You are on page 1of 8
sb ciocovaTPo(sPy2011/ 885 =~: To, ‘The Secretary / Chairman, Mls, Shree Ganesh CHS Ltd., Plot No.157, Sector-21, Kharghar, Navi Mumbai we © 4 AUG 201%, ASSESSEMENT ORDER NO. 792/2010-11 REGISTER NO.03 PAGE NO.792 [Unive Code No. SUB:- Payment of development charges for Residential Building on Plot No.157, Sector-21 at Kharghar, Navi. Mumbai REE 1) Your architect's letter dated 08/10/2010, 21/07/2011 & 03/08/2011 @PORON= 7. A) i) ii) 8 A) i) ii) 9 10. 41 12 2) Fire NOC issued by Fire Officer, CIDCO vide letter dtd. 15/12/2010 3) PSIDC NOC issued by EE(Elect) vide letter dtd. 18/01/2011 ORDER OF ASSESSMENT OF DEVELOPMENT CHARGES. (AS PER MAHARASHTRA REGIONAL & TOWN PLANNING (AMENDED) ACT 2010) Name of Assessee - The Secretary / Chairman, M/s. Shree Ganesh CHS Ltd., Location : Plot No.187, Sector-21 at Kharghar, Navi Mumbai Land use -Residential Plot area 1679.62 Sq. mirs Permissible FSI ONE Rates as per Stamp Duty Ready Reckoners, for Sec-21, Kharghar —_: Rs.20600/- AREA FOR ASSESSEMENT:~ RESIDENTIAL Plot area :-1679.62 Sq.mtrs. Built up area -1259.42 Sq.mtrs DEVELOPMENT CHARGES = RESIDENTIAL On plot area @ 0.5% of (6) above _ :- 1679.62 Sq.mitrs X 20600 X 0.5%=Rs.173000.86 On built up area @ 2% of (6) above :- 1259.42 Sq.mtrs X 20600 X 2%=Rs.518881,04 Total Rs.691881.90 Total Assessed development Charges - (BA) = Rs, 691881.90, Say Rs. 691882/- Date of Assessment : 08/01/2011 Due date of completion ;- 26/07/2010 to 26/07/2015 Development charges paid of Rs.6,93,509/- vide i) Challan No.118379, dtd.05/01/2011, Amount of Rs.1,00,800/- ii) Receipt No.5188, dtd.21/07/2011, Amount of Rs.5,92,709/- Unique Code No. 2011 03 021 02 0794 01 is for this Development Permission on Plot No.157, Seetor-21 at Kharghar, Navi Mumbai Add. Town Pfanning Dtficer(BP) (Navi Mumbai & Khopta) C.C.10O:- Triarch 48, Gauri Complex, Sector-11, ee : CBD Belapur, Navi Mumbai owl cipcovaTro(sPy201/885 =~ = ‘ 4 AUG 207 To, ‘The Secretary / Chairman, Mis. Shree Ganesh CHS Ltd., Plot No.157, Sector-21, Kharghar, Navi Mumbai ASSESSEMENT ORDER NO. 792/2010-11_ REGISTER NO.03 PAGE NO.792 Unique Code No. [2] 07 1] 71] 9] 3] °]2[t]°[2]o]7]5]4]o] 1 ‘SUB:- Payment of Construction & Other Workers Welfare Cess charges for Residential Building on Plot No.157, Sector-21 at Kharghar, Navi_ Mumbai REEF:- 1) Your architect's letter dated 08/10/2010, 21/07/2011 & 03/08/2011 ORDER OF ASSESSMENT OF CONSTRUCTION & OTHER WORKERS WELFARE CESS (AS PER BUILDING & OTHER CONSTRUCTION WORKERS WELFARE CESS ACT-1996) 1 Name of Assessee - The Secretary / Chairman, M/s. Shree Ganesh CHS Ltd., 2. Location := Plot No.157, Sector-21 at Kharghar, Navi Mumbai 3. Land use Residential 4. Plotarea 1679.62 Sq. mtrs 5. Permissible FSI ONE 6. GROSS BUA FOR ASSESSEMENT: A) ESTIMATED COST OF CONSTN. :- 2869.000 Sq.mtrs. X 10000.00= Rs.28890000/- B) | AMOUNT OF CESS i Rs. 28690000/- X 1%= Rs.286900.00 7) Construction & Other Workers Welfare Cess charges paid Rs.2,88,900/- vide Receipt No.5188 dtd. 11/03/2011 2869.000 Sq.mtrs. Yours faitif Addl. Town Pinning Wfficer(BP) (Navi Mumbai & Khopta) C.C.TO:- Triarch 18, Gauri Complex, Sector-11, CBD Belapur, Navi Mumbai se CIDCOATPOBPI2011 BBG =m To, 4 AUG 2011 The Secretary / Chairman, a Mis. Shree Ganesh CHS Ltd., Plot No.187, Sector-21, Kharghar, Navi Mumbai Sub:-Development permission for Residential Building on Plot No.157, Sector-21 at Kharghar, Navi Mumbai REF:- 1) Your architect's letter dated 08/10/2010, 21/07/2011. & 03/08/2011 2) Fire NOC issued by Fire Officer, CIDCO vide letter dtd. 15/12/2010 3) PSIDC NOC issued by EE(Elect) vide letter dtd. Sir, Please refer to your application for development permission for Residential Building on Plot Plot No. 157, Sector-21 at Kharghar, Navi Mumbai ‘The development permission is hereby granted to construct Residential Building on the plot mentioned above. ‘The commencement certificate as required under section 45 of the Maharashtra Regional and Town Planning Act,1966 is also enclosed herewith for the structures referred above. The Developer / individual Plot Owner should obtain the proposed finished road edge level from the concemed Nodal Executive Engineer. The Developer! Plot Owner to ensure that the finished plinth level of the proposed buildings / shops to be minimum 750 mm above the proposed finished road edge level. In case, the building is having stit, the finished stilt level to be minimum 300. mm. above the road edge level. The Developers / Builders shall take all precautionary major for prevention of Malaria breeding luring the construction period of the project. If required , you can approach Health Department CIDCO, for orientation program and pest control at project site to avoid epidemic . The approval for plumbing services i.e. drainage and water supply shall be separately obtained by the applicant from the Executive Engineer, Kharghar, CIDCO, prior to the commencement of the construction Work. You will ensure that the building materials will not be stacked on the road during the construction period. Thanking you, C.C.TO;- Triarch 18, Gauri Complex, Sector-11, CBD Belapur, Navi Mumbai C.C.T0::-CUC/ EO( _/EE(Env.EE(H&C)/EE(Elect, JEE(SWM) Permission is hereby granted under Spotion-43 of the Malarashtra Regional and. Town MD oF 1965 0 The secretary) ¢ heu'vnonn . IN\S. Shwe e Ganesh fm Briton No. NSE Road No Piawni: vfect to the lowing conditions for the : Residenrial Building Corie sgfoor Wed Res Baw 124, Ur eee (Nos. of Residential Units u Nos. of Commercial units — ) one, AO N(a)_ “The development work in respect of which permission’ is granted under this ‘cate 18 not carried out oF the use thereof is not in accardance with the Sanctioned plans, 1 icate {s fable t6 be revoked by the Corp. Ay Of the Conditions subject'to whiets the some is granted or any of the ‘restrictions imposed upon by the Corporation is.contraveried. Hiei The Managing Director is satisfied that the same is obtained by the applicant ‘lvough fraud or Misrepresentaton and the applica andlor any person driving {hz junder him, in such on event shall be deemed to have cored out the evelopment work in contravention of seotion-!3 or 45 uf the Mahnmshn Regional and Town Planning Act-1986, ‘The apptieane shalt *18) Give a notice to the Corporation for completion of development work upto’ pint level, atieast 7 days before the commencetnent ofthe further work 5) Give written notice to the Corporation regarding completion ofthe work Obtain Cecupaney rtificate from the Corporation. Xl) Permit authorised officers of the Comporation {or which the permission has besn granted. a any time for the. purpose a ensuring the building eontrol Resulations and conditions of this certificate 3 the steucwral design, building materials, installations: eletricat installaions ete be in acsorcance with the provision (except for provision in sespect of lp Preseribed in the Natioual Building Code or ord / or GDR - [975 jn force, all area raito) as The tertlieate shall remaun valid for period of | year from the date of is issue, thereafter revalidation of the same shall be don in.aceurdanee with provision uf Seetionsd’ of MINTP aot. 1966 anc! as per regulation nu.16.1(2) of the LDCRs - 1g The conditions ofthis certificate shall be binding not only on the applicant but alse cn ils successors and /or every person deriving title through or under him. ‘certified copy of the approved plan shall be exhibited on site, The amount of Rs\\2. 2-80 — deposited with CIDCO as security deposit shall be forfeited either in whole or in part atthe absolute diseretion of the Corporation for breach of any of the conditions attached to the permission covered by the Commencement Certificate, Such forfeiture shell be without prejudice to any other cemedy or right of Corporation : ‘ ee “Every Building shall be provided with under ground and over head“wat tank. The capacity of the tanks shall be as per nonns fixed by CINCO. In case of high rise buildings under ground ancl over head water tank shall be provided as per the lice fighlia, requirements of CIDCO. The applicant shall seck approval of the BE(Weter Supply) of CIDCO in respect of capacity of domestic water tanks. The applicant shall. seek ‘approval of the Fire Officer Of CIDCO in respect of capacity of water tanks for the fighting purpose", You shall approach Executive Engineer, M.S.E.B. for the power requirements, location of transformer, ifany, etc. As per Gevt. of Maharashtra memorandum vide No. TBP/4393/1504/C4-287/94, UD. UDP, Dated 19% July,1994 for all buildings following additional conditions shalt apply. §] As soon as the development permission for new construction or re-development is obtained by the Owners/Developer, he shall install a “Display Beard’ on the conspicuous place on site indicating following details : 8} Name snd address of the owner/developer, Architect and Contractor, b) Survey Number/City survey Number. Plot, Number/Ssctor & Netle of Land under reference alongwith description of its boundaries o} Order Number and date of grant of development permission or re-development permission issued bythe Planning, Authority or any other authority a) Number of Residential QatvCommercial Units with areas #} Address where copies of detiled approved plans shall be available foe inspection, ‘i] A notice in the form of an advertisement, giving all the detailed mentioned in &i) above, shall be published in two widely circulated newspapers one of which should be in regional language un 12, AS per the notification did. 14 September 1999 and emendment on 27" August 2003, issued by Ministry of Environment & Forest (MOEF), Gov. of India and 88 per Ciscular issued by Urban Development Deptt. Govt. of Maharashtra, vice No FAR/102004/1 60 No.27/UD-20, dd, 27/02/2004, for ull Buildings following additional condition shall apply : The Owners (Developer shall use Fly Ash bricks or blocks or tiles or clay Ay ash bricks or cement fly ash brleks or blocks or similar products or a comblaation of AgEcegate of them to the extent of 100% (by volume) of the total bricks, blocks files as the case may be in their construction activity. As directed by the Urban Development Deptt. Govemment of Maherashira, under Section-154 of MR&TP Act-1966 and vide Provision No. TPB 432001/2133/CR. SIOLUD-11, dated 10/03/2008, forall buildings greater than 300.00 Sam. following additional condition of Rain Water Harvesting shall apply. ®) "All the layout operspaces t+ amenities spaces of Housing Society and new construction / reconstruction / additions on plots having area nol less then 300.00 Sa. - shall nave one or mere Rain Water Harvesting structures having minimum total capacity as detailed imschedule (enclosed ) Provided that the authority may approve the Rain Water Harvesting Structures of Specifeations different from those in Schedule, subject to the minimum capacity of Rein Water Harvesting being ensured in each case. ©) The owner / society of every building mentioned in the (2) above shal! ensure {hat the Rain Water Harvesting structure is maintained in good «epait for storage Of water for non patable purposes or recharge of groundwater at all tines. ©) The Authority may impose a tevy. of not exceeding Rs, 100/- per annum for every {00 Sa.m. of built up area for the failure of the onner of any building memionen in the (@) above to provide or to maintain Rain Water Harvesting structures. as required under these byelaws. ADDL.TOWPL, iG OFFICER “Navi Mumbai & Khopta C.C.TO: ARCHITECT Me 15 Prfaren : o8-o, C.C. TO: Separately to: L M(TS) 2 cuc 3. EEQKHRVPNL/KLM/DRON) 4. EE(WS) Ow ee SCHEDULE : Rain Water Harvesting in a building’site includes storage or recharging into ground of rain water falling on the térrace or on any paved or unpaved surface within the building site. 1. The following systems may be adopted for harvesting the rain water drawn from terrace and the paved surface. @) (iii) (iv) Open well of a minimum of 1.00 mt. dia and 6 mt. in depth into which rain water may be channeled and allowed after filtration for vemoving silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non potable domestic purposes such as washing, flushing and for watering the garden etc. Rain water harvesting for recharge of ground water may be done through'a bore well around which a pit of one metre width may be excavated upto a depth of at least 3.00 mt. and refilled with stone aggregate and sand. The filtered rain water may be channeled ‘to the refilled pit for recharging the borewell. An impervious surface /underground storage .tank of required capacity may be constructed in the setback or other open ‘space and the rain water may be channeled to the storage iank. The storage tank shall always. be provided with ventilating covers and shall have draw-off taps suitably placed so that the rain water may be drawn off for domestic, washing yardening and such other purposes. The storage tanks shall be provided with an overflow. The surphus rain water ater storage may be recharged into ground through percolation pits or trenches or combiriation of pits and trenches, Depending on the geomorphological and topographical condition, the pits may be of the size of 1.20 mt. width X 1.20 mt tength X 2.00 mt. to 2.50 mt. depth. The trenches can be or 0.60 mi. width X 2.60 to 6.00 mt. length X 1.50. to 2.00 mt. depth Terrace watcr shall be channeled to pits or trenches. Such pits or tres shall be back filled with filters media comprising the following materials a) 40 mm stone aggregate as tottom layer upto 50% of the depth; ») 20 mm stone aggregate as lower middie layer upto 20% of the . depih; Cl Coarse sand as upper middie layer upto 20% of the depth; di) A thin layer of fine sand as top layer: > JP ROVA/-~984(B)(400-03-2005 )-3 o 196 § e) Yop 10% of the pits/trenches wili be empty and a splash.is te be provided in this portion in such # way t falls on the splash pad. ) Brick masonry walll is to be constructed on the exposed surfac of pits/trenches and the cement mortar plastered. The depth of wall below ground shall be such that the wall prevents lose soil entering into’ pits/ trenches. The projection of the wall above ground shall atleast be 15 ms. ~ ‘Pérforated concrete’ slabs shall be provided on the pits/ trenches. gl (v) , If the open space surrounding, the building is not paved, the top layer upto a sufficient depth’ shall be rémoved and refilled with course sand to allow percolation of rain water into ground. ‘Phe terrace shall be connected ito the open well/boreweil/storage tank/recharge pit/trench by means of HDPE/PVC pipes through filter media. A valve system shall be provided to enable the first washings, front roof or terrace catchment, as they. would contain undesirable dirt. The mouths-of all pipes and opening shal!.be. covered with mosquito, (Insect) proof wire net. For the efficient discharge of rein water, there shall be at jeast two rain water pipes of 100 mm dia mtr. for a roof area of 100 sq.mt. f Rain water harvesting structures shall be sited es not to endanger the ity of building or earthwork. The structures shali be designe: dampness is caused in’eny part of the walls or foundation ‘of the building or those of an adjacent building. : The water so collected/recharged shall as’ far as possitl: be used for non-drinking and non-cooking purpose. sha: 5 iced that when the rain water in exception.tl circumstances, will be for drinking and/or cooking purpose, i shall be ensured that wilize preper filter arrangement and the separate outi rain-water has been provided. passing the first Provided further that it will be ensured that for such use, proper disinfectants and the water purification arrangements have been made at roof top water *

You might also like