2400
1800
1800
1500
900
i.e GL:10 000
MH i.e i.e r.w IL: 9 700 D:300
GL:10 000
Pipe length= 12000
SIDE ELEVATION
IL: 9500 D:500
Pipe length= 12000
BACK ELEVATION
i.e i.e i.e
r.w MH
9460
115
ROOF NOTES
230 4000 2000 115 2770 230
ROOF PITCH 5 DEG.
ab ab ab ab EAVES OVERHANG: 450mm
230
230
IBR OR OTHER SUITABLE ROOF SHEETS ON TRUSSES TO MANUFACTURER's SPECIFICATIONS.
TIMBER PURLINS TO MANUFACTURER'S DESIGN & SPECIFICATIONS ON 114x38 WALL
B.I.C
2500
KITCHEN PLATES TIED DOWN MIN 300 INTO BRICKWORK WITH STEEL HOOP STRAPS @1000mm
3385
BEDROOM 02
Ceramic
Ceramic CENTRES.
615
8mm PVC ceiling fixed to 38x38mm Timber branders @400mm c/c both ways.
115
2000
615 230mmx19mm FASCIA BOARD.
115
1115
500 125mmx100mm GI GUTTERS WITH 100mm dia. down pipes to dripstones.
500
B.I.W 100x100mm CONCEALED GALVANIZED IRON BOX GUTTER WITH SPLASH PROTECTOR.
9230
9230
75x75mm GALVANIZED IRON RAIN WATER DOWN PIPE
4655
DINING & LOUNGE ALL ENDLAPS SHALL BE SEALED WITH AN APPROVED SEALING COMPOUND.
Ceramic
A A
4270
MASTER BEDROOM
Ceramic
3500
3000
3000
MASTER DINING & LOUNGE
230
2400
BEDROOM ROOM
Render
1000 230
Render
1200
VERANDA &paint &paint
Ceramic +0.15 FL
+0.00 NGL +0.15 FL +0.00 NGL
300
5000 3700
SIDE ELEVATION
230
230
230
230 9460 230 300 700 500 700
FLOOR PLAN
538
3510
3028
SECTION A- A
NOTES TITLE
WORKMANSHIP
1.Brickforce to be put after every 4 courses FRONT ELEVATION LOCATION
2.the brick bond to be 10mm thick and to be uniform throughout the whole structure.
3.concrete slabs should be cured for at least 7 days before superstructure is built CLIENT
blinding concrete on foundation should be well compacted
DATE