Professional Documents
Culture Documents
(FOR BRIDGE)
Direction: Please check the appropriate box or, where relevant, specify your answer.
1. Type of Bridge
Wooden Bridge (Timber Trestle)
RCDG
Steel Bridge
Overflow Bridge
Others ________
REMARKS:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
2. Condition of Bridge
For Replacement
For Repair
For Rehabilitation
For Improvement
REMARKS:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
B. Without Bridge
1. Type of Bridge
Wooden Bridge (Timber Trestle)
RCDG
Steel Bridge
Overflow Bridge
Others ________
Length: ______
Cost Per Unit of Measure (Linear Meter): ________
REMARKS:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
NOTE:
1) For RROW, ownership of the land should be established prior to implementation.
2) The implementing unit is in charge in RROW acquisition including permit and clearances.
3) For new road opening, all necessary assessments shall be prepared by the implementing unit.
Evaluated by:
______________________ ______________________
Name and Position Name and Position
______________________ ______________________
Name and Position Name and Position
Approved by:
_____________________
DILG Provincial Director