Professional Documents
Culture Documents
L2
G a b a a b a
8#@100C/C 8#@150C/C
C1 12" X 18" 4-16# 2-16# 2-16# c c 12" X 24" 4-16# 2-16# 2-16# c c
F4 C14 F5 C15 F4 C16 1
a b a a b a
X=750 REST
B2
COLUMN SECTION a b b a a b b a
8#@100C/C 8#@150C/C
STUB COLUMN C2 9" X 24" 4-20# 4-20# 2-16# c c
12" X 24" 4-20# 4-20# 2-16#
c c
2 X=750 REST
a b b a a b b a
a b b a a b b a
PLINTH LVL. 12" X 24" 4-20# 4-20# 2-16# 12" X 24" 4-20# 4-20# 2-16#
8#@100C/C 8#@150C/C
3 C3 c c c c X=750 REST
a b b a a b b a
COLUMN(B4XL4)
a b a a b a
150
a b a a b a
C6, C9 12" X 18" 12" X 18" 8#@100C/C 8#@150C/C
E TIE BEAM
5 4-16# 2-16# 2-16# c c 4-16# 2-12# 2-12# c c
X=750 REST
a b a a b a
F3 C10 C11 C12 F3 C13
CF2 6
C7, C8
9" X 18" 8-20# 6-16# ----
a b a b a
9" X 18" 8-16#
a b a b a 8#@100C/C 8#@150C/C
(MIN. 2100)
6-16# ----
6" X 10" a 6" X 10" a X=750 REST
a b a a b a
b b b b
a a a a
b b
REIN.//TO B2
SHORT SIDE a b a a b a
REIN.//TO L2 12" X 18" 4-20# 2-20# 2-16# c c 12" X 18" 4-20# 2-20# 2-16# c c
8#@100C/C 8#@150C/C
C10, C13
T3
LONG SIDE 7 X=750 REST
a b a a b a
T2
T1
a b b b a a b b b a
P.C.C. 1:3:6 C11, C12 8#@100C/C 8#@150C/C
D 8 12" X 18"
4-20# 6-20# 2-20# c c
12" X 18"
4-20# 6-20# 2-20# c c X=750 REST
C B2xL2 R.C.C. a b b b a a b b b a
a b a a b a
C15 12" X 18" 12" X 18" 8#@100C/C 8#@150C/C
11 4-20# 2-16# 2-16# c c 4-16# 2-16# 2-16# c c
X=750 REST
a b a a b a
NOTES:-
TOP REINFORCEMENT (THRO.)
1. ALL DIMENSIONS ARE IN FEET & INCHES.
A STIRRUPS 2. DO NOT SCALE THIS DRAWING.
C1 C2 F1 C3 3. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS.
CF1 SLAB REINFORCEMENT
4. REINFORCEMENT SHALL BE HIGH YIELD STRENGTH DEFORMED BARS COMPLYING
WITH IS:1786 (LATEST ISSUE) DESCRIBED AS 0 BARS AND MILD STEEL PLAIN
3 11
5. CONCRETE MIX SHALL BE M:20 FOR ALL STRUCTURE.
1 2 4 5 6 7 8 9 10 12 13
6. CLEAR COVER TO MAIN REINFORCEMENT UNLESS NOTED SHALL BE AS FOLLOWS.
FOUNDATION PLAN FOOTING 50mm.
COLUMNS 40mm.
BOTTOM REINFORCEMENT (THRO.) BEAMS AND PLINTH BEAM 30mm.
P.C.C.
SCHEDULE OF FOOTINGS SLAB REINFORCEMENT SLABS 20mm.
7. NUMBER OF BAR SHOULD NOT BE COUNTED BUT SPACING INDICATED SHALL BE ADOPTED.
P.C.C. (1:3:6) FOOTING - GRADE M25
FOOTING MARK 8. LAP IF REQUIRED SHALL BE 50 x DIA. OF BAR.
REMARKS
SIZE SIZE REIN. II to REIN. II to 9. STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR CENTERING, SHUTTERING,
B1 x L1
T1
B2 x L2
T2 T3
SHORT LONG
SECTION A-A (CF) : N.T.S.
QUALITY OF MATERIAL, WELDING & MISUNDERSTANDING OF DRAWING.
10. S.B.C. TAKEN AS 20 T/SMT FOR FOOTING DESIGN, BEFORE EXECUTING THE WORK CHECK
F1 9' 9" X 8' 9" 4" 8' 9" X 7' 9" 12" 24" 12# @ 5" C/C 12# @ 5" C/C -------- 4.5"
THE S.B.C. AND CONFORM TO STRUCTARAL ENGINEER.
F2 9' 5" X 8' 11" 4" 8' 5" X 7' 11" 12" 24" 12# @ 5" C/C 12# @ 5" C/C --------
F3 10' 1" X 9' 7" 4" 9' 1" X 8' 7" 12" 30" 10# @ 4" C/C 10# @ 4" C/C --------
LIFT WALL 4.5" THICK
F4 6' 8" X 7' 2" 4" 5' 8" X 6' 2" 12" 18" 10# @ 6" C/C 10# @ 6" C/C -------- 10#@ 6" C/C 10#@ 6" C/C
CF1 1' 6" 4" 10# - 5" c/c 8# - 6" c/c 2' 4" X 2' 6 NO. -16 # 6 NO. -16 # 10# - 4 LEGG. 4" c/c
P.C.C-1:3:6
ALTAF SHAIKH
10# @ 4" C/C
CF2 1' 6" 4" 10# - 5" c/c 8# - 6" c/c 2' 2" X 2' 6" 6 NO. -16 # 6 NO. -16 # 10# - 4 LEGG. 4" c/c
6"
SECTION B-B : N.T.S.
FOOTING SIZE OF SIZE OF THICKNESS THICKNESS SLAB TOP & BOTTOM REIN.
NO. P.C.C FOOTING OF SLAB OF P.C.C.
PAR II TO PAR II TO
SHORT SIDE LONG SIDE
RAFT 11' 6" X 12' 10' 6" X 11' 1' 6" 4" 10# - 4" c/c 10# - 4" c/c