Professional Documents
Culture Documents
4
4
4
TOP CUT BARS
3000.00
0.20m
3000.00
3.40m
B2
B2
B2
TB
B2
B2
B2
TB
S2 S2 S2 S2
BEDROOM-02
C1F1 C1F1 BEDROOM-01C1F2 3.425m
KITCHEN 0.225m
TB
0.225m TB B1 B2 B1 B2
3
3
3
C.J. C.J.
S2
SB
4000.00
4000.00
B1
B1
B1
SB
DINING AREA S2 S2
B1
B1
B1
SB
S2
TB
TB
S2 S2
0.225m
16 15 14 13 12 11 COMMON AREA 16 15 14 13 12 11
STAIR WELL
3.425m
1 2 3 4 5 6 7 8 9 10 CLOSET 5 6 7 8 9 10
C1F1 C1F1 C1F2
3.425m
TB TB B1 B2 B1 B2
2
2
2
FAMILY AREA
S2
CB
3.425m
MASTER BEDROOM
3000.00
S2
3000.00
LIVING AREA
TB
B1
S2
B2
B2
3.425m
B1
S2
B2
TB
0.225m
1
1
1
3.40m
CARPORT
S1
CB
CB
0.20m
SB
S SCHEDULE OF BEAMS
4400.00 3600.00 4400.00 3600.00
2 SCALE: 1:30 METERS
4" CHB
S FOUNDATION PLAN S S
1 SCALE: 1:100 METERS
2 SCALE: 1:100 METERS 2 SCALE: 1:100 METERS STRUCTURAL SLAB LEVEL & HORIZONTAL BARS AT EVERY 3
LAYERS OF CHB
BARS SPACED
AT 200mm
O.C.B.W
L/2
@ 200mm O.C.
SECOND FLOOR LEVEL
TEMPERATURE
BARS SPACED @
L/4
BARS SPACED @
200mm O.C.
BARS SPACED @
NOSING BARS
200mm
2/3
BOTTOM BARS
@ 150mm O.C. C.J.
BARS SPACED @
G.F.F.L 200mm
C1F2 DETAILS
SLAB-ON-GRADE LEVEL TO MID LANDING
DESIGNED BY: DRAFTED BY: PROJECT TITLE/LOCATION: SHEET CONTENT: APPROVED BY: SHEET NO: