You are on page 1of 8
© 7 4 AUG 201% cipcoapoery2011/ 885 =~ = To, The Secretary / Chairman, Mis. Shree Ganesh CHS Ltd., Plot No.157, Sector-21, Kharghar, Navi Mumbai ASSESSEMENT ORDER NO. 792/2010-11_ REGISTER NO.03 PAGE NO.792 Unique Code Ni SUB:- Payment of development charges for Residential Building on Plot No.157, Sector-21 at Kharghar, Navi Mumbai REE:- 1) Your architect's letter dated 08/10/2010, 21/07/2011 & 03/08/2011 2) Fire NOC issued by Fire Officer, CIDCO vide letter dtd. 15/12/2010 3) PSIDC NOC issued by EE(Elect) vide letter dtd. 18/01/2011 ORDER _OF ASSESSMENT OF DEVELOPMENT CHARGES. (AS PER MAHARASHTRA REGIONAL & TOWN PLANNING (AMENDED) ACT 2010) 1. Name of Assessee - The Secretary / Chairman, Mis. Shree Ganesh CHS Ltd., 2. Location Plot No.157, Sector-21 at Kharghar, Navi Mumbs 3. Land use -Residential 4 Plotarea “1679.62, Sq. mtrs 5. Permissible FSI ONE, 6 _ Rates as per Stamp Duty Ready Reckoners, for Sec-21, Kharghar —_: Rs.20800/- 7. AREA FOR ASSESSEMENT:- A) RESIDENTIAL i) Plot area -1679,62 Sqmtrs. it) Built up area -1259.42 Sq.mirs 8. DEVELOPMENT CHARGES. » A) RESIDENTIAL i) Onplot area @ 0.5% of (6) above: 1679.62 Sqmtrs X 20600 X 0.5% ii) On built up area @ 2% of (6) above :- 1259.42 Sqmtrs X 20800 X _2% Total Rs.691881.90 9. Total Assessed development Charges (8A) = Rs, 691881.90, Say Rs. 691882/- 10. Date of Assessment : 08/01/2011 44. Due date of completion ~ 26/07/2010 to 25/07/2015 42. Development charges paid of Rs.6,93,509/- vide i) Challan No.118379, dtd.05/01/2011, Amount of Rs.1,00,800/- ii) Receipt No.5188, dtd.21/07/2011, Amount of Rs.5,92,709/- Unique Code No. 2011 03 021 02 0794 01 is for this Development Permission on Plot No.157, Sector-21 at Kharghar, Navi Mumbai Add, Town Panning Dificer(BP) (Navi Mumbai & Khopta) €.0.10:- Triarch : 48, Gauri Complex, Sector-11, we CBD Belapur, Navi Mumbai owl cincoaTrowry20i1885 = 7 = : L 4 AUG 2017. To, . 7 The Secretary / Chairman, Mis. Shree Ganesh CHS Lta., Plot No.157, Sector-21, Kharghar, Navi Mumbai ASSESSEMENT ORDER NO. 792/2010-11_ REGISTER NO.03 PAGE NO.792 [Unique Coen. T27ToT aT +o sto T2ftio] 2 [op 7 {ets {t SUB:- Payment of Construction & Other Workers Welfare Cess charges for Residential Building on Plot No.157, Sector-21 at Kharghar, Navi Mumbai REF:- 1) Your architect's letter dated 08/10/2010, 21/07/2011 & 03/08/2011 ORDER OF ASSESSMENT OF CONSTRUCTION & OTHER WORKERS WELFARE CESS (AS PER BUILDING & OTHER CONSTRUCTION WORKERS WELFARE CESS ACT-1896) Name of Assessee The Secretary / Chairman, M/s. Shree Ganesh CHS Ltd., Location .- Plot No.187, Sector-21 at Kharghar, Navi Mumbai Land use ~ Residential Plot area - 1679.62 Sq. mirs Permissible FSI - ONE GROSS BUA FOR ASSESSEMENT:- 2869.000 Sq.mtrs. ESTIMATED COST OF CONSTN. _:- 2869.000 Sq.mtrs. X 10000.00= Rs.28680000/- AMOUNT OF CESS Rs. 28690000/- X 1%= Rs.286900.00 Construction & Other Workers Welfare Cess charges paid Rs.2,86,900/- vide Receipt No.5188 dtd. 11/03/2011 Yours ‘aut Adal, Town Planning Wfficer(BP) (Navi Mumbai & Khopta) C.C.TO:- Triarch 48, Gauri Complex, Sector-11, CBD Belapur, Navi Mumbai DOvoAAeNs aS CIDCO/ATPO(BP)/2011/ 886 eas To, 4 AUG 2019 The Secretary / Chairman, Mis. Shree Ganesh CHS Ltd., Plot No.157, Sector-21, Kharghar, Navi Mumbai Sub:-Development permission for Residential Building on Plot No.187, Sector-21 at Kharghar, Navi Mumbai REF:- 1) Your architect's letter dated 08/10/2010, 21/07/2011 & 03/08/2011 2) Fire NOC issued by Fire Officer, CIDCO vide letter dtd.15/12/2010 3) PSIDC. NOC issued by EE(Elect) vide letter dtd. Sir, Please refer to your application for development permission for Residential Building on Plot Plot No.157, Sector-21 at Kharghar, Navi Mumbai The development permission is hereby granted to construct Residential Building on the plot mentioned above. The commencement certificate as required under section 45 of the Maharashtra Regional and Town Planning Act,1966 is also enclosed herewith for the structures referred above. ‘The Developer / individual Plot Owner should obtain the proposed finished road edge level from the concerned Nodal Executive Engineer. The Developer/ Plot Owner to ensure that the finished piinth level of the proposed buildings / shops to be minimum 750 mm above the proposed finished road edge level. Incase, the building is having stilt, the finished stit level to be minimum 300 mm. above the road edge level ‘The Developers / Builders shall take all precautionary major for prevention of Malaria breeding during the construction period of the project. IF required , you can approach Health Department CIDCO, for orientation program and pest control at project site to avoid epidemic The approval for plumbing services ie. drainage and water supply shall be separately obtained by the applicant from the Executive Engineer, Kharghar, CIDCO, prior to the commencement of the construction Work, You will ensure that the building materials will not be stacked on the road during the construction period Thanking you, (Navi Mumbai & Khopta) C.C.TO:- Triarch Ae 18, Gauri Complex, Sector-11, CBD Belapur, Navi Mumbai C.C.TO: -CUC/ EO( — EE(Env.)/EE(H&C)/EE(Elect.)/EE(SWM) NOCINOATPOG BE = ie IN STRIAL DEW arashtra Regional and 1 ‘Met 1966 © The secretary) ¢ heu'vncan MOMS. Since e Ganesh (o-oo. tts4 sacieby (tds DattOIon No. NSE Road No___-_, Sector 2 Node narqlaey of > s per the approved plane ar development work of the proposed Resi bended Rraiicding Coty sempre) Ted Rent Bow alecaur en (Nos, of Re! set to the folfowing conditions for the jeatial Units_24__ Nos, of Commercial units_——_) - tet abe be eka ie carenan ess 22 Va) The development work in respect of which permission’ is granted under this ernificate is not carried ow or the use Uhereaf is not in accordance with the Sanctioned plans, 1 This Ce Woy of the conditions subject 19 whica the same is granted or any of the restrictions imposed upon by the Corporation is contravened, Hic} The Managing Direetor is satisfied that the same is obtained by the applicant through fraud or Misrepresentation and the applicant and/or any person deriving lille under him, in such an event shall be deemed to have ‘carried out the evelopment work in contravention of sectiont3 or 45 of the Maharashtra Regional and Town Planning Act-1966. 2, ‘The apptiesne shalt : {2} Give @ notice to the Corporation fer completion of development work upto’ plinth level, atleast 7 days befare the commencement af the further work. 20h} Give written notice to the Corporation regarding completion of the work, Xe) Gbrein Oecupancy Certificate from the Corporation Ziel) Permit authorised officers of the Corporation to enter the building or premises for which the permission has been granted . at any time for the purpose ensuring the building control Regulations ancl concitions of this cenificate 4 3 he sicuctural design, building nnterials, installations. elccitical installations ete. Shali be in accordance with the provision (except for provision in respect af oor aren ra prescribed in the National Building Code or and for GDCRe - 1975 in fores, 7 The Certeticate shall remain valid tor period of | year trom the date of its issue, thereatter revalidetion of the same shall be dons in accordance with provision af Se MIRTP Act- (966 and as per regulation nu. 16.1(2) of the UDCRs - 19° 16. g 1 ‘The conditions ofthis certificate shall be binding not only on the applicant but also en its sueeessots and /or every person deriving title through or under him, Acettfied copy of the approved plan shall be exhibited on site. ‘The amount of RsAXz "2-00 J=_ deposited with CIDCO as security deposit shall be forfeited either in whole or in part atthe absolute discretion of the Corporation for breach of any of the conditions attached to the permission covered by the Commencement Certificate. Such forfeiture shall be without prejudice to any other remedy ot right of Corporation. Pale ie LE “Bvery Building shall be provided with under ground and over hoad“water tank. The capacity of the tanks shall be as per norms fixed by CIDCO. In case of high rise ‘buildings under ground and over head water tank shall be peovided as per the fire fighting, requirements of CDCO. The epplicant shall seek approval of the EB(Water Supply) of CIDCO in respect of capacity of domestic water tanks. The applicant shall seek. approval of the Fire Officer of CIDCO in respect of capacity of water tanks for the fighting purpose". BB. for the power requirements, location You shall approach Executive Engineer, ) of transformer, if any, etc. As per Govt, of Maharashtra memorandum vide No. TBP/4393/1504/C4-287/94, UD- THARDP, Dated 19" July, 1994 for alt buildings following <éditional conditions shai apply. i] As soon as the development permission for new construction or re-development is obtained by the Owners/Developer, he shall install @ “Display Board’ on the conspicuous place on site indicating following details - 3} Name and address of the owner/developer, Architect and Contractor. wy survey Number. Plot. Number/Sector & Node of Land, ith description of its boundaries b) Survey NomberiCi under relerence alo ¢) Order Number and date of grant of development permission or re-clevelopiment permission issued by the Planning Authority o any other authority é) Number of Residential MatsCémmercial Units with areas €) Address where copies of detailed approved plans shall be available for inspection. ii] A noties in the form of an advertisement. giving all the detailed mentioned in (i) abore, shall be published in two widely circulated newspapers one of which should be in regional language. u 12, As per the notification dtd. 14“ September 1999 and amendment on 27" August 2003, issued by Ministry of Environment & Forest (MOEF), Gow. of India and as per Circular issued by Urban Development Dept, Govt. of Maharashtra, vide No. FAR/102004/160/P.No.27/UD-20, dtd. 27/02/2004, for all Buildings following addi condition shall epply ‘The Owners Developer stall use Fly Ash bricks or blocks or tiles or clay fly ash bricks or coment fly ash bricks or blocks or similar products or a combination of aggregate of them to the extent of 100% (by volume) of the total bricks, blocks & tiles as the case may be in their construction activity. As directed by the Urban Development Deptt. Government of Maharashtra, under Section-I54 of MR&TP Act-1966 and vide Provision No. TPB 432001/2133/CR- ‘2BO/O/UD-11, dated 10/03/2005, for all buildings greater than 300.00 Sq.m. following ‘additional condition of Rain Water Harvesting shall apply. a) "All the layout open spaces / amenities spaces of Housing Society and new construction / reconstruction / additions on plots having area nol less than 300.00 Sq.m . shall have one or more Rain Water Harvesting structures having minimum total capacity as detailed in-schedule (encloses) Provided that the authority may approve the Rain Water Harvesting Structures of specifications different from those in Schedule, subject to the minimum capacity ‘of Rein Water Harvesting being ensured in each case, b) The owner / society of every building mentioned in the (2) above shall ensure ‘that the Rain Water Harvesting structure is maintained in good repair for storage ‘of water for non potable purposes or recharge of groundwater at all times. ©) The Authority may impose a levy. of not exceeding Rs. 100/- per annum for every 100 Sqm, of built up area for the faiture of the owner of any building mentioned in the (a) above to provide or to maintain Rain Water Harvesting structures as. required under these byotaws. ADDL. TOWXPLANNING OFFICER ~ Navi Mumbai & Khopta C.C.TO: ARCHITECT Me 214 trfaren c 8-0. C.C, TO: Separately to: 1 Mqrs) 2 cuc 3. EEQHR/PNL/KLM/DRON) 4 EEQWS) Rain Water Harvesting in a building site includes storage or recharging into ground of rain water falling on the térrace or on any paved dr unpaved surface within the building site. RAIN WATER HARVESTING 1. The following systems may be adopted for harvesting the rain water drawn from terrace and the paved surface. io) (ii) Gi) tiv) Open well of a minimum of 1.00 mt. dia and 6 mt. in depth into which rain water may be channeled and allowed after filtration for removing silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non potable domestic purposes such as washing, flushing and for watering the garden etc. Rain weter harvesting for recharge of ground water may be done through a bore well around which a pit of one metre width may be excavated upto a dépth of at least 3.00 mt. and refilled with stone aggregate and sand. The filtered rain water may be channeled ‘to the refilled pit for recharging the borewell. An impervious surface /underground storage .tank of required capacity may be constructed in the setback or other open ‘space and the rain water may be channeled to the storage tank. The storage tank shal! always. be provided with ventilating covers and shail have draw-off taps suitably placed so that the rain water may be drawn off for domestic, washing gardening and such other purposes. The storage tanks shall be provided with an overflow. ‘The surplus rain water aiter storage rnay be recharged iato ground through percolation pits or trenches or combination of pits and trenches. Depending un the geomorphological and topographical condition, the pits may be of the size of 1.20 mt. width X 1.20 mit. iength X 2.00 mt, to 2.50 mt. depth. The trenches can be or 0.60 mit. width X 2.00 to 6.00 mt. length X 1.50. to 2.00 mt. depth Terrace water shall be channeled to pits or trenches. Such pits or tren shall be back filled with filter media comprising the following materials a) 40 mm stone aggregate as bottorn layer upto 50% of the depth; b) 20 mm stone aggregate as lower middle layer upto 20% of the » depth; c) Coarse sand as upper middie layer upto 20% of the depth; d) A thin: layer of fine sand as top layer; > AP ROTA/I-984 (B)(400-03-2005)-3 v o a} ‘Top 10% of the pits/trenches wili be empty and a splash.is te be provided in this portion in such @ way that roof top water falls on the splash pad. ‘ 1) Brick masonry wall is to be constructed on of pits/trenches and the cement mortar plastered. sed surface ee, The deptt of wall below ground shall be such that the wall prevents lose soil entering info’ pits/ trenches. The projection of the wall above ground:shall atleast be 15 cms: “Perforated contrete’’ ‘slabs shall be provided on the pits/trenches. (e) , If the open space surrounding, the building is not paved, the top layer upto a sufficient depth shall be removed and refilled with coarse sand to allow percolation of rain water into ground. The terrace shall be connected ito the open well/boreweil/ storage tank/recharge pit/trench by jmeang of HDPE/PVC pipes through filter media. A valve system shall be provided to enable the first washings from caer ar terrace catchment, as they. would contain undesirable dirt. The snouts of all pipes and opening shall.be.covered with mosquito tiacect) proof wire net. For the efficient discharge of rain water, there shali be at ere two rain water pipes of 100 mm dia mtr. for a roof area of 100 sq.mt. : Fain water harvesting structures shell be sited as not to endanger the siding of earthwork. The structures shall be designed such din any part of the walls or foundation of the that no deanpness is caus building or those of an adjacent building. The water so collected/recharged shall as'far as possible he used for non-drinking and non-cooking purpose. ed that when the rain water in exception. circumstances, will be for drinking and/or cooking purpose, it shall be ensured thal proper filter arrangement and the separate outlet for by passing the first rain-water has been provided. Provided further that it will be ensured that for such proper disinfectants and the water purification arrangements have been made

You might also like