You are on page 1of 78

CONTENT

1. General .............................................................................................................................................1
2. Main function...................................................................................................................................3
3. Control principle ..............................................................................................................................8
4. Technique index .............................................................................................................................10
5. Frame and panel definition ............................................................................................................13
5.1 Trunk configuration ..............................................................................................................13
5.2 Main inserted pieces..............................................................................................................13
5.3 Panel definition and illumination..........................................................................................14
5.4 Keystroke definition..............................................................................................................15
5.5 Display lamp illumination.....................................................................................................15
6.Man-machine operation ...............................................................................................................17
6.1 Main page layout illumination ..............................................................................................17
6.2 LCD main menu tree frame illumination..............................................................................17
6.3 Main Menu instruction..........................................................................................................18
6.4 Run Monitor instruction........................................................................................................19
6.5 Set Point instruction ..............................................................................................................19
6.6 Parameter Set Instruction ......................................................................................................21
6.7 Event Record Instruction ......................................................................................................24
6.8 Manual Print introduction .....................................................................................................25
6.9 Other Function introduction..................................................................................................26
7. Instruction of backboard terminals connection and installation ....................................................30
7.1 Power board terminals instruction ........................................................................................32
7.2 TA board terminals instruction..............................................................................................32
7.3 TV board terminals instruction .............................................................................................32
7.4 CPU board terminals instruction...........................................................................................33
7.5 EDI heavy current input board terminals instruction............................................................35
7.6 Output board terminals instruction .......................................................................................35
8. Debug and dispose of abnormity ...................................................................................................38
9. Commissioning instructions and notices........................................................................................40
10. Storage and maintain....................................................................................................................40
11. Whole set supplied .......................................................................................................................40
Appendix 1: Set point table................................................................................................................41
Appendix 2: Parameter list.................................................................................................................46
Appendix 3: Back up scheme instruction ..........................................................................................49
(V1.42)
2011.03.

The company reserves the right to change products, the specification is subject to change without
notification,the device shall prevail. For details, please call the company or the local agents.
我们致力推动世界电力技术的科技进步!

SID-409 RESERVE SUPPLY AUTO-TRANSFER DEVICE (TYPE B)


1. General
1.1 Application
An uninterruptible power supply is the important assurance for national economy normally
operating, the power system development and technical advance is toward the goal. The assurance
of uninterruptible power supply relays on every stage of power generation and transmission.
SID-409 reserve supply auto-transfer device (type B) improved many requirements on power
supply reliability, especially industry enterprise. With rich operation experience in local, we present
SID-409, a fine designed reserve supply auto-transfer device. And provide 21 kinds (9 fixed, the
other can customize the design according to the user’s demands) reserve supply auto-transfer logic
to adapt different primary main bus connection.

1.2 Device frame character


— Standard 4U 19/2 inches strengthen unit trunk, designed according to resisting strong
oscillation, strong disturb, applying to wicked environment.
— All industrial and military for IC, the device possesses high stability and reliability.
— High speed industrial RISC processor for main control CPU, the main frequency reaches
200MHz, support DSP expand dictates.
— Adopt high speed high precision multi-route A/D synchronized sampling technique, sampling
64 points each cycle, ensure high measurement accuracy.
— The software based on the embedded RTOS and the TCP/IP protocol, is of stability and
credibility, easily expanded
— LCD display, entirely English menu man-computer interface, the operation and the debugging
are convenient.
— Various reserve supply auto-transfer scheme are embedded in the device, the special scheme
according to the needs of customer can be customized at any moment.
— 10 set point area are optional, it is safe and convenient to transfer between every two area.
— Big capability of recording information function.
— Powerful of switching wave record function, once can record information, including analog
value and digital value, output value and set-point during the process of switching. The record
can be uploaded to the computer through the Ethernet, where it will be analyzed and exported
as a standard COMTRADE file.
— Automatically or manually print protection set-point and event record.
---------------------------1-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
— Support multi-language, can switch online.
— Strong communication function, supporting Ethernet, double RS485, CAN bus, multi
communication stipulation, such as integrated IEC60870-5-1-103, modbus.

1.3 Device specification


SID-409 reserve supply auto-transfer device (type B) used four postfixes to denote,the first one
is TV voltage select, the second one is TA current select, the third one is JK6 inserter select, and the
last one is voltage levels select, the definition of each code is described as follows:
Format: SID-409B /*-*-*-*

DC220V or DC110V, input voltage levels select;


N or T or O, N means no inserter (routine allocation), T means allocate
operation board, O means allocate output expansion board;
5A or 1A, CT rated output current;
380V or 100V, PT output voltage.

---------------------------2-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2. Main function
The main function of SID-409 as follows:
— Reserve supply auto put in function
— Normal manual switch function
— Protection function
— Reserve supply auto put in fault lock function
— Event record function
— Transferring record wave function
— Communication, print, GPS adjusting time function

2.1 Reserve supply auto put in function explanation


The device possesses auto-transfer reserve supply function when the bus lost power (or the
working switch mis-trip), can realize varied operating mode of one bus breaker and four incomer
breaker. In appendix 3, some common used running modes such as bus breaker or bridge breaker
switch, two incomers switch, hot backup transformer switch, cold backup transformer transfer,
double reserve supply transfer are illuminated in detail. The users can set the scheme according to
their needs by setting parameters. Furthermore, we can customize the scheme according to your
demands.
2.1.1 Backup switch principle
1) To avoid backup switch mis-trip which caused by work bus voltage short-term declining, the
low-volt. start delay of the backup switch device must longer than the longest external fault clearing
time.
2) To avoid backup supply closed due to fault or work supply send power to backup supply after
the close operation of backup switch device, we need to ensure that put in the backup supply after
tripping work supply, and the delay time before closing the backup supply must longer than the time
that work breaker cut off the circuit completely.
3) The backup switch device shouldn’t switch when receiving the external lock signal (backup
switch general lock).
4) The backup switch device shouldn’t switch when the backup supply does not meet the
requirements.
5) Manual remove work supply should not cause device action when normal operating.
6) Trip or close action of the device can only carried out once.
7) When the backup transformer is cold backup, we need to dispel the transient exciting current

---------------------------3-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
caused by putting in backup supply to ensure the success of backup switch, so SID-3YL Inrush
Suppressor is needed when the transformer backup switch is cold backup.
2.1.2 Backup switch control logic
The reserve supply switch process concludes: charging, operation and affirm reset.
The charging:
When incomer and bus voltage and every breaker state are at normal condition, the charging
begins. The “Auto switch “lamp on the panel begins to wink, and after ten seconds the lamp
constant bright, it indicates that the Reserve auto-transfer enter operation and monitor state.
The operation process:
Under monitoring state, if the reserve supply has voltage and no blocking signal, then the
following conditions happen:
1) Bus voltage lower than no-voltage set-point, and the last time exceed the no-voltage starting
time.
2) The work power switch turn to open and remain mis-trip starting time.
If any conditions is satisfied, and the working line has no current (to avoid mis-trip when the bus
TV line-break, use line current as the lock criterion of bus no-voltage), it will trip off the work
power switch. The device will close the reserve supply switch and input the reserve supply when
the bus no-voltage test condition is satisfied and the delay set-point is maturated. After transfer, no
matter success or fail, the device enters the state of affirm reset.
The affirm reset process:
Under the affirm reset state, the device stores the record wave dates. It may not enter charging
state to ready for next transfer until delay 10s and remote or local reset operation is received. If the
operation succeeded, the device reset automatically after 10s.

2.2 Normal manual switch explanation


2.2.1 Manual switch principle
1) Manual switch is available only when work supply switch and backup supply switch are
exclusive. When plural reserve normal operating, the signal should selected by external connect
mode to ensure the exclusive of manual switch. See appendix 1 for the detail logic.
2) Manually switch start signal can either input from local, or from remote communication
control command. Signal must be longer than 50ms pulse signal.
3) Manual switch must be bi-directional; we can not only cut work supply to backup supply, but
also cut backup supply to work supply.

---------------------------4-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
4) The manual switch function can be select, and the switch mode can be set according to
different needs.
Through setting the manual switch set-point, the device can realize flexible configuration of
manual switch function in a variety of occasions, the set options as follows:
[Exit] --- Exit manual switch function.
[Series] --- Check bus, backup supply with voltage, trip work (backup) switch first, and then
close backup (work) switch.
[Auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel synchronizing
condition is satisfied, close backup switch first, then trip work switch.
[Semi-auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel
synchronizing condition is satisfied, close backup switch. Work switch is operated manually.
[Parallel & Series] --- Detect the parallel synchronization conditions as the [Auto Parallel] logic,
if the synchronization conditions can not satisfied in the detect delay then choose [Series Switch].
2.2.2 Manual switch control logic
Under normal running condition, the device can realize the transfer function between work
supply and reserve supply through external manual switch (pulse) signal or remote switch order.
Normal manual switch has “test synchronization” function.
When the breaker state is satisfied for manual switch condition, the “manual switch” lamp
normal bright, and the Reserve auto-transfer device enter the manual switch operation and monitor
state. Under this state, if local or remote manual switch signal is gathered, working breaker will
transfer with backup breaker automatically. If the operation fails, the device enter waiting affirm
reset state. It may not enter charging state to ready for next transfer until delay 10s and remote or
local reset operation is received. If the operation succeeded, the device reset automatically after 10s.

2.3 Protection function


SID-409 has protection function, the main function includes: bus linkage over-current protection
segment 1 and segment 2, bus over-current instantaneous trip protection; each incomer, bus
no-voltage alarm protection; TV disconnection alarm function. The value, delayed time and soft
switch of each protection can be set independently in protection set-point.
2.3.1 Bus linkage over-current protection segment 1
When bus linkage over-current protection segment 1 function is put in, bus linkage current is
larger than segment 1 set-point, bus breaker tripped after time set-point delayed
2.3.2 Bus linkage over-current protection segment 2

---------------------------5-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
When the bus linkage over-current protection segment 2 function is put in, and the bus linkage
current larger than segment 2 set-point, bus breaker will tripped after time set-point delayed.
2.3.3Bus linkage haste protection
When bus breaker changes from open to closed, the device opens haste protection for 5 seconds.
During the period if haste protection function is put in, bus linkage current is larger than current set
point, the bus breaker tripped after set time delayed.
2.3.4 No-voltage alarm protection
When no-voltage alarm protection of every incomer and bus is put in and the voltage is lower
than each no-voltage alarm voltage set-point, the general alarm signal is port-out after no-voltage
alarm set time delayed.
2.3.5 Incomer TV disconnection alarm
Each incomer TV secondary disconnection protection soft switch put in and incomer voltage
lower than 70%Un and incomer breaker is at closed, after ten seconds delayed, alarm signal send by
protection and device TV disconnection alarm signal is sent out.
2.3.6 Bus TV disconnection alarm
Bus TV disconnection protection soft switch put in, single phase or three-phase voltages lower
than 70%Un, after ten seconds delayed, alarm signal sent by protection and device TV disconnection
alarm signal is sent out.

2.4 Reserve supply auto put in fault lock function


The device possesses fault lock function. It can detect abnormality of the breaker and external
lock signal and self check internal hardware for determining whether need to lock transfer. The
criterion of breaker abnormal detect is that the breaker is opening and the line has current and can
last 2 second.

2.5 Event record function


The device possesses record function of remote signal event, protection event, wave record event,
operation event, self check event. Users can inquire record information like action time, event name
through “event record” on LCD screen.

2.6 Wave record function


The device begins to record wave once transfer is started. The wave recorded includes 25 cycles
before start and 50 cycles after start-up. Each transfer total wave recording time is 1.5 seconds and

---------------------------6-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
total twice. The device storage is up to 12 groups of record data. The contents include bus voltage,
bus current, incomer voltage, incomer current and all digital input information e.g.. The wave
recording event index can be looked over in “wave recording event”, the waveform, record data can
be transmitted to background computer for analyzing.

2.7 Communication/print/GPS adjust time function


The device possesses powerful and reliable communication function. It has installed an Ethernet
interface, three RS485 serial interfaces and a CAN bus. Among them, RS485 interface 1 and the
Ethernet interface and CAN bus can be used to communicate with supervisory control background
with different communication hardware. RS485 serial interface 2 is for print function, it can connect
with printer directly or connect to SID-401PS print server deployed by my company, realize
multi-device sharing one printer, RS485 serial interface 3 is used to communicate with GPS,
complete adjusting time function. If two RS485 communications is needed in local, RS485 serial
interface 2 can be used to communicate with supervisory control, print function can be realized by
SID-401PS print server through Ethernet.

---------------------------7-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
3. Control principle
In the backup switching process, before closing the breaker, to avoid the high residual voltage
causing large surge current when closing, it will damage the device or make the backup switch and
normal switch fail, so in occasion that the reliability requirement is very strict but speed
requirements isn’t that high, we can use bus un-voltage detection to ensure the success of backup
switch or normal series switch. Un-voltage switch means after tripping the work supply switch,
check bus voltage, until the three line voltages of bus are all lower than voltage set-point of bus
un-volt. switch, and after the time set-point of un-volt. switch, closing the backup supply switch is
allowable, the software flow of backup switch control logic is shown in figure 1.
Normal manual switch is mainly used in work supply and backup supply switching for each other
when normal operating, such as overhaul, test etc. Therefore, in occasion of high requirement of
continuity and reliability about supply and allow short time loop closing, we can select Parallel
Auto / Semi-auto mode, while if loop closing is not allowed, we must select series mode. Normal
manual switch logic is shown in figure 2.

Control logic software procedure:


START

A
Fill the auto-switch Reset the charge timer,
N
charge condition? auto-switch lamp dark
Report trip failed
Trip succeed? N
Y incident

Y
Charge 10s timer The auto-switch lamp
N Switch longest delay Report overtime
come? glitter when charging Y
time come? incident
Y
N
Charge complete, auto-
switch lamp normally light N Bus un-voltage and
delay time come?
Reset the charge timer,
Fill the auto-switch
N auto-switch lamp dark, Y
discharge condition?
return to charge status
N Close reserve supply
N switch

Work switch open and Report closed failed


Y Close succeed? N
delay time come? incident

Y
N

Switch succeed Switch failed


Bus un-voltage and Device locked
Y Device locked
delay time come? General alarm
General alarm
Waiting for reset Waiting for reset
Trip work supply switch

Figure 1 Auto-switch control logic

---------------------------8-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 2 Manual switch logic

---------------------------9-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
4. Technique index
4.1 Rated data
— Power supply 220V, 110V AC/DC allowable error +15%, -20% (indicated when
contract)
— TV signal 110V or 380V (indicated when contract)
— TA signal 5A or 1A (indicated when contract)
— Frequency 50 Hz
— Thermal stability
AC voltage circuit: long run 1.2 Un Un----rated voltage
AC current circuit: long run 2 In In-----rated current
1 second 40 In

4.2 Power consumption


— AC voltage signal <0.5 VA/phase
— AC current signal <1 VA/phase (In=5A)
<0.5 VA/X phase (In=1A)
— Power supply Normal < 15W
When protection acting <30W

4.3 Environment condition


— Work temperature: -20℃~+ 55℃
— Store condition: in house whose temperature is -30℃~+80℃, the relative humidity not
larger than 80%, surrounding air does not contain acidic, alkaline or other caustic, volatile gas,
and the house is rain and snow prevented; under high-point, if no excitation, no irreversible
change, the device can working normally when temperature restore.
— Relative humidity: the month average of maximal relative humidity of the most humid month
is 90%, and the month average of minimal temperature is 25℃ and no dew appears. The
highest temperature is +40℃, the maximal average humidity does not exceed 50%.
— Atmospheric pressure: relative height above sea level is less than 2 km.

4.4 Anti-interference performance


— Pulse group interference
The device can endure decaying and surging wave whose frequency is 1 MHz and 100 KHz

---------------------------10-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
as stated in GB/T14598.13-1998(the first half wave voltage magnitude common-mode is 2.5
KV, difference mode is 1 KV) pulse group interference test.
— Fast transient interference
The device can endure fast transient interference test whose inclemency grade is A as stated
in the fourth chapter of GB/T14598.10-1996
— Radiant electromagnetic field interference
The device can endure Radiant electromagnetic field interference test whose inclemency
grade is Ⅲ as stated in the fourth chapter of GB/T14598.9-1995
— Static discharge
The device can endure static discharge test whose inclemency grade is 3 as stated in 4.1 of
GB/T14598.14-1998.

4.5 Insulated performance


— Insulation resistance
Impose 500V open circuit voltage of test instrument on each electric conducting circuit to
ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC current loop to
AC voltage loop, and the insulation resistance tested should not lower than 100 MΩ.
— Dielectric strength
It can endure AC voltage of 50 Hz, 2 KV (effective value) on each electric conducting
circuit to ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC
current loop to AC voltage loop, lasting for 1 min, no breakdown and flashover phenomenon.
— Impulse voltage
It can endure 5 KV (peak value) standard lightning surge test on each electric conducting
circuit to ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC
current loop to AC voltage loop

4.6 Mechanical performance


— Vibration response
The device can endure vibration response test whose inclemency grade is Ⅰas stated in
4.2.1 of GB/T11287-2000
— Impact response
The device can endure impact response test whose inclemency grade is Ⅰas stated in 4.2.1
of GB/T14537-1993.

---------------------------11-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
— Vibration endurance
The device can endure vibration endure test whose inclemency grade is Ⅰas stated in 4.2.2
of GB/T11287-2000.
— Impact endurance
The device can endure impact endure test whose inclemency grade is Ⅰas stated in 4.2.2
of GB/T14537-1993.
— Collision
The device can endure collision test whose inclemency grade is Ⅰas stated in 4.3 of
GB/T14537-1993.

4.7 Measuring precision


— Measuring error of each analogue value not exceed ± 3% of rating
— Digital value resolution not large than 1 ms
— Frequency measuring error not exceed 0.01Hz
— Time element error not exceed 1% set value +30ms

---------------------------12-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
5. Frame and panel definition
5.1 Trunk configuration
Adopt whole panel form. LCD, signal indicator, operation keyboard are collocated on the panel.
It is a 19/2 inch 4U strengthened trunk, it is designed for resisting strong vibration, strong
interference. Ensure high reliability even on wicked spot. It is no need adding AC or DC
anti-interference module no matter packaged or install separately.
The outline size is shown in figure 3; the install aperture size is shown in figure 4.

Figure 3 Outline picture

Figure 4 Install aperture size on face

5.2 Main inserted pieces


The device is composing of signal inserted piece, supply inserted piece, CPU inserted piece, AC
inserted piece and man-machine conversation inserted piece.
— Supply inserted piece
Through this module convert external AC or DC supply to DC supplies that device need to work.

---------------------------13-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
It outputs +5V, ± 12V and +24V. +5V voltage is for digital circuit, ± 12V is for A/D sampling,
and 24V is for driving relay and light coupling circuit of internal DI signal.
— AC inserted piece
TV inserted board can connect to 7 channels of voltage.
TA inserted board can connect to 6 channels of current.
— CPU inserted piece
CPU inserted piece is composing of main control CPU, SDRAM, Flash Memory and A/D
sample chip. The main control CPU is high speed RISC MPU, its master frequency reaches
200MHz, support DSP operation dictate integration. It adopts 14 channels high precision
high speed synchronous sampling technique to ensure response speed of device. All
industrial and military IC make the device own high stability and high reliability.
— Signal inserted piece
Signal board can divided into two types: digital input and digital output.
There are one input pieces, and can totally connect to 15 strong electric input points. The
drive voltage is 220V DC, brought in from extern.
There are two digital output pieces, owning 23 independent output nodes.
— Man-machine conversation inserted piece
It mainly refers to the fore panel which provides 9 keystrokes, 16 signal lamp, a LCD screen
of 192*64 size for convenient of man-machine conversation, and at the same time a USB 2.0
Host interface for special use of factory test.

5.3 Panel definition and illumination


The sketch map of panel is shown below.

Figure 5 Front view picture of panel

Panel of the device is composing of display lamps, LCD screen and keyboard viewed from left to
---------------------------14-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
right.

5.4 Keystroke definition


There are four direction-control keys and “+”, “-”, “enter”, “exit”, “reset” key on the panel.
Upwards key, used to move cursor upwards
Downwards key, used to move cursor downwards
Left key, used to move cursor to left. Press longer than 3s, can achieve switch between
Chinese and English.
Right key, used to move curse to right
Plus key, used to modify number, achieve adding 1
Minus key, used to modify number, achieve reducing 1
Enter is used to enter the next stage menu or to confirm operation
Exit is used to return to the last menu or to cancel operation
Reset press transitorily revert control, alarm, lamp signal. Long-term (longer than 1.6s) press
revert device.
Note that, display in reverse of parameter, symbol, number or letter express the present location
of cursor.

5.5 Display lamp illumination


On the panel there are two rows of 16 display lamps, used to display different operating condition.
The illumination is shown in the follow table.
Table 1 Panel lamp illumination
Name Illumination Name Illumination

POWER SUPPLY Power supply indicating 1DL 1DL acting display lamp, light for

lamp, normal light closing, dark for tripping

ALARM Alarm signal lamp, light 2DL 2DL acting display lamp, light for

when alarming closing, dark for tripping

BLOCKING Blocking signal lamp, 3DL 3DL acting display lamp, light for

light when lock signal closing, dark for tripping

putout

COMMUNICATION Communication indicating 4DL 4DL acting display lamp, light for

lam,glitter when message closing, dark for tripping

normal

---------------------------15-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
ACTION Action signal lamp, light COUPLER Coupler acting display lamp, light for

when device acting closing, dark for tripping

LOAD SHEDDING Load shedding signal BACKUP Reserve auto-transfer charging monitor

lamp, light when load SWITCH lamp, crush out when condition not

shedding satisfied; glitter when condition fulfill;

lighting when over charged

COUPLER Coupler closed signal MANAUL Manual switch allowable lamp, light

CLOSED lamp, light when coupler SWITCH when manual switch is allowed

closed

COUPLER Coupler tripped signal RUNNING Device running lamp, glitter once per

TRIPPED lamp, light when coupler second normally

tripped

---------------------------16-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
6.Man-machine operation
Man-machine page layout is made up of display light,keystroke,LCD. The hardware has been
explained before, please refer to “frame and panel definition” in section 5. And here will be a
presentation about the content and manipulation of every LCD page layout.

6.1 Main page layout illumination


The page layout when electrified is shown in figure 6:

Figure 6 Main page layout view of run

In the figure:
On the top left corner is scheme name: SID-409.
On the right of top corner is the number of the scheme running currently: scheme 02 (See
appendix 3 for detail)
On the middle: The name of the device: Reserve Supply Auto-transfer Device.
Area Number of the set-point running currently: 02.
Running time: 2008-06-06 14:06:06.
On the bottom line is the status of device, if any abnormal present, the corresponding record will
display at here. Record displays when abnormal disappear; if transfer acted, here display
corresponding action event for prompt. Check event details in ‘event record’.

6.2 LCD main menu tree frame illumination


In the boot-strap page, press "Enter" key to enter the main menu of the device. Man-machine
command main menu is a multi-level menu with tree frame, shown in Figure 7. In the main menu
page, press "up" and "down" key to move the cursor to select the entry, press "Enter" key to enter
the next level menu, press the "Exit" key to return to the previous menu. If the next level menu is
still selection menu, you can continue use "up" and "down" key to select the entry, press the "Enter"
key to enter next screen. The "up" "down" "left" "right" keys in most screens is adjusted by cursor,
the data can modify by using "+" and "-" keys, and write the corresponding numerical into the
memory. For the selection menu, when the cursor moved to the specified location, press "Enter" key

---------------------------17-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
to enter the project will be selected.

Measure Primary Value


Measurement Value Measure Secondary Value

Run Moniotr Digital Input Status Reserve Supply Transfer Set


Set Point Area Protect Set
Set Point Monitor 0-9 Manual Switch Set
Expand Set

Set Point Switch Reserve Supply Transfer Set


Set Point Area Protect Set
Set Point Set Point Modify 0-9 Manual Switch Set
Expand Set
Set Point Copy
Telesignalling

AC Measure

Parameter Set Communication

Language
MAIN
MENU Scheme

Telesignalling Event

Self-checking Event

Event Record Operate Event

Protection Event

Record Waveform Event


Print Event
Manual Print
Print Set Point

Driving
Device Debug Communication
Record Waveform
Time Adjust
Telecontrol
Event Clear
Other Function Revert Way
Password Set Measure Debug
Product Information Telemetering Cycle
Resume Default Value
Manufacturer Founction Reset Count
Linkage Logic
Output Board Choose
Software Updata

Figure 7 Tree structure multilevel menu

6.3 Main Menu instruction


The main menu is shown in figure 8. There are six options: Run Monitor, Set Point, Set

---------------------------18-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Parameter, Event Record, Manual Print, and Other Functions

Figure 8 Main menu

6.4 Run Monitor instruction


Choose “Run Monitor” in main menu, press “Enter” to enter “Run Monitor” page. There are
three monitor options in the page, as shown in figure 9:

Figure 9 Run monitor


☆ Measurement Value monitor:
This is for monitoring measurement value like magnitude, phase angle and frequency of incomer
and bus of 7 AC voltage channels and 6 current channels. After enter the run monitor main menu
through pressing “Enter”, the user can choose “primary value” and “secondary value” to examine.
☆ Digital Input Status monitor:
This is for monitoring the open or close status of 16 digital inputs. You can enter this menu
through choosing Digital Input Status and pressing “ENTER”.
☆ Set Point monitor:
This is for monitoring the set point. In Run Monitor page, choose Set Point Monitor and press
“Enter” to put in. The device provides ten set point areas numbered from 0~9. Before enter Set
Point Monitor, you need to choose set point area, “Current Set Point Area” is currently running set
point area number, “Select Set Point Area” is the set point area which need to be monitored,press
+/- to change Select Set Point Area number. You can examine set point of ten areas. If the set point
area selected is the same of the current one, then you can check the set point of current area.
Note that: Set Point Monitor is only used for check set point, but not for modifying. If you want
to modify the set point, enter “Set Point” and input the right password.

6.5 Set Point instruction


Choose “Set Point” in main menu, press “Enter”, and input right password (the ex-factory

---------------------------19-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
password is 0000 and you can set new password as you like) to enter “Set Point” page. There are
three setting contents in the page, which is shown in figure 10:
Set Point
Set Point Switch
Set Point Modify
Set Point Copy
Device Status: Normal

Figure 10 Set Point


☆ Set Point Switch
Switch different set point area to current area. Press +/- to modify “Set Point Select Area” area
number, press “ENTER” to complete the switch. For example, “Current Set Point Area” is 2, “Set
Point Select Area is” 0, as shown in figure 11, after press “enter” button, the “Current Set Point
Area” is modified to 0, as shown in fig. 12.

Figure 11 Set Point Switch Forehead

Figure 12 Set Point Switch Rear


☆ Set Point Modify:
This is for modifying set point with different type in different area. After enter “Set Point
Modify”, you should firstly choose the area number which needs to be modified. “Current Set Point
Area” shows the area number that device currently uses, “Set Point select area” shows the area
number that you want to modify. Press +/- to change the select area number,press “Enter” to enter
the corresponding page. There is four type set point for the device: Reverse Supply transfer Set
Point, Manual Switch Set Point, Protection Set Point and Expand Set point, and the menu is shown
in figure 13. You can consult Appendix 1 Set point table and setting introduction to modify set point.
Please pay attention to the range of value. If the scope is exceeded,the modified value will not be
memorized. Press “Enter” to save the set after modifying, and return to previous menu.

---------------------------20-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 13 Set Point Modify


☆ Set Point Copy:
This is for copying set point from “Source Set Point Area” to “Aim Set Point Area”. Press +/- to
change the number of set point area. Press “up”, “Down” to move cursor, choose the content which
you want to amend. Press “Enter” to copy date from “Source Set Point Are” to “Aim Set Point
Area”. For example, if you want to copy date from set point area 1 to set point area 2,firstly set
“Source Set Point Area” to 1,as shown in figure 14,and then press “Down” to move cursor to “Aim
Set Point Area”, set “Aim Set Point Area” to 2,as shown in figure 15. After pressing “Enter”, the
set point will be copied from Set Point Area 1 to Set Point Area 2.

Figure 14 Set Point Copy Forehead

Figure 15 Set Point Copy Rear

6.6 Parameter Set Instruction


Select “Parameter Set” in main menu, press “ENTER” and input right password, then enter
Parameter Set page. There are five contents in the page layout, as shown in figure16.

Figure 16 Parameter Set


☆ Telesignalling Parameter:
This is used for setting 17 channels the anti-trill time and digital input property(normal
open/normal close) of Telesignalling sampling. Press “Up”, “Down” to turn over pages and

---------------------------21-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
choose digital input with different number to set. Press “Left”、“Right” to select the anti-trill time
and digital input property of this route, press +/- to set the time value and convert the digital input
property between normal open and normal close. As shown in figure 17. In the figure, the number
“01” on top left corner represents the current digital input sequence number, the number “16” on
top right corner represents that there are 17 routes of signal totally. After finish the setting,press
“Enter” to save, and return to previous menu.

Figure 17 Telesignalling Parameter


☆ AC Parameters:
These parameters are for setting current transformer and potential transformer ratio, secondary
rated value of TV/TA. Press “Up” and “Down” to turn over page and choose AC variable with
different sequence number to set. Press “Left” and “Right” to choose rated value and ratio
property of this route of AC variable secondary TV/TA, press +/- to set the rated value and ratio.
The primary rated value of instrument transformer is calculated automatically and is shown in
figure 18. In the figure, the number “1” on top left corner represents current AC variable
sequence number, the number “9” on top right corner represents that there are 9 routes of AC
variable totally. After finish the setting,press “Enter” to save, and return to the previous menu.

Figure 18 AC Parameters

☆ Communication Parameter:
This function is for setting series interface, Ethernet interface and CAN Bus communication
parameters. After entering “Communication Parameter” page, press “Up”, “Down” to choose the set
communication type. Choose Network Parameter to enter Network Parameter Set page, you can set
IP, subnet Mask and Gateway of network, as shown in figure 19. Choose “CAN Bus” to enter the
CAN Bus and set the parameters. You can set CAN Bus Communication Address, Baud Ratio, as

---------------------------22-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
shown in figure 19.
Choose “Series Port Parameter” to enter the page and set the parameters. You can set
Communication Address, Communication Rule, Baud Ratio, Check Way of the three series port:
supervisor guardian used RS485-1, print use RS485-2, GPS private use RS485 as shown in figure
20. After finish the setting,press “Enter” to save, and return to the previous menu.
Net 1 Set Net 2 Set
IP Addr: 192.000.000.002 IP Addr: 192.001.000.002
Mask: 255.255.000.000 Mask: 255.255.000.000
Gateway: 192.000.000.001 Gateway: 192.001.000.001
Device Status: Normal Device Status: Normal

Figure 19 Net Parameter

Figure 20 Series Parameter


Note:
In RS485 series port 1-3 parameter Setting, Communication Rule SID-TEST is used to test series
port communication link hardware.
RS485 series port 1 is used to communicate with background supervisory control.
Communication rule which contains IEC60870-5-103, Modbus is supplied to users for choosing.
Communication Address,Baud Ratio,Check Way can be set according to the setting area.
RS485 series port 2 is used to communicate with printer. Baud Ratio is fixed to 9600 bps,Check
Way is No Check. Note that when the device is connected with printer directly,you must choose
EPSON ESC/P rule. And when the device connects with printer through print server SID-401PS,
you must choose SID-401PS rule. Supervision communication can choose IEC60870-5-103、
Modbus.
RS485 series port 3 is used to communicate with GPS. Communication rule contains
IRIG-B–RS485、IRIG-B–TTL、WEIKOT.
☆ Language Setting:
This is for setting page layout with Chinese or English language. Press “up”, “down” to choose
“Chinese” or “English”,press “Enter” to complete setting of display language,show as figure 21.
Besides you can switch the language by shortcut key “Left”. After press “ ” exceed three seconds
in any page, you can switch the language.

---------------------------23-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 21 Language Setting


☆ Scheme Set:
This is for setting scheme that consists with locale primary electric main connection, as shown in
figure 22. The characteristic of every scheme and primary main bus connection is introduced in
presentation of logic scheme in Appendix 3. Press +/- to set the serial number of scheme. After
finish the setting, press “Enter” to save, and return to previous menu. Return to main menu, you can
see the scheme number running currently on the top right corner.

Figure 22 Scheme Set

6.7 Event Record Instruction


Select “Event Record” in main menu, press “ENTER” to enter Event Record page. There are five
items of contents. as shown in figure 23.

Figure 23 Event Record


☆ Telesignalling Event:
It is for displaying telesignalling event happened. The telesignalling event can be divided into
real telesignlling event (real status change event of 16 real digital input signal channels) and virtual
telesignalling event (action event is recorded in the process of auto-transfer and manual switch).
Press “up”, “down” to turn over page. The event is listed by time, and the number of latest event is
1.
☆ Protection Event:

It is used for displaying protection or switch event which had happened. Press “up”, “down” to
turn over page. The event is listed by time, and the number of latest event is 1.
☆ Record Waveform Event:
---------------------------24-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
This is used for displaying recorded event and waveform. Events are listed by time. The last
event gets 1.
☆ Operation Event:
It is for displaying local operation (remote debug, modify set point, parameter etc) and remote
control that have happened. Press “up”, “down” to turn over page. The event is listed by time, and
the number of latest event is 1.
☆ Self Check Event:

It is used to display happened device self check events, mainly are self diagnose information of
important element on master CPU. Press “up”, “down” to turn over page. The event is listed by time,
and the number of latest event is 1.

6.8 Manual Print introduction


Choose “Manual Print” in main menu, and press “Enter” can enter the manual print page. There
are two options: Print Event and Print Set point. Note that, in order to print successfully the
communication rule must be set right before print (consult the setting introduction of series port 2
communication parameter), the connection with printer or SID-401PS be correct (consult the
introduction of CPU board connection in 7.4), and the estate of print server is normal. If the
connection with printer server is wrong or printer server is in abnormal, after 10 seconds you
pressed the Enter key, it will display “N” on the below right corner to indicate “Printer server
connect error”; otherwise it will display “Y” to indicate “Printer server connect normal”.
☆ Print Event:
Used to printing different types of events. Enter into manual print page, select print event, then it
will go into the print event page as shown in Figure 24. Press up, down, left, right to move the
cursor, press + / - key to modify the cursor line. The event type, paper type, starting time, ending
time can be set respectively, and print out the event record which occurred between starting time
and ending time. Note the starting time must be less than or equal to the end time, then it can be
print correctly. After setting, press the Enter key to start printing the corresponding events.

Figure 24 Print Event


☆ Print Set-point:
Used to printing set-points in different areas. Enter into the manual print page, select the print
---------------------------25-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
set-point, then it will go into print set-point page as shown in Figure 25. Press up, down key to
move the cursor to select the set-point area, paper type or print type. Press + / - key to modify the
cursor line. After setting, it will come out the dialog box "confirm the implementation", press the
Enter key to execute the print options in the print set-point area, press exit key will not
implemented.

Figure 25 Print Event

6.9 Other Function introduction


Choose “Other Function” in main menu, press “Enter” to enter Other Function page. There are
six options in the page, as shown in figure 26.

Figure 26 Other Function introduction


6.9.1 Device Debug
Device Debug contains five items, which include: Drive Debug, Communication Debug, Record
Waveform Debug, Telecontrol Debug, and Breaker Time Test.
☆ Drive Debug:
This is used for output relay testing. Entering “Drive Debug” needs right password. When in
“Drive Debug”, the logic control function and the protection will quit. The drive debug page layout
is shown in figure 27, the number on the top right corner (12 is backup, 14 is control circuit board,
22 is output expansion board), the driving number changed as the output board altered, if it displays
“1” on the top left corner, it means that it’s the first output circuit driving currently. Press Up/Down
to move cursor to choose output test circuit. If test item is “Output”, press “Enter” to control the
corresponding relay output, and then “Output” will become “Return”. Press “Enter” again will
control corresponding relay return. Note that, the cursor can be moved only when the relay is at
“Return” status.

---------------------------26-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 27 Device Debug


☆ Communication Debug:
This is used for testing communication channel. It can transmit virtual input signal, virtual
measurement signal to background supervisory control software,check the parameters of the
communication link and the background. Communication debug contains two options:
Telesignalling Debug, Telemetering Debug.
Enter “Communication Debug” to choose “Telesignalling Debug”, press “enter” to put in
Telesignalling Debug page, as shown in figure 28,There are 120 channels of Telesignalling signal
(event virtual Telesignalling and input real Telesignalling) to dummy transmitted. Press “+/-” to
switch test option “clear/setup”. When it is “clear”, press “Enter” and then it will transmit “0”.
When it is “setup”, press “Enter” and then it will transmit “1”.
Enter “Communication Debug”, choose “Telemetering Debug” and enter Telemetering Debug
page which is shown in figure 29,there are 13 channels of telemetering signal which can be dummy
transmitted. Press “+/-” to manual set telemetering value, press “Enter” to transmit telemetering
data to background.

Figure 28 Telesignalling Debug

Figure 29 Telemetering Debug


☆ Record Waveform Debug
This is used for manual triggering a record wave event. Enter “Record Waveform Debug”, press
“Enter” to trigger a record wave event, as shown in figure 6.26。And solidify record wave data needs
about 3 seconds.

---------------------------27-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 30 Record Waveform Debug


☆ Telecontrol Debug
This function is used for simulating telecontrol switch on the spot,and testing respond action to
telecontrol the device operation. The “Telecontrol Debug” page layout is shown in figure 31, “7”on
the top right corner indicates that there’re 7 circuits telecontrol objectives, “1”on the top left corner
indicates that it’s the first circuit runningcurrently. Press “+/-” to switch test option “off”/ “on”.
After press “Enter”, dialog box “Sure?” appears, then press “Enter” again to perform corresponding
telecontrol operation, or press “Exit” to cancel corresponding telecontrol operation.

Figure 31 Telecontrol Debug


6.9.2 Time Adjust
This function is used for adjusting current run time, Time Adjust page is shown in figure 32.
Press “Left”, “Right” to move the cursor, press +/- to change the time value, press “Enter” to
confirm the time adjusted.

Figure 32 Time Adjust


6.9.3 Event Clear
This is used for clearing every kinds of event record and reset count. The Event Clear page is
shown in figure 33. Press “Up” “Down” to choose the option which to be cleared, press “Enter” to
execute it.

Figure 33 Event Clear

---------------------------28-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
6.9.4 Password Set
Password Set page is shown in figure 34. This function is for setting new password. The
password is 0000 when the device leave factory, user can set new password by himself. Please pay
attention that when set new password, it need to input new password twice and they must be same.
Once the setting is successful, you must remember the new one in order to operate next time.

Figure 34 Password Set


6.9.5 Product Information
Product Information mainly contains current version, CRC verify code, contact phone and our
company’s address, as shown in figure 35. If technique support is needed, you can contact with us
through contact manner.

Figure 35 Product Information


6.9.6 Manufactory Function
Factory Function contains eight functions: Revert Way, Measure Debug, Telemetering Cycle,
Resume Default Value, Reset Count, linkage Logic and Output Board Choose. They are mainly
provided for personnel of our company to use. The user needn’t know.

---------------------------29-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7. Instruction of backboard terminals connection and installation
Device back view drawing as follow:

电源板 备用 信号开出板 系统板 强电开入板 电压互感器板 电流互感器板


POWER EDO CPU EDI TV TA

JK7 JK5 JK4 JK3 JK2 JK1

1 1
1 1 1 1
2 2 2 2 2 2
3 3 3 3
4 4 4 4 3 3
5 5 5 5
6 6 6 6 4 4
7 7 7 7
8 8 8 8 5 5
9 9 9 9
10 10 10 10 6 6
11 11 11
12 12 12 7 7
13 13 13
14 14 14 8 8
15 15 15
16 16 16
9 9
17
18
10 10
19
20
11 11
12 12
网 口

Figure 36 Device back view drawing


Device back terminals sketch map as follow:

---------------------------30-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 37 Back board terminals sketch map

---------------------------31-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7.1 Power board terminals instruction
Power board Jk7 back terminals sketch map 38:

Figure 38 Power board terminals instruction

7.2 TA board terminals instruction


Jk1 Back board terminal sketch map 39:

Figure 39 TA board terminals instruction

7.3 TV board terminals instruction


JK2 back board terminal sketch map 40:

---------------------------32-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 40 TV board terminals instruction


c d Note: If the reserve supply is double, connect incomer 3 voltage.

7.4 CPU board terminals instruction


CPU board terminals contain two types; there are phoenix connection terminals and RJ 45
terminal.
CPU JK4 back board terminal sketch map 41:
Code Name Instruction
1 CANH CAN Communication
2 CANL Interface
3 TXGND
4 485A-1 RS485 Communication
5 485B-1 Interface 1
6 485A-2 RS485 Communication
7 485B-2 Interface 2
8 Weak Current Reset + Signal Reset 24V
9 Input Public - Weak
10 Backup Input 1 Backup Current
11 Backup Input 2 Input
12 Backup Public -
13 GPS Pulse+ GPS Second Pulse
14 GPS Pulse-
15 485A-GPS GPS485 Interface
16 485B-GPS
RJ45 Ethernet Interface Net Communicate Interface

Figure 41 CPU board terminals instruction

The definition of each pin in Ethernet interface:


Table 2
Code Definition Signification
1 TX+ Send signal+

---------------------------33-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2 TX- Send signal-
3 RX+ Receive signal +
4 N/C Vacancy
5 N/C Vacancy
6 RX- Receive signal -
7 N/C Vacancy
8 N/C Vacancy
The instruction of device printing function:
The connection between one device and one printer as follow:

Figure 42 Connection between one device and one printer

The connection between multi-device and one printer server as follow: (Two device adopt
RS485,multi-device adopt Ethernet).

Figure 43 Connection between multi-device and one printer


Note: When device communicate with GPS, before connect corresponding terminals please turn
GPS communication signal to RS 485 communicate mode.

---------------------------34-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
7.5 EDI heavy current input board terminals instruction
Device equipped one EDI board, heavy current input and heavy current telesignalling have
different definitions in different running scheme, please refer to input terminals instruction in
appendix 3 for detail. Heavy current input public negative pole and heavy current telesignalling
public negative pole are independent inside the device. If needed, you can short-circuit outside the
device, and use a 220V heavy current public negative.
EDI_B1 input JK3 back board sketch map 44:

Figure 44 EDI_B1 input board terminals definition


Note:
1 KM select DC 220V or 110V.

2 Device input signal uses electrical independent contact mode, so please connect public point with
negative pole of exterior input signal.

7.6 Output board terminals instruction


There are two output boards, one is EDO_JK5,the other can be backup, control circuit board
TRIP_JK6 or expansion output board OUT_JK6 according to the local needed. The standard
collocate of the second output is backup board, for special needed, please indicate in the ordering
contract. The second output board is TRIP_JK6 when independent control circuit is needed; the
second output board is OUT_JK6 when extra output is needed. The definition of terminals as
follow:
---------------------------35-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
EDO output JK5 back board terminals sketch map 45:

Figure 45 Output board terminals instruction


If the second output board is TRIP-Jk6, output board is control circuit, the terminals sketch map
46:

Figure 46 Control circuit board terminals instruction

---------------------------36-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
If the second output board is OUT-JK6, output board is expansion output board the terminals
sketch map 47:
Code Name Instruction
1 Public Point Expansion
2 Expansion Output 1
Output 1、2
3 Expansion Output 2
4 Public Point Expansion
5 Expansion Output 3
Output 3、4
6 Expansion Output 4
7 Public Point Expansion
8 Expansion Output 5
Output 5、6
9 Expansion Output 6
10 NC Not Connect
11 Public Point Expansion
12 Expansion Alarm 1 Alarm 1
13 Public Point Expansion
14 Expansion Alarm 2 Alarm 2
15 Public Point Expansion
16 Expansion Alarm 3 Alarm 3
17 Public Point Expansion
18 Expansion Alarm 4 Alarm 4
19 NC
Not Connect
20 NC

Figure 47 EDO_JK6 output expansion board terminals instruction


Note:
The six outputs of the breaker in EDO_JK5 have different definition in different scheme. Please
refer to terminals instructions in appendix 3 for detail.

---------------------------37-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
8. Debug and dispose of abnormity
Device don’t need debug basically, you have to complete several inspection as following, if OK,
namely the device going well.
☆ Procedure and version checking
“Other Function” includes product information which gives device version, CRC correcting code
and etc. If the information content is not correspond with order sheet or following document, please
contact consumer service branch for updating.
☆ Switch input checking
If the input of switch state is incorrect, please check the exterior connection; if connection is Ok
and problem still exist, please change the input board; if the above methods ineffectively, please
change the CPU board.
☆ Output circuit checking
The record menu includes fault record. If the fault record prompts problem in the output circuit,
please check output circuit according to record.
☆ Analog value input checking
Enter “Parameter setting” interface to check if AC parameter setting is correct. Enter “Run
monitor” interface to check if the measured value of primary side and secondary side is correct.
Note, in “parameter set”, secondary rated value is the primary rated values of device TV/TA ratio.
☆ Whole group test

If all checking above are correct, the device is out of question. To be cautiously, you can renew
device set-point; observe the device action to confirm validity of set point.
☆ Device fault alarm
If the device hardware went wrong,LCD shows the fault information and send alarm, then lock
the output circuit of protection. The device will send alarm signal when lost power.
☆ GPS time calibrating
The device receive information as year, month, date, hour, minute and second by communicate
with main automation transformer substation. Moreover, the device collocate a GPS time
calibrating communication interface and a second pulse input interface, which can connect to GPS
directly or connect to second pulse output in substation, time calibrating precision is less than 1 ms.
☆ Net communication
The device can communicate with microcomputer monitor or protection manager, the
communicate interface can be RS-485 or Ethernet。
☆ Dispose of abnormity

---------------------------38-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Table 3
Abnormal phenomenon Solution

Line 1 TV disconnection Check wire fuse of line 1 TV secondary

Line 2 TV disconnection Check wire fuse of line 2 TV secondary

Line 3 TV disconnection Check wire fuse of line 3 TV secondary

Bus 1 TV disconnection Check wire fuse of bus 1 TV secondary

Bus 2 TV disconnection Check wire fuse of line 2 TV secondary

A/D fault Replace CPU or sampling board

Output fault Replace corresponding output circuit board

Setp-oint fault Reset point or replace CPU board

Set-point channel fault Transfer channel

---------------------------39-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
9. Commissioning instructions and notices
☆ Check whether the device model, version and electric parameter are correspond with ordering
contract or not;
☆ Check strictly before commissioning, confirm there is no wrong in device or external circuit;
☆ Set point is strictly according to the set-point list, confirm that the not devoted protection are
set to off;
☆ Confirm that group number and set-point are correct;
☆ Check boards connection, cables connection and terminals connection are reliable;.
☆ Check the polarity of DC supply correct;
☆ Check the display of AC values and the net communication normal.

10. Storage and maintain


☆ Product storage temperature range: -25℃~+70℃, relative humidity less than 80%, the room
can defend rain and snow and atmosphere all round not include components as acidity, alkalescency,
causticity or explosiveness; Device will not be permanent damaged when energized under extreme
condition. If temperature back to normal, device will work well.
☆ Device is only warranty in one year if you transport, install, storage and use absolutely abide
the instruction.

11. Whole set supplied


11.1 The document goes with device
☆ A product certification.
☆ A instruction enclosed wiring diagram.
☆ A packing list.
11.2 The accessories go with product
☆ According to the need of product construction that provides the supply of annex.

---------------------------40-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 1: Set point table
Fixed value include: system set-point, manual switch set-point, fault switch set point, accident
switch set-point, switch criteria set-point, protection set-point. Device can store 10 groups set-point
show as 0~9. Each group can be set independently.
Table 4
Group number Instruction
setting Device can store 10 groups set-point show as 0~9. default 0

System set-point

Code Name [Item/range] Default Instruction


To choose Unidirectional Switch (only transfer from work
Switch Direction
Bi-directional supply to backup supply) or Bi-directional Switch (switch
01 [Unidirectional Switch ,
Switch each other between work supply and backup supply) when
Bi-directional Switch]
accident switch and fault switch.
The setting time used for check breaker status, failed
Check Time of Trip
02 200ms switch if the status not checked during the setting time.
[020 -- 999]ms
The fitted setting is 1.5--2 times real closing time
Pulse Of Trip For setting output signal time, which can be applied by
03 200ms
[020 -- 999]ms user customize
Volt. Type of Input Line
For setting the type of incomer voltage, which can be
04 1 [Ua, Ub, Uc, Uab, Ua
applied by user customize
Ubc, Uca]
For setting the leading angle between incomer and bus
Leading Angle of Input
05 0.0° voltage since star-delta convert work incomer voltage,
Line 1 [0°, +30°, -30°]
which can be applied by user customize
Volt. Type of Input Line
For setting the type of incomer voltage, which can be
06 2 [Ua, Ub, Uc, Uab, Ua
applied by user customize
Ubc, Uca]
For setting the leading angle between incomer and bus
Leading Angle of Input voltage since star-delta convert work incomer voltage,
07 0.0°
Line 2 [0°, +30°, -30°] which can be applied by user customize which can be
applied by user customize
Volt. Type of Input Line
For setting the type of incomer voltage, which can be
08 3 [Ua, Ub, Uc, Uab, Ua
applied by user customize
Ubc, Uca]
For setting the leading angle between incomer and bus
Leading Angle of Input
09 0.0° voltage since star-delta convert work incomer voltage,
Line 3 [0°, +30°, -30°]
which can be applied by user customize
To set TA connection between line 1 and device, for
TA of Input Line 1
10 None distinguish switch abnormal and prevent mistrip since the
[None, Having]
connection of auxiliary contacts mistake, which can be
---------------------------41-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
applied by user customize
To set TA connection between line 2 and device, for
TA of Input Line 2 distinguish switch abnormal and prevent mistrip since the
11 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
To set TA connection between line 3 and device, for
TA of Input Line 3 distinguish switch abnormal and prevent mistrip since the
12 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
Normal- Volt. Set of For distinguish whether backup voltage normally for
13 Line 90.0%Un charging condition, which can be applied by user
[85.0 --100.0] %Un customize
Normal- Volt. Set of Bus For distinguish whether bus voltage normally for charging
14 90.0%Un
[85.0 -- 100.0] %Un condition, which can be applied by user customize
Low- Volt. Set of Line Used for setting alarm of backup loss power, which can be
15 80.0%Un
[40.0 – 90.0] %Un applied by user customize
Low- Volt. Set of bus Used for setting alarm of bus loss power, and accident
16 70.0%Un
[40.0 – 90.0] %Un switch actuate, which can be applied by user customize
Delay of Acing Low- The delay ids used for ensure loss power when accident
17 Volt. 0.20S switch actuate for prevent mistrip, which can be applied
[0.02 – 10.00]S by user customize
The delay ids used for ensure loss power when accident
Mis-trip Start Delay
18 0.05S switch actuate for prevent mistrip, which can be applied
[0.05 – 5.00]S
by user customize
Un-volt.. Set of Bus Used for distinguishing the un-volt.. set of bus, which can
19 20.0%Un
[0.05 – 5.00]S be applied by user customize
Delay Set of Un-volt.
Used for distinguishing the delay set of un-volt.. bus,
20 Bus 1.00S
which can be applied by user customize
[40.0 – 90.0] %Un
Used for switching abnormity management (such as exit all
Allowable Delay Limit the switch criterion) , judge the time limit of switch
21 of Switch 30.00S failure, if switch not succeed in the time limit, it will
[40.0 – 90.0] %Un report switch overtime failure, which can be applied by
user customize

Manual switch set-point


Manual Switch Way
[Off, Series Switch, Auto For choose manual switch way or exit manual switch,
01 Auto Parallel
Parallel, Semi-auto Parallel, which can be applied by user customize
Parallel & Series]
For setting Vol. diff. allowed which refer to Sync. Catch
Parallel Max Volt. Diff.
02 5.0%Un Switch criteria when paralleling switch, which can be
[1.0 -- 20.0] %Un
applied by user customize
---------------------------42-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
For setting Freq. diff. allowed which refer to Sync. Catch
Parallel Max Freq. Diff.
03 0.50Hz Switch criteria when paralleling switch, which can be
[0.1 -- 2.0]Hz
applied by user customize
Parallel Max Angle Diff. For setting Angle diff. allowed when paralleling switch,
04 10.0°
[0.0 -- 60.0]° which can be applied by user customize
Clamp of Decoupling The soft switch of decoupling function, which can be
05 On
[Off, On] applied by user customize
Delay of Decoupling Delay of Decoupling, to prevent system power off , which
06 0.20S
[0.05 – 5.00]S can be applied by user customize
For setting bus breaker real closing time, must be strictly in
Bus Breaker Closing
07 100ms accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.
For setting breaker 1DL real closing time, must be strictly
1DL Breaker Closing
08 100ms in accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.
For setting breaker 2DL real closing time, must be strictly
2DL Breaker Closing
09 100ms in accordance with the actual situation to ensure a good
Time 2 [020 -- 999]ms
closing angle.
For setting breaker 3DL real closing time, must be strictly
3DL Breaker Closing
10 100ms in accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.
For setting breaker 4DL real closing time, must be strictly
4DL Breaker Closing
11 100ms in accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.

Protection set-point
Bus Breaker Over Bus breaker over current 1, which can be applied by user
01 Off
Current 1 [On, Off] customize
Bus Breaker Over
Bus breaker over current 1 current, which can be applied
02 Current 1 Current 6.00A
by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current 1 time, which can be applied by
03 Current 1 Time [0.10 – 0.2S
user customize
10.00]S
Bus Breaker Over Bus breaker over current 2, which can be applied by user
04 Off
Current 2 [On, Off] customize
Bus Breaker Over
Bus breaker over current 2 current, which can be applied
05 Current 2 Current 5.00A
by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current 2 time, which can be applied by
06 Current 2 Time [0.10 – 0.50S
user customize
10.00]S

07 Bus Breaker Over Off Bus breaker over current haste, which can be applied by
---------------------------43-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Current haste [On, Off] user customize
Bus Breaker Over
Bus breaker over current haste current, which can be
08 Current Haste Current 5.00A
applied by user customize
[1.00 – 99.99]A
Bus Breaker Over
Bus breaker over current haste time, which can be applied
09 Current Haste Time 0.20S
by user customize
[0.10 – 3.00]S
Line Low-volt. Alarm The delay setting of Line Un-volt.. Alarm, which can be
10 10.00S
Delay [1.00 -- 99.99] S applied by user customize
Bus Low-volt. Alarm The delay setting of Bus Un-volt.. Alarm, which can be
11 10.00S
Delay [1.00 -- 99.99] S applied by user customize
Bus 1 Low-volt. Alarm The soft switch of Bus 1 Un-volt.. Alarm function, which
12 Off
[ On ,Off] can be applied by user customize
Bus 2 Low-volt. Alarm The soft switch of Bus 2 Un-volt.. Alarm function, which
13 Off
[ On ,Off] can be applied by user customize
Line 1 Low-volt. Alarm The soft switch of Line 1 Un-volt.. Alarm function, which
14 Off
[ On ,Off] can be applied by user customize
Line 2 Low-volt. Alarm The soft switch of Line 2 Un-volt.. Alarm function, which
15 Off
[ On ,Off] can be applied by user customize
Line 3 Low-volt. Alarm The soft switch of Line 3 Un-volt.. Alarm function, which
16 Off
[ On ,Off] can be applied by user customize
Bus 1 TV Line-break The soft switch of Bus 1 TV disconnection Alarm function,
17 Off
Alarm [ On ,Off] which can be applied by user customize
Bus 2 TV Line-break The soft switch of Bus 2 TV disconnection Alarm function,
18 Off
Alarm [ On ,Off] which can be applied by user customize
Line 1 TV Line-break The soft switch of Line 1 TV disconnection Alarm
19 Off
Alarm [ On ,Off] function, which can be applied by user customize
Line 2 TV Line-break The soft switch of Line 2 TV disconnection Alarm
20 Off
Alarm [ On ,Off] function, which can be applied by user customize
Line 3 TV Line-break The soft switch of Line 3 TV disconnection Alarm
21 Off
Alarm [ On ,Off] function, which can be applied by user customize

Scheme expand set-point


For setting breaker 5DL real closing time, must be strictly
5DL Breaker Closing
01 100ms in accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.
For setting breaker 6DL real closing time, must be strictly
6DL Breaker Closing
02 100ms in accordance with the actual situation to ensure a good
Time [020 -- 999]ms
closing angle.
To set TA connection between line 4 and device, for
TA of Input Line 4 distinguish switch abnormal and prevent mistrip since the
03 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize

---------------------------44-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
To set TA connection between line 5 and device, for
TA of Input Line 5 distinguish switch abnormal and prevent mistrip since the
04 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
To set TA connection between line 6 and device, for
TA of Input Line 6 distinguish switch abnormal and prevent mistrip since the
05 None
[None, Having] connection of auxiliary contacts mistake, which can be
applied by user customize
Breaker Mis-trip Way The soft switch of function which input all switches (or
06 [All switches, incomer Off incomer switches) or exit all switches, which can be
switches, Off] applied by user customize
Zero dimension
07 0000 Backup
set-point 1 [0000 - 9999]
Zero dimension
08 0000 Backup
set-point 2 [0000 - 9999]
Zero dimension
09 0000 Backup
set-point 3 [0000 - 9999]
Zero dimension
10 0000 Backup
set-point 4 [0000 - 9999]
Zero dimension
11 0000 Backup
set-point 5 [0000 - 9999]
Zero dimension
12 0000 Backup
set-point 6 [0000 - 9999]
Zero dimension
13 0000 Backup
set-point 7 [0000 - 9999]

Remark:
☆ System set-point
This is used for setting system value which is used in common.
☆ Manual switch set-point
This is used for setting manual switch way and switch principle.
☆ Protection set-point
This is used for setting set-point that is related to protection function.
☆ Project expand set-point
This is used for setting set-point related to special project.

---------------------------45-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 2: Parameter list

Type Code Name Range Default value

Telesignalling parameter

Anti-trill time 01 - 16 00-15 Input anti-disturb [ 1-999 ]ms 10ms

time

Input attribute 01 - 16 00-15 Input attribute [Open/Close] Open

AC parameter

01 Bus 1 voltage [1- 9999] 100

TV 02 Bus 2 voltage [1- 9999] 100


Ratio 03 Line 1 voltage [1- 9999] 100

04 Line 2 voltage [1- 9999] 100

05 Line 3 voltage [1- 9999] 100

06 Bus breaker current [1- 9999] 100

TA 07 Line 1 current [1- 9999] 100


Ratio 08 Line 2 current [1- 9999] 100

09 Line 3 current [1- 9999] 100

10 Bus 1 secondary rated vol. [1- 999] V 100 V

11 Bus 2 secondary rated vol. [1- 999] V 100 V

12 Line1 secondary rated vol. [1- 999] V 100 V


Secondary 13 Bus2 secondary rated vol. [1- 999] V 100 V
rated value 14 Bus3 secondary rated vol. [1- 999] V 100 V

15 Bus breaker secondary [1- 999] V 5A

rated current

16 Line 1 secondary rated cur [1- 999] V 5A

17 Line 2 secondary rated cur [1- 999] V 5A

18 Line 3 secondary rated cur [1- 999] V 5A

Communication parameter

IP [002 -- 255] 192.0.0.49

Network 01 Mask [-] 255.255.0.0


communication Gateway [-] 192.0.0.1

Communication address [0 - 127] 1

---------------------------46-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Communication protocol [IEC60870-5-103、Modbus SID-TEST

01 、SID-TEST]

Communication velocity [300 bps – 19200 bps ] 9600 bps

Check way [No check, odd parity, even No check


RS 485 parity]
series Communication address [0 - 127] 1
communication Communication protocol [SID-401PS、EPSON ESC/P、 SID-TEST

IEC60870-5-103、Modbus、
02 SID-TEST]

Communication velocity [300bps -- 19200bps ] 9600 bps

Check way [No check, odd parity, even No check

parity]

Communication address [0 - 127] 1

Communication protocol [SID-TEST 、 SID-TEST

IRIG-B–RS485 、
03 IRIG-B–TTL、WEIKOT]

Communication velocity [300 bps – 19200 bps ] 9600 bps

Check way [No check, odd parity, even No check

parity]

CAN Bus Communication address [0 - 999] 001

communication 01 Communication velocity [20kbps、50kbps、125kbps] 125kbps

Language

Language 01 Chinese [Chinese/English] Chinese

Scheme

Scheme 01 Scheme [1 -- 20] 2

Remark:
☆ Telesignalling parameter
This is used for setting input signal attribute and anti-disturb time, the default value: open,
10 ms
☆ Ac parameter
This is used for setting AC current and voltage transformer ratios. The secondary rated

---------------------------47-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
value is the value of TA or TV inside the device.
☆ Communication parameter
This is used for setting the parameter of RS485 series communication, Ethernet
communication and CAN bus communication.
RS 485 series 1 is used for communication when the same background controlled. Users
can choose communication protocol between IEC 60870-5-103 and Modbus. The address,
velocity and check mode are according to parameter range.
RS 485 series 2 can use for printer communication when not used, baud rate: 9600 bps,
check mode: no check. The communication protocol is EPSON ESC/P when device and
printer connected directly; the communication protocol is SID-401 PS when printer server
connected with printer.
RS 485 series 3 is used for GPS communication; users can choose communication protocol
during IRIG-B–RS485、IRIG-B–TTL、WEIKOT.
☆ Language
This is used for interface language setting (Chinese or English).
☆ Scheme parameter
This is used for setting backup scheme that correspond with local primary electrical main
connection.

---------------------------48-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Appendix 3: Back up scheme instruction
Note:
Bus low-volt:The voltage is lower than low-volt set-point, keep over verifying delay of acking
low-volt., and delay of bus un-volt. switch, then protection startup.
Switch mis-trip: The work breaker is open and without current, keeps longer than verify
delay.

Scheme 1: Bus breaker or bridge switch control (Plural reserve)


Wiring diagram as figure 48:

Figure 48 Main connection

Control logic:
Normal operating:
1 DL closed,bus I energized by supply 1 through 1 DL.
2 DL closed,bus II energized by supply 2 through 2 DL.
Bus breaker tripped, bus I, bus II backing for each other.
Device energized, if the voltage of bus I and bus II are both higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
When bus I voltage low or 1DL mis-trip, bus II voltage is higher than under-voltage set-point,
then trip 1DL, after the un-volt. test and delay condition of bus I are satisfied, close bus breaker.
When bus II voltage low or 2DL mis-trip, bus I voltage is higher than under-voltage set-point,
then trip 2DL, after the un-volt. test and delay condition of bus II are satisfied, close bus breaker.
(Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage; or 1DL and
---------------------------49-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL closed, bus breaker tripped, and the external input signal mode 1 or mode 2 closed, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 1DL when the
un-volt. test condition of bus I is satisfied.
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 2DL when the
un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL are closed, bus breaker tripped, the external input signal mode 1 closed, mode
2 tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 2DL , close bus breaker when the un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL closed, bus breaker tripped, the external input signal mode 2 closed, mode 1
tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 1DL and close bus breaker when the un-volt. test condition of bus I is satisfied.
[Auto Parallel]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully, then the transfer process is over, otherwise decoupling and trip 1DL; (Note: The
decoupling function can be applied by user customize)
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL; (Note: The
decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 1 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker; (Note: The decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 2 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling

---------------------------50-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
and trip bus breaker; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

Figure 49 Scheme 1 terminal instruction

Scheme 2: Incomer transfer control (Exclusive backup)


---------------------------51-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Wiring diagram as figure 50:

Figure 50 Main connection

Control logic:
Normal operating:
Bus energized by supply 1 through 1 DL, bus breaker. Power supply 2 is used for backing
through 2DL.
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
System switches logic:
Bus breaker and 1DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
Bus breaker and 2DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay
condition of bus are satisfied, close 1DL.
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay
condition of bus are satisfied, close 2DL.
---------------------------52-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
[Auto Parallel]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip 2DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 1DL; (Note: The decoupling function can
be applied by user customize)
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip 1DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 2DL; (Note: The decoupling function can
be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

---------------------------53-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 ML-Ia Link Line Phase A 1 1M-Ua1 Bus Phase A Voltage
2 ML-Ia' Current 2 1M-Ub1 Bus Phase B Voltage
3 ML-Ib Link Line Phase B 3 1M-Uc1 Bus Phase C Voltage
4 ML-Ib' Current 4 NC Not Connected
5 ML-Ic Link Line Phase C 5 NC Not Connected
6 ML-Ic' Current 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1LI1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 1L-U2 Incomer 2 Voltage
10 2L-I2' 10 1L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 Bus Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point Bus Breaker 7 NC
8 NC Tripping Output 8 NC
9 Bus Breaker Tripping 9 NC
10 Public Point Bus Breaker 10 NC
11 NC Closing Output 11 NC
12 Bus Breaker Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not Connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 51 Scheme 2 terminal instruction

Scheme 3: Line switch transfer control 1 (Exclusive backup)


Wiring diagram as figure 52:

Figure 52 Main connection


---------------------------54-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Control logic:
Normal operating:
Bus energized by supply 1 through 1 DL. Power supply 2 is used for backing through 2DL.
Or bus energized by supply 2 through 2DL. Power supply 1 is used for backing through 1DL.
(Only valid if bi-direction transfer is selected).
Device energized, if backup supply and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of power supply 2 is
higher than under-voltage set-point, then trip 1DL, after the un-volt. test and delay condition of bus
are satisfied, close 2DL.
2DL closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of power supply 1 is
higher than under-voltage set-point, then trip 2DL, after the un-volt. test and delay condition of bus
are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When 1DL or 2DL tripped, and the voltage of reserve supply is higher than under-voltage
set-point, the manual switch function of the device is available. The transfer logics in different
transfer mode as follow:
[Series Switch]:
2DL closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual
switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are satisfied,
close 1DL.
1DL closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual
switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are satisfied,
close 2DL.
[Auto Parallel]:
2DL closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual
switch signal presence, close 1DL when the parallel synchronization condition is satisfied, trip 2DL
after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL; (Note: The decoupling function can be applied by user customize)
1DL closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual
switch signal presence, close 2DL when the parallel synchronization condition is satisfied, trip 1DL
after closed successfully, if tripped successfully then the transfer process is over, otherwise

---------------------------55-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
decoupling and trip 2DL; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 NC
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking + Central Signal
20 Device Blocking - Alarm Output

Figure 53 Scheme 3 terminal instruction

Scheme 4: Line switch transfer control 2 (Exclusive backup)

---------------------------56-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Wiring diagram as figure 54:

Figure 54 Main connection

Control logic:
Normal operating:
Bus energized by supply 1 through 1DL. Power supply 2 is used for backing through 2DL.
Or bus energized by supply 2 through 2DL. Power supply 1 is used for backing through 1DL.
(Only valid if bi-direction transfer is selected).
Device energized, if bus voltage is higher than voltage set-point, the device begin to charge 10
s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL tripped, if bus I low-voltage or 1DL mis-tripped, then trip 1DL, after the
un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL tripped, if bus I low-voltage or 2DL mis-tripped, then trip 2DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer
is selected).
Manual transfer logic:
When 1DL or 2DL tripped, the manual switch function of the device is available. For there has
no voltage transformer in this scheme, so only series switch is available, and parallel & series is
also valid. The series switch logic as follow:
[Series Switch]:
2DL closed, 1DL tripped, if manual switch signal presence, trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL.
1DL closed, 2DL tripped, if manual switch signal presence, trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
After manual switch, the device will return to normal operating mode.
---------------------------57-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Terminal instruction:
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 NC Not Connected
8 1L-I1' 8 NC
9 2L-I2 Incomer 2 Current 9 NC Not Connected
10 2L-I2' 10 NC
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 NC
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 55 Scheme 4 terminal instruction

Scheme 5: Hot backup transformer transfer control (Exclusive backup)


Wiring diagram as figure 56:

---------------------------58-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 56 Main connection

Control logic:
Hot backup: The transformer of backup supply is in no-load status when normal operating, the
high-voltage side breaker connected with the backup supply when in closed status.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL, 3DL and 4DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
2DL, 3DL and 4DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When 1DL, 3DL and 4DL are closed, 2DL tripped, or 2DL, 3DL and 4DL are closed, 1DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of
---------------------------59-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
bus are satisfied, close 1DL when the bus un-volt. test conditions satisfied.
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of
bus are satisfied, close 2DL.
[Auto Parallel]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip 2DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 1DL; (Note: The decoupling function can be applied by user
customize)
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip 1DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 2DL; (Note: The decoupling function can be applied by user
customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

---------------------------60-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 4DL Breaker Aux. Contact
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 7 NC
8 NC Not connected 8 NC
9 NC 9 NC
10 Public Point 10 NC
11 NC Not connected 11 NC
12 NC 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 57 Scheme 5 terminal instruction

Scheme 6: Cold backup transformer transfer control (Exclusive backup)


Wiring diagram as figure 58:

Figure 58 Main connection

---------------------------61-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Control logic:
Cold backup: The transformer of backup supply is in no-power status when normal operating,
the double side breakers are disconnected.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL and 4DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL and 3DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL and 3DL closed, 2DL and 4DL tripped, if bus low-voltage or 1DL (3DL) mis-tripped,
voltage of power supply 2 is higher than under-voltage set-point, then trip 1DL and 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 4DL, if 4DL closed successfully, then
close 2DL, the transient exciting current generated by close the transformer with no-load through
4DL may cause 4DL close fail.
2DL and 4DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL (4DL) mis-tripped,
voltage of power supply 1 is higher than under-voltage set-point, then trip 2DL, 4DL, after the
un-volt. test and delay condition of bus are satisfied, close 3DL, if 3DL closed successfully, then
close 1DL. (Only valid if bi-direction transfer is selected). As mentioned above, close the
transformer with no-load through 3DL may cause 3DL close fail.
Manual transfer logic:
When 1DL and 3DL closed, 2DL and 4DL tripped, or 2DL and 4DL are closed, 1DL and 3DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL and 4DL, after the un-volt. test and delay
condition of bus are satisfied, close 3DL, if 3DL closed successfully, then close 1DL.
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL and 3DL, after the un-volt. test and delay
condition of bus are satisfied, close 4DL, if 4DL closed successfully, then close 2DL.
[Auto Parallel]:

---------------------------62-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 3DL, then close 1DL when the parallel
synchronization condition is satisfied, trip 2DL and 4DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 1DL and 3DL; (Note:
The decoupling function can be applied by user customize)
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 4DL, then close 2DL when the parallel
synchronization condition is satisfied, trip 1DL and 3DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL and 4DL; (Note:
The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
For the transient exciting current generated by close the transformer with no-load may cause
transformer protection mis-trip, and re-trip the breaker in the supply side, this will lead the transfer
control fail. To solve this problem, we designed SID-3YL Inrush Suppresser. This device can
suppress the transient exciting current generated by close the transformer with no-load, and achieve
success at the first time. The suppresser can install on the operating box of 3DL and 4DL, and send
the control signal of 3DL or 4DL to the Inrush Suppresser, then the Suppresser will connect the
tripping, closing circuit to realize close successfully one time.

Terminal instruction:

---------------------------63-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus Phase A Voltage
2 NC 2 1M-Ub1 Bus Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 NC Not Connected 11 NC Not Connected
12 NC 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 4DL Breaker Aux. Contact
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 NC
8 3DL Tripping Transfer Output 8 NC
9 3DL Closing 9 NC
10 Public Point 4DL Breaker 10 NC
11 4DL Tripping Transfer Output 11 NC
12 4DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 59 Scheme 6 terminal instruction

Scheme 7: Double backup transfer control (Exclusive backup, secondary backup supply has
no PT)
Wiring diagram as figure 60:

Figure 60 Main connection


---------------------------64-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Normal operating:
Bus energized by supply 1 through 1DL, supply 2 and 3 is used for backup (supply 2 is primary
backup, 3 is secondary backup, 2 take precedence over 3), 1DL closed, 2DL and 3DL tripped;
Or bus energized by supply 2 through 2 DL, supply 1 and 3 is used for backup (supply 1 is
primary backup, 3 is secondary back up, 1 take precedence over 3, only valid if bi-direction transfer
be selected), 2DL closed, 1DL and 3DL tripped; bus I energized by supply 2 through 2 DL, supply 3
is used for backup (Only valid if single direction transfer be selected), 2DL closed, 3DL tripped.
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of power
supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and delay
condition of bus are satisfied, close 2DL, if 2DL closed fail, then close 3DL; if supply 2 is
low-voltage, then trip 1DL, after the un-volt. test and delay condition of bus are satisfied, close
3DL.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of power
supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and delay
condition of bus are satisfied, close 1DL (Only valid if bi-direction transfer is selected), if 1DL
closed fail, then close 3DL. If select single direction transfer or supply 2 is low-voltage, then trip
2DL, after the un-volt. test and delay condition of bus are satisfied, close 3DL.
Manual transfer logic:
When one of 1DL, 2DL and 3DL is closed, and the others are tripped, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
satisfied, close 2DL; if 2DL closed fail or incomer 2 is un-voltage, then close 1DL if manual switch
signal presence, after the un-volt. test and delay condition of bus are satisfied, close 3DL.
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL, if 1DL closed fail or incomer 2 is un-voltage, then close 2DL if manual switch
signal presence, after the un-volt. test and delay condition of bus are satisfied, close 3DL .
3DL closed, 1DL and 2DL tripped, and manual switch signal presence, if incomer 1 and 2 voltage

---------------------------65-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
are both or only incomer 1 voltage is higher than under-voltage set-point, , trip 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL, if 1DL closed fail or incomer 1 is
un-voltage and incomer 2 voltage is higher than under-voltage set-point, then trip 3DL and close
2DL
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize)
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize)
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Note: When supply 3 used as work supply to energize the bus, the device only open the manual
switch function, and backup supply 1 take precedence over backup supply 2.
Terminal instruction:

---------------------------66-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus I Phase A Voltage
2 NC 2 1M-Ub1 Bus I Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus I Phase C Voltage
4 NC 4 NC Not Connected
5 NC Not Connected 5 NC Not Connected
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 3L-I3 Incomer 3 Current 11 NC Not Connected
12 3L-I3' 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 NC
8 NC Tripping Output 8 NC
9 3DL Tripping 9 NC
10 Public Point 3DL Breaker 10 NC
11 NC Closing Output 11 NC
12 3DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 61 Scheme 7 terminal instruction

Scheme 8: Exclusive backup and plural reserve interconversion


Wiring diagram as figure 62:

Figure 62 Main connection


Control logic:
---------------------------67-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
The specialty of the scheme is that backup supply will convert to exclusive backup after
switching successfully. Exclusive backup still keep exclusive backup mode to run after switching
successfully, the device will return to plural reserve mode after manual switch successfully only.
Normal operating:
Plural reserve:
1DL closed,bus I energized by supply 1 through 1DL.
2DL closed,bus II energized by supply 2 through 2DL.
Bus breaker tripped, bus I, bus II backing for each other.
Device energized, if the voltage of bus I and bus II are both higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Exclusive backup:
1DL and bus breaker closed,2DL tripped, bus I and bus II energized by supply 1 through 1DL
and bus switch, supply 2 is used for backup through 2DL;
2DL and bus breaker closed,1DL tripped, bus I and bus II energized by supply 2 through 2DL
and bus switch, supply 1 is used for backup through 1DL (Only valid if bi-direction transfer is
selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
Plural reserve:
When bus I voltage low or 1DL mis-trip, bus II voltage is higher than under-voltage set-point,
then trip 1DL, after the un-volt. test and delay condition of bus I are satisfied, close bus breaker.
When bus II voltage low or 2DL mis-trip, bus I voltage is higher than under-voltage set-point,
then trip 2DL, after the un-volt. test and delay condition of bus II are satisfied, close bus breaker.
(Only valid if bi-direction transfer is selected)
Exclusive backup:
1DL and bus breaker closed,When bus I and bus II voltage low or 1DL mis-trip or bus breaker
mis-trip(Only valid if switch mis-trip monitor set-point select all the switches), supply 2 voltage is
higher than under-voltage set-point, then trip 1DL or bus breaker, after the un-volt. test and delay
condition of bus I and bus II are satisfied, close 2DL.
2DL and bus breaker closed,When bus I and bus II voltage low or 2DL mis-trip or bus breaker
mis-trip(Only valid if switch mis-trip monitor set-point select all the switches), supply 1 voltage is
higher than under-voltage set-point, then trip 2DL or bus breaker, after the un-volt. test and delay

---------------------------68-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
condition of bus I and bus II are satisfied, close 1DL. (Only valid if bi-direction transfer is selected)
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, backup supply voltage is higher than
under-voltage set-point, the manual switch function of the device is available. The transfer logics in
different transfer mode as follow:
[Series Switch]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus I are satisfied, close 1DL;
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus II are satisfied, close 2DL;
1DL and 2DL closed, bus breaker tripped, external input signal mode 1 closed, mode 2 tripped
and bus I voltage is higher than under-voltage set-point, if manual switch signal presence, trip 2DL,
after closing delay of reserve supply switch, and close bus breaker when the bus II un-volt. test
conditions satisfied;
1DL and 2DL closed, bus breaker tripped, external input signal mode 2 closed, mode 1 tripped
and bus II voltage is higher than under-voltage set-point, if manual switch signal presence, trip 1DL,
after closing delay of reserve supply switch, and close bus breaker when the bus I un-volt. test
conditions satisfied;
[Auto Parallel]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 1DL. (Note: The decoupling function can be applied
by user customize)
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 2DL. (Note: The decoupling function can be applied
by user customize)
1DL and 2DL closed, bus breaker tripped, and mode 1 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after

---------------------------69-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
1DL and 2DL closed, bus breaker tripped, and mode 2 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the transfer
process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

---------------------------70-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!

Figure 63 Scheme 8 terminal instruction

Scheme 9: Double backup transfer control (Exclusive backup, secondary backup supply has
PT)
Wiring diagram as figure 64:

Figure 64 Main connection


---------------------------71-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
Control logic:
Characteristics:
If the status of the external input value mode 1 and mode 2 are different, the work supply is
incomer 1, backup supply is determined by mode selection status. When mode 1 closed, mode 2
tripped, incomer 2 is the backup supply; When mode 2 closed, mode 1 tripped, incomer 3 is the
backup supply.
If the status of the external input value mode 1 and mode 2 are same, the close sequence of
backup supply is determined by quality of the voltage, the priority level of the voltage from high to
low is:incomer 1,incomer 2,incomer 3,the principle of backup switch is as follows:
①: Incomer 2 and 3 are backup supplies, if only the voltage of incomer 2 is qualified, close 2DL;

if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 2 and 3 are
qualified, close 2DL; if close 2DL failed, then close 3DL;
②: Incomer 1 and 3 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;

if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 1 and 3 are
qualified, close 1DL; if close 1DL failed, then close 3DL;
③: Incomer 3 is backup supply, if the voltage of incomer 3 is qualified, close 3DL;

④: Incomer 1 and 2 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;

if only the voltage of incomer 2 is qualified, close 2DL; if both the voltage of incomer 1 and 2 are
qualified, close 1DL.
Normal operating:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 and 3 is
used for backup (supply 2 is primary backup, 3 is secondary backup, 2 take precedence over 3);
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 and 3 is
used for backup (supply 1 is primary backup, 3 is secondary back up, 1 take precedence over 3,
(Only valid if bi-direction transfer be selected); bus energized by supply 2 through 2DL, supply 3 is
used for backup (Only valid if single direction transfer be selected).
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 is used for
backup;
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
When mode 2 closed, mode 1 tripped:

---------------------------72-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 3 is used for
backup;
3DL closed, 1DL and 2DL tripped, bus energized by supply 3 through 3DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
Device energized, if the voltage of bus and any backup supplies are qualified, the device begin to
charge 10 s, then system enter fault monitor state.
Backup switch logic:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close backup supply according to backup
close principle ①.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL. If
bi-direction transfer is effective, after the un-volt. test and delay condition of bus are satisfied, close
backup supply according to backup close principle ②. If single direction transfer is effective, close
backup supply according to backup close principle ③.
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
When mode 2 closed, mode 1 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 3DL.
3DL closed, 1DL and 2DL tripped, if bus low-voltage or 3DL mis-tripped, then trip 3DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
Manual transfer logic:
When mode 1 and mode 2 are both closed or tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, if manual switch signal presence, trip 1DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ①.

---------------------------73-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
2DL closed, 1DL and 3DL tripped, if manual switch signal presence, trip 2DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ②.
3DL closed, 1DL and 2DL tripped, if manual switch signal presence, trip 3DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle ④.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize); if
close 2DL fail, or incomer 2 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 1DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if
close 1DL fail, or incomer 1 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 2DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the

---------------------------74-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 1 closed, mode 2 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL when the bus un-volt. test conditions satisfied.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 2 closed, mode 1 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are

---------------------------75-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
satisfied, close 3DL.
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 3DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 3DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

---------------------------76-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com
我们致力推动世界电力技术的科技进步!
AC Current Value (JK1) AC Voltage Value (JK2)
Code Name Instruction Code Name Instruction
1 NC Not Connected 1 1M-Ua1 Bus I Phase A Voltage
2 NC 2 1M-Ub1 Bus I Phase B Voltage
3 NC Not Connected 3 1M-Uc1 Bus I Phase C Voltage
4 NC 4 3L-U3 Incomer 3 Voltage
5 NC Not Connected 5 3L-U3'
6 NC 6 NC Not Connected
7 1L-I1 Incomer 1 Current 7 1L-U1 Incomer 1 Voltage
8 1L-I1' 8 1L-U1'
9 2L-I2 Incomer 2 Current 9 2L-U2 Incomer 2 Voltage
10 2L-I2' 10 2L-U2'
11 3L-I3 Incomer 3 Current 11 NC Not Connected
12 3L-I3' 12 NC
Output(Jk5) Input(JK3)
+KM Input Signal Supply 1
Code Name Instruction Code Name
1 Public Point 1DL Breaker 1 1DL Breaker Aux. Contact
2 1DL Tripping Transfer Output 2 2DL Breaker Aux. Contact
3 1DL Closing 3 3DL Breaker Aux. Contact
4 Public Point 2DL Breaker 4 NC
5 2DL Tripping Transfer Output 5 General Blocking +KM Input Signal Supply 2
6 2DL Closing 6 -KM Signal Grounding
7 Public Point 3DL Breaker 7 Mode 1
8 NC Tripping Output 8 Mode 2
9 3DL Tripping 9 NC
10 Public Point 3DL Breaker 10 NC
11 NC Closing Output 11 NC
12 3DL Closing 12 NC
13 Signal Public Point 13 NC
14 Backup Switch Act Central Signal 14 NC
15 External Fault Alarm Alarm Output 15 Signal Reset
16 Device Alarm 16 Manual Switch Input
17 NC Not connected
18 NC
Note: KM select DC 220V or 110V
19 Device Blocking Central Signal
20 Alarm Output

Figure 65 Scheme 9 terminal instruction

---------------------------77-------------------------
Tel: (0755)83416189 ,83663989 Fax: (0755)83663603 website: http://www.szidd.com

You might also like