83
1 2 9 10
Sl. Total oilseeds Sugar cane
No. Area Area
Names of the Average Yield Total production Average Yield Total production
Districts (ha) per ha (qtl) (qtl) (ha) per ha (qtl) (qtl)
Total Irri Rf. Irri Rf. Irri Rf. Total Irri Rf. Irri Rf. Irri Rf.
55 Basti 3149 2902 247 10.01 N.A. 31530 N.A. 38344 37386 958 531.20 N.A. 20366800 N.A.
56 Sant Kabir Nahar 3778 2250 1528 9.07 N.A. 34250 N.A. 3707 3672 35 531.20 N.A. 1969010 N.A.
57 Mahrajganj 6053 3816 2237 5.29 N.A. 32020 N.A. 19667 16363 3304 503.50 N.A. 9901940 N.A.
58 Gorakhpur 6969 2798 4171 7.97 N.A. 55510 N.A. 3257 3228 29 547.50 N.A. 1783270 N.A.
59 Kushinagar 10198 3614 6584 7.61 N.A. 77570 N.A. 70163 33350 36813 539.10 N.A. 37826280 N.A.
60 Deoria 5186 1825 3361 8.07 N.A. 41830 N.A. 11400 11383 17 484.00 N.A. 5517140 N.A.
61 Azamgarh 1376 1226 150 9.99 N.A. 13740 N.A. 20644 20034 610 406.80 N.A. 8398800 N.A.
62 Mau 595 105 490 7.92 N.A. 4710 N.A. 6967 6961 6 382.80 N.A. 2666970 N.A.
63 Ballia 1325 336 989 9.75 N.A. 12920 N.A. 6699 6234 465 317.00 N.A. 2123320 N.A.
64 Jaunpur 2462 1872 590 8.86 N.A. 21820 N.A. 10233 10233 0 588.60 N.A. 6023140 N.A.
65 Ghazipur 525 252 273 9.35 N.A. 4910 N.A. 7316 7310 6 539.00 N.A. 3943140 N.A.
66 Chandauli 1550 38 1512 5.31 N.A. 8230 N.A. 715 715 0 539.00 N.A. 385370 N.A.
67 Varanasi 1009 265 744 7.66 N.A. 7730 N.A. 4086 4086 0 414.70 N.A. 1694550 N.A.
68 Sant Ravidas
Nagar 398 75 323 2.16 N.A. 860 N.A. 1087 1087 0 433.00 N.A. 470670 N.A.
69 Mirzapur 10988 322 10666 7.12 N.A. 78280 N.A. 1850 1837 13 433.00 N.A. 801050 N.A.
70 Sonbhadra 13331 21 13310 3.00 N.A. 40020 N.A. 169 158 11 433.00 N.A. 73180 N.A.
Total U.P. 978526 475254 503272 7.70 N.A. 7538050 N.A. 2188650 2036549 152101 598.51 N.A. 1309921930 N.A.

84
1 2 11
Sl. Potato
No. Area
Names of
the Districts (ha) Average Yield per ha (qtl) Total production (qtl)
Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 542 542 0 220.41 N.A. 119460 N.A.
2 Muzaffar
Nagar 2317 2316 1 220.40 N.A. 510660 N.A.
3 Bijnor 904 904 0 254.14 N.A. 229740 N.A.
4 Moradabad 11667 11667 0 286.37 N.A. 3341080 N.A.
5 Rampur 2438 2438 0 254.14 N.A. 619600 N.A.
6 J.P. Nagar 3806 3806 0 155.39 N.A. 591410 N.A.
7 Meerut 5654 5654 0 148.15 N.A. 837640 N.A.
8 Bagpat 273 273 0 159.56 N.A. 43560 N.A.
9 Gaziabad 5097 5097 0 163.71 N.A. 834430 N.A.
10 G.B.Nagar 229 229 0 159.56 N.A. 36540 N.A.
11 Bulandshahar 7105 7105 0 165.43 N.A. 1175380 N.A.
12 Aligarh 13642 13642 0 234.03 N.A. 3192640 N.A.
13 Hathras 31401 31401 0 293.34 N.A. 9211170 N.A.
14 Mathura 10399 10399 0 274.40 N.A. 2853490 N.A.
15 Agra 42357 42357 0 230.63 N.A. 9768790 N.A.
16 Firozabad 37150 37150 0 261.01 N.A. 9696520 N.A.
17 Etah 10139 10139 0 213.46 N.A. 2164270 N.A.
18 Mainpuri 14940 14940 0 198.11 N.A. 2959760 N.A.
19 Badaun 20038 20038 0 170.07 N.A. 3407860 N.A.
20 Bareily 5154 5154 0 180.62 N.A. 930920 N.A.
21 Pilibhit 564 564 0 172.36 N.A. 97210 N.A.
22 Shahjahanpur 8232 8232 0 173.96 N.A. 1432040 N.A.
23 Lakhimpur
Khiri 1247 1123 124 172.41 N.A. 214990 N.A.
24 Sitapur 3830 3827 3 172.41 N.A. 660330 N.A.
25 Hardoi 9241 9241 0 154.66 N.A. 1429210 N.A.
85
1 2 11
Sl. Potato
No. Area
Names of
the Districts (ha) Average Yield per ha (qtl) Total production (qtl)
Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 542 542 0 220.41 N.A. 119460 N.A.
26 Unnao 7070 7070 0 214.70 N.A. 1517930 N.A.
27 Lucknow 4797 4797 0 163.81 N.A. 785800 N.A.
28 Raebareli 5484 5484 0 155.44 N.A. 852430 N.A.
29 Farrukhabad 29400 29400 0 263.58 N.A. 7749250 N.A.
30 Kannauj 37620 37620 0 254.28 N.A. 9566010 N.A.
31 Etawah 9862 9862 0 233.61 N.A. 2303860 N.A.
32 Auraiya 3864 3864 0 308.84 N.A. 1193360 N.A.
33 Kanpur
Dehat 3385 3385 0 255.29 N.A. 864150 N.A.
34 Kanpur
Nagar 10579 10579 0 237.57 N.A. 2513250 N.A.
35 Jalaun 495 495 0 220.40 N.A. 109100 N.A.
36 Jhansi 421 421 0 220.40 N.A. 92790 N.A.
37 Lalitpur 391 391 0 220.40 N.A. 86170 N.A.
38 Hamirpur 22 22 0 220.40 N.A. 4850 N.A.
39 Mhoba 134 134 0 220.40 N.A. 29530 N.A.
40 Banda 146 144 2 220.40 N.A. 32180 N.A.
41 Chitrakut 298 298 0 220.40 N.A. 65680 N.A.
42 Fatehpur 6248 6248 0 145.06 N.A. 906330 N.A.
43 Pratapgarh 4787 4785 2 176.97 N.A. 847160 N.A.
44 Kaushambi 3851 3851 0 146.44 N.A. 563940 N.A.
45 Allahabad 11750 11749 1 203.99 N.A. 2396880 N.A.
46 Barabanki 11656 11652 4 114.54 N.A. 1335080 N.A.
47 Faizabad 3676 3671 5 114.54 N.A. 421050 N.A.
48 Ambedkar
Nagar 4086 4086 0 114.54 N.A. 468010 N.A.
49 Sultanpur 6720 6720 0 114.54 N.A. 769710 N.A.

86
1 2 11
Sl. Potato
No. Area
Names of
the Districts (ha) Average Yield per ha (qtl) Total production (qtl)
Total Irri Rf. Irri Rf. Irri Rf.
1 Saharanpur 542 542 0 220.41 N.A. 119460 N.A.
50 Bahraich 2134 2093 41 220.40 N.A. 470330 N.A.
51 Shravasti 498 351 147 220.40 N.A. 109760 N.A.
52 Balrampur 1066 786 280 220.40 N.A. 234950 N.A.
53 Gonda 2915 2912 3 220.40 N.A. 642470 N.A.
54 Siddharth
Nagar 2494 2494 0 220.40 N.A. 549680 N.A.
55 Basti 2737 2732 5 220.40 N.A. 603230 N.A.
56 Sant Kabir
Nahar 1950 1946 4 220.40 N.A. 429780 N.A.
57 Mahrajganj 2774 2763 11 184.30 N.A. 511250 N.A.
58 Gorakhpur 4384 4384 0 184.30 N.A. 807970 N.A.
59 Kushinagar 1613 1210 403 184.30 N.A. 297280 N.A.
60 Deoria 1698 1698 0 184.30 N.A. 312940 N.A.
61 Azamgarh 4966 4966 0 240.73 N.A. 1195470 N.A.
62 Mau 1130 1130 0 240.73 N.A. 272020 N.A.
63 Ballia 6973 6973 0 240.73 N.A. 1678610 N.A.
64 Jaunpur 10014 10014 0 176.17 N.A. 1764170 N.A.
65 Ghazipur 7583 7563 20 254.01 N.A. 1926160 N.A.
66 Chandauli 977 977 0 209.69 N.A. 204870 N.A.
67 Varanasi 3192 3192 0 209.70 N.A. 669350 N.A.
68 Sant Ravidas
Nagar 1091 1091 0 220.40 N.A. 240450 N.A.
69 Mirzapur 2051 2039 12 220.40 N.A. 452040 N.A.
70 Sonbhadra 769 699 70 220.40 N.A. 169490 N.A.
Total U.P. 478117 476979 1138 220.40 N.A. 105375470 N.A.
SOURCE;Statistical Dairy/ Abstract 2008 , U.P.

87
5.2.4- Gap in Productivity and Potential
Although there is a marked gap in the productivity of various crops grown in U.P. compared to other State and countries, yet it has
wide variation from one zone and region to another. On the basis of an analysis of crop cutting experiments this gap has clearly been
identified, where a large number of farmers could get significantly very high yield of crops, which can be termed as workable potential
and can be compared with any other State. The gap between potential and actual yield is depicted in Table – 5.2.4

Table – 5.2.4 - Gap between potential and actual yield (qtl./ha.)


S.N. Particulars Tarai & Bhabhar WP MWP SWSDP MP BUND NEP EP VIN Uttar Pradesh
1 Rice
Potential 95 62 53 65 47 25 43 49 33 47
Present yield 25 24 22 24 21 5 20 20 16 21
Gap (a-b) 72 38 31 41 26 20 23 29 17 26
2 Wheat
Potential 65 68 54 57 73 41 52 57 38 57
Present yield 31 34 30 32 29 16 28 26 20 28
Gap (a-b) 34 34 24 25 44 25 24 31 18 29
3 Maize
Potential 45 52 30 52 54 50 55 42 55 45
Present yield 10 19 16 21 15 7 10 12 8 14
Gap (a-b) 35 33 14 31 39 43 45 30 47 31
4 Lentil
Potential 20 20 20 20 20 20 22 22 20 20
Present yield 8 5 10 7 8 5 9 9 7 7
Gap (a-b) 12 15 10 13 12 15 13 13 13 13

88
S.N. Particulars Tarai & Bhabhar WP MWP SWSDP MP BUND NEP EP VIN Uttar Pradesh
5 Bajra
Potential 30 30 30 25 25 25 30 29 30 30
Present yield 13 15 14 17 16 6 16 11 11 15
Gap (a-b) 17 15 16 8 9 19 14 18 19 15
6 Gram
Potential 30 30 30 30 31 23 18 34 18 26
Present yield 8 7 8 14 11 5 7 10 9 7
Gap (a-b) 22 23 22 16 20 18 11 24 9 19
7 Barley
Potential 45 42 42 67 42 42 45 42 19 42
Present yield 22 30 22 27 20 11 23 19 7 21
Gap (a-b) 23 12 20 40 22 31 22 23 12 21
Source – Annual Plan 2009-10

*(WP=Western Plain, MWP= Mid Western Plain, SWSDP= South Western Semi Dry Plain, MP= Mid Plain, BUND= Bundelkhand,
NEP= North-Eastern Plain, EP= Eastern Plain, VIN= Vindhyan)
* The potential yield of various crops indicated in the table is actually the highest potential yield of varieties recommended for
corresponding agro climatic zone. * Base year 2005-06.

89
5.2.5 - STATE-WISE COMPARATIVE PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS:
Comparative production and productivity of some major crops with some other States are depicted in the following Table 5.2.5
Table 5.2.5 – Comparative production and productivity of some major crops with some other States
Crop State Area under crop (lakh ha) Production (lakh tons) Average yield (qtl per ha)
Rice
Andhra Pradesh 39.80 117.00 29.39
Chhattisgarh 37.50 50.10 13.37
Punjab 26.40 101.90 38.58
Uttar Pradesh 55.80 111.30 19.96
Orissa 44.80 68.60 15.31
West Bengal 57.80 145.10 25.09
India 436.60 917.90 21.02
Maize
Andhra Pradesh 7.60 30.90 40.73
Bihar 6.50 13.60 20.98
Madhya Pradesh 8.60 12.50 14.50
Rajasthan 10.00 11.00 10.98
Uttar Pradesh 8.10 10.50 12.95
India 75.90 147.10 19.38
Wheat
Bihar
Hariyana 23.00 88.60 38.44
Madhya Pradesh 36.90 59.60 16.13
Punjab 34.70 144.90 41.79
Rajasthan 21.20 58.70 27.62
Uttar Pradesh 91.60 240.70 26.27
India 264.80 693.50 26.19

90
Crop State Area under crop (lakh ha) Production (lakh tons) Average yield (qtl per ha)
Chick pea
Andhra Pradesh 3.90 6.30 15.91
Madhya Pradesh 25.60 23.70 9.26
Maharashtra 10.20 7.10 6.91
Rajasthan 10.80 4.80 4.43
Uttar Pradesh 7.40 6.60 8.93
India 69.30 56.00 8.08
Pigeon pea
Andhra Pradesh 4.90 3.00 6.09
Gujrat 2.50 2.80 11.02
Madhya Pradesh 3.20 2.40 7.39
Maharashtra 11.00 7.90 7.20
Uttar Pradesh 3.80 3.70 9.87
India 25.80 27.40 7.65
Rapeseed/

Mustard
Gujrat 3.40 4.60 13.49
Hariyana 7.10 7.90 11.17
Rajasthan 37.70 44.20 12.05
Uttar Pradesh 7.90 9.10 11.49
West Bengal 4.20 3.80 9.09
India 72.80 81.30 11.17
Sugarcane
Andhra Pradesh 2.30 179.60 767.65
Karnataka 2.20 182.70 834.11
Maharashtra 5.00 388.50 755.51
Uttar Pradesh 21.60 1254.70 582.01
Tamilnadu 3.40 351.10 1046.71
India 42.00 2811.70 669.28

91
Crop State Area under crop (lakh ha) Production (lakh tons) Average yield (qtl per ha)
Potato
Bihar 1.42 12.33 86.63
Gujrat 0.44 12.10 275.00
Punjab 0.75 12.23 163.07
Uttar Pradesh 4.45 99.87 224.32
West Bengal 3.55 74.63 210.51
India 14.01 239.05 170.58
5.3 Plan Outlay
The plan outlay is the most effective and widely known source of investment. There is a wide range of activities which are
financed from the outlay and the State has large freedom and choice in the use of the same. The plan outlay in the Agriculture and Allied
sector since First Five Year Plan is given in Table – 5.3
Table – 5.3 -Percentage Expenditure on Agriculture & Allied Sector over Plan period in Uttar Pradesh (Rs. In lakh)
Plan Total Outlay / Expenditure Agriculture & Allied Sector Percentage
First Plan 15337 2487 16.2
Second Plan 23336 2625 11.2
Third Plan 56063 5789 10.3
Fourth Plan 115924 9921 8.6
Fifth Plan 287118 16350 5.7
Sixth Plan 645312 44307 6.9
Seventh Plan 1194872 122678 10.3
Eighth Plan 2164246 206116 9.5
Ninth Plan 2830918 274375 9.7
Tenth Plan 5485571 425126 7.7
Eleventh Plan 18109400 1914637 10.6
Source – State Annual Plan 2009-10
An analysis of the above table shows that the share of Agriculture and Allied sector which stood at 16.2 percent in the First Plan decreased
to 5.7 percent in the fifth Plan, but thereafter some higher allocation are done. During Eleventh Five Year Plan it is expected to be 10.6 percent.
However these allocations are not sufficient in view of the 32 % contribution in agriculture and allied sector to state SGDP.
92
5.4 - Growth Rate in Agriculture
High growth in agriculture sector is necessary for attaining higher growth in the overall economy of the State, as also for reduction
in the incidence of poverty. Average annual growth rate in agriculture sector during the 10th Plan was targeted at 5.1 percent. However,
the achievement has been only about 2 percent. A lower growth rate of this order is indicative of the fact that there was ‘something’
missing in our efforts and strategies for agriculture development. A review of past growth rates in the agriculture sector reveal that the
state had achieved a growth rate of 5.7 percent during Fifth Plan. Thus, the State has potential of achieving higher growth in the sector. It
is in this background that a growth rate of 5.7 percent envisaged in agriculture sector during Eleventh Plan. The growth rate in the
Agriculture and Allied sector since First Five Year Plan is given in Table – 5.4
Table – 5.4 - Agriculture and Allied Sectors Growth Rate in Plan Periods
# Plan Agriculture & Allied Sectors Overall Economy (percent)
(percent)
U.P. India U.P. India
1. First Plan (1951-56) 1.7 2.7 2.0 3.6
2. Second Plan (1956-61) 1.4 3.2 1.9 4.0
3. Third Plan (1961-66) (-) 0.5 (-) 0.7 1.6 2.2
4. Three Annual Plan (1966-69) 0.6 4.2 0.3 4.0
5. Fourth Plan (1969-74) 0.8 2.6 2.3 3.3
6. Fifth Plan (1974-79) 5.7 6.3 5.7 5.3
7. Sixth Plan (1981-85) 9.7 2.5 8.7 5.3
8. Seventh Plan (1985-90) 2.7 3.5 5.7 5.8
9. Two Annual Plan (1990-92) 5.4 4.0 3.1 2.5
10. Eighth Plan (1992-97) 2.7 3.9 3.2 6.8
11. Ninth Plan (1997-02) 0.8 1.9 2.0 5.6
12. Tenth Plan (2002-07) 2.10 1.1 5.3 7.7
13. Eleventh Plan (2007-12) 5.70 4.1 10.0 9.0
Source – Annual Plan 2009-10

93
5.5 FERTILIZER CONSUMPTION
Use of chemical fertilizers in comparison to neighbor states Hariyana and Punjab is very low and also below the national average.
As per the U.P. Statistical Diary 2006-07 there was 37.34 Lakh M.T. (N 27.14 Lakh M.T. , P 8.53 Lakh M.T., K 1.68 Lakh M.T.)
consumption in the state. Consumption of chemical fertilizers is going ahead in a positive trend but there is a threat of imbalance use
which caused the deterioration of soil health.

The recommended fertilizer use is focused on NPK ratio which should be in the ideal form i.e. 4:2:1. The pattern of fertilizer
consumption in the state shows that the NPK ratio is gradually narrowing. During 2002-03 the ratio was 16.6:5.1:1 which has narrowed to
10.7:4:1 indicating the efforts for balanced use of fertilizer. Details are shown in Table – 5.5 .

Table 5.5 – Fertilizer Consumption (Per/ha) in U.P.


Year Nitrogen(kg/ha) Phosphorus (kg/ha) Potash (kg/ha) NPK Ratio
2002-03 93.10 28.60 5.60 16.6:5.1:1
2003-04 93.10 30.10 6 15.5:5:1
2004-05 104 32 8 13:4:1
2005-06 107 34 8 12.5:4.25:1
2006-07 107 40 10 10.7:4:1
Source – State Annual Plan – 2009-10

Lack of quality seed, imbalance use of fertilizers are the other reasons of low yield. Though the availability of quality seed has
increased during the past three years but farmers often mistaken in selecting appropriate variety with consideration to region, date of
sowing, type of soil and other requisites of variety. Imbalance use of chemical fertilizers and wider ratio of NPK against the
recommended ratio also hamper desired results. Rains also play an important role in agriculture especially for kharif crops. Moreover,
illiteracy or semi literacy, poverty and lack of resources or poor access to amenities are the root cause which inhibits timely and scientific
operation of most of the agriculture practices many times in many cases.

5.6 SEED REPLACEMENT RATE


Seed is one of the most vital inputs responsible for higher production under specific agro-climatic situation and can contribute 10
to 15 percent increase in production. The seed scenario in Uttar Pradesh during Xth Five Year Plan (2002-07) period has been highly
encouraging in the case of cereal seeds especially the paddy and wheat. There is an encouraging trend in the Seed Replacement Rate
94
during the current Five Year Plan which is evident from Table – 5.6
Table 5.6 : Crop-Wise Seed Replacement Rate in U.P.
SN Name of Crop 2007-08 Targetted (2008-09)
1. Paddy 25.00 27.00
2. Maize 19.51 22.00
3. Pearl Millet 57.30 72.50
4. Sorghum 17.13 24.50
5. Black gram 16.21 20.50
6. Green gram 84.98 86.00
7. Pigeon pea 19.20 19.00
8. Groundnut 4.36 3.50
9. Sesame 13.56 18.50
10. Soybean 33.00 42.00
11. Sunflower 71.80 100.00
12. Cotton 70.71 71.75
Kharif 23.66 25.08
13. Wheat 26.84 28.75
14. Barley 24.96 26.75
15. Gram 14.89 19.01
16. Pea 18.57 24.00
17 Lentil 27.81 29.68
18. Rape seed/Mustard 61.24 61.41
19. Brassica compestris 98.62 100.00
20. Linseed 10.70 11.60
Rabi 26.00 28.19
Annual 25.40 25.82
Source – State Annual Plan- 2009-10
However, the seed replacement in case of pulses and oil seed are not at the desired level. Infacts these crops are from the rainfed
areas and in watershed development activities, for improving the productivity of pulses and oil seed, special emphasis will have to be
given on seed replacement of pulses & oilseeds.

95
5.7 Major Constraints in agriculture productivity and production
The state’s position in overall production of foodgrains is at number one position having around 20 percent of the overall
production of country. Infact the State contributes around 35 percent of wheat in the country. State is at 2 nd position of the rice
production, first in sugarcane and potato production. However at the productivity level the state has poor performance compared to some
advanced states like Punjab, Hariyana and Tamilnadu .The main reason for lower productivity levels are:
1– Irrigation even 80 percent of area is reported to have been under irrigation but in terms of number of irrigation as per requirement
of crops is not sufficient. 65 percent area irrigation is by mostly Diesel operated privately owned tube wells. The cost of diesel operated
pumps being high, the farmers are not irrigating through pumps in kharif. Even in rabi they irrigate only 2 to 3 times instead of 5 to 6
times required for wheat crop. In canal commands due to poor maintenance of canal and distribution system, the availability of water is
poor. Water availability is also poor especially at tail ends.
2– Timely availability of inputs like seed fertilizer etc. is poor.
3– Dwindling extension services. Most of the posts are vacant with the result the farmers are not getting timely and required technical
inputs.
4– Land holding size is day by day getting smaller with the result the investment capacity of the farmers is poor, resulting is low
productivity.

5– Problematic area: - the state has a total problematic area of around 120 lac. Ha. which includes erosin , soil salinity alkalinity ,
ravines, waterlogging, diyara lands etc. This affects productivities from these areas.
6 – Poor investments in agriculture sectors.
7– In case of milk production also the State stands at number one but productivity per animal is poor due to non availability of
sufficient quality feed and green fodder.
8– In case of vegetable and fruits also the States position is at no 2 level but in these crops also the productivity as compared from the
other states-position is poor.
9– Erratic Mansoon trend and occasional moisture stress conditions with long dry spell especially in rainfed areas and run off from
sloppy lands causing severe erosion also results in poor productivity and production.
10 – Poor soil health and low organic matter content in the soil is also a major cause for low productivity. Soils are getting deficiency is
some important nutrients like Sulpher, Iron, Zinc, Boron etc. which also results in low productivities of different crops and vegetables &
low seed replacement rate particularly in case of pulses & oilseeds the main crops of the rainfed areas.

96
5.7.1 U.P State Agriculture Policy
In its policy document for agriculture (2005) the State has given due emphasis on the following issues.
i- Efficient utilization of natural resources and environment management
ii - Efficient and judicious utilization of natural resources for agriculture would be ensured considering its technical feasibility,
economic viability and eco-friendliness besides its social acceptability.
iii- Soil Management - On line availability of information regarding inventory of land resources based on their capabilities will be
ensured. Land use pattern would be monitored regularly and changes if any, would be updated at every five years interval. Waste and
degraded lands available in the form of usar barren, ravine, fallow and diara would be reclaimed and subsequently utilized for
agriculture, horticulture, forestry and pasture. The farmers are not getting any income from the sodic and waste land in state. On the basis
of ‘public-private panchayat partnership model’,
iv - The self help groups of farmers will be encouraged for the plantation of Jetropha, Ratanjot, etc. for production of bio diesel.
v - The unirrigated and erosion affected lands will be managed through integrated watershed management approach using vegetable,
mechanical and agronomical measures. For the success of watershed management programme, the ownership of the common village
resources such as pasture lands, forest and water resources will be decided in such a way so that they can be utilized by all the villagers
living in the command of concerned watershed. If required, necessary changes in existing law will be made.
vi - Development of Pasture & Forest Land –Pasture and forest lands will be developed for growing of grasses, forage, fuel and timber
trees to cater local needs.

97
A. comparative average yield of major crops of the State and India during Triennia 1972-73 to 1974 -75 and 1992-93 to
1994-95 (in Kg/Ha.) is given in Table-SPSP 1 -

Table-SPSP 13: Comparative average yield of major crops of the State and India during Triennia
1972-73 to 1974 -75 and 1992-93 to 1994-95 (in Kg/Ha.)

1 2 3 4

Major Crop/crop Period I: 1972-73 to 1974-75 Period II: 1992-93 to 1994-95 Post 1994-95#
group
State India State India State India
Rice 797.56 1088.60 1843.91 1848.24 1858.00 1911.00

Wheat 1124.29 43827.30 2349.05 2423.45 2505.00 2559.00

Sugarcane 41895.83 50676.14 58136.34 67512.95 59942.00 71254.00

Souce : AGRICULTURE STATISTICS ,U.P.

98
Chapter-6
Implementation of Watershed Programme in the State at present
At present the watershed development programme activities are being handled by the department of Agriculture and the Land
Development and Water Resources, Department of Uttar Pradesh Government. The Department of Agriculture has got 98 Soil Conservation
Units, Ramganga Command Project 53 Units and Sharda Sahayak Command Project 44 Units. The Watershed development Programmes in the
state were being taken up under U.P. Bhumi avam Jal Sanrakshan Act 1963 where as theLand Development and Water Resources Department
of U.P. are working as per G.O.I's guidelines of 1994 and Hariyali Guidelines of 2003. Each of these organization has got a well organized
structure of units working in the districts with Deputy Directors at the Regional level and Additional Director, Soil Conservation under
Director of Agriculture at state level in the Department of Agriculture and Administrators of Ramganga Command and Sharda Sahayak
Command in their area of Jurisdition.All the 71 Districts are covered under the following various watershed programmes.
6.1 -
Sl.N0. Name of Schemes Sponsored by
1. Integrated Wasteland Development Programme (IWDP) Ministry of Rural Development, GOI Deptt. Of Land
Resources
2 Drought Prone Area Programme (DPAP) -do-
3 National Watershed Development Programme for Rainfed Area (NWDPRA) Ministry of Agriculture and Cooperation Natural Resource
Management (NRM) Division
4 River Valley Programme (RVP)/Flood Prone Area -do-
5 Scheme of Watershed Development under RIDF NABARD
6 Scheme of Watershed Development Programme under Watershed NABARD
Development Fund (WDF)
7 U.P. Land Reclamation Project World Bank
8 Macro Management of Agriculture Ministry of Agriculture, GOI
9 State Soil Conservation Programme U.P. State
10 Kishan Hit Yojana U.P.State
11 Mitigation of Drought through Rain Water Harvesting and better Water U.P.State
Management
12 Efficient Water Management U.P.State
It is to be noted that the majority of the programmes are centrally sponsored i.e. by the Ministry of Agriculture and Ministry of
Rural Development.
99
6.2 State level Nodal Agency (SLNA)
It is further indicated that the state Govt. vide its notification No. 126/54-3/2009/1(samadesh)/2008 dated 25-2-2009 has
constituted the State Level Nodel Agency (SLNA) to overlook the various watershed development programmes being operated in the
state by various development departments and agencies (APPENDIX-I).
Now onwords i.e. from 1-4-2009 the common guideline issued by the Rainfed Area Development Authority,formulated under the
Ministry of Agriculture and Cooperation of Govt of India will be followed in the state:

6.3 Status of Watershed Programme in the State –


As per demarcation of Watershed & Micro Watersheds done by the State Remote Sensing Agency, the total number of Watersheds
in the State is 328 & no’s of Micro Watersheds are 21278 ranging from 1.02 ha. to 3477 ha. size. 4074 Micro Watersheds are
overlapping in some adjoining districts, thereby in districtwise details as indicated in Table SPSP – 14 , total no’s of Micro Watersheds
shown are more than actual Watersheds as depicted in column no. 5 & 6 of Table SPSP – 14 (of 63 Districts, excluding 07 Distt. Jhansi,
Lalitpur, Jalaun, Hamirpur, Mahoba, Banda & Chitrakoot Of Bundelkhand Region due to Bundelkhand Package)

Watersheds and Micro Watersheds in the State are shown in Map 6.3.1 & Map 6.3.2

As pre IWMP Project, the two major watershed management activities i.e. DPAP and IWDP of the Ministry of Rural Development,
Department of Land Resources, were in operation, wherein, total 1355 micro watersheds were covered with an area of 12.81 lac ha. within
63 Districts. The schemes of other Ministries (mostly Department of Agriculture ,RIDF, and other State Government Schemes) were also in
operation in 8660 micro watersheds covering an area of 83.28 lac. ha. within 63 Districts. Thus so far, total micro watersheds taken up are
10015 and area covered 96.09 lac ha. within 63 Districts. At present 6611 micro watersheds with an area of 71.56 lac ha. within 63
Districts is yet to be covered. The districtwise (63 Districts, excluding 07 Distt., Jhansi, Lalitpur, Jalaun, Mahoba, Hamirpur, Banda &
Chitrakoot of Bundelkhand region) details of the total number of Micro Watersheds and their areas, Micro Watersheds covered under
IWDP/DPAP and the schemes of others Ministries of GOI i.e. Agricuture and States scheme along with RIDF of NABARD etc., are given
in Table No. SPSP-14.

100
Map - - 6.3.1 - Watershed of Uttar Pradesh

101
Map – 6.3.2 – Watersheds and Microwatersheds of Uttar Pradesh

102
Table-SPSP 14 Status of District-wise area covered(63 Districts, excluding 07 Distt. Of Bundelkhand Region) under the watershed
programme (ha)* (MIS Table-M(SP)2)
S. Names of Watersheds Untreatable Treatable Micro Watersheds Covered by Total Net watersheds
No. Districts Demarkated by Micro watersheds Dept. of Land Resources Other Ministries/ watersheds to be covered
Remort Sensing watersheds Depts. covered
Pre-IWMP projects Any other
(DPAP +DDP +IWDP) watershed project
No. Area(ha.) No. Area No. Area(ha.) No. Area (ha.) No. Area No. Area No. Area
(ha.) (ha.) (ha.) (ha.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Saharanpur 335 368900 85 93564 250 275336 5 5000 118 129950 123 134950 127 140386
2 Muzaffar Nagar 359 400800 92 103172 267 297628 4 5000 215 240490 220 245490 47 52138
3 Bijnor 410 456100 77 86050 333 370050 9 10336 228 254000 238 264336 95 105714
4 Moradabad 566 371800 75 49147 491 322653 8 5000 220 144500 228 149500 264 173153
5 Rampur 457 236700 44 22852 413 213848 0 0 251 130000 251 130000 162 83848
6 J.P. Nagar 285 224900 40 31903 245 192997 0 0 19 14900 19 14900 226 178097
7 Meerut 254 259000 82 83315 172 175685 0 0 127 129950 127 129950 45 45735
8 Bagpat 147 132100 15 13697 132 118403 0 0 47 42500 47 42500 84 75903
9 Gaziabad ** 227 114800 124 62304 103 52496 0 0 73 41650 73 41650 30 10846
10 G.B.Nagar ** 237 144200 47 28633 190 115567 0 0 135 90500 135 90500 55 25067
11 Bulandshahar 393 435200 50 55464 343 379736 5 5000 80 88800 85 93800 258 285936
12 Aligarh 417 365000 60 52743 357 312257 14 12480 180 157500 194 169980 163 142277
13 Hathras 146 184000 20 24892 126 159108 0 0 85 107399 85 107399 41 51709
14 Mathura ** 364 334000 105 96314 259 237686 7 6372 222 200670 229 207042 30 30644
15 Agra ** 553 402700 125 94853 428 307847 53 34165 324 244350 377 278515 51 29332
16 Firozabad 312 236100 47 35699 265 200401 35 26479 100 75600 135 102079 130 98322

103
S. Names of Watersheds Untreatable Treatable Micro Watersheds Covered by Total Net watersheds
No. Districts Demarkated by Micro watersheds Dept. of Land Resources Other Ministries/ watersheds to be covered
Remort Sensing watersheds Depts. covered
Pre-IWMP projects Any other
(DPAP +DDP +IWDP) watershed project
No. Area(ha.) No. Area No. Area(ha.) No. Area (ha.) No. Area No. Area No. Area
(ha.) (ha.) (ha.) (ha.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 Etah & KashiRam 513 444600 62 53738 451 390862 12 10108 313 271216 325 281324 126 109538
Nagar
18 Mainpuri 259 276000 52 55524 207 220476 9 9400 132 140350 141 149750 66 70726
19 Badaun 748 516800 42 29225 706 487575 23 16000 449 310210 472 326210 234 161365
20 Bareily 523 412000 99 77802 424 334198 13 10060 344 270650 356 280710 68 53488
21 Pilibhit 301 349900 118 137270 183 212630 10 11830 94 108750 104 120580 79 92050
22 Shahjahanpur 250 457500 23 42602 227 414898 12 21100 24 44014 36 65114 191 349784
23 Lakhimpur Khiri 282 768000 73 198939 209 569061 27 74356 22 61250 50 135606 159 433455
24 Sitapur 354 574300 30 49162 324 525138 51 82153 28 45199 79 127352 245 397786
25 Hardoi 345 598600 50 86113 295 512487 12 20000 37 65012 49 85012 246 427475
26 Unnao 476 455800 95 90877 381 364923 36 34095 246 235850 282 269945 99 94978
27 Lucknow 288 252800 93 81627 195 171173 17 15113 40 34752 57 49865 138 121308
28 Raebareli 396 460900 110 128468 286 332432 21 23900 86 100050 106 123950 179 208482
29 Farrukhabad 209 218100 15 15554 194 202546 1 1500 117 122500 119 124000 75 78546
30 Kannauj 228 209300 41 37996 187 171304 17 16000 131 120000 148 136000 38 35304
31 Etawah ** 332 231100 108 74639 224 156461 29 20000 143 109710 172 129710 52 26751
32 Auraiya 294 201500 107 73158 187 128342 22 15150 52 35400 74 50550 114 77792
33 Kanpur Dehat ** 291 302100 50 51915 241 250185 12 12039 200 208000 212 220039 29 30146
34 Kanpur Nagar 372 315500 92 77928 280 237572 12 10510 171 145350 184 155860 96 81712
35 Fatehpur 421 415200 54 53288 367 361912 15 14880 224 220500 239 235380 128 126532

104
S. Names of Watersheds Untreatable Treatable Micro Watersheds Covered by Total Net watersheds
No. Districts Demarkated by Micro watersheds Dept. of Land Resources Other Ministries/ watersheds to be covered
Remort Sensing watersheds Depts. covered
Pre-IWMP projects Any other
(DPAP +DDP +IWDP) watershed project
No. Area(ha.) No. Area No. Area(ha.) No. Area (ha.) No. Area No. Area No. Area
(ha.) (ha.) (ha.) (ha.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
36 Pratapgarh 347 371700 92 98172 255 273528 25 27085 65 69337 90 96422 165 177106
37 Kaushambi ** 175 178000 28 28504 147 149496 5 5000 114 115500 118 120500 29 28996
38 Allahabad ** 600 548200 192 175821 408 372379 54 49482 302 276000 356 325482 51 46897
39 Barabanki 321 440200 76 104854 245 335346 8 11603 40 54206 48 65809 197 269537
40 Faizabad 222 234100 61 63855 161 170245 21 22127 100 105300 121 127427 41 42818
41 Ambedkar Nagar 263 235000 48 42513 215 192487 12 11000 146 130650 159 141650 57 50837
42 Sultanpur 425 443600 82 85819 343 357781 21 22039 208 217500 229 239539 113 118242
43 Bahraich ** 301 442000 59 86715 242 355285 102 150000 113 160000 215 310000 27 45285
44 Shravasti 217 245800 39 44214 178 201586 39 44000 97 110200 136 154200 42 47386
45 Balrampur 318 334900 71 75079 247 259821 69 73000 134 140600 203 213600 44 46221
46 Gonda 214 400300 15 28903 199 371397 6 12157 111 206900 117 219057 81 152340
47 Siddharth Nagar 290 289500 30 30363 260 259137 0 0 155 155000 155 155000 104 104137
48 Basti 163 268800 15 24529 148 244271 0 0 110 180650 110 180650 39 63621
49 Sant Kabir Nahar 143 164600 17 19331 126 145269 0 0 18 20150 18 20150 109 125119
50 Mahrajganj 255 295200 82 95458 173 199742 4 5000 101 117200 106 122200 67 77542
51 Gorakhpur 279 332100 51 60817 228 271283 9 10200 150 179000 159 189200 69 82083
52 Kushinagar 171 290600 40 68804 131 221796 0 0 59 100750 59 100750 71 121046
53 Deoria 140 253800 21 38515 119 215285 0 0 76 137800 76 137800 43 77485

105
S. Names of Watersheds Untreatable Treatable Micro Watersheds Covered by Total Net watersheds
No. Districts Demarkated by Micro watersheds Dept. of Land Resources Other Ministries/ watersheds to be covered
Remort Sensing watersheds Depts. covered
Pre-IWMP projects Any other
(DPAP +DDP +IWDP) watershed project
No. Area(ha.) No. Area No. Area(ha.) No. Area (ha.) No. Area No. Area No. Area
(ha.) (ha.) (ha.) (ha.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
54 Azamgarh 385 405400 82 86347 303 319053 8 7982 33 35000 41 42982 262 276071
55 Mau 154 171300 27 30336 127 140964 4 5000 88 97500 92 102500 35 38464
56 Ballia 193 298100 27 41361 166 256739 0 0 102 157575 102 157575 64 99164
57 Jaunpur 457 403800 104 91883 353 311917 19 16718 100 88530 119 105248 234 206669
58 Ghazipur 246 337700 53 73389 193 264311 4 5000 137 187500 140 192500 52 71811
59 Chandauli ** 329 254100 203 146790 126 107310 15 11100 108 91150 123 102250 3 5060
60 Varanasi ** 150 153500 54 50103 101 103397 22 22095 55 54845 77 76940 24 26457
61 Sant Ravidas 92 101500 21 23362 71 78138 9 9500 38 42000 47 51500 24 26638
Nagar **
62 Mirzapur 799 452100 306 172911 493 279189 117 65953 149 84150 265 150103 228 129086
63 Sonbhadra 1187 678800 257 146932 930 531868 292 167106 475 271360 767 438466 163 93402
Total 21180 21151000 4559 4386107 16621 16764893 1355 1281173 8660 8327875 10015 9609048 6606 7155845

SOURCE; State Remote Sensing & Statistical Dairy / Abstract 2008, U.P. Data.

106
6.4 Details of Watershed Projects sanctioned by DoLR in the State -
6.4.1 DPAP
Project is in operation in 15 districts and 60 Blocks covering 1777 projects Out of these, work is completed in 789 projects and 85
projects are foreclosed. At present work in 903 projects is ongoing covering an area of 4.51 lac. hacteres. Area already treated is 3.94
lac. hectares. Details are shown in Table SPSP-15.
Table-SPSP 15: Details regarding the watershed projects sanctioned by DoLR in the State:
1 2 3 4
Pre-IWMP scheme details
S.No. Item Total
DPAP DDP IWDP
1 Area sanctioned in ha. 888500 - 885768
2 Names of the districts covered 15 - 54
3 No.of Blocks covered 60 - 147
4 No.of projects sanctioned by DoLR 1777 - 138
5 No. of projects completed out of those taken at Row (4) 789 - 40
6 No.of projects foreclosed of Row (4) 85 - 12
7 No.of on-going projects of Row (4) 903 - 86
8 Area already treated by completed projects of Row (5) 394500 - 354617
9 Area for treatment by on-going projects of Row (5) 451560 - 430000
10 Total area treated and under treatment (8)+ (9) 846000 - 784612
11 Area yet to be treated and proposed to be treated by DoLR 42500 - 101156
(column 1-column 10)

107
6.4.2 IWDP
Under this project the total number districts covered are 54 with 147 blocks. So far, 138 IWDP Projects are sanctioned, out of
which work in 40 projects is completed and 12 projects are foreclosed. At present work in 86 project is ongoing . The total area already
treated is 3.54 lac hectares and area to be covered for treatment is 7.84 lac hectares.

6.5 Details of the watershed projects implemented in the State with financial assistance other than DoLR
The district and projectwise details of treated area and no. of projects under other Ministry's and State Govt and RIDF etc shown in
Table-SPSP-16.

Table-SPSP 16: Tentative Details of the watershed projects implemented in the State with the financial assistance other than DoLR
(Area in lac. ha.)
1 2 3 4
Sl. Item Total Watersed Schemes of other Ministries
No.
Ministry of Ministry Planning NABARD State EAP Others
Agriculture of E & F, Commission Govt. (Pl.
GoI GoI Specify)
1 Area sanctioned in ha. 94.02 37.54 - - 19.92 36.56 - -
2 Names of the districts covered 71 71 - - 71 71 - -
3 No. of Blocks covered 637 413 - - 362 437 - -
4 No. of projects sanctioned other than DoLR 18805 7482 - - 3985 7338 - -
5 No. of projects completed out of those taken at Row (4) 14522 6284 - - 2565 5673 - -
6 No. of projects foreclosed of Row (4) - - - - - - - -
7 No. of on-going projects of Row (4) 4283 1198 - - 1420 1665 - -
8 Area already treated by completed projects of Row (5) 69.78 28.59 - - 12.82 28.37 - -
9 Area for treatment by on-going projects of Row (5) 24.24 8.95 - - 7.10 8.19 - -
10 Total area treated and under treatment (8) + (9) 94.02 37.54 - - 19.92 36.56 - -
11 Area yet to be treated and proposed to be treated by other - - - - - - - -
than DoLR resources (column-1 - column 10)

108
6.6 Details of pending UCs :
Details of pending UCs are given in Table SPSP-17. (31.03.2009)
Table- SPSP 17 : Details of pending UCs (MIS Table-M(FM)5)
1 2 3 4 5 6 7 8 9 10 11
Amount Date of submission Reasons for
Financial Amount utilized Submission of UC not Pending UCs
Instal- of UC
S. year of released submitting/
District Project ment Amount Amount
No. release of (Rs. in (Rs.in Due delayed
no. (Rs. In Date (Rs. In Period Amount
fund lakh) lakhs) date submission of
lakhs) lakhs) UC
1 Ferozabad IWDP I 6 2003-04 45.92 45.02 1/4/2004 45.2 - - - 2003-04 45.02
2 Unnao IWDP III 2 2007-08 82.5 27.42 1/4/2008 27.42 - - - 2007-08 27.42

6.7 Details of the unspent balance on 31 March 2009 (DPAP/IWDP)


An amount of Rs. 806.33 lacs. under DPAP and Rs. 1184.67 lacs. under IWDP are unspent balances, which would be utilized
during the financial year 2009-10.
In the schemes of DPAP and IWDP, Districtwise unspent balances are shown in Table SPSP-18(1) & Table - SPSP–18(2)

Table – SPSP 18(1) : Districtwise details of Unspent balance ( MIS table – M(FM) 8)
Drought Prone Area Programme (DPAP)
S. District Project Instalment Financial year of Amount release Amount utilized Unutilised funds (Rs. in
No. No. release of fund (Rs. in lakh) (Rs. in lakh) lakh)As on 31.3.09
1 2 3 4 5 6 7 8
1 Allahabad Batch VI VI 2008-09 45.000 45.000 0.000
Batch VIII VI 2008-09 22.500 22.500 0.000
Hariyali Ist V 2008-09 22.390 22.390 0.000
Hariyali Il V 2008-09 22.450 22.450 0.000
Hariyali III IV 2008-09 54.000 54.000 0.000
Hariyali IV III 2008-09 45.500 43.500 2.000
109
S. District Project Instalment Financial year of Amount release Amount utilized Unutilised funds (Rs. in
No. No. release of fund lakh)As on 31.3.09
(Rs. in lakh) (Rs. in lakh)
1 2 3 4 5 6 7 8
2 Behraich Batch VII VII 2007-08 20.938 18.476 2.462
Batch VIII VI 2008-09 199.455 195.205 4.250
Hariyali Ist V 2008-09 146.803 145.883 0.920
Hariyali Il IV 2008-09 179.089 167.811 11.278
Hariyali III III 2008-09 372.272 350.817 21.455
Hariyali IV III 2008-09 407.152 378.393 28.759
3 Balrampur Batch VII VI 2007-08 12.240 12.240 0.000
Batch VIII VI 2007-08 24.675 24.675 0.000
Hariyali Ist III 2008-09 108.000 97.692 10.308
Hariyali Il IV 2008-09 51.340 43.535 7.805
Hariyali III III 2008-09 137.920 128.930 8.990
Hariyali IV III 2008-09 147.760 111.995 35.765
4 Banda Batch VIII VI 2007-08 61.126 53.168 7.958
Hariyali Ist IV 2008-09 142. 284 108.765 33.519
Hariyali Il IV 2008-09 152.957 120.075 32.882
Hariyali III IV 2008-09 180.808 141.522 39.286
Hariyali IV III 2008-09 277.378 209.699 67.679
5 Chitrakoot Batch V V 2006-07 9.846 4.120 5.726
Batch VII IV 2008-09 121.063 101.892 19.171
Hariyali Ist IV 2008-09 93.504 77.999 15.505
Hariyali Il IV 2008-09 97.574 78.291 19.283
Hariyali III IV 2008-09 106.501 81.892 24.609
Hariyali IV III 2008-09 180.440 158.848 21.596

110
S. District Project Instalment Financial year of Amount release Amount utilized Unutilised funds (Rs. in
No. No. release of fund lakh)As on 31.3.09
(Rs. in lakh) (Rs. in lakh)
1 2 3 4 5 6 7 8
6 Hamirpur Batch V VII 2005-06 1.600 0.000 1.600
Batch VI VI 2008-09 14.650 14.650 0.000
Batch VII IV 2008-09 28.6025 28.603 0.000
Batch VIII VI 2008-09 28.198 28.198 0.000
Hariyali Ist IV 2008-09 30.010 30.010 0.000
Hariyali Il V 2008-09 22.550 22.550 0.000
Hariyali III IV 2008-09 36.000 35.550 0.450
Hariyali IV III 2008-09 77.3775 70.178 7.200
7 Jalaun Batch VI IV 2008-09 14.640 10.800 3.840
Batch VII IV 2008-09 28.800 14.000 14.800
Batch VIII V 2008-09 28.870 14.500 14.370
Hariyali Ist III 2007-08 55.500 48.600 6.900
Hariyali Il IV 2008-09 41.650 31.840 9.810
Hariyali III III 2008-09 127.500 78.510 48.990
Hariyali IV III 2008-09 95.910 83.350 12.560
8 Jhansi Batch VII VII 2008-09 31.652 31.652 0.000
Batch VIII VII 2008-09 112.500 112.500 0.000
Hariyali Ist V 2008-09 45.653 43.898 1.755
Hariyali Il V 2008-09 74.875 70.359 4.516
Hariyali III IV 2008-09 129.614 110.481 19.133
Hariyali IV IV 2008-09 239.104 212.617 26.487

111
S. District Project Instalment Financial year of Amount release Amount utilized Unutilised funds (Rs. in
No. No. release of fund lakh)As on 31.3.09
(Rs. in lakh) (Rs. in lakh)
1 2 3 4 5 6 7 8
9 Kheri Batch V VI 2004-05 1.179 0.000 1.179
Batch VII VI 2008-09 21.390 18.000 3.390
Batch VIII V 2008-09 42.072 33.570 8.502
Hariyali Ist IV 2008-09 28.626 28.266 0.360
Hariyali Il IV 2008-09 59.040 50.570 8.470
Hariyali III IV 2008-09 34.945 33.685 1.260
Hariyali IV III 2008-09 68.330 66.831 1.517
10 Lalitpur Hariyali Il IV 2008-09 19.700 19.200 0.500
Hariyali III III 2008-09 56.850 55.850 1.000
Hariyali IV III 2008-09 55.595 53.595 2.000
11 Mahoba Batch VII V 2008-09 21.125 7.848 13.277
Batch VIII IV 2007-08 12.702 6.219 6.483
Hariyali Ist V 2008-09 20.563 10.737 9.826
Hariyali Il IV 2008-09 25.858 18.312 7.546
Hariyali III IV 2008-09 35.440 13.700 21.740
Hariyali IV III 2008-09 70.021 59.737 10.284
12 Mirzapur Batch VI V 2004-05 2.024 0.000 2.024
Batch VIII VII 2004-05 1.087 0.000 1.087
Hariyali Ist Il 2008-09 36.372 30.700 5.672
Hariyali Il III 2008-09 37.871 35.259 2.612
Hariyali III IV 2008-09 28.313 25.382 2.931
Hariyali IV III 2008-09 52.480 49.599 2.881

112
S. District Project Instalment Financial year of Amount release Amount utilized Unutilised funds (Rs. in
No. No. release of fund lakh)As on 31.3.09
(Rs. in lakh) (Rs. in lakh)
1 2 3 4 5 6 7 8
13 Shravasti Batch V Il 2000-01 20.373 0.000 20.373
Batch VII I 2001-02 1.295 0.000 1.295
Batch VIII I 2002-03 2.408 0.000 2.408
Hariyali Ist III 2008-09 124.346 120.230 4.116
Hariyali Il III 2008-09 127.580 122.022 5.036
Hariyali III III 2008-09 144.117 139.287 4.830
Hariyali IV III 2008-09 144.227 140.270 3.957
14 Sitapur Batch V VI 2008-09 17.078 16.500 0.578
Batch VI VI 2008-09 27.048 26.699 0.049
Batch VIII IV 2008-09 54.431 54.000 0.431
Hariyali Ist IV 2008-09 40.504 40.500 0.004
Hariyali Il IV 2008-09 40.654 40.500 0.154
Hariyali III IV 2008-09 49.716 48.833 0.883
Hariyali IV Il 2007-08 0.268 0.262 0.006
15 Sonebhadra Batch VI V 2008-09 267.877 247.689 20.188
Hariyali Ist Il 2007-08 76.042 75.801 0.241
Hariyali Il IV 2008-09 223.198 213.104 10.900
Hariyali III III 2008-09 197.136 185.007 12.129
Hariyali IV III 2008-09 311.005 300.408 10.597
Total 7166.823 6502.780 806.333

113
Table - SPSP 18(2) :Districtwise details of Unspent balance, as on 31.03.2009 (MIS Table-M FM) 8)
Name of Scheme- Integrated Wasteland Development Programme (IWDP)
S.No. District Project Instalment Financial year of Amount released Amount utilized Unutilised funds
no. release of fund (Rs.in laks) (Rs.in laks) (Rs.in laks) as on
31-03-2009
1 2 3 4 5 6 7 8
1 Aligarh I Vl 2008-09 53.840 5.840 48.000
2 Faizabad I VI 2008-09 85.660 56.400 29.260
3 Mirzapur II IV 2008-09 100.610 100.610 0.000
4 Sitapur II Vll 2007-08 12.580 0.000 12.580
5 Sitapur III V 2008-09 36.660 15.300 21.360
6 Sitapur IV IV 2008-09 135.510 127.500 8.010
7 Sitapur V III 2008-09 90.540 88.500 2.040
8 Pilibhit I IV 2008-09 81.730 66.050 15.680
9 Pilibhit II II 2008-09 90.090 89.550 0.540
10 Sahajahanpur I III 2003-04 15.760 1.540 14.220
11 Sahajahanpur II IV 2008-09 45.810 45.580 0.230
12 Sahajahanpur III III 2008-09 91.150 90.780 0.370
13 Sahajahanpur IV II 2008-09 90.000 89.370 0.630
14 Lalitpur II VII 2007-08 40.610 40.410 0.200
15 Lalitpur III V 2008-09 31.000 29.400 1.600
16 Lalitpur IV V 2008-09 78.090 43.100 34.990
17 Banda I V 2008-09 72.340 65.380 6.960
18 Banda II IV 2008-09 60.430 46.670 13.760
19 Banda III IV 2008-09 69.090 55.950 13.140
20 Allahabad I VII 2008-09 85.810 72.060 13.750
21 Allahabad II IV 2008-09 46.950 44.650 2.300
22 Allahabad III V 2008-09 75.080 69.000 6.010
23 Allahabad IV III 2008-09 100.340 91.870 8.470
24 Allahabad V III 2008-09 99.300 90.150 9.150
25 Allahabad VI III 2008-09 91.000 86.800 4.200
114
S.No. District Project Instalment Financial year of Amount released Amount utilized Unutilised funds
no. release of fund (Rs.in laks) (Rs.in laks) (Rs.in laks) as on
31-03-2009
1 2 3 4 5 6 7 8
26 Allahabad VII III 2008-09 180.000 110.890 69.110
27 Hamirpur II VII 2008-09 97.250 97.250 0.000
28 Hamirpur III V 2008-09 40.750 40.750 0.000
29 Hamirpur IV IV 2008-09 151.000 113.310 37.690
30 Badaun I VI 2008-09 80.030 31.640 48.390
31 Badaun II IV 2008-09 137.260 130.610 6.950
32 Badaun III IV 2008-09 137.320 130.580 6.740
33 Barabanki I V 2008-09 64.540 48.500 16.040
34 Barabanki II III 2008-09 98.300 91.300 2.000
35 Saharanpur I IV 2008-09 55.060 51.170 3.890
36 Mujaffarnagar I V 2008-09 46.080 41.490 4.590
37 Hardoi I IV 2008-09 45.000 39.000 6.000
38 Hardoi II III 2008-09 90.000 82.520 7.480
39 Hardoi III III 2008-09 91.500 84.550 6.950
40 Hardoi IV III 2008-09 91.500 84.000 7.500
41 Mahoba I V 2008-09 39.140 29.810 9.330
42 Mahoba II III 2008-09 104.130 84.150 19.980
43 Mahoba III II 2008-09 99.870 88.450 11.420
44 Kausambi I III 2008-09 90.000 88.190 1.810
45 Sultanpur II IV 2008-09 47.520 47.210 0.310
46 Sultanpur III IV 2008-09 138.270 136.380 1.890
47 Jalaun I IV 2008-09 53.550 1.000 52.550
48 Jalaun II III 2008-09 98.920 86.910 12.010
49 Etawa I IV 2008-09 139.010 89.760 49.250
50 Etawa II IV 2008-09 151.070 98.540 52.530
51 Etawa III IV 2008-09 151.470 99.050 52.420
52 Etawa IV III 2008-09 111.610 105.580 6.030

115
S.No. District Project Instalment Financial year of Amount released Amount utilized Unutilised funds
no. release of fund (Rs.in laks) (Rs.in laks) (Rs.in laks) as on
31-03-2009
1 2 3 4 5 6 7 8
53 Pratapgarh II IV 2008-09 49.990 49.390 0.600
54 Pratapgarh III III 2008-09 93.890 93.540 0.350
55 Pratapgarh IV II 2008-09 94.490 94.490 0.000
56 Firozabad II IV 2008-09 69.570 51.470 18.100
57 Firozabad III III 2008-09 125.850 125.850 0.000
58 Firozabad IV III 2008-09 131.740 131.740 0.000
59 Mirzapur III IV 2008-09 47.530 44.360 3.170
60 Mirzapur IV IV 2008-09 86.650 81.140 5.510
61 Mirzapur V III 2008-09 97.820 90.180 7.640
62 Agra III IV 2008-09 61.880 54.460 7.420
63 Agra IV V 2008-09 89.190 84.150 5.040
64 Agra V III 2008-09 103.670 97.200 6.470
65 Raibarely III III 2008-09 90.340 87.570 2.770
66 Raibarely IV III 2008-09 90.000 87.540 2.460
67 Faizabad II V 2008-09 44.890 42.270 2.620
68 Faizabad III III 2008-09 117.050 114.010 3.040
69 Kannouj I IV 2008-09 136.220 130.580 5.640
70 Kannouj II IV 2008-09 54.850 52.070 2.780
71 Kannouj III III 2008-09 111.940 110.140 1.800
72 Jhansi IV V 2008-09 41.120 41.120 0.000
73 Jhansi V IV 2008-09 76.100 76.100 0.000
74 Jhansi VI III 2008-09 94.900 91.880 3.020
75 Orraya II III 2008-09 95.850 88.750 7.090
76 Moradabad I IV 2008-09 176.110 136.640 39.470
77 Kanpurnagar II I 2005-06 1.950 0.000 1.950
78 Jaunpur II IV 2008-09 135.000 133.800 1.200
79 Bulandshayar I V 2008-09 88.270 61.240 26.930

116
S.No. District Project Instalment Financial year of Amount released Amount utilized Unutilised funds
no. release of fund (Rs.in laks) (Rs.in laks) (Rs.in laks) as on
31-03-2009
1 2 3 4 5 6 7 8
80 Bijnour I III 2007-08 63.290 39.670 23.620
81 Bijnour II III 2008-09 125.880 118.820 7.060
82 Unnao III II 2007-08 3.290 3.290 0.000
83 Unnao IV II 2008-09 90.020 43.350 46.670
84 Kheri III III 2008-09 97.070 83.370 13.700
85 Kheri IV III 2008-09 140.540 117.470 23.070
86 Kheri V III 2008-09 113.630 93.950 19.680
87 Kheri VI III 2008-09 97.340 89.830 7.510
88 Bareiley I III 2008-09 108.120 101.680 6.440
89 Bareiley II III 2008-09 106.110 99.310 6.810
90 Mainpuri II III 2008-09 124.110 124.110 0.000
91 Maharajganj II II 2008-09 95.880 93.520 2.360
92 Fatehpur II III 2008-09 114.230 98.070 16.160
93 Ambedkarnagar II III 2008-09 141.280 111.220 30.060
94 Etha I III 2008-09 116.370 109.690 6.680
95 Etha II III 2008-09 109.390 101.760 7.630
96 Gazipur I III 2008-09 97.690 90.390 7.300
97 Gorakhpur I II 2008-09 96.600 92.760 3.840
98 Gorakhpur II II 2008-09 100.120 96.150 3.970
99 Mau I III 2008-09 105.620 81.000 24.620
100 Balrampur I III 2008-09 100.490 95.170 5.320
101 Mathura II III 2008-09 110.800 104.010 6.790
TOTAL 9074.860 7885.320 1184.670

117
CHAPTER- 7
Implementation Strategy
As per common guidelines issued by the Govt. of India, the Project Implemtation will be in the following 3 phases.
1- Preparatory Phase – 1 to 2 yrs.
2- Watershed work Phase – 3 to 5 yrs
3- Consolidation & Withdrawl Phase – 1 to 2 yrs

7.1 Phase-I- Preparatory phase


In fact this is very important phase of the watershed development programme and work as a foundation of the entire activities to be
taken up in 2nd phase i.e. Implementation of works phase. This will include detailed data collection, PRA exercises, training for capacity
building. The most important activity in this phase is to draw up detailed plan for entry point activities to be taken up to build up a rapport
with the village community. In this phased, based on available and generated data and identification of the problems and their
prioritization a detailed project report (DPR) will be prepared. The SLNA in close coordination of DWDU/DRDA take up the following
activities before entering into the village.
 Massive awareness compaign.
 Preparation of communication and information packages for GPs and village communities.
 Training/Orientation of project functionaries (DWDU, PIAs ) on the vision of the project, the processes, roles and responsibilities of
each entity, and rules.
 Training of project functionaries on how to work with GPs and village communities in preparing a Plan (focus on process, roles and
responsibilities, rules, from where to seek what information.)
 Development of training module for various levels of project functionaries.
 Selection of PIAs by SLNA/DWDUs.
 Formation of WDT by the PIAs.

118
7.1.1 Orienting Communities and GPs to the Programme :
By: PIA staff supported by communication activities by VO's.
When: Soon after village entry
 Entry of WDT into village to give basic information on the project
 Consensus among communities and GP to participate in the project
 Signing of MOU between the WC and PIAs intent to participate in the project as per the project rules and guidelines for participation
and implementation.
 Social mobilization including PRA, at village and GP levels; facilitation by WDT.
 Use of communication tools such as print material, audio-visuals, folk performance to enhance awareness among the community.
 Help by WDT and community to carry out Participatory Communication Needs Assessment (PCNA) to identify communication gaps
and develop measure and process to address them
 Community receives detailed information on watershed management, concept of community- driven and process-led development,
concept of ownership and details of its contribution to the project.
 Information on the project such as vision and objectives, rules, roles and responsibilities of each entity, process of participation and
implementation.
 Information sources such as posters and brochures
 Community receives complete information on financial allocation for its GP and details of the allocation formula
 Detailed information on how community will prepare the Watershed Development Plan and complete information on processes, rules
and guidelines.
7.1.2 Selection and training of Secretary Watershed Committee:
Selection to be done by GP/GS; training by DWDUs
After sharing complete project-related information with GP & community
 Secretary need to help WC and individuals maintain proper accounts and records, and facilitate smooth transfer of funds.
 GP/GS/WDT will be part of process to select Secretary.
 Basic criteria and qualifications for Secretary to be fixed by PIAs/DWDU
 The WC develops a set of roles and responsibilities for the Secretary WC in consultation with the WDT.
 The WDT will develop a list of three qualified persons from the GP/GS who are interested in working as the Secretary.
 The President WC will finalize the candidate from this list to work as the Secretary.
 The DWDU shall be responsible for providing adequate training to the selected candidate within four months.
119
 The Secretary will receive his/her honorarium directly from the PIA.
 The Gram Panchayat may terminate the services of particular Secretary if Gram Sabha passes a resolution to this effect. The WDT
shall then make search for another Secretary at the earliest in consultation with the Gram Panchayat.

7.1.3 Capacity Building Activities


 Sensitization and training of project staff (SLNA/ DWDUs/ PIAs) and GPs to facilitate the implementation of a community driven
watershed project.
 Comprehensive information, training and capacity building of individual and CBOs in the village communities to participate
effectively in the project.
 Training of PIA staff, GPs and Watershed Committee, on the rules and regulations of the project.
 Training of Secretary Watershed Committees to provide services to the Watershed Committees.

7.1.4 Development of village Watershed Proposal:


Watershed Committee (WC) in consultation and guidance by WDT prepare the proposal.
This will be done after receiving complete information and initial training on the project
 The Watershed Committee of the Revenue Village (RV) is responsible for developing its proposal.
 Each member of the RV shall get the opportunity to present his/ her views on what activities should be included in the Proposal.
 The watershed committee and revenue village must thoroughly understand the rules and processes of the project.

7.1.5 Development of Gram Panchyat Watershed Development Plan(GPWDP)/ Detailed project Report (DPR):
This job will be done by WC in collaboration with WDT
 The WC receives Proposals from all its Revenue Villages and in consultation and guidance prepare (GPWDP)/DPR.
 The WC shall integrate all the Proposals and form a combined plan known as Gram Panchayat Watershed Development Plan
(GPWDP). The WDT will facilitate in the structured presentation of the GPWDP so that it makes easy consolidation of data
regarding the contents of the GPWDP at the level of PIA to ensure provision of budget as well as monitor the progress.
 The GPWDP shall include an implementation plan over years and withdrawal strategy after fourth /Fifth .year.

120
7.1.6 Review and apprisal of GPWDP:
Who: PIA & DWDU
When: After receiving proposed GPWDP from WC
 Receipt of the proposed GPWDP by DWDU/DRDA
 Appraisal of the GPWDP by DWDU/DRDA
 If any shortcoming is found or if the GPWDP proposes to spend beyond the financial ceiling set for the GP, then DWDU will
send it back to the WC with written observations and recommendtions.
 The WC shall consider these observations and recommendation and may make appropriate changes in its GPWDP and if
need be may again go to Gram Sabha for approval.
 The final GPWDP shall be resubmitted to DWDU for approval.

7.1.7 Formation of SHG's


While preparing a watershed development plan, self help groups (SHG's) of women and landless laborers will also be formed in
initial stages and they will be trained for taking up various income generating activities along with the training in maintenance of
Accounts. The members of the groups will be motivated to take up monthly saving activity and interloaning for there requirements. These
groups, after their functioning for six months will be linked to Banks for their credit requirements for IGA.

7.1.8 Implementation Agency for Work:


The WC with the assistance of PIA functionaries will be the implementation agency of the work:
 The Gram Panchayat
 The Individual Farmer (Beneficiary) for the work to be executed on his individual land. (Individual will work as a executer, in
such cases)
 User Group/SHG may be engaged for the activities to be implemented on common/community village assets or on individual land
or asset, should the beneficiary have no objection to this arrangement. Revenue Village Committee may also work as a executing
agency.

The First Right of implementation of each work under the project rests with village-level entities such as the User Group, SHG's and
individual farmer. If these options are not available then the WC itself may decide to execute the works. Contractors will not be
engaged for execution of works.
121
7.2 PHASE-II Watershed works phase.
After taking up the activities in preparatory stage the Detailed Project Report (DPR) will be prepared. On the basis of DPR Annual Work
Plan (AWP) will be prepared to start executing various soil and water conservation activities proposed under the works plan. Necessary sanction
from the competent authorities of the estimates will be obtained and then only execution will be undertaken. It is worth mentioning over here that
all the activities will be executed under the supervision of the watershed committee (WC)with the technical support of the PIA i.e. Bhumi
Sanrakshan Adhikari Unit. This is main phase of the programme and the activities to be taken up in this phase will be as under:
1- Activities of Afforestation and planting , diversion drains etc. to control run off from upper reaches of the watershed.
2- Drainage line treatment with combination of vegetative and engineering structures including earthen check dams, brush wood check
dams, gully plugs etc.
3- Construction of water harvesting structures
4- Raising of plant and grass nursery
5- In-situ moisture conservation activities like field and contour bunding, levelling etc.
6- Crop demonstrations and farmer to farmer distribution of improved seed varieties suiting to local areas.
7- Various income generating activities such as Animal raring, bee keeping, back yard poultry etc.through SHG's formed in the first phase.
8- Developments of water bodies for fisheries and protective irrigation .
9- For implementation of Agricultural Demonstration and allied activities suitable qualified agricultural graduates/post graduates will be
appointed on contract basis.
10- The project activities proposed includes the Horticultural crops.
11- Animal husbandry activities like fodder development, improvement of breed and cattle health will be an integral part of the plan.
12- Plantation on field boundaries, Agro forestry and growing medical plants are proposed to be taken up in the project.
13- Convergence of allied department activities.
14- Convergence of allied Departmental activities.
In fact the project will promote farming system approach.
Over and above this, bio-fuel plantations, non conventional energy activities will also be taken up in this phase. Some of the activities
can be taken up by having convergence of funding and activities of other department and schemes such as NAREGS, BRGF etc.
7.2.1 DISTRICT WISE AREA PROPOSED FOR TREATMENT
The district wise area to be treated and which would be taken up for treatment have been annexed in Table SPSP-19 . A total of 71.56 lac.
ha. area would be taken up for treatment within 63 Districts of the State. The prospective plan of 63 Districts (excluding 07 Districts of
Bundelkhand Region due to Bundelkhand Package) has been proposed in 6611 micro watershed for Integrated Watershed Management
122
programme (IWMP).
7.2.2 Physical and Financial implications of the project of 63 Districts (excluding 07 districts of Bundelkhand)
The plan wise phasing of the physical and financial programme of watershed development has been depicted in Table – SPSP-19.
Table-SPSP 19: Plan-wise phasing of physical (area in ha) & financial (Rs. in Crore) targets of IWMP for next 18 years of 63 Districts
Remaining period of XI
S.No

Plan XII Plan XIII Plan XIV Plan Total for 18 years
(2009-10 to 2011-12) (2012-13 to 2016-17) (2017-18 to 2021-22) (2022-23 to 2026-27)
District Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11 12
1 Saharanpur 25000 30.00 40000 48.00 40000 48.00 35386 42.46 140386 168.46
2 Muzaffar Nagar 20000 24.00 10000 12.00 10000 12.00 12138 14.57 52138 62.57
3 Bijnor 25000 30.00 28500 34.20 28500 34.20 23714 28.46 105714 126.86
4 Moradabad 25000 30.00 50000 60.00 50000 60.00 48153 57.78 173153 207.78
5 Rampur 25000 30.00 25000 30.00 25000 30.00 8848 10.62 83848 100.62
6 J.P. Nagar 25000 30.00 50000 60.00 50000 60.00 53097 63.72 178097 213.72
7 Meerut 23460 28.15 8500 10.20 8500 10.20 5275 6.33 45735 54.88
8 Bagpat 25000 30.00 18500 22.20 18500 22.20 13903 16.68 75903 91.08
9 Gaziabad ** 10846 13.02 0 0.00 0 0.00 0 0.00 10846 13.02
10 G.B.Nagar ** 25067 30.08 0 0.00 0 0.00 0 0.00 25067 30.08
11 Bulandshahar 25000 30.00 90000 108.00 90000 108.00 80936 97.12 285936 343.12
12 Aligarh 25000 30.00 40000 48.00 40000 48.00 37277 44.73 142277 170.73
13 Hathras 25000 30.00 10000 12.00 10000 12.00 6709 8.05 51709 62.05
14 Mathura ** 25000 30.00 5644 6.77 0 0.00 0 0.00 30644 36.77
15 Agra ** 25000 30.00 4332 5.20 0 0.00 0 0.00 29332 35.20
16 Firozabad 25000 30.00 25000 30.00 25000 30.00 23322 27.99 98322 117.99
17 Etah & KashiRam Nagar 25000 30.00 30000 36.00 30000 36.00 24538 29.45 109538 131.45
18 Mainpuri 25000 30.00 16000 19.20 16000 19.20 13726 16.47 70726 84.87
19 Badaun 25000 30.00 50000 60.00 50000 60.00 36365 43.64 161365 193.64
20 Bareily 25000 30.00 10000 12.00 10000 12.00 8488 10.19 53488 64.19
21 Pilibhit 25000 30.00 25000 30.00 25000 30.00 17050 20.46 92050 110.46
123
22 Shahjahanpur 25000 30.00 110000 132.00 110000 132.00 104784 125.74 349784 419.74

124
Remaining period of XI
S.No

Plan XII Plan XIII Plan XIV Plan Total for 18 years
(2009-10 to 2011-12) (2012-13 to 2016-17) (2017-18 to 2021-22) (2022-23 to 2026-27)
District Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11 12
23 Lakhimpur Khiri 25000 30.00 140000 168.00 140000 168.00 128455 154.15 433455 520.15
24 Sitapur 25000 30.00 130000 156.00 130000 156.00 112786 135.34 397786 477.34
25 Hardoi 25000 30.00 140000 168.00 140000 168.00 122475 146.97 427475 512.97
26 Unnao 25000 30.00 24000 28.80 24000 28.80 21978 26.37 94978 113.97
27 Lucknow 25000 30.00 30000 36.00 30000 36.00 36308 43.57 121308 145.57
28 Raebareli 25000 30.00 68000 81.60 68000 81.60 47482 56.98 208482 250.18
29 Farrukhabad 25000 30.00 26000 31.20 26000 31.20 1546 1.86 78546 94.26
30 Kannauj 25000 30.00 10304 12.36 0 0.00 0 0.00 35304 42.36
31 Etawah ** 25000 30.00 1751 2.10 0 0.00 0 0.00 26751 32.10
32 Auraiya 25000 30.00 20000 24.00 20000 24.00 12792 15.35 77792 93.35
33 Kanpur Dehat ** 25000 30.00 5146 6.18 0 0.00 0 0.00 30146 36.18
34 Kanpur Nagar 25000 30.00 20000 24.00 20000 24.00 16712 20.05 81712 98.05
35 Fatehpur 25000 30.00 41000 49.20 35000 42.00 25532 30.64 126532 151.84
36 Pratapgarh 25000 30.00 55000 66.00 55000 66.00 42106 50.53 177106 212.53
37 Kaushambi ** 16996 20.40 12000 14.40 0 0.00 0 0.00 28996 34.80
38 Allahabad ** 22897 27.48 12000 14.40 12000 14.40 0 0.00 46897 56.28
39 Barabanki 25000 30.00 93000 111.60 83000 99.60 68537 82.24 269537 323.44
40 Faizabad 25000 30.00 12600 15.12 5218 6.26 0 0.00 42818 51.38
41 Ambedkar Nagar 25000 30.00 10000 12.00 10000 12.00 5837 7.00 50837 61.00
42 Sultanpur 25000 30.00 30000 36.00 30000 36.00 33242 39.89 118242 141.89
43 Bahraich ** 30000 36.00 15285 18.34 0 0.00 0 0.00 45285 54.34
44 Shravasti 25000 30.00 10000 12.00 10000 12.00 2386 2.86 47386 56.86
45 Balrampur 25000 30.00 10000 12.00 10000 12.00 1221 1.47 46221 55.47
46 Gonda 25000 30.00 40000 48.00 45000 54.00 42340 50.81 152340 182.81

125
Remaining period of XI
S.No

Plan XII Plan XIII Plan XIV Plan Total for 18 years
(2009-10 to 2011-12) (2012-13 to 2016-17) (2017-18 to 2021-22) (2022-23 to 2026-27)
District Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11 12
47 Siddharth Nagar 25000 30.00 28000 33.60 28000 33.60 23137 27.76 104137 124.96
48 Basti 25000 30.00 15000 18.00 15000 18.00 8621 10.35 63621 76.35
49 Sant Kabir Nahar 25000 30.00 35000 42.00 35000 42.00 30119 36.14 125119 150.14
50 Mahrajganj 25000 30.00 21600 25.92 21400 25.68 9542 11.45 77542 93.05
51 Gorakhpur 25000 30.00 25000 30.00 25000 30.00 7083 8.50 82083 98.50
52 Kushinagar 25000 30.00 35000 42.00 35000 42.00 26046 31.26 121046 145.26
53 Deoria 25000 30.00 20000 24.00 20000 24.00 12485 14.98 77485 92.98
54 Azamgarh 25000 30.00 98000 117.60 85000 102.00 68071 81.69 276071 331.29
55 Mau 25000 30.00 10000 12.00 3464 4.16 0 0.00 38464 46.16
56 Ballia 25000 30.00 30000 36.00 30000 36.00 14164 17.00 99164 119.00
57 Jaunpur 25000 30.00 75000 90.00 65000 78.00 41669 50.00 206669 248.00
58 Ghazipur 25000 30.00 20000 24.00 20000 24.00 6811 8.17 71811 86.17
59 Chandauli ** 5060 6.07 0 0.00 0 0.00 0 0.00 5060 6.07
60 Varanasi ** 26457 31.75 0 0.00 0 0.00 0 0.00 26457 31.75
61 Sant Ravidas Nagar ** 17638 21.17 9000 10.80 0 0.00 0 0.00 26638 31.97
62 Mirzapur 25000 30.00 37000 44.40 37000 44.40 30086 36.10 129086 154.90
63 Sonbhadra 25000 30.00 25000 30.00 25000 30.00 18402 22.08 93402 112.08
Grand Total 1523421 1828.11 2086162 2503.39 1974582 2369.50 1571680 1886.02 7155845 8587.01

The cost per hectare Rs. 12000-00 has been proposed, as indicated in the common guidelines of GOI. Thus a total prospective
plan outlay of Rs. 8587 Crores covering 71.56 lac. ha. within 63 Districts has been projected for a period of 18 years, perspective plan
outlay of remaning 07 Districts of Bundelkhand regions are projected in Bundelkhand Package seperately. The financial provision
required for the 11th plan is Rs.1828 Crores, for the 12th Plan, it is Rs 2503 Crores, for the 13th Plan Rs. 2370 Crores and for the 14th Plan
it is Rs. 1886 Crores.The physical target for 11th ,12th ,13th and 14th five year plan will be 15.23, 20.86, 19.74, 15.72 lac ha. within 63
Districts respectively.
126
The annual plan for the remaining 11th plan period regarding 63 districts, showing the Districtwise Micro Watershed area for
treatment and yearwise financial requirement , are depicted in Table-SPSP-20.
Table-SPSP 20: Year-wise phasing of physical (area in ’000 ha) & financial (Rs. in lakh) targets of IWMP for remaining
period of XI Plan of 63 Districts.

Remaining period of XI Plan


2009-10 2010-11 2011-12 Total
S. Phy. Phy. Phy. Phy.
District
N. No. of No. of No. of No. of
Area Fin. Area Fin. Area Fin. Area Fin.
projects projects projects projects
H&D O H&D O H&D O H&D O H&D O H&D O H&D O H&D O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1 Saharanpur 1
0 0 7.610 913 0 0 10.434 1252 0 0 6.956 835 0 0 25.000 3000
2 Muzaffar Nagar 1
0 0 7.772 933 0 0 7.337 880 0 0 4.891 587 0 0 20.000 2400
3 Bijnor 1
0 0 7.985 958 0 0 10.209 1225 0 0 6.806 817 0 0 25.000 3000
4 Moradabad 1
0 0 6.867 824 0 0 10.880 1306 0 0 7.253 870 0 0 25.000 3000
5 Rampur 1
0 0 7.520 902 0 0 10.488 1259 0 0 6.992 839 0 0 25.000 3000
6 J.P. Nagar 1
0 0 6.136 736 0 0 11.318 1358 0 0 7.546 905 0 0 25.000 3000
7 Meerut 1
0 0 5.310 637 0 0 10.890 1307 0 0 7.260 871 0 0 23.460 2815
8 Bagpat 1
0 0 9.190 1103 0 0 9.486 1138 0 0 6.324 759 0 0 25.000 3000
9 Gaziabad ** 1
0 0 5.556 667 0 0 3.174 381 0 0 2.116 254 0 0 10.846 1302
10 G.B.Nagar ** 1
0 0 5.600 672 0 0 11.680 1402 0 0 7.787 934 0 0 25.067 3008
11 Bulandshahar 1
0 0 4.698 564 0 0 12.181 1462 0 0 8.121 974 0 0 25.000 3000
12 Aligarh 1
0 0 5.510 661 0 0 11.694 1403 0 0 7.796 936 0 0 25.000 3000
13 Hathras 1
0 0 4.488 539 0 0 12.307 1477 0 0 8.205 985 0 0 25.000 3000
14 Mathura ** 1
0 0 5.550 666 0 0 11.670 1400 0 0 7.780 934 0 0 25.000 3000
15 Agra ** 1
0 0 11.000 1320 0 0 8.400 1008 0 0 5.600 672 0 0 25.000 3000
16 Firozabad 1
0 0 5.703 684 0 0 11.578 1389 0 0 7.719 926 0 0 25.000 3000
127
S. District Remaining period of XI Plan
N. 2009-10 2010-11 2011-12 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
No. of Area No. of Area No. of Area No. of Area
projects projects projects projects
H&D O H&D O H&D O H&D O H&D O H&D O H&D O H&D O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
17 Etah & KashiRam 0 1 0 4.534 544 0 0 12.279 1474 0 0 8.186 982 0 0 25.000 3000
Nagar
18 Mainpuri 0 1 0 4.449 534 0 0 12.330 1480 0 0 8.220 986 0 0 25.000 3000
19 Badaun 0 1 0 5.671 681 0 0 11.597 1392 0 0 7.732 928 0 0 25.000 3000
20 Bareily 0 1 0 5.598 672 0 0 11.641 1397 0 0 7.761 931 0 0 25.000 3000
21 Pilibhit 0 1 0 6.773 813 0 0 10.936 1312 0 0 7.291 875 0 0 25.000 3000
22 Shahjahanpur 0 1 0 7.696 923 0 0 10.383 1246 0 0 6.922 831 0 0 25.000 3000
23 Lakhimpur Khiri 0 1 0 7.597 912 0 0 10.442 1253 0 0 6.961 835 0 0 25.000 3000
24 Sitapur 0 1 0 7.371 885 0 0 10.577 1269 0 0 7.051 846 0 0 25.000 3000
25 Hardoi 0 1 0 6.407 769 0 0 11.156 1339 0 0 7.437 892 0 0 25.000 3000
26 Unnao 0 1 0 7.578 909 0 0 10.453 1254 0 0 6.969 836 0 0 25.000 3000
27 Lucknow 0 1 0 7.883 946 0 0 10.270 1232 0 0 6.847 822 0 0 25.000 3000
28 Raebareli 0 1 0 7.101 852 0 0 10.740 1289 0 0 7.160 859 0 0 25.000 3000
29 Farrukhabad 0 1 0 5.948 714 0 0 11.431 1372 0 0 7.621 915 0 0 25.000 3000
30 Kannauj 0 1 0 5.543 665 0 0 11.674 1401 0 0 7.783 934 0 0 25.000 3000
31 Etawah ** 0 1 0 5.880 706 0 0 11.472 1377 0 0 7.648 918 0 0 25.000 3000
32 Auraiya 0 1 0 6.863 824 0 0 10.882 1306 0 0 7.255 871 0 0 25.000 3000
33 Kanpur Dehat ** 0 1 0 5.250 630 0 0 11.850 1422 0 0 7.900 948 0 0 25.000 3000
34 Kanpur Nagar 0 1 0 7.440 893 0 0 10.536 1264 0 0 7.024 843 0 0 25.000 3000
35 Fatehpur 0 1 0 5.783 694 0 0 11.530 1384 0 0 7.687 922 0 0 25.000 3000
36 Pratapgarh 0 1 0 7.429 891 0 0 10.543 1265 0 0 7.029 843 0 0 25.000 3000

128
S. District Remaining period of XI Plan
N. 2009-10 2010-11 2011-12 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
No. of Area No. of Area No. of Area No. of Area
projects projects projects projects
H&D O H&D O H&D O H&D O H&D O H&D O H&D O H&D O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
37 Kaushambi ** 0 1 0 5.696 684 0 0 6.780 814 0 0 4.520 542 0 0 16.996 2040
38 Allahabad ** 0 1 0 7.880 946 0 0 9.010 1081 0 0 6.007 721 0 0 22.897 2748
39 Barabanki 0 1 0 7.987 958 0 0 10.208 1225 0 0 6.805 817 0 0 25.000 3000
40 Faizabad 0 1 0 5.671 681 0 0 11.597 1392 0 0 7.732 928 0 0 25.000 3000
41 Ambedkar Nagar 0 1 0 5.650 678 0 0 11.610 1393 0 0 7.740 929 0 0 25.000 3000
42 Sultanpur 0 1 0 7.879 945 0 0 10.273 1233 0 0 6.848 822 0 0 25.000 3000
43 Bahraich ** 0 1 0 8.098 972 0 0 13.141 1577 0 0 8.761 1051 0 0 30.000 3600
44 Shravasti 0 1 0 5.224 627 0 0 11.866 1424 0 0 7.910 949 0 0 25.000 3000
45 Balrampur 0 1 0 9.460 1135 0 0 9.324 1119 0 0 6.216 746 0 0 25.000 3000
46 Gonda 0 1 0 6.390 767 0 0 11.166 1340 0 0 7.444 893 0 0 25.000 3000
47 Siddharth Nagar 0 1 0 7.455 895 0 0 10.527 1263 0 0 7.018 842 0 0 25.000 3000
48 Basti 0 1 0 5.079 609 0 0 11.953 1434 0 0 7.968 956 0 0 25.000 3000
49 Sant Kabir Nahar 0 1 0 4.073 489 0 0 12.556 1507 0 0 8.371 1004 0 0 25.000 3000
50 Mahrajganj 0 1 0 6.799 816 0 0 10.921 1310 0 0 7.280 874 0 0 25.000 3000
51 Gorakhpur 0 1 0 4.085 490 0 0 12.549 1506 0 0 8.366 1004 0 0 25.000 3000
52 Kushinagar 0 1 0 6.515 782 0 0 11.091 1331 0 0 7.394 887 0 0 25.000 3000
53 Deoria 0 1 0 4.782 574 0 0 12.131 1456 0 0 8.087 970 0 0 25.000 3000
54 Azamgarh 0 1 0 7.599 912 0 0 10.441 1253 0 0 6.961 835 0 0 25.000 3000
55 Mau 0 1 0 6.024 723 0 0 11.386 1366 0 0 7.590 911 0 0 25.000 3000
56 Ballia 0 1 0 5.975 717 0 0 11.415 1370 0 0 7.610 913 0 0 25.000 3000

129
S. District Remaining period of XI Plan
N. 2009-10 2010-11 2011-12 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
No. of Area No. of Area No. of Area No. of Area
projects projects projects projects
H&D O H&D O H&D O H&D O H&D O H&D O H&D O H&D O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
57 Jaunpur 0 1 0 6.486 778 0 0 11.109 1333 0 0 7.406 889 0 0 25.000 3000
58 Ghazipur 0 1 0 4.782 574 0 0 12.131 1456 0 0 8.087 970 0 0 25.000 3000
59 Chandauli ** 0 1 0 5.060 607 0 0 0.000 0 0 0 0.000 0 0 0 5.060 607
60 Varanasi ** 0 1 0 8.100 972 0 0 11.014 1322 0 0 7.343 881 0 0 26.457 3175
61 Sant Ravidas Nagar 0 1 0 5.647 678 0 0 7.195 863 0 0 4.796 576 0 0 17.638 2117
**
62 Mirzapur 0 1 0 4.665 560 0 0 12.201 1464 0 0 8.134 976 0 0 25.000 3000
63 Sonbhadra 0 1 0 5.885 706 0 0 11.469 1376 0 0 7.646 918 0 0 25.000 3000
Grand Total 0 63 0 404.234 48508 0 0 0 671.512 80581 0 0 0 447.674 53721 0 0 0 1523.421 182811

130
Approximately covering an area of 15.23 lac ha. within 63 Districts would be taken up for treatment in 11th plan period. The
district wise details are provided in Table - SPSP-21.

Table-SPSP 21: Details of district wise (63 Districts) and category-wise area proposed to be taken up under IWMP during next
3 years i.e in 11th Five Year Plan (Part – I) (Area in 000 Ha.)

Terrain of the proposed area Land use type of proposed area


Total area available for treatment Total area proposed Others
S. to take up under

2009-10

2010-11

2011-12
District cultivated rainfed Uncultivated
No. IWMP in the next 3 Hilly Desert
Total years (Pl.specify) area Wasteland

1 2 3 4 5 6 7 8 9 10 11 12
1 Saharanpur
7.610 10.434 6.956 25.000 25.000 0 0 25.000 22.500 2.500
2 Muzaffar Nagar
7.772 7.337 4.891 20.000 20.000 0 0 20.000 17.900 2.100
3 Bijnor
7.985 10.209 6.806 25.000 25.000 0 0 25.000 22.625 2.375
4 Moradabad
6.867 10.880 7.253 25.000 25.000 0 0 25.000 22.313 2.688
5 Rampur
7.520 10.488 6.992 25.000 25.000 0 0 25.000 21.563 3.438
6 J.P. Nagar
6.136 11.318 7.546 25.000 25.000 0 0 25.000 22.125 2.875
7 Meerut
5.310 10.890 7.260 23.460 23.460 0 0 23.460 20.703 2.757
8 Bagpat
9.190 9.486 6.324 25.000 25.000 0 0 25.000 22.156 2.844
9 Gaziabad **
5.556 3.174 2.116 10.846 10.846 0 0 10.846 9.761 1.085
10 G.B.Nagar **
5.600 11.680 7.787 25.067 25.067 0 0 25.067 22.560 2.507
11 Bulandshahar
4.698 12.181 8.121 25.000 25.000 0 0 25.000 22.688 2.313
12 Aligarh
5.510 11.694 7.796 25.000 25.000 0 0 25.000 22.250 2.750
13 Hathras
4.488 12.307 8.205 25.000 25.000 0 0 25.000 21.188 3.813
14 Mathura **
5.550 11.670 7.780 25.000 25.000 0 0 25.000 22.690 2.310
15 Agra **
11.000 8.400 5.600 25.000 25.000 0 0 25.000 22.560 2.440

131
Terrain of the proposed area Land use type of proposed area
Total area available for treatment Total area proposed Others
S. to take up under

2009-10

2010-11

2011-12
District cultivated rainfed Uncultivated
No. IWMP in the next 3 Hilly Desert
Total years (Pl.specify) area Wasteland

1 2 3 4 5 6 7 8 9 10 11 12
16 Firozabad
5.703 11.578 7.719 25.000 25.000 0 0 25.000 22.219 2.781
17 Etah & KashiRam Nagar 4.534 12.279 8.186 25.000 25.000 0 0 25.000 22.613 2.388
18 Mainpuri
4.449 12.330 8.220 25.000 25.000 0 0 25.000 22.125 2.875
19 Badaun
5.671 11.597 7.732 25.000 25.000 0 0 25.000 21.813 3.188
20 Bareily
5.598 11.641 7.761 25.000 25.000 0 0 25.000 21.719 3.281
21 Pilibhit
6.773 10.936 7.291 25.000 25.000 0 0 25.000 22.625 2.375
22 Shahjahanpur
7.696 10.383 6.922 25.000 25.000 0 0 25.000 22.688 2.313
23 Lakhimpur Khiri
7.597 10.442 6.961 25.000 25.000 0 0 25.000 23.594 1.406
24 Sitapur
7.371 10.577 7.051 25.000 25.000 0 0 25.000 20.500 4.500
25 Hardoi
6.407 11.156 7.437 25.000 25.000 0 0 25.000 21.688 3.313
26 Unnao
7.578 10.453 6.969 25.000 25.000 0 0 25.000 21.750 3.250
27 Lucknow
7.883 10.270 6.847 25.000 25.000 0 0 25.000 22.000 3.000
28 Raebareli
7.101 10.740 7.160 25.000 25.000 0 0 25.000 22.250 2.750
29 Farrukhabad
5.948 11.431 7.621 25.000 25.000 0 0 25.000 22.375 2.625
30 Kannauj
5.543 11.674 7.783 25.000 25.000 0 0 25.000 22.563 2.438
31 Etawah **
5.880 11.472 7.648 25.000 25.000 25.000 22.870 2.130
32 Auraiya
6.863 10.882 7.255 25.000 25.000 0 0 25.000 22.500 2.500
33 Kanpur Dehat **
5.250 11.850 7.900 25.000 25.000 25.000 22.548 2.452
34 Kanpur Nagar
7.440 10.536 7.024 25.000 25.000 0 0 25.000 22.188 2.813
35 Fatehpur
5.783 11.530 7.687 25.000 25.000 0 0 25.000 22.125 2.875

132
Terrain of the proposed area Land use type of proposed area
Total area available for treatment Total area proposed Others
S. to take up under

2009-10

2010-11

2011-12
District cultivated rainfed Uncultivated
No. IWMP in the next 3 Hilly Desert
Total years (Pl.specify) area Wasteland

1 2 3 4 5 6 7 8 9 10 11 12
36 Pratapgarh
7.429 10.543 7.029 25.000 25.000 0 0 25.000 21.625 3.375
37 Kaushambi **
5.696 6.780 4.520 16.996 16.996 0 0 16.996 14.702 2.294
38 Allahabad **
7.880 9.010 6.007 22.897 22.897 0 0 22.897 19.806 3.091
39 Barabanki
7.987 10.208 6.805 25.000 25.000 0 0 25.000 22.563 2.438
40 Faizabad
5.671 11.597 7.732 25.000 25.000 0 0 25.000 20.351 4.649
41 Ambedkar Nagar 25.000 0 0 25.000
5.650 11.610 7.740 25.000 22.200 2.800
42 Sultanpur
7.879 10.273 6.848 25.000 25.000 0 0 25.000 22.438 2.563
43 Bahraich **
8.098 13.141 8.761 30.000 30.000 30.000 27.000 3.000
44 Shravasti
5.224 11.866 7.910 25.000 25.000 0 0 25.000 22.219 2.781
45 Balrampur
9.460 9.324 6.216 25.000 25.000 0 0 25.000 22.475 2.525
46 Gonda
6.390 11.166 7.444 25.000 25.000 0 0 25.000 22.550 2.450
47 Siddharth Nagar
7.455 10.527 7.018 25.000 25.000 0 0 25.000 22.575 2.425
48 Basti
5.079 11.953 7.968 25.000 25.000 0 0 25.000 22.094 2.906
49 Sant Kabir Nahar
4.073 12.556 8.371 25.000 25.000 0 0 25.000 20.275 4.725
50 Mahrajganj
6.799 10.921 7.280 25.000 25.000 0 0 25.000 22.438 2.563
51 Gorakhpur
4.085 12.549 8.366 25.000 25.000 0 0 25.000 22.000 3.000
52 Kushinagar
6.515 11.091 7.394 25.000 25.000 0 0 25.000 22.688 2.313
53 Deoria
4.782 12.131 8.087 25.000 25.000 0 0 25.000 22.375 2.625
54 Azamgarh
7.599 10.441 6.961 25.000 25.000 0 0 25.000 22.313 2.688
55 Mau
6.024 11.386 7.590 25.000 25.000 0 0 25.000 22.813 2.188
133
Terrain of the proposed area Land use type of proposed area
Total area available for treatment Total area proposed Others
S. to take up under

2009-10

2010-11

2011-12
District cultivated rainfed Uncultivated
No. IWMP in the next 3 Hilly Desert
Total years (Pl.specify) area Wasteland

1 2 3 4 5 6 7 8 9 10 11 12
56 Ballia
5.975 11.415 7.610 25.000 25.000 0 0 25.000 22.094 2.906
57 Jaunpur
6.486 11.109 7.406 25.000 25.000 0 0 25.000 22.313 2.688
58 Ghazipur
4.782 12.131 8.087 25.000 25.000 0 0 25.000 22.688 2.313
59 Chandauli **
5.060 0.000 0.000 5.060 5.060 5.060 4.554 0.506
60 Varanasi **
8.100 11.014 7.343 26.457 26.457 26.457 23.811 2.646
61 Sant Ravidas Nagar **
5.647 7.195 4.796 17.638 17.638 0 0 17.638 15.257 2.381
62 Mirzapur
4.665 12.201 8.134 25.000 25.000 0 0 25.000 19.969 5.031
63 Sonbhadra
5.885 11.469 7.646 25.000 25.000 0 0 25.000 21.261 3.739
Grand Total 404.234 671.512 447.674 1523.420 1523.421 0 0 1523.421 1349.771 173.650

134
Table-SPSP 21: Details of district wise (63 Districts) and category-wise area proposed to be taken up under IWMP during
next 3 years i.e upto 11th Five Year Plan.(Part-II)

Ownership pattern of the proposed area No. of beneficiaries covered Identified DPAP/ DDP Blocks covered
S. DPAP DDP
District
No. Commu- Others (pl. Total
Private Forest MF SF LF Landless Total No.of No. of
nity specify) area Area Area
blocks blocks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Saharanpur
23.750 1.250 0 0 25.000 28.001 8.162 7.874 13.236 57.272 0 0 0 0
2 Muzaffar Nagar
18.800 1.200 0 0 20.000 39.419 10.397 9.133 0.003 58.952 0 0 0 0
3 Bijnor
23.625 1.375 0 0 25.000 41.569 12.339 9.554 17.060 80.522 0 0 0 0
4 Moradabad
23.875 1.125 0 0 25.000 69.606 13.627 8.324 11.900 103.458 0 0 0 0
5 Rampur
23.500 1.500 0 0 25.000 27.113 8.081 4.707 8.162 48.062 0 0 0 0
6 J.P. Nagar
23.250 1.750 0 0 25.000 24.274 6.865 4.640 2.873 38.651 0 0 0 0
7 Meerut
21.349 2.111 0 0 23.460 24.756 8.574 5.160 3.477 41.967 0 0 0 0
8 Bagpat
23.500 1.500 0 0 25.000 15.415 3.986 3.187 0.021 22.609 0 0 0 0
9 Gaziabad **
10.141 0.705 0 0 10.846 25.573 5.924 3.860 2.428 37.786 0 0 0 0
10 G.B.Nagar **
23.588 1.479 0 0 25.067 15.285 2.818 5.142 2.460 25.704 0 0 0 0
11 Bulandshahar
23.750 1.250 0 0 25.000 39.711 10.571 7.674 6.919 64.875 0 0 0 0
12 Aligarh
23.500 1.500 0 0 25.000 33.487 11.448 8.583 6.630 60.148 0 0 0 0
13 Hathras
23.625 1.375 0 0 25.000 21.230 5.649 3.881 3.971 34.730 0 0 0 0
14 Mathura **
23.400 1.600 0 0 25.000 13.628 6.590 7.819 4.946 32.982 0 0 0 0
15 Agra **
23.375 1.625 0 0 25.000 32.210 10.365 7.983 5.329 55.887 0 0 0 0
16 Firozabad
23.875 1.125 0 0 25.000 23.375 7.221 4.719 3.727 39.042 0 0 0 0

135
Ownership pattern of the proposed area No. of beneficiaries covered Identified DPAP/ DDP Blocks covered
S. DPAP DDP
District
No. Commu- Others (pl. Total
Private Forest MF SF LF Landless Total No.of No. of
nity specify) area Area Area
blocks blocks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 Etah & KashiRam
Nagar 0 0 25.000 59.810 14.890 6.751 2.010 83.461 0 0 0 0
23.500 1.500
18 Mainpuri
23.250 1.750 0 0 25.000 43.808 8.726 3.768 5.801 62.103 0 0 0 0
19 Badaun
22.750 2.250 0 0 25.000 76.839 16.612 9.514 12.851 115.816 0 0 0 0
20 Bareily
23.500 1.500 0 0 25.000 68.669 13.659 7.371 16.291 105.990 0 0 0 0
21 Pilibhit
23.750 1.250 0 0 25.000 26.123 8.316 6.029 7.791 48.259 0 0 0 0
22 Shahjahanpur
23.500 1.500 0 0 25.000 55.793 13.155 8.512 7.641 85.100 0 0 0 0
23 Lakhimpur Khiri
23.625 1.375 0 0 25.000 82.787 19.711 10.520 25.103 138.121 2 1.950 0 0
24 Sitapur
23.875 1.125 0 0 25.000 90.727 17.582 8.977 15.211 132.497 3 2.900 0 0
25 Hardoi
23.500 1.500 0 0 25.000 92.965 15.790 8.210 12.816 129.781 0 0.000 0 0
26 Unnao
23.250 1.750 0 0 25.000 69.831 12.559 5.840 13.120 101.351 0 0.000 0 0
27 Lucknow
22.750 2.250 0 0 25.000 39.197 6.600 2.593 5.416 53.806 0 0.000 0 0
28 Raebareli
23.500 1.500 0 0 25.000 66.946 10.549 5.597 18.844 101.936 0 0.000 0 0
29 Farrukhabad
23.750 1.250 0 0 25.000 35.269 7.594 3.151 12.152 58.166 0 0.000 0 0
30 Kannauj
23.500 1.500 0 0 25.000 40.656 5.163 2.491 4.219 52.528 0 0.000 0 0
31 Etawah **
23.500 1.500 0 0 25.000 27.971 5.914 4.274 6.233 44.392 0 0.000 0 0
32 Auraiya
23.625 1.375 0 0 25.000 29.150 5.671 3.012 5.656 43.489 0 0.000 0 0
33 Kanpur Dehat **
23.625 1.375 0 0 25.000 37.681 8.554 4.676 12.648 63.559 0 0.000 0 0
34 Kanpur Nagar
23.875 1.125 0 0 25.000 34.980 7.213 5.534 5.699 53.426 0 0.000 0 0
35 Fatehpur
23.875 1.125 0 0 25.000 59.490 12.332 7.459 10.794 90.074 0 0.000 0 0
36 Pratapgarh
23.500 1.500 0 0 25.000 82.238 8.230 5.528 20.259 116.255 0 0.000 0 0
136
Ownership pattern of the proposed area No. of beneficiaries covered Identified DPAP/ DDP Blocks covered
S. DPAP DDP
District
No. Commu- Others (pl. Total
Private Forest MF SF LF Landless Total No.of No. of
nity specify) area Area Area
blocks blocks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
37 Kaushambi **
15.806 1.190 0 0 16.996 32.682 4.853 2.607 7.327 47.469 0 0.000 0 0
38 Allahabad **
20.836 2.061 0 0 22.897 86.487 12.342 7.794 2.795 109.419 1 0.995 0 0
39 Barabanki
23.500 1.500 0 0 25.000 69.991 10.069 4.366 32.436 116.861 0 0.000 0 0
40 Faizabad
23.125 1.875 0 0 25.000 51.624 6.371 3.234 6.003 67.232 0 0.000 0 0
41 Ambedkar Nagar 25.000 85.207 0 0 0
23.600 1.400 0 0 53.830 5.411 1.954 24.012 0.000
42 Sultanpur
23.400 1.600 0 0 25.000 101.814 9.932 3.985 16.911 132.641 0 0.000 0 0
43 Bahraich **
28.080 1.920 0 0 30.000 69.735 14.023 7.307 9.262 100.327 10 18.550 0 0
44 Shravasti
23.500 1.500 0 0 25.000 27.965 4.819 2.502 3.393 38.679 4 13.750 0 0
45 Balrampur
24.110 0.890 0 0 25.000 41.417 8.723 5.054 6.167 61.361 4 3.950 0 0
46 Gonda
23.500 1.500 0 0 25.000 81.879 10.087 4.857 8.440 105.263 0 0.000 0 0
47 Siddharth Nagar
23.600 1.400 0 0 25.000 61.195 9.477 3.413 10.615 84.700 0 0.000 0 0
48 Basti
23.875 1.125 0 0 25.000 51.799 7.019 3.110 8.732 70.660 0 0.000 0 0
49 Sant Kabir Nahar
23.650 1.350 0 0 25.000 37.302 4.401 1.940 11.971 55.614 0 0.000 0 0
50 Mahrajganj
23.375 1.625 0 0 25.000 67.057 7.565 3.455 4.310 82.386 0 0.000 0 0
51 Gorakhpur
23.600 1.400 0 0 25.000 80.522 8.610 3.941 20.161 113.235 0 0.000 0 0
52 Kushinagar
24.115 0.885 0 0 25.000 74.508 6.871 2.799 5.636 89.814 0 0.000 0 0
53 Deoria
23.638 1.363 0 0 25.000 64.682 6.701 3.123 1.684 76.190 0 0.000 0 0
54 Azamgarh
23.365 1.635 0 0 25.000 97.177 10.453 5.038 5.434 118.102 0 0.000 0 0
55 Mau
23.581 1.420 0 0 25.000 32.551 4.082 2.064 8.715 47.411 0 0.000 0 0
56 Ballia
23.858 1.142 0 0 25.000 57.416 7.155 4.402 13.973 82.946 0 0.000 0 0

137
Ownership pattern of the proposed area No. of beneficiaries covered Identified DPAP/ DDP Blocks covered
S. DPAP DDP
District
No. Commu- Others (pl. Total
Private Forest MF SF LF Landless Total No.of No. of
nity specify) area Area Area
blocks blocks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
57 Jaunpur
23.633 1.367 0 0 25.000 117.484 9.773 3.688 6.086 137.031 0 0.000 0 0
58 Ghazipur
23.500 1.500 0 0 25.000 66.264 8.679 4.614 14.346 93.904 0 0.000 0 0
59 Chandauli **
4.731 0.329 0 0 5.060 33.728 3.475 2.448 8.115 47.766 0 0.000 0 0
60 Varanasi **
24.737 1.720 0 0 26.457 34.607 3.079 1.102 7.960 46.748 0 0.000 0 0
61 Sant Ravidas Nagar
** 16.580 1.058 0 0 17.638 32.709 2.306 0.836 0.000 35.851 0 0.000 0 0
62 Mirzapur
23.561 1.440 0 0 25.000 39.753 8.582 5.095 23.704 77.134 2 0.500 0 0
63 Sonbhadra
23.500 1.500 0 0 25.000 21.274 5.897 6.279 1.001 34.451 8 10.000 0 0
Grand Total 1433.258 90.163 0 0 1523.421 3183.033 552.188 323.053 582.888 4641.162 34 52.595 0 0

It is estimated that out of the total area of 15.23 lac ha. proposed within 63 Districts to be treated during 11th five year plan with a
total cost of Rs.1828 crores. Componentwise details of 63 Districts (excluding 07 districts Jhansi, Lalitpur, Jalaun, Hamirpur, Mahoba,
Banda & Chitrakoot) are given in the following Table – 7.2.2

138
Table – 7.2.2 - Component/Institution wise Budget Allocation for the Remaining Periods of XIth Plan, XIIth Plan , XIIIth Plan
& XIVth Plan for 63 Districts

Watershed Micro
Admn Monitoring Evaluation EPA I&CB DPR Livelihoods Consolidation Total Physical.
Planing Detail Works Enterprise
(10%) (1 %) (1 %) (4 %) (5 %) (1 %) (10 %) (5 %) (100%) Lakh. Ha
(50 %) (13 %)

Remaing Plan
XI 2009 - 2012
182.81 18.28 18.28 73.12 91.41 18.28 914.06 182.81 237.65 91.41 1828.11 15.23

Plan XII
2012 - 2017
250.34 25.03 25.03 100.14 125.17 25.03 1251.70 250.34 325.44 125.17 2503.39 20.86

Plan XIII
2017-2022
236.95 23.70 23.70 94.78 118.48 23.70 1184.75 236.95 308.04 118.48 2369.50 19.74

Plan XIV
2022-2027
188.60 18.86 18.86 75.44 94.30 18.86 943.01 188.60 245.18 94.30 1886.02 15.72

TOTAL 18
YEARS
858.70 85.87 85.87 343.48 429.35 85.87 4293.51 858.70 1116.31 429.35 8587.02 71.55

139
7.2.3 Convergence
Convergence is proposed with NREGS, BRGF & others. It is expected that around Rs. 256.00 crores would be available through
convergence of these schemes. Details are given in Table SPSP-22.
Table-SPSP 22: Details of Convergence of IWMP with other Schemes* (MIS Table-M(P)3)

1 2 3 4 5 6 7
S. No. Name of the Names of Funds to be made Was this fund Name of Level at which
District Departments available to IWMP due included in activity/task/structure decision for
with Schemes to convergence (Rs. Rs.12,000/15,000 per to be undertaken convergence was
converging with Crores) ha. with converged funds taken$
IWMP Yes No
Soil & moisture
BRGF,NREGS
1 All districts 258-00 0 No conservation / MORD, G.O.I.
& Others
structure

7.3 PHASE-III Consolidation and Widthdrawl Phase


After the creation of assets and implementation of the various works in the project area consolidation and withdrawn phase starts.
The WC and the SHG's and User Groups are expected to take up further activities and management and maintenance of the assets created.
Watershed Development Funds(WDF) will be properly utilized for maintenance of assets created under the project. The following
activities are expected in this phase.
1- Consolidation and maintenance of various works.
2- Management of developed natural resources.
3- Intensification and improvement of farm production system, off farm livelihood activities taken up by SHG's.
4- Maintenacne of Assets.

140
7.4 FINANCIAL MANAGEMENT:
Initially the WC will get funds for implementation from the project through their DWDU/DRDA and will also have to collect the
beneficiary contributions as agreed to with SLNA. In the beginning 10% of the funds required as per Annual work plan will be
provided to W.C.The Funds made available to WC by the project will be of two kinds.
1-Implementation Fund
2-Revolving Fund
Besides this, fund generated by the WC will be watershed Development Fund(WDF) for which separate bank account will be maintained.
In fact this, fund will be utilized in the last phase for maintenance of assets.
7.4.1 Implementation Fund: Implementation Fund will be the grant transferred to the WC for the implementation of Project
activites. As such major amounts received by the WC will be under this head. This fund will be used only for the activities proposed in
the Project. The amount will be received in a saperate Bank Account i.e. `Watershed Management Committee Account` which will be
opeated by chairman and Secretary of WC jointly.
7.4.2 Revolving Fund: This fund relates to the amounts transferred to the WC for the purpose of enhancing financial capacity of the
SHG's formed in the village. The amount will be received by the WC in its `Watershed Revolving Fund Account`
7.4.3 Watershed Development Fund: The user charges shall be credited to the W.D.F. for maintenance of the asset during the
prjoject.
7.4.4 Flow of Funds to the WC:
On-Account payment to the extent of 10% of the Annual Work Plan shall be given at the beginning of the Project to the WC. It
will be however adjusted on completion of the GPWDP cycle.Funds will be provided as per requirements on the basis of funds utilized.
7.4.5 Reimbursement of Cost of Works: During implementation of Project, reimbursement of expenditure on works shall be
made on submission of monthly financial statements. All expenditure made as per the agreed work plan and GWDP,incurred during the
month will be reimbursement by the DWDU. In the event that the money is completely spent before the end of the month, the WC can
submit the financial statements before the end of the month to get the reimbursement.
7.5 Estimates and Technical Sanction:
Estimates will be prepared in coordination with WDT and sanctions will be obtained for the proposed works from competent authority to
be decided by DWDU. Payment of works will be done after proper measurements and its verifications by the technical experts of WDT.

141
Chapter 8
Livelihood concerns
The State has got 76 percent marginal farmers and 14 percent small farmers. It is expected that the project areas may also have the
same status of the farmers owning the land in the project areas. Besides this there are number of landless agricultural labourers who may
not get direct benefits from the project activities. In order to have their participation and to improve the livelihood opportunities to all the
people belonging to watershed areas, they will be organized in groups and provided training for taking up Income Generating Activities
(IGA) to enhance their income and improve their likelihood.
In order to improve the production and productivity in different crops, activities like Integrated Plant Nutrient Management
(IPNM), Integrated Crop Management, Integrated Water Management, and Integrated Pest Management (IPM) will be promoted in the
project areas by providing training, and demonstration. In fact, since the farmers are having small holdings, farming system approach
will be adopted in which animal husbandry activities, vegetables growing, growing of medicinal plants etc. will be promoted in the
project areas which will improve the income levels of the farmers.
In order to provide benefits to landless laborers and women in project areas, they will be organized into the Self Help Groups
(SHG’s). These SHG’S will be provided training in various types of income generating activities like raising of milch Animals, Backyard
Poultry, Sheep and goat raring etc. Besides this women will be trained in tailoring, garment manufacturing, food processing like sattu,
bari, pickle making activities etc. All these activities will be planned systematically and will be provided backward and forward linkages.
These Income Generating Activities (IGA) will improve the income of these women and landless labourers.
In order to start the various IGA’s, the groups may require revolving funds to begin with. This fund will be provided as loan with
no interest. Once the group starts generating funds, this loan will be returned in installments. This revolving funds will be provided in
rotation to different SHG’s. They will be encouraged to have regular saving habits to create and generate their own funds in a systematic
way. Training in maintenance of accounts will also be provided to these groups.

142
Necessary funds are proposed for training and revolving fund. Further additional funds will be arranged through bank linkages of
the groups.
The SHG’s that can take up the following activities in the project areas which are mentioned below.
1. Horticulture- Vegetable Production, Mushroom cultivation and Floriculture.
2. Food processing, preservation, pickle making, manufacture of soybean by-products and bakery.
3. Cultivation of medicinal plants.
4. Fiber handicraft, plate/rope making, Carpet making.
5. Livestock production (backyard poultry, goat/sheep units), Dairy unit-processing plants.
6. Fisheries.
7. Beekeeping
8. Forest/horticulture nurseries.
9. Seri Culture.
10. Varmi culture
11. Tailoring with shared/individual owned sewing machine, setting up indivisdual/jointly owned shops or tea-stalls and
production of tools for artisan activities.

These activities will be chosen as per market demand and the skill will be developed amongst the members of SHG’s through
training for different activities.
In order to give support to the groups formed, they will be organized in clusters and federation. This will help in giving
marketing support for disposal and sale of the various items produced with different Income Generating activities.

143
The livelihoods expected tobe generated for landless people and farmers are mentioned in Table SPSP-24(A) and Table SPSP -
25-(B). However, the districtwise and micro watershedwise details will be given in the Detailed Project Plans (DPR).

Table- SPSP 24:(A) Details of livelihoods expected tobe created for landless people*(MIS Table-M(PO)D2:(i))

1 2 3 4 5 6 7 8
District Name No. of beneficiaries Pre- Expected Funds Sources of funding (Rs.)
of project change in required
activity income income for the
S. No.

(Rs.)per from activity


capita/ project (Rs.)
year intervention
SC ST Others Women Total per capita/ Project Benefi- Financial NGO Others
year Fund ciary institution

1324.80 Cr.

165.60 Cr.

165.60 Cr.

993.6 Cr.
320755

286732

271408

616836

16060

21000
9349

All
5

0
Districts

NOTE- 1- Animal Husbandry 2- Fisheries 3- Agriculture Allied activities, 4- Dairy and milk product marketing etc.

144
Table-SPSP 25: (B) Details of other livelihoods created for farmers*(MIS Table- M(PO)D2:(ii))

1 2 3 4 5 6 7 8
S. No. District Name of activity No. of beneficiaries Pre- Expecte Funds Sources of funding (Rs.in Crores )
project d required
SF MF LF Other Total income change for the Project Benefi- Financi NGO Oth
(Rs.)/ in activity Fund ciary al ers
per income (Rs.in instituti
capita/ from Crores ) on
year project
intervent
ionper
capita/
year
1- Seed Production
2- Agriculture Farming
3- Animal Husbandary
All
1 4- Milk Producting 627410 3331781 384445 0 4343636 24500 36000 667.36 215.28 21.52 430.56
Distt.
5- Vegetable and Fruit Production
6- Afforestation
7- Fodder Development

145
CHAPTER-9

INSTITUTIONAL ARRANGEMENT
In accordance to the provisions of new common guidelines for implementation of Integrated Watershed Management Programme,
an appropriate institutional arrangement would be made at various levels for effective decision making and professional management of
the project.

9.1 State level Institutional arrangement- STATE LEVEL NODAL AGENCY :


The Govt. of Uttar Pradesh has constituted State Level Nodal Agency (SLNA) under the chairmanship of Agriculture Production
Commissioner to implement new Common Guidelines(Appendix-I). The SLNA will be having an independent bank account. Central
assistance for SLNA will be transferred directly to the account of SLNA. The SLNA will sign an MOU with the Departmental Nodal
Agency setting out mutual expectations with regard to performance, timelines and financial parameters including conditions related to
release of funds by SLNA. The SLNA will be required to review the programme and provide enabling mechanism to set up State Data
Cell and ensure regular reporting to the Central Government/ Nodal Agency at the central level in the Department. There would be
multidisciplinary professional support team at the State level to implement the programme. The State Level Nodal Agency is having a
full-time CEO, who is a serving Government officer and is also the Chief Project Director, Watershed Development Programmes of Uttar
Pradesh.
The SLNA consists of one representative from the NRAA, one representative from the Central Nodal Ministry, one representative
from NABARD, one representative each from the State Department of Rural Development, Agriculture, Animal Husbandry, Rural Engg.
Service, Forest, Milk Development, Panchayat Raj, Horticulture, Professor & Head Forestry Deptt. of C.S.Agricultural
University,Kanpur, Joint DirectorSIRD, Bakshi Ka Talab, Deptt. of Land and Water Management, and allied sector, one representative
from Ground Water Board and one representative from an eminent voluntary organization and two professional experts from research
institutes/academics of the State. There is also representation from NREGS,BRGF and other related implementing agencies at the state
level.
The SLNA will sanction watershed projects for the State on the basis of approved State Perspective and Strategic Plan as per
procedure in vogue and oversee all watershed projects in the state within parameters set out in Government of India Guidelines.

146
A Team of 4 to 7 professional experts would be nominated to assist the State Level Nodal Agency. This team would be selected
by the State Level Nodal Agency from the line departments/retired professionals. Their disciplines will, inter-alia, include agriculture,
soil conservation/water management, capacity building, social mobilization, information technology, administration and finance
/accounts, etc. A requisite number of technical administrative staff would be deputed to support this team of experts.

The State level Nodal Agency will be assisted by the Ramganga and Sharda Sahayak Development Authorities along with the
department of Agriculture for implementation of the proposed watgershed development programme under the perspective plan.

The Main functions of the SLNA will be:


a) Prepare a perspective and strategic plan of watershed development for the state on the basis of plans prepared at the block and
district level and indicate implementation strategy and expected outputs/outcomes, financial outlays and approach the Nodal
Agency at the central level in the Department for appraisal and clearance.
b) Establish and maintain a state level data cell from the funds sanctioned to the State, and connect it online with the National
Level Data Centre.
c) Provide technical support to District Watershed Development Units(DWDU) of the state.
d) Approve a list of independent institutions for capacity building of various stakeholders within the state and work out the overall
capacity building strategy in consultation with NRAA/Nodal Ministry.
e) Approve Project Implementing Agencies identified/selected by DWDU/District Level Committee by adopting appropriate
objective selection criteria and transparent systems.
f) Establish monitoring, evaluation and learning systems at various levels (Internal and external/independent systems).
g) Ensure regular and quality on-line monitoring of watershed projects in the state in association with Nodal Agency at the central
level and securing feedback by developing partnerships with independent and capable agencies.
h) Constitute a panel of Independent Institutional Evaluators for all watershed projects with the state, get this panel duly approved
by the concerned Nodal Agencies at the central level and ensure that quality evaluations take place on a regular basis.
i) Prepare State Specific Process Guidelines, Technology Manuals etc. in coordination with the Nodal Ministry/NRAA and
operationalise the same.
j) Overall management and coordination with different agencies for implementation of the programme in the State.

147
9.2 District Level Institutional arrangements: Establishment of Dirstrict Level Watershed Development
Unit(DWDU/DRDA)
As per common guide lines where the project area is less than 25000 hectare DRDA will continue to oversee the watershed
development programme. In districts where the coverage of area under watershed development work is more than 25000 hectare separate
DWDU will be established under the Chairmanship of Dirstict Magistrate. The DRDA/DWDU will oversee the implementation of
watershed programme in each district and will have separate independent account for this purpose. DWDU will function in close co-
ordination with the District Planning Committee. There will also be representation in DWDU from NREGA and other implementing
agencies at the district level.
DWDU would function as separate unit with full time Project Manager and 3 to 4 subject matter specialists in Agriculture, soil
conservation/Water Management/Social Mobilisation/Management & Accounts appointed on the basis of their qualification and expertise
on contract/deputation/transfer etc. The Chief Development Officer will act as a Project Manager, DWDU as per present arrangements.If
open market recruitment is necessary, this will be done by the SLNA. In such cases, the Project Manager, DWDU will sign a contract (
for a period not less than three years) with SLNA that will spell out well-defined annual goals, against which his/her performance will be
constantly monitored. The arrangements for setting up/strengthening the DWDUs/Districst Data Cell will be financially supported by the
Government of India after review of available staff, infrastructure and the actual requirement.

The main functions of DWDU will be as follows:


a) Identify potential Project Implementing Agencies (PIAs) in consultation with SLNA as per the empanelment process as decided
by the State Government.
b) Take up the overall responsibility of facilitating the preparation of strategic and annual action plans for watershed development
projects in respective districts.
c) Providing professional technical support to Project Implementing Agencies (PIAs) in planning and execution of watershed
development projects.
d) Develop action plans for capacity building, with close involvement of resource organizations to execute the capacity building
action plans.
e) Carry out regular monitoring, evaluation and learning.
f) Ensure smooth flow of funds to watershed development projects.
g) Ensure timely submission of required documents to SLNA /Nodal Agency of the Department at central level.
h) Facilitate co-ordination with relevant programmes of agriculture, horticulture, rural development, animal husbandry, etc with
watershed development project for enhancement of productivity and livelihoods.
148
i) Integrate watershed development projects/plans into District Plans of the district Planning Committees. All expenditure of
watershed project would be reflected in district plans.
j) Establish and maintain the District Level Data Cell and link it to the State Level and National Level Data Centre.
k) Management & coordination for implementation of programme in the district.
9.3 Role of Panchayati Raj Institutions at district and Block levels:
The full responsibility of overseeing the watershed program within the district will lie with the DWDU/DRDA which will work in
close collaboration with the District Planning Committee (DPC). The DPC will provide full governance support to the programme. The
DPC will approve the perspective and annual action plans relating to watershed projects in the district. DPC will integrate the watershed
development plans with over all district plans and also oversee its implementation. DWDU/DRDA will help the DPC in providing
oversight and ensuring regular monitoring and evaluation of the programme. The District Panchayat/Zilla Parishad will have an important
role of governance in matter relating to the co-ordination of various sectoral schemes with watershed development projects, review of
progress, settling disputes etc.
Similarly,Block Panchayats have an important role in planning the watershed development projects at the intermediate level. They
can also provide valuable support to PIAs and Gram Panchayats/Watershed Committees in technical guidance with the help of their
subject matter specialists.
9.4 Institutional Arrangements at Project Level: PROJECT IMPLEMENTING AGENCY (PIA)
SLNA will select and approve the PIAs following appropriate mechanisms for District. PIA’s may include Line Departments,
Autonomous Org. under State/ Central Govt., Govt. Institutions/ Research bodies, Block Panchayats, Voluntary Org. (V.O.’s) However
U.P State is having quite a good no. of regular BSA units functioning in the districts. In majority of the cases they are proposed to Act
as PIA's.
1)PIA i.e. BSA units are having experience in watershed related aspects and management of watershed development programme.
2)PIA/BSA unit will constitute dedicated Watershed Development Teams.
Voluntary Organizations (VOs): Voluntary Organizations will have an important role in the program and their services will be
utilized specially in the areas of awareness generation, capacity building, IEC and social audit among others.Women representative of
VO's will be included in WDT for these activities. The selection of VO's will be done after taking into consideration their expertise on
above aspects as well as in group formation.
It is worth mentioning that the State of U.P has about 200 soil conservation units/BSA units under Command Area Development
Projects of Ramganga and Sharda Sahayak Command along with the Department of Agriculture . As such at this moment the services of
VO's may not be necessary. However for creating awareness, formation of SHGs and UGs, the services of VO's will be taken up and the
panchayat, Govt agency and nominated expertise will work in co-ordination for implementation of the programme .
149
Concerned soil conservation units (BSA Units) which will works as PIA will sign a contract/MOU with the concerned DWDU. It
will spell out well-defined annual outcomes, against which the performance of each PIA/BSA unit will be monitored each year and
evaluated on a regular basis by institutional evaluators from a panel approved by the SLNA / Departmental Nodal Agency at the central
level.
Each PIA must put in position a dedicated watershed development team (WDT) with the approval of DWDU. The WDT will be
constituted out of the staff available with BSA units. As regards Socal /Women members of the WDT, women representative from VO's
will be inducted in the team . The composition of the WDT will be indicated in the contract/MOU. No programme funds as per DPR and
proposed watershed works, under any circumstances would be released to either the PIA or Watershed Committed (WC) unless the
composition of the WDT has been clearly indicated in the MOU/contract and the team members are fully in place.
9.4.1 Roles and Responsibilities of the PIA
The Project Implementing Agency (PIA) will provide necessary technical guidance to the Gram Panchayat for preparation of
development plans for the watershed through Participatory Rural Appraisal (PRA) exercise, undertake community organization and
training for the village communities, supervise watershed development activities, inspect and authenticate project accounts, encourage
adoption of low cost technologies and build upon indigenous technical knowledge, monitor and review the overall project implementation
and set up institutional arrangements for post-project operation and maintenance and further development of the assets created during the
project period
The PIA/BSA unit after careful scrutiny, shall submit the Action Plan for Watershed Development Project for approval of the
DWDU and other arrangements. The PIA /BSA unit shall submit the periodical progress report to DWDU. The PIA shall also arrange
physical, financial and social audit of the works undertaken. It will facilitate the mobilization of additional financial resources from other
government programmes, such as NREGS, National Horticulture Mission, BRGF etc
9.5 WATERSHED DEVELOPMENT TEAM(WDT):
The BSA unit will form a WDT for each Micro Watershed in which one women member will be nominated from the selected V.O.
Each WDT should have at least four members, broadly with knowledge and experience in agriculture, soil science/conservation water
management along with social mobilization and institutional building. This work of social mobilization and institutional building will be
assigned to V.O. and its representative in the WDT. At least one of the WDT members would be a woman. The WDT members should
preferably have a professional degree. However, the qualification can be relaxed by the DWDU with the approval of SLNA in deserving
cases keeping in view the practical field experience of the candidate. The WDT should be located as close as possible to the watershed
project. At the same time, it must be ensured that the WDT should function in close collaboration with the team of experts at the district
and state level. The expenses towards the salaries of the WDT members shall be charged from the administrative support to the PIA.
DWDU will facilitate the training of the WDT members.
150
9.5.1 Roles and responsibilities of WDT: The WDT will guide the Watershed Committee (WC) in the formulation of the
watershed action plan. An indicative list of the roles and responsibilities of the WDT would include among others the following.
1. Assist Gram Panchayat/Gram Sabha in constitution of the Watershed Committee and their functioning.
2. Organizing and nurturing User Groups and Self-Help Groups.
3. Mobilising women to ensure that the perspectives and interests of women are adequately reflected in the watershed action plan.
4. Conducting the participatory base-line surveys, training and capacity building.
5. Preparing detailed resources development plans including water and soil conservation or reclamation etc. to promote sustainable
livelihoods at household level.
6. Common property resources management and equitable sharing.
7. Preparing Detailed Project Report (DPR) for the consideration of Gram Sabha.
8. Undertake engineering surveys, prepare engineering drawings and cost estimates for any structures to be built.
9. Monitoring, checking, assessing, undertaking physical verification and measurements of the work done .
10. Facilitating the development of livelihood opportunities for the landless.
11. Maintaining project accounts.
12. Arranging physical, financial and social audit of the work undertaken.
13. Setting up suitable arrangements for post-project operation, maintenance and future development for assets created during the
project period.
9.6 Local Level Institutions: WATERSHED COMMITTEE(WC)
The Gram Sabha will constitute the Watershed Committee (WC) to implement the Watershed project with the technical
support of the WDT in the village. The Watershed Committee (WC) has to be registered under the Society Registration Act, 1860.
The Gram Sabha may elect/appoint any suitable person from the village as the Chairman of Watershed Committee. The secretary of
the Watershed Committee (WC) will be a paid functionary of the Watershed Committee (WC). The Watershed Committee (WC) will
comprise of at least 10 members, half of the members shall be representatives of SHGs and User Groups, SC/ST community, women
and landless persons in the village. One member of the WDT shall also be represented in the Watershed Committee (WC). Where the
Panchayat covers more than one village, they would constitute a separate sub committee for each village to manage the watershed
development project in the concerned village. Where a watershed project covers more than one Gram Panchayat, separate committees
will be constituted for each Gram Panchayat. The Watershed Committee (WC) would be provided with an independent rented office
accommodation.

151
The Watershed Committee will open a separate bank account to receive funds for watershed projects and will utilize the
same for undertaking its activities. The expenses towards the salaries of the WDT members and Secretary of Watershed Committee
(WC) shall be charged from the administrative expenses under the professional support to the PIA.
9.6.1 Secretary, Watershed Committee: The Secretary of the Watershed Committee (WC) will be selected in meeting of the
Gram Sabha. This person would be an independent paid functionary different and separate from the Panchayat Secretary. He would be
a dedicated functionary with no responsibilities other than the assistance to the Watershed Committee (WC) and would work under
the direct supervision of the President of Watershed Committed (WC) and would be selected on the basis of merit and experience. The
expenses towards the honorarium to be paid to Secretary of Watershed Committee (WC) wil be charged from the administrative
support to the PIA. The Secretary will be responsible for the following tasks:
 Convening meetings of the Gram Sabha, Gram Panchyat, Watershed Committee for facilitating the decision making process in
the context of Watershed Development Programme.
 Taking follow-up action on all decisions.
 Maintaining all the records of project activities and proceedings of the meetings of Gram Panchayat, watershed committee
(WC) and other institutions for Watershed Development Project.
 Ensuring payments and other financial transactions.
 Signing the cheques jointly with the WDT nominee on behalf of the watershed committee.

9.6.2 SELF HELP GROUPS (SHG): The Watershed Committee would constitute SHGs in the watershed area with the help
of WDT/VO from amongst poor, small and marginal farmer households , landless/asset less poor agricultural labourers,
women,shepherds and SC/ST persons. These groups shall be homogenous groups having common identity and interest who are
dependent on the watershed area for their livelihood. Each self help group will be provided with a revolving fund of an amount to be
decided by the nodal ministry.
9.6.3 USER GROUP (UG) The Water shed Committee (WC) shall also constitute User Groups in the watershed area with the
help of WDT/VO. These shall be homogenous group of persons 'most effected by each work/activity and shall include those having
land holdings within the watershed areas. Each User Group shall consist of those who are likely to derive direct benefits from the
particular whatershed work or activity. The Watershed Committee (WC) with the help of the WDT shall facilitate resource-use
agreements among the User Group based on the principles of equity and sustainability. These agreements must be worked out before
the concerned work is undertaken. It must be regarded as a pre-condition for that activity. The User Groups will be responsible for the
operation and maintenance of all the assets created under the project in close collaboration with the Gram Sabha.
152
9.6.4 PANCHAYAT AND THE GRAM SABHA: The gram panchayat would perform the following important functions:
 Supervise, support and advise Watershed Committee from time to time.
 Authenticate the accounts/expenditure statements of watershed.
 Facilitate the convergence of various projects/ schemes to watershed development project.
 Maintain asset registers under watershed development projects with a view to retain it after the watershed development project.
 Provide office accommodation and other requirements of Watershed Committee.
 Allocate usufruct rights to deserving user groups/ SHGs over the assets created.
Village Community and GP: will plan and implement the project through the notified watershed committee.
DWDU/ DRDA : Provide overall coordinations and assist the village communities & GPs
PIA Carry out social mobilization, may provide techinal assistance and undertake other activities as agreed to with GPs.

Detais of SLNA, Chairperson & C.E.O are presented in Table SPSP 26 &27.
Table-SPSP 26: Details of SLNA (MIS Table-M(IS)1)
1 2 3 4 5 6
Total no. of members of
#
S. No. State Date of Notification Type of SLNA Date of MoU with DoLR SLNA
1 U.P 25.02.2009 Deparment Underprocess 18

Table-SPSP 27: Details of Chairperson & CEO of SLNA (MIS Table-M(IS)1) (Contd..)

7 8
Chairperson CEO
Date of Nature of Tenure
Name Designation# Name Designation Contact Ph. No./ Fax/ E-mail
Appointment appointment $ (No. of years)
Sri S.N. State Govt. 0522-2238936
Sri V.K. Sharma APC Special Secretary 25.02.2009 upto Posting
Panday Officer ss@upldwr.com

Details of functionaries in the SLNA are given in the Table SPSP 28 & 29.
153
Table-SPSP 28: Details of functionaries in the SLNAs* (MIS Table-M(IS)2)
1 2 3 4 5
Total no. of
persons
working in Monthly
the SLNA for Remunera- Total budget of Funding expected
Sl.No. IWMP Names & Designation Qualification Experience Work allocation tion SLNA (Rs) from DoLR (Rs)
R NR R NR
1 Msc. (Ag) 5 years Implementation 50000/- & & 50000/- &
Agriculture of Programme

2 Ag engg. 5 years Implementation 50000/- & & 50000/- &


Water Management of Programme
3 5 years Implementation 50000/- & & 50000/- &
Social Mobilization of Programme
MSW
4 5 years Implementation 40000/- & & 40000/- &
Informatiom Technology of Programme
7 MCA
5 5 years Implementation 40000/- & & 40000/- &
Fin. Controler of Programme
CA
6 10 years Implementation 50000/- & & 50000/- &
Director M&E of Programme
Msc in (st)
7 10 years Implementation 50000/- & & 50000/- &
Forest of Programme
Msc. In Forest
8 Total 330000/-

NOTE – (1) Per year requirement of remuneration amount Rs. 39.60 Lakh.
(2)Appointments of specialists are under process. At present Project Preparation and Monetring Cell/ Samadesh Bandhu with Principal Secretary, Land and
Water Resources Management,Govt.of U.P. is assesting the SLNA for Watershed Development Project and allied activities.
154
Table-SPSP 29: Details of functionaries in the SLNAs* (MIS Table-M(IS)2)
1 2 3 4 5

Total no. of
persons
working in Monthly
the SLNA for Remunera- Total budget of Funding expected
s.no IWMP Names & Designation Qualifi-cation Experience Work allocation tion SLNA (Rs) from DoLR (Rs)
R NR R NR
1 Computer Programmer MCA 3 years Computer 30000/- 30000/-
Programming

2 Computer Operator-2 Diploma in 1 years Data Entry 40000/- 40000/-


computer
6 course
3 Statistical Officer -2 Bsc/Msc 3 years 60000/- 60000/-
Math/Statics
Jr. High 5 years 7000/- 7000/-
Peon School
Total 137000/-
NOTE – (1) Per year requirement of remuneration amount Rs. 16.44 Lakh.
(2) Appointments of specialists are under process. At present Samadesh Bandhu ( PPM CELL) Offcials are performing the duties related to above Offcials.

155
Chapter- 10
10.0 “Capacity Building Activities”
Capacity building support is a crucial component to achieve the desire result from Watershed Development Programme. Uttar
Pradesh has the distinction of implementing a large number of watershed projects for a long time and has been addressing the critical
issues associated with the watershed programmes. Participatory watershed management for conserving rain water and other valuable
natural resources is quite promising. New guideline for watershed development programme issued by govt. of India in April 2008 is an
important step to converge, harmonize and rationalize, development of land & water resources.
Capacity building would be a continuous process enabling functionaries to enhance their knowledge and skill and develop the
correct orientation and perspectives thereby becoming more effective in performing their roles and responsibilities.
In execution of Watershed Programme in the past, it has been found that lack of trained personnel’s of implementing agency,
community organization and PRI functionaries has adversely affected the watershed development programme. It has been experienced
that the sanctioned projects are not completed within the time frame and funds are not utilized properly. This is happening due to lack of
proper training, lack of awareness and improper capacity building of above three institutions.
The training programme of watershed development may be divided into two distinct parts, one is formal and the other is informal.
The formal training is to be imparted at the selected institutes and informal training to be provided at the watershed level by the
WDT/Mobile training team during the informal discussions on a weekly or fortnightly basis with the various groups.
Generally no institutional arrangements are required for village level training programmes except than to identify nearby
institution/agency which should be able to provide the institutional support by making available the multimedia and other audio/video
facilities through mobile team.
10.1 - Formal Training
The formal training has to be given in the institutions. This again can be divided into two parts. Some functionaries could be given
training at the district level or at best at a regional level by combining three or four districts by District Training Support Organization.
The other group, like members of WDT, members of PIA, District Watershed Development Unit (DWDU) officers could be provided
training at the state level. It would be useful to organize training workshops at the state and districts for members of Zila Parishad, district
level officers and members of Block Panchayat and Block level officers. The workshop will be common for the elected representatives
and officers so that there is sense of participation in the common programme. The exchange of idea, would also help in taking corrective
measures. One such workshop could be organized every year at State and Commissionary (Divisional level).
156
In the guidelines for watershed developments there is provision for spending 5% of the project cost on training. This should
include expenditure on training of formal and informal of all the functionaries indentified at the micro watershed level as well as
members of DWDU, PIAs and WDTs.
The middle lavel and senior officers in the Project Implementing Agency (PIA) will be trained at state and national level
institutions and agricultural universities for giving a proper importance to technical aspects in the programme.

10.1.1 - Objectives of Formal training :


1. To develop proper conceptual understanding about participatory management of watershed programme.
2. To create necessary skills and competence among the officials and office bearers of PRI/PIA about planning (DPR) and
implementation of various watershed activities.
3. To build necessary confidence, skills and capability among the stakeholders in the efficient management of the watershed
programme.

157
10.2 - PROPOSED IWMP TRAINING STRUCTURE

A- FORMAL TRAINING of Management of Watershed Programmes and Technical aspects.


(FOR SLNA & STSO) – (Senior Officers and TOT)
National Level Training Institutes
NIRD, Hyderabad, Soil Conservation Training Centre Dehradun,
MANAGE- Hyderabad Central Dry Land Research Institution, Hyderabad Central Arid Zone Research Institute, Jodhpur etc.

(FOR DWDU<PIA<WDT)
State level Training Support Organization (STSO)
LD & WRD Institute, Lucknow, SIMA Rehmankhera, Lucknow, Agril. Universities, SIRD Lucknow

(FOR PROJECT LEVEL TRAINING-WC/WS/VLF)
District Level Training Support Organizations:

B- INFORMAL TRAINING-
(FOR village level training-
SHG’S/UG’S/WDT)TSO/MOBILE TEAM- to be provided by local institutions
and identified agencies.
C- Specialized training for Income Generating Activities (IGA) - to be organized at specialized
identified institutions.

158
10.3 -Proposed watershed training organization of Uttar Pradesh

National level Training


Institutes and Agricultural
Universities.

STATE LEVEL DISTRICT LEVEL


BETTER
TRAINING TRAINING
PERFORM
INSTITUTE INSTITUTE
ANCE OF

 Concept and importance of Watershed development.


 Salient features of watershed guidelines 2008.
 Role responsibility of PRI and development functionary in the Programme.
 Communication methods and training.
LOCAL / VILLAGE
LEVEL

159
 Project formulation and people's participation.
10.4 -Major Contents of Training Programme/ Capacity Building
 Concept and importance of watershed development.
 Salient features of watershed guidelines 2008
 Role responsibilities of PRI and development functionary in the programme.
 Communication method and training.
 Project formulation and people’s participation.
 Sharing of experiences and benefits.
 Problems and classifications of barren lands.
 Micro planning of rainfed area.
 Soil and water conservation techniques.
 Development of animal husbandry and pasture.
 Management of natural resources.
 Departmental/non departmental coordination and convergence.
 Dispute management.
 Experienced problems and their solutions in WS.
 Maintenance of finance and accounts in WS.
 Maintenance of created properties.
 Use of remote sensing & GIS technique in WS.
 Concept, method and procedure of forming SHG/UG.

160
10.5 – Proposed Action on Lessons learnt from Past
 Landless villagers to be clear about the benefits of watershed's by formation of SHG.
 The concepts and approaches pertaining to duties, benefits and income generating activities to be cleared to SHG members.
 SHG/UG are to be trained as to how to organize properly so that working plan and sanctions are not just a formality only.
 Watershed association/committee to be constituted with coordination of government officials and representatives of watershed
association.
 Employees to be guided as per GOI. Guidelines in formation of watershed association and watershed committees.
 Opening of bank accounts and precautions to be taken in its operation to be explained.
 PIA to participate actively in training.
 Less participation of women due to household works. A consensus is necessary to take training seriously.-timing of the training to
be suitably adjusted
 Orientation for cooperation of district officials like PD, CDO, EDO for proper organization of training programmes.
 Awareness creation for watershed development programme by publicity viz: wall paintings, sign boards, slogans etc. concerned
levels to be oriented through training.
 DRDA and PIA to be oriented towards due provision of benefits/training to members/SHG’S for agriculture, fisheries, food
processing, animals husbandary to be supported by veterinary services, in the DPR’s.
 PIA’s to be oriented towards sensitive and helpful towards capacity building and developmental activities.
 PIA to ensure benefits to local community through SHG for their economic and social development orientation in this regard.
 Watershed community to be oriented to function in collaboration with different SHG and guide them from time to time.
 Watershed development team to be oriented to educate the Community for use and maintenance of water and proper use for better
health & hygiene. How to activate water user groups.
 WDT to be oriented to encourage Users Groups and clarify their roles.

10.6 - Training category


National level Training Institutions
State Level Nodal Agency (SLNA) and senior officers training to be imparted by national level institutions and
agricultural universities.
1. TOT of watershed management. (Faculty of TSO, NGO, subject matter specialist and Government Officers.)
District level training . (Training for Zila Panchayat, DRDA officials & NGOs)
161
State level institutions
1. District Watershed Development Unit
(DWDU).
2. Project Implementing Agencies (PIA).
3. Watershed Development Team (WDT).

Village and district level by local training


institutions/kvks and selected agencies.
1. watershed committee(WC)
2. Self Help Group (SHG)
3. User Group (UG)
4. Watershed Secretary (WS)
5. Village Level Government Functionaries

10.7 - Training modules


10.7.1 - State Level Nodal Agency (SLNA)
Workshop/ Seminar at State level -
 Status of natural resource management of U.P.
 Common watershed guideline an overview
 Concept of rain fed area development
 Perspective plan of watershed for the state.
 Selection criteria of PIAs.
 Coordination with DWDU.( technical support)
 Capacity building & training arrangement.
 quality monitoring (regular basis)
 MIS (State Level Data Base).
 Evaluators of watershed projects.
162
10.7.2 - District Watershed Development Unit (DWDU)
Workshop / Seminar at District level -
 Status of natural resource management of U.P.
 Common watershed guideline an overview.
 Concept of rainfed area development
 Watershed perspective plan of watershed for the district.
 Sanction projects and approve selection of PIAs.
 Coordination
 Capacity building & training arrangement.
 quality monitoring (regular basis)
 MIS (district Level Data Base).
 Evaluation of watershed projects
10.7.3 - Project Implementation Agency (PIA) - 6 days training programme
 Common watershed guideline an overview
 Concept of rainfed area development
 Principle of organizations management
 Organizations of Watershed Development Team (WDT).
 Role of Panchayati Raj Institutions
 Resource-use agreements.
 Participatory base-line survey (PRA)
 Watershed Planning
 DPR
 Coordination with WCs
 Convergence with NREGS and SGSY
 Over view of soil and water conservation
 Conservation horticulture crops, forest and livestock management ;Rainfed farming
 Over view of local area economy, markets, enterprises and finance;

163
 Social mobilization; book-keeping and accounts.

10.7.4 - Watershed Development Team (WDT)


Members of WDT are the key functionaries on the planning and implementation of the programme. 10 days training programme
will be needed.
 Common watershed guideline an overview.
 Concept of rain fed area development.
 Sustainability Issues.
 Formation of Self-Help Groups.
 Formation of user Groups.
 Management of Common Pool Resources and sharing of usufructs.
 Equity issue.
 Conflict resolution.
 Role of Panchayati Raj Institutions.
 Resource-use agreements.
 Participatory base-line (PRA)
 Watershed Planning.
 DPR.
 Coordination with WCs.
 Convergence with NREGS and SGSY.
 Techniques of soil and water conservation.
 Conservation horticulture.
 Crops, forest and livestock management;
 Rain fed farming
 local area economy, markets, enterprises and finance;
 social mobilisation;
 Watershed Management Fund.
 Social Audit ;-formalities of SHG’s UG’s
 book-keeping and accounts.
164
10.7.5 - Watershed Committee (WC)
 Common watershed guideline an overview.
 Concept of rain fed area development.
 Why watershed development.
 Over view of Land degradation Soil and Water Conservation and Natural Resources Management.
 Management of Common Property Resource including village common land, ponds, streams etc.
 Control and Regulation of Grazing and Social Fencing.
 Community Organization.
 Role of SHG and UG in watershed management.
 Watershed development planning.
 Role and responsibility of WC in watershed management.
 Review and monitoring.
 Need for convergence of other development programme with watershed.
 Watershed action plan for the village.
 Identification of beneficiaries based on considerations of equity.
 Need for voluntary contributions.
 Social audits of the programme.
 Maintenance of created assets.
 Watershed Management Fund.
10.7.6 - Self-Help Group
Three days Training once in a fortnight at project level.
 Need for maintaining common property resources.
 Prevention of grazing and sharing of usufructs from the common lands and other resources.
 Role in maintaining village ecology and environment.
 The training on benefits of the watershed development programme in terms of regeneration of natural resources, sharing of usufructs
and the revolving fund and other programmes
 Formation and management
Thrift and Saving

165
 Skill up gradation for Income Generating Activites (IGA)
 Marketing and linkages
 Accounts keeping.
10.7.7 - User Groups
Three days Training once in a fortnight at project level.
 Land Degradation- various aspects.
 Concept of Watershed Development.
 Interdependence of the Land use with Natural Resource Generation and Productivity.
 Management of CPR including village common land,
common ponds, stream and rivulets.
 Soil and Water conservation measures including need
for maintaining moisture balance and rain farming.
 Optimal land use planning.
 Grazing and Social Fencing.
 Animal Husbandry and Pasture Development.
 Cropping intensify and Cropping pattern.
 Horiculture, Farm Forestry.
 Sharing of benefits- Formation of Rules for sharing of benefits.
10.7.8 - Watershed Secretary
Professional Training for 10 days at TSO level:
The training may cover the following topics: -
 Common watershed guideline an overview
 Concept of rain fed area development
 Sustainability Issues
 Formation of Self-Help Groups
 Formation of user Groups
 Management of Common Pool Resources and sharing of
usufructs
 Equity issue
166
 Conflict resolution
 Role of Panchayati Raj Institutions
 Resource-use agreements.
 Participatory base-line (PRA)
 Watershed Planning
 DPR
 Convergence with NREGS and SGSY
 Techniques of soil and water conservation
 Conservation horticulture
 crops, forest and livestock management;
 Rain fed farming
 local area economy, markets, enterprises and finance;
 social mobilization;
 Watershed Management Fund.
 Social Audit
 Maintenance of records and proceedings of WC
 book-keeping and accounts.
10.7.9 - Village Level Government Functionaries (Staff)
One day training at Districts level.
 Common watershed guideline an overview.
 Concept of rain fed area development .
 Sensitisation to enlist their support/involvement in watershed development.
 Concept and importance of Watershed Development Programme.
 Support for community organisation, formation of Group and
Village level institutions
 Rule of Govt. functionaries at village level in implementation and follow up activities of Watershed Development Programme.

167
10.7.10 - Trainers Training -
TOT of watershed management. (Faculty of TSO, NGO, subject matter specialist and Government Officers.) District level
training. (Training for zila panchayat, DRDA officials & NGOs) 6days duration and following subjects may be covered in the
training programme.
 New Guidelines for Watershed Development.
 Watershed Approach
(Background genesis and importance of watershed management in rain fed areas )
 Approach and strategy - the twin concepts of Integrated Watershed Management and Sustainable Farming Systems.
 Need for Natural Resource Management.
 Community organization.
 Formation of User/Self Help Group.
 Development of Village Level Institutions.
 Coordination with Panchayati Raj Institution.
 Technical aspects of Watershed Development.
 Development of Watershed Development Plan
 Participatory Rural Appraisal Exercise.
 Management of Common Pool Resources.
 Sustainability.
 Equity Issues.
 Involvement of Women.
 Integrated approach and inter-departmental
coordination.
 Outcome and Benefits of the project.
 Monitoring.

168
10.8 - Details of capacity Building is given in the Table 10.1 & 10.2
Table 10.1 Training Action Plan of Uttar Pradesh for Watershed Development Programme

S. Training/ Seminar Trainees Duration Organ Cover No. of Period date/ Rate/ Day / Total Expenditure
No Days i-zer -age Training month/ yrs. Trainee (yrs.) (Rs.)
1 National Institution Senior Officers One STSO 25 2 1000 50000
week
2. SIRD Work shop All member & line One day STSO 50 1 600 30,000.00
department officials
3. DWDU Member of DWDU One day STSO 240 8 500 120000.00
4. PIA Member of PIA Six day STSO/ 600 20 400 1440000.00
TSO
5. WDT WDT Members Ten Day STSO/ 1800 60 400 7200000.00
TSO
6 WC WC Members Three TSO 4500 150 400 5400000.00
day
7. SHG Secretary Member Three TSO 12000 400 400 14400000.00
day

8. UG Secretary Member Three TSO 6000 200 400 7200000.00


day
9. WS Secretary Secretary Ten day TSO 450 15 400 1800000.00
10. Village Local/ Gov. Field Staff One day TSO 600 20 400 240000.00
Functionaries
11. Trainers Training PIA/ BSA/ Trainer/ Six day STSO 120 4 400 288000.00
SMG/ WDT
12. Training on DPR Preparations PIA/ BSA & Others Six Day STSO 120 4 400 288000.00
13. Technical Training PIA/ BSA & Others Six day STSO 120 4 400 288000.00
14. Divisional Level Work shop on Divisional & Distt. Two day STSO 240 8 500 240000.00
Common Guide line 2008 level affirs
Total 38984000.00
169
Table 10.2 Capacity Building
Stake holders and capacity building requirements

S.No Project Stakeholder Critical capacity gaps


1 Target community Lack of awareness about the usefulness and effect of watershed activity. Role GPs in planning and
implementation.
2 GPs Role of GPs in Watershed Development and their responsibilities.
3 Watershed Communities Lack of awareness, Technical aspect of the Programme, Record maintenance.
4 SHGs Lack of training in income generating activity, record keeping, conflict management.
5 UGs Technical Training for usage of water and other activities like fishery.
6 WDTs Lack of Technical knowledge, capacity building for formation of SHG and user groups.
7 PIAs Management of Watershed Programme and Technical issuses
8 DRDA/ZP cell Concept of Watershed Management
9 SLNA Concept of Watershed Management

b) Strategies for capacity building – Arranging state level workshop


Training of senior officer at National and State levels.
Briefly describe about strategies for Training of Trainers at state level institutions
capacity building-
c) Indicate capacity building programme to Management of Watershed Development Programme formation of user groups
be taken up- and SHGs Maintenance of Accounts and records
d) Indicate institutional arrangements made At State – SIRD and Belikala institute.
for capacity building at State level, At District- Regional Training Centers of Rural Development, Identified experts
District level,Block and village level from different institutes.
e) Training manuals developed for training The Belikala instititute will develop training manual and programme by
programme and field training proposed- organizing on State level workshop of experts in various activities of Watershed
Development. This will include Technical and Managerial aspects.

170
10.9 - List of training institutes for capacity building at the State & District level is presented in the Table
SPSP-31.
Table-SPSP 31: List of Training Institutes@ identified for Capacity Building at State level (MIS Table-M(CB)1)
1 2 3 4 5 6 7
S. Name of the Training Institute Full Address with Name & Type of Area(s) of speciali- Accreditation details
No. contact no., website & Designation Institute# zation$
e-mail of the Head
of Institute
1 National Institute of Rural Development NIRD, Hyderabad Director National level Watershed & Ministry of Rural
Hyderabad. Genaral Extension Development Gov. of India
(NIRD) Management New Delhi.
2 National Institute of Agriculturual MANAGE Director National level Extension Ministry of Agricultural
Extension Management (MANAGE) Hyderabad. General Management Gov. of India New Delhi.
Hyderabad
3 C.S.C.Research and Training Centre, Chhalesar, Agra Regional I C. A. R Technical, Soil & Lucknow University
Chhalesar Agra Director water cons & Social
4 I.G.F.R.I. Jhansi I.G.F.R.I. Jhansi Director ICWR Fodder & Forest

5 I.I.M Lucknow I.I.M Sitapur Hardoi Director Central Govt. Social and HRD Ministry of HRD New
Road Lucknow Delhi
6 State Institute of Rural Development State Institute of Rural Director State Govt Technical, Soil & Department of Rural
(SIRD) Bakshi ka Talab Lucknow Development (SIRD) General Rural water cons & Social Development Govt. of U.P.
RIRD & DIRD’s Bakshi ka Talab Development
Lucknow
7 State Institute of Agriculture Rehman Khera, P.O. Director Autonomous Soil & Water
Management, Rehman Khera, P.O. Kakori, Lucknow Body Management
Kakori, Lucknow

171
1 2 3 4 5 6 7
S. Name of the Training Institute Full Address with Name & Type of Area(s) of speciali- Accreditation details
No. contact no., website Designation Institute# zation$
& e-mail of the Head
of Institute
8 U.P.L. D.W.R Trainning Institute Belikala Belikala L.K.O Director State Gov. Land Technical, Soil &
Lucknow Development & water cons & Social
water Resources capacity Building
Department
9 Agriculture School, Gorakhpur Gorakhpur Principal State Govt. Agriculture &
Watershed
Development
10 Agriculture School, Jhansi Chirgaon, Jhansi Principal State Govt. Agriculture &
Watershed
Development
11 Agriculture School, Bulandsahar Bulandsahar Principal State Govt. Agriculture &
Watershed
Development
12 Soil Conservation Training Centre, Muzaffarabad, Officer State Govt. Soil & Water
Muzaffarabad, Saharanpur. Saharanpur Incharge Conservation
13 Soil Conservation Training Centre, Mauranipur, Jhansi Officer State Govt. Soil & Water
Mauranipur, Jhansi Incharge Conservation
14 N.D. University of Agriculture & Tech N.D.A & Tech V.C State Agriculture Soil & water cons &
Kumarganj Faizabad University Faizabad University Animal husbandry
Kumarganj and, Multidicipline
15 S.B.P University of Ag. &Tech. Meerut S.B.P Ag. Tech. V.C State Agriculture Soil & water cons &
University Meerut University Social, Multidicipline

172
1 2 3 4 5 6 7
S. Name of the Training Institute Full Address with Name & Type of Area(s) of speciali- Accreditation details
No. contact no., website Designation Institute# zation$
& e-mail of the Head
of Institute
16 Centre for Development and Social Studies Lucknow university Director Autonomous Social sector
Lucknow University lucknow Body

17 CSA University of Agriculture and CSA Kanpur V.C. State Govt. Soil & Water
Technology, Kanpur. Management etc.

18 KVK’S of State Universities Concerned District Senior Autonomous Agriculture & Allied
Scienctist

19 Giri Institute of development studies Giri Institute Aligang Director Autonomous Social
Aligang Lucknow L.K.O Body

173
Chapter 11

- Monitoring and Evaluation


It will be ensured that regular monitoring will be done at all levels i.e. watershed, District, Regional level, Department level and
ultimately at state level. Watershed level self monitoring by watershed committee (WC) will have to be done on day to day basis for
execution of various activities. At watershed level WDT will be responsible for reviewing the progress of work on a weekly basis. Project
Implementing Agencies will submit fortnightly progress reports to District Watershed Development unit which will review and submit
monthly report to regional level office i.e. Deputy Director. These reports after compilation of progress of district covered under the
region will be submitted to departmental heads.
It is also expected that the system of on line monitoring will be developed through MIS by providing computers at the level of
Project Implementing Agency (PIA), Regional level, Departmental level and state level. GIS/Web based on line monitoring system will
be developed.
Monthly progress reports will be compiled at the departmental level for their area of jurisdiction and submitted to state level.
The State level nodal agency will review the progress on quarterly basis. After reviewing the progress, a quarterly report will be
submitted to National Rainfed Areas Development Authority.
Thus the different streams and levels of monitoring will be as under:
 On going monitoring by W.C .
 On going Internal Monitoring by WDTs .
 Field visit/ inspections of Departmental Officers/ Specialists or as directed by SLNA
 Submission of monthly progress report by PIA to DWDU/DRDA & to Regional Offices .
 Compilation and submission of Monthly Progress Report To Departmental Nodal Heads i.e. Department of Agriculture
and Administrator Sharda Sahayak & Ramganga Command by concern regional officer’s.
 Compilation of Monthly Progress Report at Departmental Nodal Agency level for onwards submission to S.L.N.A
 Quarterly review of progress by SLNA and its Submission to Nodel Department of GOI.
 Development of MIS & Computerization & Internatting at all levels.

174
Social Audit by Gram Panchyat will also be ensured at the watershed Association/Gram Sabha level by having open monthly
meetings. Efforts will be made to select a team representing women, SC/ST members, SHG/UG member representatives to take social
audits on regular basis to keep constant watch on various project activities. This team will work independently, however members of the
team will be other than the W.C. member.
External Agencies will be identified/ Notified to take up independent monitoring of the project activities from time to time
whose reports will be submitted to departmental heads and suitable remedial measures and corrective action will be ensured. Action taken
on these reports will be submitted to State Level Nodal Agency for their review.

- Evaluation –
SLNA has already identified the institutions and Agencies having expertise in watershed activities to take up evaluation work.
Infact a panel of agencies and institutions will be submitted to National Agency and get it approved by them. Evaluation work will be
assigned to only Approved Agencies.
The Evaluation aspect will include physical, financial issues besides the Social Audit. It is expected that the evaluators will not
act as inspectors but they will be facilitators to PIA’s and watershed committee (W.C.)
Evaluators will emphasize on following up of guide lines for the Watershed Development Activities. This evaluation will be
done annually at every stage of activity and final stages. The release of funds will be based on evaluation reports.
The post project evaluation will be basically to evaluate the outcome of the project activities after the implementation of
project. This will help in assessing the projections made at the formation stage and actual results obtained on various parameters. This
will help in taking up future watershed development activities as per the observation and suggestion of the evaluation agency.

175
The list of identified institution for monitoring and evaluation in Table SPSP - 33 is enclosed herewith for ready reference.

Table-SPSP 33: List of Institutes@ identified for M & E at State level


1 2 3 4 5 6 7
Name &
Designa
Name of the Full Address with tion of Area(s) of
S. Type of
Training contact no., website the speciali- Accreditation details
No. Institute#
Institute & e-mail Head of zation$
Institut
e
1 State Institute of State Institute of Rural Director State Govt, Technical, Soil &
Rural Development Development (SIRD) General Training water cons &
(SIRD) Bakshi ka Bakshi ka Talab Lucknow Institute Social aspect
Talab, Lucknow
2 C.S.A Ag. C.S.A Ag. Technology V.C State Agri Soil & water cons
Technology University Kanpur University & Social
University Kanpur
3 I.I.M. Lucknow I.I.M. Sitapur Hardoi Road Director Central Govt. Social aspect
Lucknow Institute
4 Giri Institute for Giri Institute Aligang Director Autonomous Social aspect
Development L.K.O Body
Studies Aligang,
L.K.O
5 Centre for Lucknow university Director Autonomous Social aspect
Development and lucknow Body
Social Studies,
L.K.O University

176
1 2 3 4 5 6 7
Name &
Designa
Name of the Full Address with tion of Area(s) of
S. Type of
Training contact no., website the speciali- Accreditation details
No. Institute#
Institute & e-mail Head of zation$
Institut
e
U.P.L. D.W.R Belikala L.K.O Director State Govt, Technical, Soil &
Training Institute Department water cons &
6 Belikala, L.K.O Social aspect
State Resource S.R.C.L.H L.K.O Director Autonomous
Centre Litrasi Body Multidisciplinary
7 House L.K.O & social aspect

177
Chapter 12
12.0 - Expected outcome of the project
All planned activities under the project will be implemented in the participatory mode for which necessary training for capacity
building of the watershed committee (W.C) has been provided under the project.
 It is expected that the maintenance of the assets created will be taken up with suitable administrative and financial arrangement.
Funds available i.e. watershed development funds (WDF) will be suitably utilized for maintenance.
 The orientation and training provided to the W.C., members and volunteers will improve their skill. It is expected that these
personals are expected to take up follow up and maintenance activities after the withdrawal of the project intervention.
 Self Help Group’s formed during the project implementation are expected to upgrade their skill and take up different types of
Income Generating Activities (IGA). This will provide additional income to the members of the groups and provide support to
improve their social status.
 Various project activities like land development, water harvesting and adopting of improved agricultural practices will help in

1- Increasing the cropping intensity.


2- Increasing the productivity of crops.
This will increase the over all production and add to the income of the beneficiaries
 Implementation of various activities will provide wage labour to landless labourers and the farmer beneficiaries which will
directly add to their one time income. Besides adoption of improved techniques will improve crop yields. This will also add to
the generation of more labour employment which will provide additional income on recurring basis.
 Various activities planned and executed in the project will directly help in rainwater harvesting and recharge of the ground
water. This will improve the ground water level besides providing additional water for irrigation and drinking within the
watershed area.
 Thus it is expected that the watershed development programme undertaken in rainfed areas of the state will help in overall
development of the area and increasing income of the household levels in the watershed areas. The direct benefit that will
accrue will be provision of employment to the local people in implementation of various activities proposed under the project.

178
12.1 Proposed soil and water conservation activities along with improved agricultural practices, which will be promoted under the
project, is likely to improve the productivity & production of different crops by at least 30 to 40 percent .This will improve the income of
farm households. Besides this there will be increase in cropping intensity by at least 20 to 25 percent. The various water harvesting activities
would provide life saving irrigation to various crops, resulting in increase in productivity. With formulation of Self Help Groups under the
project the women and landless labourers, would undertake various income generating activities which will provide employment as well as
income to these groups in the watershed area.
12.2 Plantation and grassland development activities will provide fuel and fodder for which at present the people of the area are
dependent on outside sources. This will also help in overall improvement in the environment .
The state level expected/estimated outcomes (for calculation purpose standard area of 20,000 ha. per Distt. has been taken. as
indicater) in quantitative terms for the project area to be covered in the last three years of 11th Five Year Plan has been given in Table – 12.1
Table-12.1 : Expected/ Estimated Outcomes from Watersheds During the Project Period of 4 to 7 years for Watersheds Proposed during 2009-10
1 2 3 4 5
Item Unit Pre-project Status Post-project Status Remarks
Status of water table Meters BGL 15 TO 25 14.50 TO 24
Ground water structures repaired/ rejuvenated No’s Approximate 3800 All such structures will be repaired
Quality of drinking water Quality Muddy/ Contaminated Will improve
Availability of drinking water No of days About 240 days 300 days
Increase in irrigation potential ha. Approximate 3700 Approximated about 12000
Change in cropping/ land use pattern
Area under agricultural crop Lac. Ha. 2.64 2.86
i Area under single crop Lac. Ha. 1.84 1.71
ii Area under double crop Lac. Ha. 1.15
0.80
Area under multiple crop
iii Cropping Intensity % 130 140

179
1 2 3 4 5
Item Unit Pre-project Status Post-project Status Remarks

Increase in area under vegetation (tree cover) ha. Approx. 7500 Approx. 12000

Increase in area under horticulture Ha Approx. 1300 Approx. 2000

Area under fuel & fodder Ha Approx. 500 Approx. 1200


Increase in milk production Percapita Per-day Ltr. 1.5 to 2.00 2.00 to 3.00

No. of SHGs No’s Approx. 1300 Approx. 4800


Increase in income Rs./ Capita /Annum Approx. 16000 Approx. 30000

Migration % 10 6

SHG Federations formed No’s 2 10


Credit linkage with banks No’s 1200 4800

180
The district wise details of 63 Districts (excluding 07 Districts of Bundelkhand Region) in the State expected/ estimated outcomes
of the area that will be treated in remaining three years of 11th Five Year Plan are given in Table – SPSP- 34. (but for calculation purpose
standard area of 20,000 ha. per Distt. has been taken as indicater)
Table – SPSP- 34. Districtwise (63 districts) Expected/ Estimated Outcomes (MIS Table – M (PO) F1)
1 2 3 4 5 6 7
S. Name of the Item Unit of Pre-project Status Expected Post-project Remarks
No. District measurement Status

1 Saharanpur Status of water table Meters 6.00 to 9.00 4.00 to 5.00

2 Ground water structures No. - 104


repaired/ rejuvenated
3 Quality of drinking water No, poor Good

4 Availability of drinking Days 325 365


water
5 Increase in irrigation % 5%
potential
6 Change in cropping/ land Cropping pattern Rice/urd/mung/Til/Groundnut- Rice/Urd-
use pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea

7 Area under agricultural Ha. 14145 15551


crop
8 i Area under single crop Ha 9596 10092

9 ii Area under double crop Ha 3935 4725

10 iii Area under multiple Ha 614 733


crop

181
11 Net increase in crop Ha 0 496
production area
12 Increase in area under Ha 696 739
vegetation
13 Increase in area under Ha 1377 1450
horticulture
14 Increase in area under fuel Ha 159 174
& fodder
15 Increase in milk production Av.Lt/day/ cattle 0.34 0.42

16 No. of SHGs NOS 79 160


17 Increase in no. of NO 4 10
livelihoods
18 Increase in income RS. 16164 21013
19 Migration % 10 6 16

20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 25 160

Resource use agreements Agreed 100 % as per required

23 WDF collection & 5 to 10 % - 100 % Collection During


management Project Period
24 Summary of lessons learnt

182
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Muzaffar Status of water table Meters 6.00 to 9.00 4.00 to 8.00
nagar
2 Ground water structures repaired/ No. - 103
rejuvenated
3 Quality of drinking water No, poor Good

4 Availability of drinking water Days 335 365

5 Increase in irrigation potential % - 4%

6 Change in cropping/ land use pattern Cropping pattern Rice/urd/mung/Til/Groundnut- Rice/Urd-


Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea

7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9769 10274

9 ii Area under double crop Ha 3786 4568

10 iii Area under multiple crop Ha 591 709

11 Net increase in crop production area Ha 0 505

183
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ cattle 0.36 0.42

16 No. of SHGs NOS 80 160


17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 14137 18379


19 Migration % 10 6
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 21 160


22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period

24 Summary of lessons learnt

184
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Bijnour Status of water table Meters 7.00 to 9.00 5.50 to 7.00
2
Ground water structures repaired/ No. - 102
rejuvenated

3 Quality of drinking water No, Coliods Good


4
Availability of drinking water Days 345 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 11051 11622

9 ii Area under double crop " 2676 3401

10 iii Area under multiple crop " 418 528

185
11 Net increase in crop production area Ha. 0 571

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.36 0.42


cattle
16 No. of SHGs Nos. 79 155
17 Increase in no. of livelihoods "" 4 10

18 Increase in income Rs.(%) 13585 17660


19 Migration % 10 5 15
20 SHG Federations formed " 5 7

21 Credit linkage with banks " 22 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

186
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Moradabad Status of water table Meters 6.00 to 9.00 5.00 to 7.00

2 Ground water structures repaired/ NO - 105


rejuvenated

3 Quality of drinking water Quality poor Good

4 Availability of drinking water Month 345 365

5 Increase in irrigation potential % 0 0

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 14145 15551

8 i Area under single crop Ha 8037 8452

9 ii Area under double crop Ha 5283 6145

10 iii Area under multiple crop Ha 825 954

187
11 Net increase in crop production Ha 0 416
area

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & Ha 159 174


fodder

15 Increase in milk production Av.Lt/day/ 0.4 0.56


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 11714 15228


19 Migration % 10 6
20 SHG Federations formed NOS 4 6

21 Credit linkage with banks NOS 20 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

188
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Rampur Status of water table Meters 6.00.00 to 9.00 5.00 to 6.00

2 Ground water structures repaired/ No. - 104


rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 7445 7830

9 ii Area under double crop Ha 5796 6684

10 iii Area under multiple crop Ha 905 1037

11 Net increase in crop production area Ha 0 385

189
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.38 0.48


cattle
16 No. of SHGs NOS 78 150
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 11389 14805


19 Migration % 9 4 13
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 22 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

190
1 2 3 4 5 6 7
S. Name of Unit of Expected Post-project
No. the District Item measurement Pre-project Status Status Remarks
1 J.P nagar Status of water table Meters 6.00 to 9.00 5.00 to 6.00

2 Ground water structures repaired/ NO - 105


rejuvenated
3 Quality of drinking water Quality poor Good

4 Availability of drinking water Month 320 365

5 Increase in irrigation potential % 0 3

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 14145 15551

8 i Area under single crop Ha 9245 9852

9 ii Area under double crop Ha 4238 4934

10 iii Area under multiple crop Ha 661 766

11 Net increase in crop production area Ha 0 484

12 Increase in area under vegetation Ha 696 739

191
13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.4 0.57


cattle
16 No. of SHGs NOS 81 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 16127 20965


19 Migration % 10 5 15
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 22 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

192
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Meerut Status of water table Meters 6.00.00 to 700. 5.00 to 6.50

2 Ground water structures repaired/ No. - 106


rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9245 9723

9 ii Area under double crop Ha 4238 5045

10 iii Area under multiple crop Ha 661 783

11 Net increase in crop production area Ha 0 478

12 Increase in area under vegetation Ha 696 739

193
13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.4 0.55


cattle
16 No. of SHGs NOS 82 165
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 17341 22543


19 Migration % 9 4 13
20 SHG Federations formed NOS 4 8

21 Credit linkage with banks NOS 24 165

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

194
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Baghpat Status of water table Meters 7.00 to 8.00 6.00 to 7.00

2 Ground water structures repaired/ No. 92


rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 320 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8841 9298

9 ii Area under double crop Ha 4588 5413

10 iii Area under multiple crop Ha 716 840

11 Net increase in crop production area Ha 0 457

12 Increase in area under vegetation Ha 696 739

195
13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.42 0.56


cattle
16 No. of SHGs NOS 76 150
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 16175 21027


19 Migration % 10 6
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 21 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

196
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Gaziabad Status of water table Meters 6.50.00 to 7.50 6.00 to 7.00

2 Ground water structures No. 96


repaired/ rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking Days 325 365


water
5 Increase in irrigation % 3%
potential
6 Change in cropping/ land Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-
use pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural Ha. 14145 15551
crop
8 i Area under single Ha 9010 9475
crop
9 ii Area under double Ha 4442 5260
crop
10 iii Area under multiple Ha 693 816
crop

11 Net increase in crop Ha 0 466


production area

12 Increase in area under Ha 696 739


vegetation
197
13 Increase in area under Ha 1377 1449
horticulture
14 Increase in area under Ha 159 174
fuel & fodder

15 Increase in milk Av.Lt/day/ 0.39 0.44


production cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of NO 2 9
livelihoods
18 Increase in income RS. 17906 23278
19 Migration % 7 3 10
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS


23 160
22 Resource use agreements Agreed 100 % as per required

23 WDF collection & 5 to 10 % - 100 % Collection During


management Project Period
24 Summary of lessons
learnt

198
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Guttam Status of water table Meters 8.00 to9.00 7.00 to8.00
buddha
nagar
2 Ground water structures No. 107
repaired/ rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking Days 330 365


water
5 Increase in irrigation % 5%
potential
6 Change in cropping/ land Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-
use pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural Ha. 14145 15551
crop
8 i Area under single crop Ha 8953 9415

9 ii Area under double Ha 4491 5311


crop
10 iii Area under multiple Ha 701 824
crop

11 Net increase in crop Ha 0 463


production area

199
12 Increase in area under Ha 696 739
vegetation
13 Increase in area under Ha 1377 1449
horticulture
14 Increase in area under fuel Ha 159 174
& fodder

15 Increase in milk production Av.Lt/day/ 0.32 0.39


cattle
16 No. of SHGs NOS 80 162
17 Increase in no. of NO 5 10
livelihoods
18 Increase in income RS. 37889 49268
19 Migration % 9 5 14
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 26 162

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & 5 to 10 % - 100 % Collection During


management Project Period
24 Summary of lessons learnt

200
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Bulandshahr Status of water table Meters 7.00 to8.00 6.00 to 7.50

2 Ground water structures repaired/ No. 102


rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 345 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8272 8700

9 ii Area under double crop Ha 5080 5931

10 iii Area under multiple crop Ha 793 920

11 Net increase in crop production area Ha 0 428

12 Increase in area under vegetation Ha 696 739

201
13 Increase in area under horticulture Ha 1377 1450

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.45 0.54


cattle
16 No. of SHGs NOS 79 165
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 15013 19517


19 Migration % 8 4 12
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 24 165

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

202
1 2 3 4 5 6 7
S. Name of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Aligarh Status of water table Meters 6.50.00 to 8.50 5.0 to 6.0

2 Ground water structures repaired/ No. 103


rejuvenated
3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 300 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8129 8550

9 ii Area under double crop Ha 5204 6061

10 iii Area under multiple crop Ha 812 940

11 Net increase in crop production area Ha 0 420

12 Increase in area under vegetation % 696 739

203
13 Increase in area under horticulture % 1377 1449

14 Increase in area under fuel & fodder % 159 174

15 Increase in milk production Av.Lt/day/ 3.5 4.5


cattle
16 No. of SHGs NOS 78 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 12737 16558


19 Migration % 10 6 16
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 23 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

204
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Hathras Status of water table Meters 7.0. to 9.00 6.00 to 7.50

2 Ground water structures No. 95


repaired/ rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 300 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8731 9183

9 ii Area under double crop Ha 4683 5513

10 iii Area under multiple crop Ha 731 855

11 Net increase in crop production Ha 0 451


area

205
12 Increase in area under vegetation Ha 696 739

13 Increase in area under Ha 1377 1449


horticulture
14 Increase in area under fuel & Ha 159 174
fodder

15 Increase in milk production Av.Lt/day/ 0.44 0.58


cattle
16 No. of SHGs NOS 76 150
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 13848 18002


19 Migration % 10 4
20 SHG Federations formed NOS 4 8

21 Credit linkage with banks NOS 21 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

206
1 2 3 4 5 6 7
Name of
S. the Unit of
No. District Item measurement Pre-project Status Expected Post-project Status Remarks
1 Mathura Status of water table Meters 10.00 to11.00 9.00 to 10.00

2 Ground water structures repaired/ No. 109


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 280 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9688 10189

9 ii Area under double crop Ha 3855 4642

10 iii Area under multiple crop Ha 602 720

207
11 Net increase in crop production Ha 0 501
area

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & Ha 159 174


fodder

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 84 170
17 Increase in no. of livelihoods NO 2 8

18 Increase in income RS. 14884 19349


19 Migration % 11 5
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 27 170

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

208
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Agra Status of water table Meters 9.00 to 10.00 8.00 to 9.0

2 Ground water structures repaired/ No. 106


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9755 10260

9 ii Area under double crop Ha 3797 4581

10 iii Area under multiple crop Ha 593 711

209
11 Net increase in crop production area Ha 0 504

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1450

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.325 0.45


cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 13561 17630


19 Migration % 12 8
20 SHG Federations formed NOS 3 5

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

210
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Firozabad Status of water table Meters 10.00 to11.00 08.00 to 9.00

2 Ground water structures repaired/ No. 98


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 335 365

5 Increase in irrigation potential %


5%
6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-
pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8841 9298

9 ii Area under double crop Ha 4588 5413

10 iii Area under multiple crop Ha 716 840

11 Net increase in crop production area Ha 0 457

211
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.44 0.57


cattle
16 No. of SHGs NOS 71 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 11302 14692


19 Migration % 10 5
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 22 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

212
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Etah Status of water table Meters 9.00 to 10.00 8.0 to 9.500

2 Ground water structures repaired/ No. 108


rejuvenated

3 Quality of drinking water No, Poor good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8621 9066

9 ii Area under double crop Ha 4778 5613

10 iii Area under multiple crop Ha 746 871

213
11 Net increase in crop production area Ha 0 446

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 81 155
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 10105 13136


19 Migration % 12 7
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 24 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

214
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-


No. the District Item measurement Pre-project Status project Status Remarks
1 Mainpuri Status of water table Meters 10.00 to11.00 09.00 to 10.00

2 Ground water structures repaired/ rejuvenated No. 104


3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugar
wheat/Chickpea/gram/pea cane.
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 7144 7513

9 ii Area under double crop Ha 6056 6958

10 iii Area under multiple crop Ha 945 1080

11 Net increase in crop production area Ha 0 369

12 Increase in area under vegetation Ha 696 739

215
13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.47


cattle
16 No. of SHGs NOS 76 160
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 8846 11500


19 Migration % 11 6
20 SHG Federations formed NOS 3 5

21 Credit linkage with banks NOS 21 160

22 Resource use agreements Agreed 100 % as per


required
23 WDF collection & management 5 to 10 % - 100 % Collection
During Project
Period
24 Summary of lessons learnt

216
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 BADAUN Status of water table Meters 10.00 to11.00 9.00 to 10.00

2 Ground water structures repaired/ NO 103


rejuvenated
3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 320 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop 14145 15551

8 i Area under single crop Ha 8368 8800

9 ii Area under double crop Ha 4997 5844

10 iii Area under multiple crop Ha 780 907

11 Net increase in crop production area Ha 0 433

217
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.3 0.45


cattle
16 No. of SHGs NOS 81 165
17 Increase in no. of livelihoods NO 3 10

18 Increase in income Annual 11407 14829


19 Migration % 11 6 17
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 26 165

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

218
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Bareily Status of water table Meters 9.00 to 10.00 8.00 to 9.00

2 Ground water structures repaired/ No. 95


rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 345 350

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8625 9071

9 ii Area under double crop Ha 4775 5610

10 iii Area under multiple crop Ha 745 870

11 Net increase in crop production area Ha 0 446

219
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.39 0.56


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 11922 15499


19 Migration % 10 4
20 SHG Federations formed NOS 4 8

21 Credit linkage with banks NOS 27 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

220
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Pilibhit Status of water table Meter 10.00 to 11.00 9.00 to 10.00

2 Ground water structures repaired/ - 102


rejuvenated
3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop 14145 15551
Ha.

8 i Area under single crop Ha 8420 8855

9 ii Area under double crop Ha 4952 5797

10 iii Area under multiple crop Ha 773 899

11 Net increase in crop production area Ha 0 435

221
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.34 0.45


cattle
16 No. of SHGs 82 165
17 Increase in no. of livelihoods Nos 3 10

18 Increase in income Nos 11357 14764


19 Migration % 12 6
20 SHG Federations formed 5 8

21 Credit linkage with banks 27 165

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

222
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Shahjahanpur Status of water table Meters 10.00 to 11.00 9.00 to 10.00

2 Ground water structures repaired/ 105


rejuvenated
3 Quality of drinking water Poor Normal

4 Availability of drinking water Month 335 365

5 Increase in irrigation potential 4%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop 14145 15551

8 i Area under single crop Ha 8037 8452

9 ii Area under double crop Ha 5283 6145

10 iii Area under multiple crop Ha 825 954

11 Net increase in crop production area Ha 0 416

223
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.5


cattle
16 No. of SHGs Nos 903 165
17 Increase in no. of livelihoods Nos 3 9

18 Increase in income Rs 9793 12731


19 Migration % 10 4
20 SHG Federations formed 3 6

21 Credit linkage with banks 26 165

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

224
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Lakhimpur Status of water table Meters 6.00 to7.0. 5.00 to 6.0

2 Ground water structures repaired/ 0 105


rejuvenated

3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 345 365

5 Increase in irrigation potential Ha 0 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 28290 31102

8 i Area under single crop Ha 19377 20378

9 ii Area under double crop Ha 7710 9283

10 iii Area under multiple crop Ha 1203 1440

225
11 Net increase in crop production area Ha 0 1002

12 Increase in area under vegetation Ha 1391 1478

13 Increase in area under horticulture Ha 2754 2898

14 Increase in area under fuel & fodder Ha 319 348

15 Increase in milk production Av.Lt/day/ 0.36 0.58


cattle
16 No. of SHGs no 80 160
17 Increase in no. of livelihoods no 2

18 Increase in income Rs 9941 12923


19 Migration % 10 4
20 SHG Federations formed No 4 7

21 Credit linkage with banks No 24 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

226
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Sitapur Status of water table Meters 6.00 to7.0. 5.00 to 6.0

2 Ground water structures repaired/ - 3


rejuvenated

3 Quality of drinking water Poor Normal

4 Availability of drinking water Month 340 365

5 Increase in irrigation potential - - 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 7072 7775

8 i Area under single crop Ha 4778 5025

9 ii Area under double crop Ha 1984 2380

10 iii Area under multiple crop Ha 310 369

11 Net increase in crop production area Ha 0 247

227
12 Increase in area under vegetation Ha 348 370

13 Increase in area under horticulture Ha 688 725

14 Increase in area under fuel & fodder Ha 80 87

15 Increase in milk production Av.Lt/day/ 3.5 4.5


cattle
16 No. of SHGs Nos 80 160
17 Increase in no. of livelihoods Nos 3 8

18 Increase in income Rs 8502 11052


19 Migration % 9 5
20 SHG Federations formed - 3 7

21 Credit linkage with banks - 22 160

22 Resource use agreements - Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

228
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Hardoi Status of water table Meters 6.00 to7.0. 5.00 to 6.0
2
Ground water structures repaired/ rejuvenated No.

3 Quality of drinking water No,


4 Coliods Good
Availability of drinking water Days 310 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


7 pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 8841 9298


9
ii Area under double crop " 4588 5413

10 iii Area under multiple crop " 716 840

11 Net increase in crop production area Ha. 0 457


12

229
Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449


14
Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs Nos. 81 160
17 Increase in no. of livelihoods "" 4 10

18 Increase in income Rs.(%) 7997 10397


19 Migration % 10 4
20 SHG Federations formed " 4 6

21 Credit linkage with banks " 21 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

230
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project Remark
No. District Item measurement Pre-project Status Status s
1 Unnao Status of water table Meters 6.00 to7.0. 5.00 to 6.0

2 Ground water structures repaired/ NO 103


rejuvenated
3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 330 360

5 Increase in irrigation potential % 0 0

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 14145 15551

8 i Area under single crop Ha 9067 9536

9 ii Area under double crop Ha 4392 5207

10 iii Area under multiple crop Ha 685 808

11 Net increase in crop production area Ha 0 469

231
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.325 0.49


cattle
16 No. of SHGs NOS 81 160
17 Increase in no. of livelihoods NO 3 12

18 Increase in income RS. 9461 12299


19 Migration % 10 6
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 24 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

232
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Lucknow Status of water table Meters 6.00 to7.0. 5.00 to 6.0

2 Ground water structures repaired/ NO 0 102


rejuvenated

3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 320 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 7072 7775

8 i Area under single crop Ha 4715 4958

9 ii Area under double crop Ha 2039 2438

10 iii Area under multiple crop Ha 318 378

233
11 Net increase in crop production area Ha 0 244

12 Increase in area under vegetation Ha 348 370

13 Increase in area under horticulture Ha 688 725

14 Increase in area under fuel & fodder Ha 80 87

15 Increase in milk production Av.Lt/day/ 0.38 0.57


cattle
16 No. of SHGs NOS 84 160
17 Increase in no. of livelihoods NO 5 2

18 Increase in income Rs 19270 25052


19 Migration % 9 4
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 24 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

234
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Raibareli Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 104


rejuvenated

3 Quality of drinking water No, Poor Good


4
Availability of drinking water Days 310 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9368 9852

9 ii Area under double crop " 4132 4934

10 iii Area under multiple crop " 645 766

235
11 Net increase in crop production area Ha. 0 484

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.36 0.59


cattle
16 No. of SHGs Nos. 81 160
17 Increase in no. of livelihoods "" 4 12

18 Increase in income Rs.(%) 7310 9503


19 Migration % 10 6
20 SHG Federations formed " 3 7

21 Credit linkage with banks " 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

236
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Farrukhabad Status of water table (M) 7.00 to 8.00 6.00 to 7.00

2 Ground water structures repaired/ - - 104


rejuvenated

3 Quality of drinking water Poor Quality Good Quality

4 Availability of drinking water Month 300 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9688 10189

9 ii Area under double crop Ha. 3855 4642

10 iii Area under multiple crop Ha. 602 720

237
11 Net increase in crop production area Ha. 0 501

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.39 0.57


cattle
16 No. of SHGs No 79 160
17 Increase in no. of livelihoods 4 10

18 Increase in income Rs 9249 12023


19 Migration % 10 5
20 SHG Federations formed No 5 8

21 Credit linkage with banks - 25 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

238
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Kannuj Status of water table Meter 7.00 to 8.00 6.00 to 7.00

2 Ground water structures repaired/ rejuvenated No 98

3 Quality of drinking water & Poor Good Quality

4 Availability of drinking water Month 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop & 14145 15551

8 i Area under single crop Ha. 9067 9536

9 ii Area under double crop Ha. 4392 5207

239
10 iii Area under multiple crop Ha. 685 808

11 Net increase in crop production area Ha. 0 469

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.30 0.40


cattle
16 No. of SHGs 21 76 150
17 Increase in no. of livelihoods 2 10

18 Increase in income Rs. 9139 11881


19 Migration % 10 5
20 SHG Federations formed 6 8

21 Credit linkage with banks 19 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

240
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Etawah Status of water table Meters 7.00 to 8.00 6.00 to 7.00

2 Ground water structures repaired/ No. 105


rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea

7 Area under agricultural crop Ha. 14145 15551 7.00 to


8.00
8 i Area under single crop Ha 8521 8962 7.00 to
8.00
9 ii Area under double crop Ha 4865 5704 7.00 to
8.00
10 iii Area under multiple crop Ha 759 885 7.00 to
8.00

11 Net increase in crop production area Ha 0 441

241
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.40 0.59


cattle
16 No. of SHGs NOS 81 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 10002 13003


19 Migration % 11 6
20 SHG Federations formed NOS 3 7

21 Credit linkage with banks NOS 24 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

242
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Auraiya Status of water table Meters 7.00 to 8.00 6.00 to 7.00

2 Ground water structures repaired/ No. 103


rejuvenated
3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 320 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8625 9071

9 ii Area under double crop Ha 4775 5610

10 iii Area under multiple crop Ha 745 870

11 Net increase in crop production area Ha 0 446

12 Increase in area under vegetation Ha 696 739

243
13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 78 150
17 Increase in no. of livelihoods NO 2 10

18 Increase in income RS. 9580 12455


19 Migration % 11 5
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 22 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

244
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Kanpur Status of water table Meters 7.00 to 8.00 6.00 to 7.00
Dehat
2 Ground water structures repaired/ No. 102
rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 300 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9961 10476

9 ii Area under double crop Ha 3619 4393

10 iii Area under multiple crop Ha 565 682

11 Net increase in crop production area Ha 0 515

245
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 77 150
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 9464 12303


19 Migration % 12 6
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 71 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

246
1 2 3 4 5 6 7
Name of
the Unit of Expected Post-project
S. No. District Item measurement Pre-project Status Status Remarks
1 Kanpur Status of water table Meters 7.00 to 8.00 6.00 to 7.00
nagar
2 Ground water structures repaired/ No. 1535
rejuvenated
3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 280 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9823 10331

9 ii Area under double crop Ha 3739 4519

10 iii Area under multiple crop Ha 583 701

11 Net increase in crop production area Ha 0 508

247
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 3.5 4.5


cattle
16 No. of SHGs NOS 76 150
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 16326 21223


19 Migration % 5 2 7
20 SHG Federations formed NOS 3 8

21 Credit linkage with banks NOS 20 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

248
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Fatehpur Status of water table Meters 10.00 to11.00 10.00 to 11.00

2 Ground water structures repaired/ No. 104


rejuvenated
3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 10176 10702

9 ii Area under double crop Ha 3433 4197

10 iii Area under multiple crop Ha 536 651

11 Net increase in crop production area Ha 0 526

249
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.3 0.4


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 7477 9720


19 Migration % 10 4 14
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 18 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

250
1 2 3 4 5 6 7
S. Name of the Item
No. District Unit of Expected Post-project
measurement Pre-project Status Status Remarks
1 Pratapgarh Status of water table Meters 7.00 to 8.00 6.0 to7.0
2
Ground water structures repaired/ No.
rejuvenated

3 Quality of drinking water No, Poor Good


4
Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 10556 11102

9 ii Area under double crop " 3105 3852

10 iii Area under multiple crop " 485 598

251
11 Net increase in crop production area Ha. 0 546

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.39


cattle
16 No. of SHGs Nos. 78 160
17 Increase in no. of livelihoods "" 2 9

18 Increase in income Rs.(%) 5758 7538


19 Migration % 10 6
20 SHG Federations formed " 5 8

21 Credit linkage with banks " 22 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

252
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Kaushambi Status of water table Meters 7.00 to 8.00 6.0 to7.0

2 Ground water structures repaired/ No. 103


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 10757 11314

9 ii Area under double crop Ha 2930 3668

253
10 iii Area under multiple crop Ha 457 569

11 Net increase in crop production area Ha 0 556

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.47


cattle
16 No. of SHGs NOS 78 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 9297 12086


19 Migration % 10 6
20 SHG Federations formed NOS 4 8

21 Credit linkage with banks NOS 27 160

22 Resource use agreements 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

254
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Allahabad Status of water table Meters 7.00 to 8.00 6.0 to7.0

2 Ground water structures repaired/ No. 0 98


rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8841 9298

9 ii Area under double crop Ha 4588 5413

255
10 iii Area under multiple crop Ha 716 840

11 Net increase in crop production area Ha 0 457

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.34 0.39


cattle
16 No. of SHGs NOS 79 155
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 10517 13672


19 Migration % 10 5
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 27 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

256
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Barabanki Status of water table Meters 7.00 to 8.00 6.0 to7.0

2 Ground water structures repaired/ NO 0 104


rejuvenated

3 Quality of drinking water Quality Poor Good

4 Availability of drinking water days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop HA
14145 15551
8 i Area under single crop Ha 7688 8085

257
9 ii Area under double crop Ha 5586 6463

10 iii Area under multiple crop Ha 872 1003

11 Net increase in crop production area Ha 0 397

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 4 11

18 Increase in income Rs 9577 12449


19 Migration % 9 4
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 24 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period

258
24 Summary of lessons learnt

1 2 3 4 5 6 7
S. Name of Item
No. the District Unit of Expected Post-project
measurement Pre-project Status Status Remarks
1 Faizabad Status of water table Meters 7.00 to 8.00 6.0 to7.0
2
Ground water structures repaired/ No. 106
rejuvenated

3 Quality of drinking water No, Good Good


4
Availability of drinking water Days 320 days whole year

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 11503 12646

259
8 i Area under single crop Ha. 7101 7468

9 ii Area under double crop Ha. 3808 4483

10 iii Area under multiple crop Ha. 594 696

11 Net increase in crop production area Ha. 0 367

12 Increase in area under vegetation Ha. 566 601

13 Increase in area under horticulture Ha. 1120 1179

14 Increase in area under fuel & fodder Ha. 130 141

15 Increase in milk production Av.Lt/day/ 0.35 0.5


cattle
16 No. of SHGs Nos. 81 160
17 Increase in no. of livelihoods "" 3 10

18 Increase in income Rs.(%) 7976 10369


19 Migration % 10 6
20 SHG Federations formed " 5 8

21 Credit linkage with banks " 26 160

22 Resource use agreements Agreed 100 % as per required

260
23 WDF collection & management 5 to 10 % - 100 % Collection During
Project Period
24 Summary of lessons learnt

261
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Ambedkar Status of water table Meters 7.00 to 8.00 6.0 to7.0
Nagar
2 Ground water structures repaired/ No. 99
rejuvenated

3 Quality of drinking water No, Coloids Good

4 Availability of drinking water Days 310 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8321 8751

9 ii Area under double crop Ha 5038 5887

10 iii Area under multiple crop Ha 786 913

262
11 Net increase in crop production area Ha 0 430

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of livelihoods NO 4 7

18 Increase in income RS. 7208 9370


19 Migration % 10 5 15
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

263
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Sultanpur Status of water table Meters 7.00 to 8.00 6.0 to7.0

2 Ground water structures repaired/ No. 104


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 320 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9126 9598

9 ii Area under double crop Ha 4342 5154

10 iii Area under multiple crop Ha 678 800

264
11 Net increase in crop production area Ha 0 472

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.42


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 10

18 Increase in income RS. 8003 10403


19 Migration % 10 4
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

265
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Bahraich Status of water table Meters 7.50 7

2 Ground water structures No. 106


repaired/ rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 21216 21800

8 i Area under single crop Ha 14851 13800

9 ii Area under double crop Ha 5361 6500

10 iii Area under multiple crop Ha 1004 1500

266
11 Net increase in crop production Ha 0 584
area

12 Increase in area under Ha 307 612


vegetation
13 Increase in area under Ha 25 32
horticulture
14 Increase in area under fuel & Ha 82 107
fodder

15 Increase in milk production Av.Lt/day/ 0.37 0.42


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 6404 8325


19 Migration % 0 0
20 SHG Federations formed NOS 0 1

21 Credit linkage with banks NOS 0 34

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

267
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Srawasti Status of water table Meters 3.00 to 4.00 2.50 to 3.50

2 Ground water structures repaired/ No. 95


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9961 10476

9 ii Area under double crop Ha 3619 4393

10 iii Area under multiple crop Ha 565 682

268
11 Net increase in crop production area Ha 0 515

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.34 0.42


cattle
16 No. of SHGs NOS 78 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 4570 5941


19 Migration % 10 5
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 25 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

269
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Balrampur Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ NO 102


rejuvenated

3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 340 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop 14145 15551

8 i Area under single crop Ha 9622 10120

9 ii Area under double crop Ha 3912 4702

10 iii Area under multiple crop Ha 611 730

11 Net increase in crop production area Ha 0 497

270
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.3 0.45


cattle
16 No. of SHGs NOS 78 160
17 Increase in no. of livelihoods NO 3 10

18 Increase in income RS. 7330 9529


19 Migration % 10 4 14
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 27 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

271
1 2 3 4 5 6 7
S. Name Item
No. of the Unit of Expected Post-project
District measurement Pre-project Status Status Remarks
1 Gonda Status of water table Meters 5.00 to 6.00 4.00 to 5.00
2
Ground water structures repaired/ No. 104
rejuvenated

3 Quality of drinking water No, Poor Good


4
Availability of drinking water Days 345 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9368 9852

9 ii Area under double crop " 4132 4934

10 iii Area under multiple crop " 645 766

272
11 Net increase in crop production area Ha. 0 484

12 Increase in area under vegetation % 696 739

13 Increase in area under horticulture % 1377 1449

14 Increase in area under fuel & fodder % 159 174

15 Increase in milk production Av.Lt/day/ 0.30 0.45


cattle
16 No. of SHGs Nos. 77 155
17 Increase in no. of livelihoods "" 3 10

18 Increase in income RS. 6754 8780


19 Migration % 10 4
20 SHG Federations formed " 3 7

21 Credit linkage with banks " 26 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

273
1 2 3 4 5 6 7
Name of the
S. District Unit of Expected Post-project
No. Item measurement Pre-project Status Status Remarks
1 Siddarthnagar Status of water table M. 5.00 to 6.00 4.00 to 5.00
2
Ground water structures repaired/ -
rejuvenated
3 Quality of drinking water - Poor Pure Water
4
Availability of drinking water days 330 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 8420 8855

9 ii Area under double crop Ha. 4952 5797

10 iii Area under multiple crop Ha. 773 899

11 Net increase in crop production area Ha. 0 435

274
12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.36 0.45


cattle
16 No. of SHGs Nos. 75 150
17 Increase in no. of livelihoods "" 3 10

18 Increase in income Rs. 6458 8408


19 Migration % 10 5 15
20 SHG Federations formed " 4 7

21 Credit linkage with banks " 24 150

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

275
1 2 3 4 5 6 7
Name
of the Unit of Expected Post-project
S. No. District Item measurement Pre-project Status Status Remarks
1 Basti Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 105


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9755 10260

9 ii Area under double crop Ha 3797 4581

10 iii Area under multiple crop Ha 593 711

276
11 Net increase in crop production area Ha 0 504

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.49


cattle
16 No. of SHGs NOS 82 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 6654 8651


19 Migration % 11 6
20 SHG Federations formed NOS 3 7

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

277
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Status of water table Meters 5.00 to 6.00 4.00 to 5.00
2
Ground water structures repaired/ No. 95
Sant rejuvenated
Kabir
Nagar
3 Quality of drinking water No, Smelly&oiley water Pure water
4
Availability of drinking water Days 340 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 7072 7775

8 i Area under single crop Ha. 4136 4349

9 ii Area under double crop " 2540 2965

10 iii Area under multiple crop " 396 460

278
11 Net increase in crop production Ha. 0 214
area

12 Increase in area under vegetation Ha. 348 370

13 Increase in area under horticulture Ha. 688 725

14 Increase in area under fuel & Ha. 80 87


fodder

15 Increase in milk production Av.Lt/day/ 0.34 0.45


cattle
16 No. of SHGs Nos. 78 155
17 Increase in no. of livelihoods "" 10

18 Increase in income RS. 6305 8197


19 Migration % 11 6
20 SHG Federations formed " 5 7

21 Credit linkage with banks " 27 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

279
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Maharajganj Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures No. 103


repaired/ rejuvenated

3 Quality of drinking water No, Smelly &oily water Good

4 Availability of drinking water Days 345 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 7772 8174

9 ii Area under double crop Ha 5513 6386

10 iii Area under multiple crop Ha 860 991

280
11 Net increase in crop production Ha 0 402
area

12 Increase in area under Ha 696 739


vegetation
13 Increase in area under Ha 1377 1449
horticulture
14 Increase in area under fuel & Ha 159 174
fodder

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 78 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 6267 8186


19 Migration % 10 4 14
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 27 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

281
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Gorakhpur Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 105


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 9306 9787

9 ii Area under double crop Ha 4186 4990

10 iii Area under multiple crop Ha 653 774

282
11 Net increase in crop production area Ha 0 481

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.5


cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 8579 11152


19 Migration % 8 3 11
20 SHG Federations formed NOS 3 6

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

283
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Status of water table Meters 5.00 to 6.00 4.00 to 5.00
2
Ground water structures repaired/ No. 1900
rejuvenated

Kushinagar
3 Quality of drinking water No, Smelly and oiley water Pure water
4
Availability of drinking water Days 340 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9306 9787

9 ii Area under double crop Ha. 4186 4990

10 iii Area under multiple crop Ha. 653 774

284
11 Net increase in crop production area Ha. 0 481

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.55


cattle
16 No. of SHGs 78 155
17 Increase in no. of livelihoods 4 10

18 Increase in income Rs. 6191 8048


19 Migration % 10 5 15
20 SHG Federations formed " 4 5

21 Credit linkage with banks " 27 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

285
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Deoria Status of water table Meters 5.00 to 6.00 4.00 to 5.00
2
Ground water structures repaired/ No. 102
rejuvenated

3 Quality of drinking water No, Smelly & oily water Pure water
4
Availability of drinking water Days 340 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9010 9071

9 ii Area under double crop Ha. 4442 5610

10 iii Area under multiple crop Ha. 693 870

286
11 Net increase in crop production area Ha. 0 446

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1449

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs Nos. 77 155
17 Increase in no. of livelihoods "" 4 10

18 Increase in income Rs. 5785 7520


19 Migration % 10 4 14
20 SHG Federations formed " 5 8

21 Credit linkage with banks " 26 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

287
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Azamgarh Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 104


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8321 8751

9 ii Area under double crop Ha 5038 5887

10 iii Area under multiple crop Ha 786 913

288
11 Net increase in crop production area Ha 0 430

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 3.5 5


cattle
16 No. of SHGs NOS 80 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income RS. 6757 8784


19 Migration % 10 4 14
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 25 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

289
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Mau Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ NO 103


rejuvenated

3 Quality of drinking water Quality Poor Good

4 Availability of drinking water Month 330 365

5 Increase in irrigation potential % - 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop 14145 15551

8 i Area under single crop Ha 8470 8908

9 ii Area under double crop Ha 4909 5751

10 iii Area under multiple crop Ha 766 892

290
11 Net increase in crop production area Ha 0 438

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.55


cattle
16 No. of SHGs NOS 78 155
17 Increase in no. of livelihoods NO 3 11

18 Increase in income RS. 8478 11021


19 Migration % 10 6 16
20 SHG Federations formed NOS 5 8

21 Credit linkage with banks NOS 24 155

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

291
1 2 3 4 5 6 7
Name
S. of the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Ballia Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 103


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 340 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha 8841 9298

9 ii Area under double crop Ha 4588 5413

10 iii Area under multiple crop Ha 716 840

292
11 Net increase in crop production area Ha 0 457

12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.25 0.4


cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of livelihoods NO 2 10

18 Increase in income RS. 6749 8774


19 Migration % 10 5 15
20 SHG Federations formed NOS 5 7

21 Credit linkage with banks NOS 28 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

293
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Jaunpur Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ NO 104


rejuvenated
3 Quality of drinking water Poor Good

4 Availability of drinking water days 320 365

5 Increase in irrigation potential & 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha 14145 15551

8 i Area under single crop Ha 8625 9071

9 ii Area under double crop Ha 4775 5610

10 iii Area under multiple crop Ha 745 870

11 Net increase in crop production area Ha 0 446

294
12 Increase in area under vegetation Ha 696 739

13 Increase in area under horticulture Ha 1377 1449

14 Increase in area under fuel & fodder Ha 159 174

15 Increase in milk production Av.Lt/day/ 0.35 0.5


cattle
16 No. of SHGs NO 80 160
17 Increase in no. of livelihoods NO 4 10

18 Increase in income Rs 6100 7929


19 Migration % 10 5 15
20 SHG Federations formed NO 4 7

21 Credit linkage with banks NO 27 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

295
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Gazipur Status of water table Meter 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No 87


rejuvenated

3 Quality of drinking water Poor General

4 Availability of drinking water 350 365

5 Increase in irrigation potential % 5%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop & 14145 15551

8 i Area under single crop Ha. 8573 9016

9 ii Area under double crop Ha. 4820 5657

10 iii Area under multiple crop Ha. 752 878

11 Net increase in crop production area Ha. 0 443

296
12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1450

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.37 0.52


cattle
16 No. of SHGs No 79 160
17 Increase in no. of livelihoods No 4 10

18 Increase in income Rs. 6824 8871

19 Migration % 9 4 13

20 SHG Federations formed 3 6

21 Credit linkage with banks 25 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

297
1 2 3 4 5 6 7

S. Name of the Unit of Expected Post-project


No. District Item measurement Pre-project Status Status Remarks
1 Chandauli Status of water table Meters 5.00 to 6.00 4.00 to 5.00

2 Ground water structures repaired/ No. 0 104


rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 320 305

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 4000 4050

8 i Area under single crop Ha 2800 2430

9 ii Area under double crop Ha 1000 1400

10 iii Area under multiple crop Ha 200 220

298
11 Net increase in crop production Ha 0 50
area

12 Increase in area under vegetation Ha 0 10.00

13 Increase in area under horticulture Ha 0 2.50

14 Increase in area under fuel & Ha 0 2.50


fodder

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 0 20
17 Increase in no. of livelihoods NO 2 8

18 Increase in income RS. 9406 12228


19 Migration % 9 4 13
20 SHG Federations formed NOS 1

21 Credit linkage with banks NOS 22 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

299
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Varanasi Status of water table Meter 6.50 6

2 Ground water structures repaired/ No 105 105


rejuvenated

3 Quality of drinking water - Poor will be improve

4 Availability of drinking water Month 11 12

5 Increase in irrigation potential - 0 4%

6 Change in cropping/ land use Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop - 18519 19000

8 i Area under single crop Ha. 12963 12250

9 ii Area under double crop Ha. 4631 5700

10 iii Area under multiple crop Ha. 925 1050

300
11 Net increase in crop production Ha. 0 481
area

12 Increase in area under vegetation Ha. 0 239

13 Increase in area under horticulture Ha. 45 50

14 Increase in area under fuel & Ha. 59 125


fodder

15 Increase in milk production Av.Lt/day/ 0.37 0.52


cattle
16 No. of SHGs - 20 160
17 Increase in no. of livelihoods - 2 8

18 Increase in income RS. 9913 12886


19 Migration % 10 6 16
20 SHG Federations formed - 0 1

21 Credit linkage with banks No 0 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

301
1 2 3 4 5 6 7
Name of
S. the Unit of Expected Post-project
No. District Item measurement Pre-project Status Status Remarks
1 Sant Status of water table Meters 5.00 to 6.00 4.00 to 5.00
Ravidas
Nagar
2 Ground water structures repaired/ No. 103
rejuvenated

3 Quality of drinking water No, Poor Good

4 Availability of drinking water Days 320 365

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 7072 7775

8 i Area under single crop Ha 5016 5275

9 ii Area under double crop Ha 1779 2164

10 iii Area under multiple crop Ha 278 336

302
11 Net increase in crop production area Ha 0 259

12 Increase in area under vegetation Ha 348 370

13 Increase in area under horticulture Ha 688 725

14 Increase in area under fuel & fodder Ha 80 87

15 Increase in milk production Av.Lt/day/ 0.35 0.45


cattle
16 No. of SHGs NOS 79 160
17 Increase in no. of livelihoods NO 2 10

18 Increase in income RS. 9121 11857


19 Migration % 10 5 15
20 SHG Federations formed NOS 4 7

21 Credit linkage with banks NOS 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

303
1 2 3 4 5 6 7

S. Name of Unit of Expected Post-project


No. the District Item measurement Pre-project Status Status Remarks
1 Mirzapur Status of water table Meters 4.00 to 5.00 3.0 to4.00

2 Ground water structures repaired/ No. 103


rejuvenated

3 Quality of drinking water No, Coliods Good

4 Availability of drinking water Days 280 330

5 Increase in irrigation potential % 3%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 14145 15551

8 i Area under single crop Ha. 9557 10052

9 ii Area under double crop " 3968 4761

10 iii Area under multiple crop " 619 739

304
11 Net increase in crop production area Ha. 0 494

12 Increase in area under vegetation Ha. 696 739

13 Increase in area under horticulture Ha. 1377 1450

14 Increase in area under fuel & fodder Ha. 159 174

15 Increase in milk production Av.Lt/day/ 0.3 0.4


cattle
16 No. of SHGs Nos. 78 160
17 Increase in no. of livelihoods "" 2 10

18 Increase in income RS. 7748 10073


19 Migration % 11 6 17
20 SHG Federations formed " 5 8

21 Credit linkage with banks " 26 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

305
1 2 3 4 5 6 7
S. Name of the Item Unit of Pre-project Status Expected Post-project Remarks
No. District measurement Status

1 Sonbhadra Status of water table Meters 7.00 to 8.0 6.00 to 7.0

2 Ground water structures repaired/ No. 104


rejuvenated
3 Quality of drinking water No, Coliods Good
4
Availability of drinking water Days 280 365

5 Increase in irrigation potential % 4%

6 Change in cropping/ land use pattern Cropping Rice/urd/mung/Til/Groundnut- Rice/Urd-


pattern Jowar/Mustard/wheat, Arhar- wheat/Lentil/Sugarcane.
wheat/Chickpea/gram/pea
7 Area under agricultural crop Ha. 9713 10678

8 i Area under single crop Ha. 7833 8238

9 ii Area under double crop Ha. 1626 2113

10 iii Area under multiple crop Ha. 254 328

11 Net increase in crop production area Ha. 0 405

306
12 Increase in area under vegetation Ha. 478 508

13 Increase in area under horticulture Ha. 945 995

14 Increase in area under fuel & fodder Ha. 109 119

15 Increase in milk production Av.Lt/day/ 0.3 0.4


cattle
16 No. of SHGs Nos. 79 160
17 Increase in no. of livelihoods "" 2 10

18 Increase in income Rs. 22472 29214


19 Migration % 11 5 16
20 SHG Federations formed " 3 6

21 Credit linkage with banks " 28 160

22 Resource use agreements Agreed 100 % as per required

23 WDF collection & management 5 to 10 % - 100 % Collection During


Project Period
24 Summary of lessons learnt

307
APPENDIX – I
mRrj izns’k ‘kklu
Hkwfe fodkl ,oa ty lalk/ku vuqHkkx&3
la[;k&126@54&3&2009@1¼lekns’k½@2008
y[kuÅ fnukad 25 Qjojh] 2009
dk;kZy; Kki
lfpo] Hkkjr ljdkj] xzkeh.k fodkl ea=ky;] Hkwfe lalk/ku foHkkx ds
v0’kk0i0la0&tsM&11011@7@2008&ih0ih0lh0 fn0 09-04-2008 ds lanHkZ esa jk”Vªh; o”kkZ flafpr {ks=
izkf/kdj.k ¼,uvkj,,½ d`f”k ea=ky; Hkkjr ljdkj }kjk okVj ‘ksM fodkl ifj;kstukvksa ds fy, leku ekxZn’khZ fl)kUr 2008
ds iSjk 24 o 25 esa dh x;h O;oLFkk ds dze esa Jh jkT;iky egksn; izns’k Lrj ij LVsV ysfoy uksMy ,tsUlh
¼,l0,y0,u0,0½ dk fuEuor~ xBu dh lg”kZ Lohd`fr iznku djrs gS %&
1 d`f”k mRiknu vk;qDr@vij eq[; lfpo v/;{k
2 lfpo@izeq[k lfpo] Hkwfe fodkl ,oa ty lalk/ku lnL; lfpo
3 fo'ks”k lfpo] Hkwfe fodkl ,oa ty llak/ku foHkkx vFkok vkbZ0,0,l0@ih0lh0,l0lsok ds eq[; dk;Zdkjh
fo’ks”k lfpo Lrj dk vf/kdkjh vf/kdkjh
4 lfpo@izeq[k lfpo] d`f”k lnL;
5 lfpo@izeq[k lfpo] xzkE; fodkl lnL;
6 lfpo@izeq[k lfpo] ou lnL;
7 lfpo@izeq[k lfpo] i'kqikyu lnL;
8 lfpo@izeq[k lfpo] n`X/k fodkl lnL;
9 lfpo@izeq[k lfpo] iapk;rhjkt lnL;
10 lfpo@izeq[k lfpo] m?kku lnL;
11 lfpo@izeq[k lfpo] y?kq flapkbZ ,oa xzkeh.k vfHk;a=.k lsok lnL;
12 funs'kd] HkwxHkZ ty foHkkx] m0iz0 lnL;
13 jk"Vªh; o”kkZ flafpr {ks= izkf/kdj.k¼,u0vkj0,0,0½ ds izfrfuf/k lnL;
308
14 dsUnzh; uksMy ea=ky; ds izfrfuf/k lnL;
15 jk"Vªh; d`f”k vkSj xzkeh.k fodkl cSad ¼ukckMZ½ ds izfrfuf/k lnL;
16 izksQslj ,oa gsM QkjsLVªh fMikMZesUV] pUnz’ks[kj vktkn d`f”k ,oa izkS?kksfxdh lnL;
fo’ofo/kky;] dkuiqj
17 la;qDr funs’kd] nhun;ky mik/;k;] jkT; xzkE; fodkl laLFkku] cD’kh dk rkykc] y[kuÅ lnL;
18 izfrf"Br Loa; lsoh laxBu ¼,uthvks½ ds izfrfuf/k lnL;
19 jk"Vªh; xzkeh.k jkstxkj xkjaVh vf/kfu;e ¼,u0vkj0bZ0th0,0½ ds izfrfuf/k lnL;
20 fiNMk {ks= vuqnku fuf/k ¼ch0vkj0th0,Q0½ ds izfrfuf/k lnL;
2& LVsV ysfoy uksMy ,tsUlh ¼,l0,y0,u0,0½ ds eq[; dk;Z fuEu izdkj gksaxs&
¼1½ Cykd rFkk ftyk Lrj ij rS;kj dh x;h ;kstukvksa ds vk/kkj ij jkT; ds fy;s okVj’ksM fodkl dh lan’khZ rFkk dk;Z
fufrd ;kstuk rS;kj djuk vkSj dk;kZU;o;u lEcU/kh dk;Z uhfr rFkk izR;kf’kr miyfC/k;ksa@ifj.kkeksa] foRrh;
ifjO;;ksa dks lwfpr djuk rFkk ewY;kadu vkSj Lohd`fr ds fy, foHkkx esa dsUnz Lrjh; uksMy ,tsUlh ls lEidZ
djukA
¼2½ jkT;ksa dks Lohd`r fuf/k;ksa ls jkT; Lrjh; vkdaMk izdks”B LFkkfir djuk rFkk bldk j[k&j[kko djuk vkSj jk”Vª
Lrjh; vkWdMk dsUnz ds lkFk bls vkWu ykbu tksMukA
¼3½ iwjs jkT; esa ftyk okVj’ksM fodkl bdkbZ;ksa¼Mh0MCyw0Mh0;w0½ dks rduhdh lgk;rk miyC/k djkukA
¼4½ jkT; ds Hkhrj fofHkUUk Hkkxhnkjksa ds {kerk fuekZ.k ds fy, Loar= laLFkkvksa dh ,d lwph vuqeksfnr
djuk vkSj ,u0vkj0,0,0@uksMy ea=ky; ds ijke’kZ ls lexz {kerk fuekZ.k laca/kh dk;Zuhfr rS;kj djukA
¼5½ leqfpr fo”k;fu”B p;u ekun.Mksa rFkk ikjn’khZ iz.kkfy;ksa dks viukdj Mh0MCyw0Mh0;w0@ftyk Lrjh; lfefr
}kjk vfHkKkr@p;fur ifj;kstuk dk;kZUOk;u ,tsafl;ksa dks vuqeksfnr djukA
¼6½ fofHkUu Lrjksa ¼vkarfjd ,oa okg~;½@Loar= iz.kkfy;ksa½ ij fuxjkuh] ewY;kadu rFkk KkuktZu
iz.kkfy;kW LFkkfir djukA
¼7½ dsUnz Lrjh; uksMy ,tsalh ds lg;ksx ls jkT; esa okV’ksM ifj;kstukvksa dh fu;fer rFkk xq.koRrkiw.kZ vkWu
ykbu ekWuhVfjax lqfuf’pr djuk rFkk Lora= ,oa l{ke ,tsafl;ksa ds lkFk lk>snkjh fodflr djds lwpuk izkIr djukA
¼8½ jkT; ds Hkhrj lHkh okVj’ksM ifj;kstukvksa ds fy, Lora= laLFkkxr ewY;kadudrkZ dh ,d lwph ¼iSuy½ rS;kj
djuk] bl lwph dks dsUnz Lrj ij lacaf/kr uksMy ,tsfla;ksa ls fof/kor~ :i ls vuqeksfnr djokuk RkFkk ;g lqfuf’pr
309
djuk fd xq.koRrkiw.kZ ewY;kadu dk dk;Z fu;fer vk/kkj ij fd;k tkrk gSA
¼9½ uksMy ea=ky;@,u0vkj0,0,0 ds lkFk leUo; ls jkT; fof’k”V izfdz;k ekxZn’khZ fl)kUr] izks?kksfxdh eSuqvy
vkfn rS;kj djuk rFkk bUgsa ykxw djukA
¼10½ vU; lEcfU/kr dk;ZA
3& izns’k ds lHkh foHkkx tks okVj ‘ksM ij vk/kkfjr ifj;kstuk;sa fdz;kfUor dj jgs gSa] os LVsV ysfoy uksMy
,tsUlh ¼,l0,y0,u0,0½ }kjk fu/kkZfjr dk;Zuhfr@ekudksa ,oa ijke’kZ vuqlkj dk;Z djrs jgsaxsA
4& bl lEcU/k esa Hkwfe fodkl ,oa ty lalk/ku vuqHkkx&1] m0iz0’kklu }kjk iwoZ esa fuxZr dk;kZy; Kki
la[;k&315@54&1&2008@1¼9½@2008 fnukad 01 ebZ] 2008 fujLr fd;k tkrk gSA

vrqy dqekj xqIrk


eq[; lfpo
la[;k & 126@54&3&2009@1¼lekns’k½@2008 rn~fnukadA
izfrfyfi&fuEufyf[kr dks lwpukFkZ izsf”kr &
1- lfpo] Hkkjr ljdkj] xzkeh.k fodkl ea=ky;] Hkwfe lalk/ku foHkkx] d`f”k Hkou] ubZ fnYyhA
2- LVkQ vkQhlj] eq[; lfpo] m0iz0’kkluA
3- LVkQ vkQhlj] d`f”k mRiknu vk;qDr] m0iz0’kkluA
4- lfpo@izeq[k lfpo] d`f”k] xzkE; fodkl] ou] i'kqikyu] nqX/k fodkl] iapk;rhjkt] m?kku rFkk y?kq flapkbZ ,oa
xzkeh.k vfHk;a=.k lsokA
5- leLr e.Myk;qDr] m0iz0A
6- leLr ftykf/kdkjh] m0iz0A
7- vk;qDr ,oa iz’kkld] ‘kkjnk lgk;d@jkexaxk lekns’k y[kuÅ@dkuiqjA
8- funs’kd] HkwxHkZ ty foHkkx] m0iz0] bUnzkHkou] y[kuÅA
9- eq[; dk;Zdkjh vf/kdkjh] jk”Vªh; o”kkZ flafpr {ks= izkf/kdj.k ¼,uvkj,½ Hkkjr ljdkj ] ,u0,0,l0lh0 dkEiysDl]
nso izdk’k ‘kkL=h ekxZ] iwlk] ubZ fnYyh&110012
10- eq[; egkizcU/kd] jk”Vªh; d`f”k vkSj xzkeh.k fodkl cSad xkserh uxj] y[kuÅA
11- mi dqyifr] pUnz’ks[kj vktkn d`f”k ,oa izkS?kksfxdh fo’ofo?kky;] dkuiqjA
310
12- egkfuns’kd] nhun;ky mik/;k;] jkT; xzkE; fodkl laLFkku] cD’kh dk rkykc] y[kuÅA

vrqy dqekj xqIrk


eq[; lfpo

311

You might also like