You are on page 1of 1

KEY PLAN N

1 2 3 4 5 6 7 8 9

BLOCK WORK
BLOCK WORK BLOCK WORK -1.500 (100mm TK.)
(100mm TK.) -1.500 -1.900 -1.500 -1.900
(100mm TK.) -1.500 -1.900 -1.500 -1.900 EBL EBL EBL
-1.500 -1.900 -1.500 -1.900 -1.500 -1.900 EBL EBL EBL NOTE:
EBL EBL EBL EBL EBL 1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METER
EBL EBL EBL EBL UNLESS OTHERWISE NOTED
-1.900 2. GATE LEVEL -0.33 FFL = +7.95 DMD LEVEL
3. WATER PROOFING DETAILS TO BE SUBMITTED SEPARATELY

A EBL 4. MANHOLES, CHAMBERS & GREASE TRAP DETAILS ADDED AS PER MEP
REQUIREMENT.

-1.300 -1.300

EB 300
EBL -1.500 EBL -1.300

L
- 1.
EBL -1.500 -1.500 -1.300 -1.500 EBL
EBL EBL -1.500 EBL EBL
EBL -1.500
-1.500 EBL
-1.500 EBL
EBL BLOCK WORK
(150mm TK.) BLOCK WORK
B -1.900 (100mm TK.)
-1.900 -1.900 EBL
EBL -1.500 EBL -1.500 -1.500
EBL EBL EBL -1.900
-1.500 EBL
EBL BLOCK WORK
-1.300 (150mm TK.) -1.500
-1.500 EBL -1.500 EBL
VAR. VAR. VAR. EBL EBL
EBL EBL EBL -1.500
VAR. BLOCK WORK EBL
(150mm TK.)
EBL
-2.35 SHUTTER -2.35
Loc 19
EBL EBL
-1.500
EBL

Loc 1 Loc 18 -1.900


EBL
-1.300
-2.150 EBL
EBL
Loc 6 -1.900
C EBL
Loc 15 -1.900
EBL
-1.300
EBL
-1.500
-1.500 EBL
EBL
-1.500
EBL
BLOCK WORK Lower Raft Excavation works @ Level -5.710 m
(150mm TK.) SLOPE

-1.500 Loc 4 Loc 13 -1.500


EBL
EBL BLOCK WORK
(150mm TK.)

-1.500
EBL
Loc 17 BLOCK WORK
(150mm TK.)

Loc 2 Loc 7 -1.900


D EBL
Upper Raft Excavation works @ Level -3.100 m
SLOPE Loc 14 -1.500 -1.900 -1.500
EBL EBL EBL
-1.300
EBL Loc 11 Loc 16
-1.500 -1.500
EBL EBL
-1.500
EBL

SLOPE BLOCK WORK DRAWING SUBMITTAL STATUS


(150mm TK.)
Loc 9 -1.500
EBL A Approved B Approved as Noted

Loc 5 C Revise and Resubmit D Rejected


-1.300 -1.900
EBL -1.900
Loc 12 EBL
-1.900
EBL Reviewed By: Date:

EBL
E
-1.500
Loc 8
EBL Loc 10 -1.500
EBL
-1.500
EBL

BLOCK WORK
Loc 3 BLOCK WORK
(150mm TK.) 1 21.MAR.2021 FOR APPROVAL IM

0 28.FEB.2021 FOR APPROVAL IM

REV. DATE DESCRIPTION DRAWN

PROJECT:

SHUTTER HOTEL SERVICED APARTMENT


-1.500 -1.500 -1.500 -1.500 (G+4P+1HC+31+MECH.FLOOR + ROOF)
EBL EBL EBL EBL BLOCK WORK
-1.300 (100mm TK.) -1.500 -1.500 JVT07I0HR001

EBL -1.900 JVT, DUBAI,U A E.


EBL EBL EBL CLIENT:

KRATI JAIN RAJESH JAIN


Plot No./ Area:

-1.500 JVT07I0HR001 / AL BARSHA SOUTH FIFTH

EBL
CONSULTANT:
F OFFICE 2805 - 2810, CONCORD TOWER,
MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
P.O. BOX: 79593

-1.900 -1.900 -1.900 -1.900 TEL.: 04-2989220, FAX: 04-2989210

-1.900 EBL
www.decengineering.net

EBL -1.500 EBL -1.500 EBL -1.500 EBL MAIN CONTRACTOR:

EBL EBL EBL -1.500 -1.900 Shaanxi Construction Engineering Group Corporation
EBL -1.500 EBL Office 310, Emaar Business Park Building-4

EBL -1.500 Dubai, United Arab Emirates.


Tel.: 04-5776183

-1.900 EBL
EBL SUB CONTRACTOR:

Tie Beam
G DRAWING TITLE:

-1.300 -1.300
-1.300 -1.300 -1.300 EBL RAFT FOUNDATION
-1.300 EBL EBL 21 MAR 2021
EBL EBL EBL GENERAL ARRANGEMENT LAYOUT

SCALE: 1:100 DRAWING NO. REV.

DATE: 21.MAR.2021 FIV-SGC-CIV-GF-SHD-004-01 01

EXCAVATION LAYOUT PLAN DRAWN BY

IM
Sign. & Dt. ...............
CHECKED BY

Sign. & Dt. ...............


SUBMITTAL REF. NO:

SCALE : 1/100

You might also like