Legend / Notes

LEGEND
21 7 1
R.C. WALL
SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5

SSL -1.050. SSL -1.400.


600THK. RAFT SLAB REINF. WITH 600THK. RAFT SLAB REINF. WITH
T20@150C/C BOTTOM BOTH WAYS & T25@100C/C BOTTOM BOTH WAYS &
T20@175C/C TOP BOTHWAYS T25@150C/C TOP BOTHWAYS

C9 C14 C14 C9 C17 C4 SC5


C11 C10 C10 C10 C11
1
SC5
7

600THK. RAFT SLAB


21 SSL -1.300.

SSL -1.400.
SSL -1.050. 700THK. RAFT SLAB REINF. WITH
900THK. RAFT SLAB REINF. WITH T25@100C/C BOTTOM BOTH WAYS &
T25@125C/C BOTTOM BOTH WAYS & T25@150C/C TOP BOTHWAYS
T25@175C/C TOP BOTHWAYS
SC5
C8 8 C8 C17 C2 C2 C2 C2 C3 C3 C3 C3
SC5
C16 C16

8
SSL -1.300.
700THK. RAFT SLAB

EARTH FILL

C1 C7 C7 C1 C17 C4 C2 C2 C2 C2 C13 C13 C13 C13

SC5 SC5

SSL -1.050.
600THK. RAFT SLAB REINF. WITH
T20@150C/C BOTTOM BOTH WAYS &
T20@175C/C TOP BOTHWAYS
22
C8 9 C8 C17 C4 C12 C2 C12 C6 C3 C3 C3 C3
SC5

12 SC5 12
P1
9 14 22
10
REFER FACILITY DRAWINGS FOR CONTINUATION

T25@100C/C BOTTOM BOTH WAYS &


LIFT

900THK. RAFT SLAB REINF. WITH

T25@150C/C TOP BOTHWAYS


C1 C1 SC5
C1 C1 C17 C5 C12 C12 C18 C12 C6
6

SSL -1.100.
P1

SSL -1.050 14
500THK. SLAB SSL -3.100.
600THK. RAFT SLAB 3 Key Plan

5 5
C1 C1 SC5

C1 C1 C17 C5 C12 C12 C18 C12 C6


P1
DETAIL D SSL -1.300.
700THK. RAFT SLAB
SSL -1.100.
10 900THK. RAFT SLAB REINF. WITH
T25@100C/C BOTTOM BOTH WAYS &
T25@100C/C TOP BOTHWAYS
C8 C8 C17 C4 C12 C2 C12 C6 C3 C3 C3 C3
2 SC5

SC5
12 12 P1
Location Map

SSL -1.050.
19 19 900THK. RAFT SLAB REINF. WITH
T25@125C/C BOTTOM BOTH WAYS &
T25@175C/C TOP BOTHWAYS
EARTH FILL
4
C8 C7 C7 C8 C17 C4 C2 C2 C2 C2 C13 C13 C13 C13

15 15 SC5 SC5

11
SSL -1.300.
18 18 700THK. RAFT SLAB

17 13 LIFT LIFT
CLIENT :
C8 C8 C17 SC5 C16 C16 SC5
C2 C2 C2 C2 C3 C3 C3 C3 MINISTRY OF CULTURE, SPORTS & YOUTH
P.O. Box 684, Postal Code 111
Muscat, Sultanate of Oman

600THK. RAFT SLAB


11 ARCHITECT LEAD
: CONSULTANT :

SSL -1.400.
20 20 SSL -1.300.
700THK. RAFT SLAB REINF. WITH
T25@100C/C BOTTOM BOTH WAYS & ARCHITECT
21 T25@150C/C TOP BOTHWAYS
75012 PARIS TEL: +33.1.43.45.18.00
C9 C14 C14 C9 C17 C4 SC5 SC5 E.MAIL: as@architecturestudio.fr FAX: +33.1.43.43.81.43
C11 C10 C10 C10 C11
17 13 LOCAL CONSULTANT & ENGINEERS OF RECORD :

P.O. Box.487, Muscat, TEL: +968 244 75 641


4 E-mail : gec@gulfenggoman.com FAX: +968 244 75 645

STRUCTURE / MEP THEATRE CONSULTANT: LANDSCAPE CONSULTANT:


SSL -1.050. SSL -1.400.
600THK. RAFT SLAB REINF. WITH 600THK. RAFT SLAB REINF. WITH
CONSULTANT:
SETEC TPC MDP
16 16
T20@150C/C BOTTOM BOTH WAYS & T25@100C/C BOTTOM BOTH WAYS & ACOUSTIC CONSULTANT: FACADE CONSULTANT: LIGHTING CONSULTANT:
T20@175C/C TOP BOTHWAYS T25@150C/C TOP BOTHWAYS AVA T/E/S/S 8'18"
Copyright Reserved

SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5 SC5
Scale: 1/100 on A0 size sheet 1 0 0.5 1 2.5 5 10 METRES

21
Designed by: AS Checked by: AS Approved by: AS Drawn by: AS

JUNE 2022
MINISTRY OF CULTURE, SPORTS & YOUTH DATE

Project Title:

OMAN CULTURAL COMPLEX


FOUNDATION LAYOUT SULTANATE OF OMAN

Subject:

STRUCTURE

FOUNDATION LAYOUT

1:100 JUNE 2022