Professional Documents
Culture Documents
1. General .............................................................................................................................................1
2. Main function...................................................................................................................................3
3. Control principle ..............................................................................................................................8
4. Technique index .............................................................................................................................10
5. Frame and panel definition ............................................................................................................13
5.1 Trunk configuration ..............................................................................................................13
5.2 Main inserted pieces..............................................................................................................13
5.3 Panel definition and illumination..........................................................................................14
5.4 Keystroke definition..............................................................................................................15
5.5 Display lamp illumination.....................................................................................................15
6.Man-machine operation ...............................................................................................................17
6.1 Main page layout illumination ..............................................................................................17
6.2 LCD main menu tree frame illumination..............................................................................17
6.3 Main Menu instruction..........................................................................................................18
6.4 Run Monitor instruction........................................................................................................19
6.5 Set Point instruction ..............................................................................................................19
6.6 Parameter Set Instruction ......................................................................................................21
6.7 Event Record Instruction ......................................................................................................24
6.8 Manual Print introduction .....................................................................................................25
6.9 Other Function introduction..................................................................................................26
7. Instruction of backboard terminals connection and installation ....................................................30
7.1 Power board terminals instruction ........................................................................................32
7.2 TA board terminals instruction..............................................................................................32
7.3 TV board terminals instruction .............................................................................................32
7.4 CPU board terminals instruction...........................................................................................33
7.5 EDI heavy current input board terminals instruction............................................................35
7.6 Output board terminals instruction .......................................................................................35
8. Debug and dispose of abnormity ...................................................................................................38
9. Commissioning instructions and notices........................................................................................40
10. Storage and maintain....................................................................................................................40
11. Whole set supplied .......................................................................................................................40
Appendix 1: Set point table................................................................................................................41
Appendix 2: Parameter list.................................................................................................................46
Appendix 3: Back up scheme instruction ..........................................................................................49
(V1.42)
2011.03.
The company reserves the right to change products, the specification is subject to change without
notification,the device shall prevail. For details, please call the company or the local agents.
我们致力推动世界电力技术的科技进步!
---------------------------2-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2. Main function
The main function of SID-409 as follows:
Reserve supply auto put in function
Normal manual switch function
Protection function
Reserve supply auto put in fault lock function
Event record function
Transferring record wave function
Communication, print, GPS adjusting time function
---------------------------3-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
caused by putting in backup supply to ensure the success of backup switch, so SID-3YL Inrush
Suppressor is needed when the transformer backup switch is cold backup.
2.1.2 Backup switch control logic
The reserve supply switch process concludes: charging, operation and affirm reset.
The charging:
When incomer and bus voltage and every breaker state are at normal condition, the charging
begins. The “Auto switch “lamp on the panel begins to wink, and after ten seconds the lamp
constant bright, it indicates that the Reserve auto-transfer enter operation and monitor state.
The operation process:
Under monitoring state, if the reserve supply has voltage and no blocking signal, then the
following conditions happen:
1) Bus voltage lower than no-voltage set-point, and the last time exceed the no-voltage starting
time.
2) The work power switch turn to open and remain mis-trip starting time.
If any conditions is satisfied, and the working line has no current (to avoid mis-trip when the bus
TV line-break, use line current as the lock criterion of bus no-voltage), it will trip off the work
power switch. The device will close the reserve supply switch and input the reserve supply when
the bus no-voltage test condition is satisfied and the delay set-point is maturated. After transfer, no
matter success or fail, the device enters the state of affirm reset.
The affirm reset process:
Under the affirm reset state, the device stores the record wave dates. It may not enter charging
state to ready for next transfer until delay 10s and remote or local reset operation is received. If the
operation succeeded, the device reset automatically after 10s.
---------------------------4-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
4) The manual switch function can be select, and the switch mode can be set according to
different needs.
Through setting the manual switch set-point, the device can realize flexible configuration of
manual switch function in a variety of occasions, the set options as follows:
[Exit] --- Exit manual switch function.
[Series] --- Check bus, backup supply with voltage, trip work (backup) switch first, and then
close backup (work) switch.
[Auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel synchronizing
condition is satisfied, close backup switch first, then trip work switch.
[Semi-auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel
synchronizing condition is satisfied, close backup switch. Work switch is operated manually.
[Parallel & Series] --- Detect the parallel synchronization conditions as the [Auto Parallel] logic,
if the synchronization conditions can not satisfied in the detect delay then choose [Series Switch].
2.2.2 Manual switch control logic
Under normal running condition, the device can realize the transfer function between work
supply and reserve supply through external manual switch (pulse) signal or remote switch order.
Normal manual switch has “test synchronization” function.
When the breaker state is satisfied for manual switch condition, the “manual switch” lamp
normal bright, and the Reserve auto-transfer device enter the manual switch operation and monitor
state. Under this state, if local or remote manual switch signal is gathered, working breaker will
transfer with backup breaker automatically. If the operation fails, the device enter waiting affirm
reset state. It may not enter charging state to ready for next transfer until delay 10s and remote or
local reset operation is received. If the operation succeeded, the device reset automatically after 10s.
---------------------------5-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
When the bus linkage over-current protection segment 2 function is put in, and the bus linkage
current larger than segment 2 set-point, bus breaker will tripped after time set-point delayed.
2.3.3Bus linkage haste protection
When bus breaker changes from open to closed, the device opens haste protection for 5 seconds.
During the period if haste protection function is put in, bus linkage current is larger than current set
point, the bus breaker tripped after set time delayed.
2.3.4 No-voltage alarm protection
When no-voltage alarm protection of every incomer and bus is put in and the voltage is lower
than each no-voltage alarm voltage set-point, the general alarm signal is port-out after no-voltage
alarm set time delayed.
2.3.5 Incomer TV disconnection alarm
Each incomer TV secondary disconnection protection soft switch put in and incomer voltage
lower than 70%Un and incomer breaker is at closed, after ten seconds delayed, alarm signal send by
protection and device TV disconnection alarm signal is sent out.
2.3.6 Bus TV disconnection alarm
Bus TV disconnection protection soft switch put in, single phase or three-phase voltages lower
than 70%Un, after ten seconds delayed, alarm signal sent by protection and device TV disconnection
alarm signal is sent out.
---------------------------6-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
total twice. The device storage is up to 12 groups of record data. The contents include bus voltage,
bus current, incomer voltage, incomer current and all digital input information e.g.. The wave
recording event index can be looked over in “wave recording event”, the waveform, record data can
be transmitted to background computer for analyzing.
---------------------------7-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
3. Control principle
In the backup switching process, before closing the breaker, to avoid the high residual voltage
causing large surge current when closing, it will damage the device or make the backup switch and
normal switch fail, so in occasion that the reliability requirement is very strict but speed
requirements isn’t that high, we can use bus un-voltage detection to ensure the success of backup
switch or normal series switch. Un-voltage switch means after tripping the work supply switch,
check bus voltage, until the three line voltages of bus are all lower than voltage set-point of bus
un-volt. switch, and after the time set-point of un-volt. switch, closing the backup supply switch is
allowable, the software flow of backup switch control logic is shown in figure 1.
Normal manual switch is mainly used in work supply and backup supply switching for each other
when normal operating, such as overhaul, test etc. Therefore, in occasion of high requirement of
continuity and reliability about supply and allow short time loop closing, we can select Parallel
Auto / Semi-auto mode, while if loop closing is not allowed, we must select series mode. Normal
manual switch logic is shown in figure 2.
A
Fill the auto-switch Reset the charge timer,
N
charge condition? auto-switch lamp dark
Report trip failed
Trip succeed? N
Y incident
Y
Charge 10s timer The auto-switch lamp
N Switch longest delay Report overtime
come? glitter when charging Y
time come? incident
Y
N
Charge complete, auto-
switch lamp normally light N Bus un-voltage and
delay time come?
Reset the charge timer,
Fill the auto-switch
N auto-switch lamp dark, Y
discharge condition?
return to charge status
N Close reserve supply
N switch
Y
N
---------------------------8-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------9-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
4. Technique index
4.1 Rated data
Power supply 220V, 110V AC/DC allowable error +15%, -20% (indicated when
contract)
TV signal 110V or 380V (indicated when contract)
TA signal 5A or 1A (indicated when contract)
Frequency 50 Hz
Thermal stability
AC voltage circuit: long run 1.2 Un Un----rated voltage
AC current circuit: long run 2 In In-----rated current
1 second 40 In
---------------------------10-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
as stated in GB/T14598.13-1998(the first half wave voltage magnitude common-mode is 2.5
KV, difference mode is 1 KV) pulse group interference test.
Fast transient interference
The device can endure fast transient interference test whose inclemency grade is A as stated
in the fourth chapter of GB/T14598.10-1996
Radiant electromagnetic field interference
The device can endure Radiant electromagnetic field interference test whose inclemency
grade is Ⅲ as stated in the fourth chapter of GB/T14598.9-1995
Static discharge
The device can endure static discharge test whose inclemency grade is 3 as stated in 4.1 of
GB/T14598.14-1998.
---------------------------11-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Vibration endurance
The device can endure vibration endure test whose inclemency grade is Ⅰas stated in 4.2.2
of GB/T11287-2000.
Impact endurance
The device can endure impact endure test whose inclemency grade is Ⅰas stated in 4.2.2
of GB/T14537-1993.
Collision
The device can endure collision test whose inclemency grade is Ⅰas stated in 4.3 of
GB/T14537-1993.
---------------------------12-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
5. Frame and panel definition
5.1 Trunk configuration
Adopt whole panel form. LCD, signal indicator, operation keyboard are collocated on the panel.
It is a 19/2 inch 4U strengthened trunk, it is designed for resisting strong vibration, strong
interference. Ensure high reliability even on wicked spot. It is no need adding AC or DC
anti-interference module no matter packaged or install separately.
The outline size is shown in figure 3; the install aperture size is shown in figure 4.
---------------------------13-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
It outputs +5V, ± 12V and +24V. +5V voltage is for digital circuit, ± 12V is for A/D sampling,
and 24V is for driving relay and light coupling circuit of internal DI signal.
AC inserted piece
TV inserted board can connect to 7 channels of voltage.
TA inserted board can connect to 6 channels of current.
CPU inserted piece
CPU inserted piece is composing of main control CPU, SDRAM, Flash Memory and A/D
sample chip. The main control CPU is high speed RISC MPU, its master frequency reaches
200MHz, support DSP operation dictate integration. It adopts 14 channels high precision
high speed synchronous sampling technique to ensure response speed of device. All
industrial and military IC make the device own high stability and high reliability.
Signal inserted piece
Signal board can divided into two types: digital input and digital output.
There are one input pieces, and can totally connect to 15 strong electric input points. The
drive voltage is 220V DC, brought in from extern.
There are two digital output pieces, owning 23 independent output nodes.
Man-machine conversation inserted piece
It mainly refers to the fore panel which provides 9 keystrokes, 16 signal lamp, a LCD screen
of 192*64 size for convenient of man-machine conversation, and at the same time a USB 2.0
Host interface for special use of factory test.
Panel of the device is composing of display lamps, LCD screen and keyboard viewed from left to
---------------------------14-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
right.
POWER SUPPLY Power supply indicating 1DL 1DL acting display lamp, light for
ALARM Alarm signal lamp, light 2DL 2DL acting display lamp, light for
BLOCKING Blocking signal lamp, 3DL 3DL acting display lamp, light for
putout
COMMUNICATION Communication indicating 4DL 4DL acting display lamp, light for
normal
---------------------------15-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
ACTION Action signal lamp, light COUPLER Coupler acting display lamp, light for
LOAD SHEDDING Load shedding signal BACKUP Reserve auto-transfer charging monitor
lamp, light when load SWITCH lamp, crush out when condition not
COUPLER Coupler closed signal MANAUL Manual switch allowable lamp, light
CLOSED lamp, light when coupler SWITCH when manual switch is allowed
closed
COUPLER Coupler tripped signal RUNNING Device running lamp, glitter once per
tripped
---------------------------16-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
6.Man-machine operation
Man-machine page layout is made up of display light,keystroke,LCD. The hardware has been
explained before, please refer to “frame and panel definition” in section 5. And here will be a
presentation about the content and manipulation of every LCD page layout.
In the figure:
On the top left corner is scheme name: SID-409.
On the right of top corner is the number of the scheme running currently: scheme 02 (See
appendix 3 for detail)
On the middle: The name of the device: Reserve Supply Auto-transfer Device.
Area Number of the set-point running currently: 02.
Running time: 2008-06-06 14:06:06.
On the bottom line is the status of device, if any abnormal present, the corresponding record will
display at here. Record displays when abnormal disappear; if transfer acted, here display
corresponding action event for prompt. Check event details in ‘event record’.
---------------------------17-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
to enter the project will be selected.
AC Measure
Language
MAIN
MENU Scheme
Telesignalling Event
Self-checking Event
Protection Event
Driving
Device Debug Communication
Record Waveform
Time Adjust
Telecontrol
Event Clear
Other Function Revert Way
Password Set Measure Debug
Product Information Telemetering Cycle
Resume Default Value
Manufacturer Founction Reset Count
Linkage Logic
Output Board Choose
Software Updata
---------------------------18-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Parameter, Event Record, Manual Print, and Other Functions
---------------------------19-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
password is 0000 and you can set new password as you like) to enter “Set Point” page. There are
three setting contents in the page, which is shown in figure 10:
Set Point
Set Point Switch
Set Point Modify
Set Point Copy
Device Status: Normal
---------------------------20-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------21-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
choose digital input with different number to set. Press “Left”、“Right” to select the anti-trill time
and digital input property of this route, press +/- to set the time value and convert the digital input
property between normal open and normal close. As shown in figure 17. In the figure, the number
“01” on top left corner represents the current digital input sequence number, the number “16” on
top right corner represents that there are 17 routes of signal totally. After finish the setting,press
“Enter” to save, and return to previous menu.
Figure 18 AC Parameters
☆ Communication Parameter:
This function is for setting series interface, Ethernet interface and CAN Bus communication
parameters. After entering “Communication Parameter” page, press “Up”, “Down” to choose the set
communication type. Choose Network Parameter to enter Network Parameter Set page, you can set
IP, subnet Mask and Gateway of network, as shown in figure 19. Choose “CAN Bus” to enter the
CAN Bus and set the parameters. You can set CAN Bus Communication Address, Baud Ratio, as
---------------------------22-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
shown in figure 19.
Choose “Series Port Parameter” to enter the page and set the parameters. You can set
Communication Address, Communication Rule, Baud Ratio, Check Way of the three series port:
supervisor guardian used RS485-1, print use RS485-2, GPS private use RS485 as shown in figure
20. After finish the setting,press “Enter” to save, and return to the previous menu.
Net 1 Set Net 2 Set
IP Addr: 192.000.000.002 IP Addr: 192.001.000.002
Mask: 255.255.000.000 Mask: 255.255.000.000
Gateway: 192.000.000.001 Gateway: 192.001.000.001
Device Status: Normal Device Status: Normal
---------------------------23-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
It is used for displaying protection or switch event which had happened. Press “up”, “down” to
turn over page. The event is listed by time, and the number of latest event is 1.
☆ Record Waveform Event:
---------------------------24-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
This is used for displaying recorded event and waveform. Events are listed by time. The last
event gets 1.
☆ Operation Event:
It is for displaying local operation (remote debug, modify set point, parameter etc) and remote
control that have happened. Press “up”, “down” to turn over page. The event is listed by time, and
the number of latest event is 1.
☆ Self Check Event:
It is used to display happened device self check events, mainly are self diagnose information of
important element on master CPU. Press “up”, “down” to turn over page. The event is listed by time,
and the number of latest event is 1.
---------------------------26-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------27-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------28-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
6.9.4 Password Set
Password Set page is shown in figure 34. This function is for setting new password. The
password is 0000 when the device leave factory, user can set new password by himself. Please pay
attention that when set new password, it need to input new password twice and they must be same.
Once the setting is successful, you must remember the new one in order to operate next time.
---------------------------29-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7. Instruction of backboard terminals connection and installation
Device back view drawing as follow:
1 1
1 1 1 1
2 2 2 2 2 2
3 3 3 3
4 4 4 4 3 3
5 5 5 5
6 6 6 6 4 4
7 7 7 7
8 8 8 8 5 5
9 9 9 9
10 10 10 10 6 6
11 11 11
12 12 12 7 7
13 13 13
14 14 14 8 8
15 15 15
16 16 16
9 9
17
18
10 10
19
20
11 11
12 12
网 口
---------------------------30-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------31-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7.1 Power board terminals instruction
Power board Jk7 back terminals sketch map 38:
---------------------------32-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
---------------------------33-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2 TX- Send signal-
3 RX+ Receive signal +
4 N/C Vacancy
5 N/C Vacancy
6 RX- Receive signal -
7 N/C Vacancy
8 N/C Vacancy
The instruction of device printing function:
The connection between one device and one printer as follow:
The connection between multi-device and one printer server as follow: (Two device adopt
RS485,multi-device adopt Ethernet).
---------------------------34-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7.5 EDI heavy current input board terminals instruction
Device equipped one EDI board, heavy current input and heavy current telesignalling have
different definitions in different running scheme, please refer to input terminals instruction in
appendix 3 for detail. Heavy current input public negative pole and heavy current telesignalling
public negative pole are independent inside the device. If needed, you can short-circuit outside the
device, and use a 220V heavy current public negative.
EDI_B1 input JK3 back board sketch map 44:
2 Device input signal uses electrical independent contact mode, so please connect public point with
negative pole of exterior input signal.
---------------------------36-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
If the second output board is OUT-JK6, output board is expansion output board the terminals
sketch map 47:
Code Name Instruction
1 Public Point Expansion
2 Expansion Output 1
Output 1、2
3 Expansion Output 2
4 Public Point Expansion
5 Expansion Output 3
Output 3、4
6 Expansion Output 4
7 Public Point Expansion
8 Expansion Output 5
Output 5、6
9 Expansion Output 6
10 NC Not Connect
11 Public Point Expansion
12 Expansion Alarm 1 Alarm 1
13 Public Point Expansion
14 Expansion Alarm 2 Alarm 2
15 Public Point Expansion
16 Expansion Alarm 3 Alarm 3
17 Public Point Expansion
18 Expansion Alarm 4 Alarm 4
19 NC
Not Connect
20 NC
---------------------------37-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
8. Debug and dispose of abnormity
Device don’t need debug basically, you have to complete several inspection as following, if OK,
namely the device going well.
☆ Procedure and version checking
“Other Function” includes product information which gives device version, CRC correcting code
and etc. If the information content is not correspond with order sheet or following document, please
contact consumer service branch for updating.
☆ Switch input checking
If the input of switch state is incorrect, please check the exterior connection; if connection is Ok
and problem still exist, please change the input board; if the above methods ineffectively, please
change the CPU board.
☆ Output circuit checking
The record menu includes fault record. If the fault record prompts problem in the output circuit,
please check output circuit according to record.
☆ Analog value input checking
Enter “Parameter setting” interface to check if AC parameter setting is correct. Enter “Run
monitor” interface to check if the measured value of primary side and secondary side is correct.
Note, in “parameter set”, secondary rated value is the primary rated values of device TV/TA ratio.
☆ Whole group test
If all checking above are correct, the device is out of question. To be cautiously, you can renew
device set-point; observe the device action to confirm validity of set point.
☆ Device fault alarm
If the device hardware went wrong,LCD shows the fault information and send alarm, then lock
the output circuit of protection. The device will send alarm signal when lost power.
☆ GPS time calibrating
The device receive information as year, month, date, hour, minute and second by communicate
with main automation transformer substation. Moreover, the device collocate a GPS time
calibrating communication interface and a second pulse input interface, which can connect to GPS
directly or connect to second pulse output in substation, time calibrating precision is less than 1 ms.
☆ Net communication
The device can communicate with microcomputer monitor or protection manager, the
communicate interface can be RS-485 or Ethernet。
☆ Dispose of abnormity
---------------------------38-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Table 3
Abnormal phenomenon Solution
---------------------------39-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
9. Commissioning instructions and notices
☆ Check whether the device model, version and electric parameter are correspond with ordering
contract or not;
☆ Check strictly before commissioning, confirm there is no wrong in device or external circuit;
☆ Set point is strictly according to the set-point list, confirm that the not devoted protection are
set to off;
☆ Confirm that group number and set-point are correct;
☆ Check boards connection, cables connection and terminals connection are reliable;.
☆ Check the polarity of DC supply correct;
☆ Check the display of AC values and the net communication normal.
---------------------------40-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 1: Set point table
Fixed value include: system set-point, manual switch set-point, fault switch set point, accident
switch set-point, switch criteria set-point, protection set-point. Device can store 10 groups set-point
show as 0~9. Each group can be set independently.
Table 4
Group number Instruction
setting Device can store 10 groups set-point show as 0~9. default 0
System set-point
Protection set-point
Bus Breaker Over Bus breaker over current 1, which can be applied by user
01 Off
Current 1 [On, Off] customize
Bus Breaker Over
Bus breaker over current 1 current, which can be applied
02 Current 1 Current 6.00A
by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current 1 time, which can be applied by
03 Current 1 Time [0.10 – 0.2S
user customize
10.00]S
Bus Breaker Over Bus breaker over current 2, which can be applied by user
04 Off
Current 2 [On, Off] customize
Bus Breaker Over
Bus breaker over current 2 current, which can be applied
05 Current 2 Current 5.00A
by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current 2 time, which can be applied by
06 Current 2 Time [0.10 – 0.50S
user customize
10.00]S
07 Bus Breaker Over Off Bus breaker over current haste, which can be applied by
---------------------------43-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Current haste [On, Off] user customize
Bus Breaker Over
Bus breaker over current haste current, which can be
08 Current Haste Current 5.00A
applied by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current haste time, which can be applied
09 Current Haste Time 0.20S
by user customize
[0.10 – 3.00]S
Line Low-volt. Alarm The delay setting of Line Un-volt.. Alarm, which can be
10 10.00S
Delay [1.00 -- 99.99] S applied by user customize
Bus Low-volt. Alarm The delay setting of Bus Un-volt.. Alarm, which can be
11 10.00S
Delay [1.00 -- 99.99] S applied by user customize
Bus 1 Low-volt. Alarm The soft switch of Bus 1 Un-volt.. Alarm function, which
12 Off
[ On ,Off] can be applied by user customize
Bus 2 Low-volt. Alarm The soft switch of Bus 2 Un-volt.. Alarm function, which
13 Off
[ On ,Off] can be applied by user customize
Line 1 Low-volt. Alarm The soft switch of Line 1 Un-volt.. Alarm function, which
14 Off
[ On ,Off] can be applied by user customize
Line 2 Low-volt. Alarm The soft switch of Line 2 Un-volt.. Alarm function, which
15 Off
[ On ,Off] can be applied by user customize
Line 3 Low-volt. Alarm The soft switch of Line 3 Un-volt.. Alarm function, which
16 Off
[ On ,Off] can be applied by user customize
Bus 1 TV Line-break The soft switch of Bus 1 TV disconnection Alarm function,
17 Off
Alarm [ On ,Off] which can be applied by user customize
Bus 2 TV Line-break The soft switch of Bus 2 TV disconnection Alarm function,
18 Off
Alarm [ On ,Off] which can be applied by user customize
Line 1 TV Line-break The soft switch of Line 1 TV disconnection Alarm
19 Off
Alarm [ On ,Off] function, which can be applied by user customize
Line 2 TV Line-break The soft switch of Line 2 TV disconnection Alarm
20 Off
Alarm [ On ,Off] function, which can be applied by user customize
Line 3 TV Line-break The soft switch of Line 3 TV disconnection Alarm
21 Off
Alarm [ On ,Off] function, which can be applied by user customize
---------------------------44-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
To set TA connection between line 5 and device, for
TA of Input Line 5 distinguish switch abnormal and prevent mistrip since the
04 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
To set TA connection between line 6 and device, for
TA of Input Line 6 distinguish switch abnormal and prevent mistrip since the
05 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
Breaker Mis-trip Way The soft switch of function which input all switches (or
06 [All switches, incomer Off incomer switches) or exit all switches, which can be
switches, Off] applied by user customize
Zero dimension
07 0000 Backup
set-point 1 [0000 - 9999]
Zero dimension
08 0000 Backup
set-point 2 [0000 - 9999]
Zero dimension
09 0000 Backup
set-point 3 [0000 - 9999]
Zero dimension
10 0000 Backup
set-point 4 [0000 - 9999]
Zero dimension
11 0000 Backup
set-point 5 [0000 - 9999]
Zero dimension
12 0000 Backup
set-point 6 [0000 - 9999]
Zero dimension
13 0000 Backup
set-point 7 [0000 - 9999]
Remark:
☆ System set-point
This is used for setting system value which is used in common.
☆ Manual switch set-point
This is used for setting manual switch way and switch principle.
☆ Protection set-point
This is used for setting set-point that is related to protection function.
☆ Project expand set-point
This is used for setting set-point related to special project.
---------------------------45-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 2: Parameter list
Telesignalling parameter
time
AC parameter
rated current
Communication parameter
---------------------------46-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Communication protocol [IEC60870-5-103、Modbus SID-TEST
01 、SID-TEST]
IEC60870-5-103、Modbus、
02 SID-TEST]
parity]
IRIG-B–RS485 、
03 IRIG-B–TTL、WEIKOT]
parity]
Language
Scheme
Remark:
☆ Telesignalling parameter
This is used for setting input signal attribute and anti-disturb time, the default value: open,
10 ms
☆ Ac parameter
This is used for setting AC current and voltage transformer ratios. The secondary rated
---------------------------47-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
value is the value of TA or TV inside the device.
☆ Communication parameter
This is used for setting the parameter of RS485 series communication, Ethernet
communication and CAN bus communication.
RS 485 series 1 is used for communication when the same background controlled. Users
can choose communication protocol between IEC 60870-5-103 and Modbus. The address,
velocity and check mode are according to parameter range.
RS 485 series 2 can use for printer communication when not used, baud rate: 9600 bps,
check mode: no check. The communication protocol is EPSON ESC/P when device and
printer connected directly; the communication protocol is SID-401 PS when printer server
connected with printer.
RS 485 series 3 is used for GPS communication; users can choose communication protocol
during IRIG-B–RS485、IRIG-B–TTL、WEIKOT.
☆ Language
This is used for interface language setting (Chinese or English).
☆ Scheme parameter
This is used for setting backup scheme that correspond with local primary electrical main
connection.
---------------------------48-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 3: Back up scheme instruction
Note:
Bus low-volt:The voltage is lower than low-volt set-point, keep over verifying delay of acking
low-volt., and delay of bus un-volt. switch, then protection startup.
Switch mis-trip: The work breaker is open and without current, keeps longer than verify
delay.
Control logic:
Normal operating:
1 DL closed,bus I energized by supply 1 through 1 DL.
2 DL closed,bus II energized by supply 2 through 2 DL.
Bus breaker tripped, bus I, bus II backing for each other.
Device energized, if the voltage of bus I and bus II are both higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
When bus I voltage low or 1DL mis-trip, bus II voltage is higher than under-voltage set-point,
then trip 1DL, after the un-volt. test and delay condition of bus I are satisfied, close bus breaker.
When bus II voltage low or 2DL mis-trip, bus I voltage is higher than under-voltage set-point,
then trip 2DL, after the un-volt. test and delay condition of bus II are satisfied, close bus breaker.
(Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage; or 1DL and
---------------------------49-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL closed, bus breaker tripped, and the external input signal mode 1 or mode 2 closed, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 1DL when the
un-volt. test condition of bus I is satisfied.
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 2DL when the
un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL are closed, bus breaker tripped, the external input signal mode 1 closed, mode
2 tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 2DL , close bus breaker when the un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL closed, bus breaker tripped, the external input signal mode 2 closed, mode 1
tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 1DL and close bus breaker when the un-volt. test condition of bus I is satisfied.
[Auto Parallel]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully, then the transfer process is over, otherwise decoupling and trip 1DL; (Note: The
decoupling function can be applied by user customize)
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL; (Note: The
decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 1 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker; (Note: The decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 2 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
---------------------------50-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
and trip bus breaker; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
Control logic:
Normal operating:
Bus energized by supply 1 through 1 DL, bus breaker. Power supply 2 is used for backing
through 2DL.
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
System switches logic:
Bus breaker and 1DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
Bus breaker and 2DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay
condition of bus are satisfied, close 1DL.
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay
condition of bus are satisfied, close 2DL.
---------------------------52-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
[Auto Parallel]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip 2DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 1DL; (Note: The decoupling function can
be applied by user customize)
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip 1DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 2DL; (Note: The decoupling function can
be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
---------------------------53-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 ML-Ia Link Line Phase A 1 1M-Ua1 Bus Phase A Voltage
2 ML-Ia' Current 2 1M-Ub1 Bus Phase B Voltage
3 ML-Ib Link Line Phase B 3 1M-Uc1 Bus Phase C Voltage
4 ML-Ib' Current 4 NC Not Connected
5 ML-Ic Link Line Phase C 5 NC Not Connected
6 ML-Ic' Current 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1LI1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 1L-U2 Incomer 2 Voltage
10 2L-I2' 10 1L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 Bus Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point Bus Breaker 7 NC
8 NC Tripping Output 8 NC
9 Bus Breaker Tripping 9 NC
10 Public Point Bus Breaker 10 NC
11 NC Closing Output 11 NC
12 Bus Breaker Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not Connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
---------------------------55-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
decoupling and trip 2DL; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 NC
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking + Central Signal
20 Device Blocking - Alarm Output
---------------------------56-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Wiring diagram as figure 54:
Control logic:
Normal operating:
Bus energized by supply 1 through 1DL. Power supply 2 is used for backing through 2DL.
Or bus energized by supply 2 through 2DL. Power supply 1 is used for backing through 1DL.
(Only valid if bi-direction transfer is selected).
Device energized, if bus voltage is higher than voltage set-point, the device begin to charge 10
s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL tripped, if bus I low-voltage or 1DL mis-tripped, then trip 1DL, after the
un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL tripped, if bus I low-voltage or 2DL mis-tripped, then trip 2DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer
is selected).
Manual transfer logic:
When 1DL or 2DL tripped, the manual switch function of the device is available. For there has
no voltage transformer in this scheme, so only series switch is available, and parallel & series is
also valid. The series switch logic as follow:
[Series Switch]:
2DL closed, 1DL tripped, if manual switch signal presence, trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL.
1DL closed, 2DL tripped, if manual switch signal presence, trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
After manual switch, the device will return to normal operating mode.
---------------------------57-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Terminal instruction:
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 NC Not Connected
8 1L-I1' 8 NC
9 2L-I2 Incomer 2 Current 9 NC Not Connected
10 2L-I2' 10 NC
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 NC
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
---------------------------58-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Control logic:
Hot backup: The transformer of backup supply is in no-load status when normal operating, the
high-voltage side breaker connected with the backup supply when in closed status.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL, 3DL and 4DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
2DL, 3DL and 4DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When 1DL, 3DL and 4DL are closed, 2DL tripped, or 2DL, 3DL and 4DL are closed, 1DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of
---------------------------59-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
bus are satisfied, close 1DL when the bus un-volt. test conditions satisfied.
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of
bus are satisfied, close 2DL.
[Auto Parallel]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip 2DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 1DL; (Note: The decoupling function can be applied by user
customize)
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip 1DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 2DL; (Note: The decoupling function can be applied by user
customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
---------------------------60-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 4DL Breaker Aux. Contact
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
---------------------------61-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Control logic:
Cold backup: The transformer of backup supply is in no-power status when normal operating,
the double side breakers are disconnected.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL and 4DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL and 3DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL and 3DL closed, 2DL and 4DL tripped, if bus low-voltage or 1DL (3DL) mis-tripped,
voltage of power supply 2 is higher than under-voltage set-point, then trip 1DL and 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 4DL, if 4DL closed successfully, then
close 2DL, the transient exciting current generated by close the transformer with no-load through
4DL may cause 4DL close fail.
2DL and 4DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL (4DL) mis-tripped,
voltage of power supply 1 is higher than under-voltage set-point, then trip 2DL, 4DL, after the
un-volt. test and delay condition of bus are satisfied, close 3DL, if 3DL closed successfully, then
close 1DL. (Only valid if bi-direction transfer is selected). As mentioned above, close the
transformer with no-load through 3DL may cause 3DL close fail.
Manual transfer logic:
When 1DL and 3DL closed, 2DL and 4DL tripped, or 2DL and 4DL are closed, 1DL and 3DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL and 4DL, after the un-volt. test and delay
condition of bus are satisfied, close 3DL, if 3DL closed successfully, then close 1DL.
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL and 3DL, after the un-volt. test and delay
condition of bus are satisfied, close 4DL, if 4DL closed successfully, then close 2DL.
[Auto Parallel]:
---------------------------62-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 3DL, then close 1DL when the parallel
synchronization condition is satisfied, trip 2DL and 4DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 1DL and 3DL; (Note:
The decoupling function can be applied by user customize)
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 4DL, then close 2DL when the parallel
synchronization condition is satisfied, trip 1DL and 3DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL and 4DL; (Note:
The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
For the transient exciting current generated by close the transformer with no-load may cause
transformer protection mis-trip, and re-trip the breaker in the supply side, this will lead the transfer
control fail. To solve this problem, we designed SID-3YL Inrush Suppresser. This device can
suppress the transient exciting current generated by close the transformer with no-load, and achieve
success at the first time. The suppresser can install on the operating box of 3DL and 4DL, and send
the control signal of 3DL or 4DL to the Inrush Suppresser, then the Suppresser will connect the
tripping, closing circuit to realize close successfully one time.
Terminal instruction:
---------------------------63-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 4DL Breaker Aux. Contact
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 NC
8 3DL Tripping Transfer Output 8 NC
9 3DL Closing 9 NC
10 Public Point 4DL Breaker 10 NC
11 4DL Tripping Transfer Output 11 NC
12 4DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
Scheme 7: Double backup transfer control (Exclusive backup, secondary backup supply has
no PT)
Wiring diagram as figure 60:
---------------------------65-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
are both or only incomer 1 voltage is higher than under-voltage set-point, , trip 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL, if 1DL closed fail or incomer 1 is
un-voltage and incomer 2 voltage is higher than under-voltage set-point, then trip 3DL and close
2DL
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize)
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize)
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Note: When supply 3 used as work supply to energize the bus, the device only open the manual
switch function, and backup supply 1 take precedence over backup supply 2.
Terminal instruction:
---------------------------66-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus I Phase A Voltage
2 NC 2 1M-Ub1 Bus I Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus I Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 3L-I3 Incomer 3 Current 11 NC Not Connected
12 3L-I3' 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 NC
8 NC Tripping Output 8 NC
9 3DL Tripping 9 NC
10 Public Point 3DL Breaker 10 NC
11 NC Closing Output 11 NC
12 3DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
---------------------------68-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
condition of bus I and bus II are satisfied, close 1DL. (Only valid if bi-direction transfer is selected)
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, backup supply voltage is higher than
under-voltage set-point, the manual switch function of the device is available. The transfer logics in
different transfer mode as follow:
[Series Switch]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus I are satisfied, close 1DL;
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus II are satisfied, close 2DL;
1DL and 2DL closed, bus breaker tripped, external input signal mode 1 closed, mode 2 tripped
and bus I voltage is higher than under-voltage set-point, if manual switch signal presence, trip 2DL,
after closing delay of reserve supply switch, and close bus breaker when the bus II un-volt. test
conditions satisfied;
1DL and 2DL closed, bus breaker tripped, external input signal mode 2 closed, mode 1 tripped
and bus II voltage is higher than under-voltage set-point, if manual switch signal presence, trip 1DL,
after closing delay of reserve supply switch, and close bus breaker when the bus I un-volt. test
conditions satisfied;
[Auto Parallel]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 1DL. (Note: The decoupling function can be applied
by user customize)
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 2DL. (Note: The decoupling function can be applied
by user customize)
1DL and 2DL closed, bus breaker tripped, and mode 1 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after
---------------------------69-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
1DL and 2DL closed, bus breaker tripped, and mode 2 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the transfer
process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
---------------------------70-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Scheme 9: Double backup transfer control (Exclusive backup, secondary backup supply has
PT)
Wiring diagram as figure 64:
if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 2 and 3 are
qualified, close 2DL; if close 2DL failed, then close 3DL;
②: Incomer 1 and 3 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;
if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 1 and 3 are
qualified, close 1DL; if close 1DL failed, then close 3DL;
③: Incomer 3 is backup supply, if the voltage of incomer 3 is qualified, close 3DL;
④: Incomer 1 and 2 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;
if only the voltage of incomer 2 is qualified, close 2DL; if both the voltage of incomer 1 and 2 are
qualified, close 1DL.
Normal operating:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 and 3 is
used for backup (supply 2 is primary backup, 3 is secondary backup, 2 take precedence over 3);
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 and 3 is
used for backup (supply 1 is primary backup, 3 is secondary back up, 1 take precedence over 3,
(Only valid if bi-direction transfer be selected); bus energized by supply 2 through 2DL, supply 3 is
used for backup (Only valid if single direction transfer be selected).
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 is used for
backup;
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
When mode 2 closed, mode 1 tripped:
---------------------------72-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 3 is used for
backup;
3DL closed, 1DL and 2DL tripped, bus energized by supply 3 through 3DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
Device energized, if the voltage of bus and any backup supplies are qualified, the device begin to
charge 10 s, then system enter fault monitor state.
Backup switch logic:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close backup supply according to backup
close principle ①.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL. If
bi-direction transfer is effective, after the un-volt. test and delay condition of bus are satisfied, close
backup supply according to backup close principle ②. If single direction transfer is effective, close
backup supply according to backup close principle ③.
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
When mode 2 closed, mode 1 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 3DL.
3DL closed, 1DL and 2DL tripped, if bus low-voltage or 3DL mis-tripped, then trip 3DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
Manual transfer logic:
When mode 1 and mode 2 are both closed or tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, if manual switch signal presence, trip 1DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ①.
---------------------------73-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL closed, 1DL and 3DL tripped, if manual switch signal presence, trip 2DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ②.
3DL closed, 1DL and 2DL tripped, if manual switch signal presence, trip 3DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ④.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize); if
close 2DL fail, or incomer 2 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 1DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if
close 1DL fail, or incomer 1 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 2DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
---------------------------74-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 1 closed, mode 2 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL when the bus un-volt. test conditions satisfied.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 2 closed, mode 1 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
---------------------------75-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
satisfied, close 3DL.
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 3DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 3DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Terminal instruction:
---------------------------76-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus I Phase A Voltage
2 NC 2 1M-Ub1 Bus I Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus I Phase C Voltage
4 NC 4 3L-U3 Incomer 3 Voltage
5 NC Not Connected 5 3L-U3'
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 3L-I3 Incomer 3 Current 11 NC Not Connected
12 3L-I3' 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 Mode 1
8 NC Tripping Output 8 Mode 2
9 3DL Tripping 9 NC
10 Public Point 3DL Breaker 10 NC
11 NC Closing Output 11 NC
12 3DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output
---------------------------77-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com