SCHEDULE OF COLUMNS

UPPER FLOORS
FOUNDATION
TO
SIZE 400 x 500 400 x 500 400 x 600 400 x 600 300 x 500
VERT. REINF. 14 - 25mmØ 14 - 25mmØ 16 - 25mmØ 16 - 25mmØ 12 - 25mmØ
TIES 14-25mmØ VERTICAL BARS & 12mmØ 14-25mmØ VERTICAL BARS & 12mmØ 16-25mmØ VERTICAL BARS & 12mmØ 16-25mmØ VERTICAL BARS & 12mmØ 12-25mmØ VERTICAL BARS & 12mmØ
TIES , 2@50mm, 5@100mm, REST @150 TIES , 2@50mm, 5@100mm, REST @150 TIES, 2@50mm, 5@100mm, REST @150 TIES , 2@50mm, 5@100mm, REST @150 TIES , 2@50mm, 5@100mm, REST @150
FROM BOTH ENDS FROM BOTH ENDS FROM BOTH ENDS FROM BOTH ENDS FROM BOTH ENDS

COL. MARK

FLOOR LEVEL C-1 C-2 C-3 C-4 C-5

COLUMN SCHEDULE

1
1 1

FFL
NGL
1 1 1 1 1
1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2

STAIR DETAIL
TOP AND BOT CHORD = 2L 75x75x6mm
TOP AND BOT CHORD = 2L 75x75x6mm
WEB: 1. 2L 75x75x6mm T-1 WEB: 1. 2L 75x75x6mm
HT-1
2. L 75x75x6mm 2. L 75x75x6mm
50mm x 150mm x 20mm x 2mm THK.
C-PURLINS SPACED @ 600mm O.C

PAINTED WITH RED OXIDE PRIMER 1


0.6mm THK. RIB TYPE LONG SPAN
PREPAINTED G.I ROOFING SHEET
(COLONIAL RED)

WITH WATERPROOFING
ON ALL EXPOSED SURFACES
1 1 1 HT-3
TOP AND BOT CHORD = L 75x75x6mm
150MM THK REINFORCED WEB = L 75x75x6mm
CONCRETE PARAPET 2 2 2 2

2 2 2 2
2

100MM THK REINFORCED


CONCRETE GUTTER
EB1
6'' DIAMETER PVC PIPE
DOWNSPOUT
G-1 TOP AND BOT CHORD = L 75x75x6mm
T-3
150MM X 0.4 MM THK
T-2 TOP AND BOT CHORD = 2L 75x75x6mm
HT-2 WEB = L 75x75x6mm
ALUMINUM SPANDREL TOP AND BOT CHORD = 2L 75x75x6mm WEB: 1. 2L 75x75x6mm
ON METAL FURRING 2. L 75x75x6mm
FRAMING SYSTEM; ELEVATED WEB = 2L 75x75x6mm
@ 50 MM FROM THE
BOTTOM OF BEAM

TRUSS SCHEMATIC DETAIL