Code: CMGCOY3
Lecturer: Ms Z Matsane
17 August 2020
The change order
process
Changes in the
Changes and Claims • Time extension
construction project • Documentation changes
• Implementation of change
orders
presentation….
At the end
Discuss the schedule of values, its contents, and its
of this Discuss preparation
lecture
(Progress Discuss Discuss the uses of cash flow projections
Payments):
Discuss progress payment procedure and
Discuss compilation of the progress payment
1. Changes and
Claims
Changes in the
Construction Project
• Occur in every construction project
• Small (e.g., clarifications) or large
• Normal part of the process
• Owner, architect, and contractor
• Must be aware and equipped
• Field personnel
• Must understand
• Must be able to assess each situation
Changes in the Construction
Project (cont’d.)
• Can be made at no cost
• With no change in duration
• Example: clarifications
• Can result in greater or lesser costs
• Require addition or reduction in time
• Example: change orders
Changes in the Construction
Project (cont’d.)
• Reasons for changes:
• Owner-directed change of scope
• Constructive or consequential change
• Differing site conditions
• Jobsite discovery of hazardous materials
• Code revisions
• Vendor coordination or product substitution
• Change orders
FIGURE 16–1 Hazardous Material Clause, General Conditions of the
Contract
Change Orders
Contract clauses
Contracts
Project Cash Flow Projections