You are on page 1of 7

HENDRI WICAKSONO / 1801411022 / NO.

08 / 3 PJJ

DENAH JEMBATAN

2,0 m
4m 2,0 m
B
0,3 m

A A A

4,0 m 3 m

0,3 m

BB

TAMPAK SAMPING
Pengaman Jembatan
Tembok Pengaman Tiang sandaran
(Pipa Galvanis )

0,75
C
PLAT LANTAI BETON
BALOK / GELAGAR BETON
BALOK TUMPUAN
ABUTMEN
M.A. Banjir
2,00 m

M.A.Normal

1,0 m

1,8 m 3.m 1,8 m


HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ

DETAIL D POTONGAN C-C


POTONGAN B -B TIANG PAGAR JEMBATAN DETAIL PENULANGAN TIANG

Tiang Pagar Jembatan Plat Beton T= 0,20 m 4O - 10


Beton Cor 1:2:3 (Beton cor 1:2 :3 ) C C

Balok Beton (25/50)


Beton Cor 1:2:3 1,0 m
0,15 m
D 0,20 m
0,30 m
0,15 m

0.5m 1.25m 1.25m 0.5m 0 8-15


3,5 m

DETAIL C

Plat Lantai (Beton


Cor 1:2:3)
Balok Tumpuan
(Beton Cor1:2:3)
Balok Utama DETAIL E
(Beton Cor1:2:3) 0.25 m
BALOK TUMPUAN
Abutmen
(Pas. Batu 1:4)
0.20 m

16 O 12

0.30 m 0.50 m
O 10 - 12,5

E
Angkur

0.25 m
0.5 m

0.50 m

0.5 m 0.25 m
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ

PENULANGAN PLAT & BALOK JEMBATAN

Plat Lantai
6 O 16 O 10 -15 O 10 - 10 (Cor beton 1:2:3)

0,20m

0,50m

6 O 16
0.25m 0,25 m Balok Diafragma 0.25m Balok Utama
(Cor beton 1:2:3) (Cor beton 1:2:3)

O 10 - 10

PONDASI TELAPAK
KOLOM PERKUATAN ABUTMEN
SKALA 1 : 20

O 10 - 20

O 10 - 20

0.5 m 1.25 m 1.25 m 0.5 m


3,5 m

DETAIL PENULANGAN BALOK UTAMA


DETAIL PONDASI

A B Balok ( Cor beton 1:2:3 )


6 O 16 L/4

2.75M

L
8 - O 16
O 10- 10
O 10- 15 8 - O 16
1.0M
A

150 300 150


1.8 M

POTONGAN A - A POTONGAN B - B
PENULANGAN BALOK
DIAFRAGMA

6 O 16 4 - O 16

O 10- 15
0,20 m 0,20 m O 8- 15

0.50m 0.25m

8 - O 16
0,30 m 0,30 m
O 8- 10
0
8 O 16 8 - 0 16
0.25m 0.20m
0.25m
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ
A PEKERJAAN JEMBATAN
1 Pekerjaan Galian Tanah
1.1. Galian Tanah
Bangun 1 Panjang = 3,00 m
1,00 m Tinggi = 1,50 m
Lebar 1 = 1,80 m

Volume = ( L xT ) xP = 8,10 M3

3,75m

1 1,25

1,5 m
Bangun 2 Panjang = 3,00 m
1,80 m
Tinggi = 3,75 m
1,00 m Lebar A = 1,50 m
Lebar B = 1,80 m
Volume = (((LA+LB)/2) x T ) x P)-C = 18,56 M3

3,75m 2

TOTAL GALIAN = 26,66 M3

1,80 m

2 PEKERJAAN PASANGAN BATU KALI


2.1. Pek. Pasangan Batu Kali 1 : 5
a. Abutmen
Bangun 1 Panjang = 3,00 m
Lebar 1 = 1,00 m
Lebar 2 = 1,50 m
0,25 Tinggi = 2,75 m
0,75
Jumlah bangun = 2,00 bh
0,75 3 Volume = (((L1 + L2)/ 2) x T) x P)xJlh
= (((1,0+1,4)/ 2)*2,75)*4,0)*2 bh = 20,63 M3

2,0 m
Bangun 2 Panjang = 3,00 m
1
Lebar 1 = 1,80 m
Tinggi = 1,00 m
Jumlah bangun = 2,00 bh
1,0 m
2 Volume = ((L1 x T) x P x 2
= ((1,80 x 1,25) x 4,00 x 2 bh = 10,80 M3
1,5 m

0,15 m 0,15 m
Bangun 3 Panjang = 3,00 m
Lebar = 0,75 m
Tinggi = 0,75 m
Jumlah bangun = 2,00 bh
Volume = ((L1 x T) x P x Jlh
= ((.0,50 x 0,75) x 4,00 x 2 bh = 4,50 M3

VOLUME ABUTMEN = ( 1+2 ) - 3 = 26,93 M3

b. Tembok Pengarah
Panjang = 1,00 m
Lebar = 0,30 m
Tinggi = 1,00 m
1,0 m
Jumlah bangun = 4,00 bh
Volume = (( L x T ) x P ) x Jlh

1,0 m = (( 0,30 x 1,00 ) x 1,25 ) x 4 = 1,20 M3


volume total pasangan batu kali = 28,13
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ

2.2. Pek Plesteran + Acian


e. Pek. T=1.5
Cor Balok cm 1:4dan Pengarah Jembatan
Pengaman
a. Siar/voeg volume
Tinggi = 1,00 m = 6,48 m2
b. Tembok Pengarah dan Balok Pengaman Lebar = 0,15 m
Tebal = 0,15 m
Tembok Pengarah
Jumlah = 10 bh
Volume
Volume =
= ( 0,15(((0,35*1,0)*3)+((1,,0*1,0)*2)))*4
x 0,15 ) x 1,0 x 10 = 0,23 M3
1,0 m = 12,20 M2
1,0
Balok Pengaman
1,4 m Tinggi = 1,40 m
L= T = 0,15 m
0,35 Lebar = 0,15 m
T T Volume
Tebal =
= (0,50*1,00)*22
0,15 m
= 11,00 M2

1,0 L T Jumlah = 12 bh
L Volume = ( 0,15 x 0,15 ) x 1,4 x 12 = 0,38 M3
TOTAL VOLUME COR BETON BERTULANG = 2,48 M2
c. Lantai Bawah Plat Jembatan Panjang = 4,00 m
3.2. Pek. Penulangan
Lebar = (2*0,37)+(2*1,0) = 2,74 m2
a. Penulangan Plat Lantai
Volume Ø 12
Tulangan Memanjang = (P x L) = 10,96 M2
Panjang = 2(a)+b+c = 624 cm = 6,24 m
c Jumlah (300/15)+1
=Panjang 21 Alur
d Balok Induk
ba c = 4-(3*0,2) = 3,40 m
2

= (24 x 2) x 6,24 = 262,1 m = 262 / 12 = 21,84 Ujg


Lebar = (2*0,3)+0,25 = 0,85 m
1

= 22 Ujg
O = 12 - 15 Jumlah bangun
Tulangan Melintang Ø 12
= 3,00 bh
O = 12 - 10 O = 12 - 20
1 = 3 Panjang =Volume
2(a)+d == (3,4*0,85*3)360 cm = 3,6=m 8,67 M2
Jumlah = (400/20)+1 21 Alur
d = (31 x 2) x 3,6 = 223,2 m = 223 / 12 = 18,60 Ujg
e. Balok Diafragma
e h e
1 Panjang = 3,5-(3*0,25) = 2,75 m
b g g 2 = 19 Ujg
f
Lebar = (2*0,5)+0,8 = 1,8 m
a d
3 2 Panjang =Volume
2a+2b+2e+4f+2g+h = (3,4*0,85*3)446 cm = 4,46 =m 4,95 M2
Ket : a = 7,5 e = 83 Jumlah = (400/20)+1 31 Alur
b = 15 f = 17
g = 48 4,5
= (31 x 1) x 138 m = 138 /12 = 11,52 Ujg
c = 595 TOTAL VOLUME PLESTERAN = 54,26 M2
d = 345 h = 71 12 Ujg
3,1. Pek. Pengecoran Campuran 1:2:3
a. Pek. Cor Plat Lantai TOTAL BESI O 12 TULANGAN LANTAI = 53 Ujg
b. Penulangan Balok Induk

6 - O 16
Panjang
4 O 16 = 4,00
Lebar Bersih = 2,25 (= 3m - ( 3 x lebar balok ) )
3m Tebal = 0,20
0,2 m Volume = (0.20x2,25)x4,0 = 1,80 M3
150 3000 150

O 8 - 10 8 - O 16 O 8 - 15
4,0 m

Tulangan Memanjang O 16
140 140 Panjang = (2x10)+(2x140)+(2x40)+290 = 670 cm = 6,7 m
10 290
1. 40 Jumlah = 2 Alur 3 Balok = (6,7 x 2)x3 = 40 m

b. Pek. Cor Balok Utama


2. Panjang = (2x10)+590 = 610 cm = 6,1 m
=Panjang10 Alur 3=Balok 4,00
590
10 Jumlah = (6,1 x 10)x3 = 183 m
Lebar =
JUMLAH PANJANG 0,25
= 223 M = 18,6 Ujg
3. BEGEL O 10 Tinggi = 0,30 = 19 Ujg
20 Jumlah = 3,00
Panjang = (2x6)+(2x20)+(2x44) = 140 cm = 1,40 m
44 0,3m Jumlah
Volume =
= (2x(150)/10)+(300/15)+1
(0.20x0.50)x4)X3
= 51 Alur
= 0,90 M3
6
= 51 Alur 3 Balok = 214 m = 17,85 Ujg

0,25

c. Penulangan Balok Diafragma


c. Pek. Cor Balok Diafragma
Panjang = 2,25 = 3 - (3x0,25)
Lebar = 0,20 = 183 Ujg
Tebal = 0,30
Jumlah = 3,00
1. Tulangan Memanjang O 12 Panjang = (2x7,5)+295 = 310 cm = 3,1 m
3m Volume 6 Alur
295 Jumlah = 3=Balok(0.20x0.30)x2,25)X3
= (3,6 x 6)x3 = 55,8 =
m 0,41 M3
7,5
JUMLAH PANJANG = 55,8 M = 4,65 Ujg
16
= 5 Ujg
2. BEGEL O 8
Panjang = (2x6)+(2x24)+(2x16) = 92 cm = 0,92 m
24
Jumlah = ((2x37,5)+(100x2))/15)+4 = 22,3 Alur
d. Pek. Cor Balok Tumpuan 6
= 22 Alur 3 Balok = 62 m = 5,14 Ujg
3m Panjang = 3,00 6 Ujg

0,5 Lebar = 1,25


Tebal = 0,25
d. Penulangan Balok Tumpuan 0,25
Jumlah = 2,00
25 50 Volume = ( 1,25 x 0,25 ) x 3 x 2 = 1,88 M3

0,5
0,25
50

25

1. Tulangan Memanjang O 12 Panjang = (2x7,5)+295 = 310 cm = 3,1 m


Jumlah = 16 Alur 3 Balok = (3,6 x 16)x3 = 148,8 m
345
JUMLAH PANJANG = 149 M = 12,4 Ujg
7,5
20 = 13 Ujg

Panjang = (2x6)+(2x20)+(4x45) = 232 cm = 2,32 m


2. BEGEL O 10 45 45 Jumlah = (300/12,5)+1 = 25 Alur

45 = 25 Alur 2 Balok = 116 m = 9,67 Ujg


6 = 10 Ujg
20
6
45
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ

f. Penulangan Balok Pengaman dan Balok Pengarah Jembatan


1. Tiang Pengaman Tiang Pengarah = 6 buah

Tulangan Memanjang O 10 Panjang = (2x5)+120 = 130 cm = 1,3 m


5 Jumlah = 4 Alur 6 Balok = (1,3x4)x10 = 31,2 m
JUMLAH PANJANG = 31,2 M = 2,6 Ujg
100 = 3 Ujg
120
Begel O 8
Panjang = (2x6)+(4x12) = 60 cm = 0,60 m
5 5 12
Jumlah = (100/15)+1 = 7,67 Alur
20 12 = 8 Alur 6 Balok = 28 m = 2,30 Ujg
= 3 Ujg

Pipa Galvanis O 2 " Panjang = (4 x 4) = 16 m = 3 Ujg

4,0 m
Total Volume Besi O 8 mm = 9 Ujung
Total Volume Besi O 10 mm = 196 Ujung
Total Volume Besi O 12 mm = 18 Ujung
Total Volume Besi O 16 mm = 6,7 Ujung

Total Volume Pipa Galvanis O 2" = 3 Ujung