You are on page 1of 11

Proforma-I

Constituency/ District Wise Status of Capital Works Under Scheduled Castes Sub Plan for the year 2020-21 (upto 31.3-2021)
Sr.N Name of Major Work Name of Scheme Year of Estimated A/A & E/S Accorded Total Amount released so Total Unspen Funds Status Tentative Remarks
o. Depart Head Code start of Cost far (Rs. in Lacs) Amount t required i) Not Period for
ment Work (Rs. in spent so Amoun for yet Started, completion
Lacs) Amount Date Gen. SCSP Total far (Rs. in t(Rs. in completio ii) Upto 50% i)<1 Year
(Rs. in Plan Lacs) Lacs) n (Rs. in iii) Upto ii)1-2 Years
Lacs) Lacs) 50-70% iv) > iii)>2 Years
70%
v) Work
Completed
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

NAGROTA BAGWAN CONSTITUENCY


I PMGSY
HPPWD., ----------------------------------------------------------- NIL ------------------------------------------------------------------
Tanda
II CRF
HPPWD., ----------------------------------------------------------- NIL ------------------------------------------------------------------
Tanda
III NABAR
D
1 PWD 2015-307- C/O Link road to village Khanog -- 44.96 44.96 No. PW.SEV-WS-II- -- -- -- -- -- 45.00 Work -- --
Tanda 1304 Road/2016-11047-534.3.2014 completed

2 -do- 2015-307- C/O link road to village Garni -- 68.83 68.83 -- do -- 11034-40 Dated:- 30.00 -- 30.00 -- -- 43.59 upto 50 to -- --
1306 31.3.2016 70%
5054-03-
3 -do- 789-02- 2015-307- C/O link road to village Haryat 2017 43.54 43.54 -- do -- 11027-33 Dated:- 30.00 -- 30.00 -- -- 15.00 Work -- --
SOON 1307 31.3.2016 completed
Rural road
(Nabard)
4 -do- 2015-307- C/O link road to village Matial 2017 44.18 44.18 -- do -- 11075-81 Dated:- 30.00 -- 30.00 -- -- 15.00 upto 50 to -- --
1308 31.3.2016 70%

6 -do- 2015-307- C/O Link road to Village Ghorab Km 0/00 to 2017 43.97 43.97 31.03.2016 -- 43.23 43.23 43.23 -- -- 80% 1 Years --
1305 2/100.

Total :- 245.48 245.48 -- 90.00 43.23 133.23 43.23 118.59

IV RURAL ROADS
1 PWD 2007-307- C/O Kandi Thill road 2010 58.82 58.82 Pr. Secy. SJ & E No. SJE-B- -- 2.51 2.51 -- 20.00 40.00 80 % Work -- --
Tanda 55341 C(10)-16/2009-II-Loose Dt. completed
29.01.2010
2 -do- 2007-307- C/O link road to village Kanda 2007 40.75 40.75 Pr.Secy.SJE No. SJ&E-B- -- -- -- -- -- 5.00 Work -- --
55423 C(10) 28/06 Loose-I dt 20-9- completed
07

3 -do- 2011-307- C/O link road from Kharat via 2012 219.59 219.59 Pr.Secy.SJ&E-13 -C(10) -- 93.70 93.70 -- 15.00 125.00 upto 50 to -- --
336 Kanoongo house 11/2011 Loose dt. 10.01.2012 70%
4 -do- 2016-307- C/O link road to village Ladret -- -- -- Awaited -- -- -- -- -- -- Not yet started -- --
294 Haldwari Sunni road

5 -do- 2016-307- C/O Jeepable link road from Ustehar to -- 28.10 28.10 No. PW.SEV-WS-VIII-SCSP/2016- 0.50 0.50 5.00 23.00 less than 50% -- --
110836-42 Dated:- 6.1.17
995 Khajan Chand House in Nagrota
Bagwan
5054-04-
789-01-
6 -do- SOON 2016-307- C/O link road from Chakban to -- -- -- -- -- -- -- -- -- -- Not yet started -- --
Rural Road 992 Kothi Uparli via Bag Gulehar
village Kothi
7 -do- 2016-307- C/O Link road to village Bagh -- 19.50 19.50 SE 5TH Circle Palampur vide letter -- -- -- -- 5.00 5.00 Not yet started -- --
No. PW-SEV-WS-VIII-SCSP/2020-
1660 8538-44 Dt. 25.02.202

8 -do- 2016-307- C/O Jeepable road to village -- 8.70 8.70 No. PW-SEV-WS- -- -- -- -- 5.00 5.00 10 % work -- --
1661 VIII/SCSP/2019-3650-56 Dt. 16- completed
Sarotri 8-2019

9 -do- 2016-307- C/O link road to village Matial -- 44.18 44.18 No. PW-SEV-WS-II-Road./2016- -- -- -- -- -- -- upto 50 to -- --
1004 11075-81 dt. 31.3.2016
70%
10 -do- 2017--307- C/O link road Garni -- 68.83 68.83 -- do -- 11034-40 Dated:- -- -- -- -- -- -- upto 50 to -- --
1782 31.3.2016 70%
11 -do- 2017-307- Jeepable road to village Bag -- -- -- -- -- -- -- -- -- -- Not yet started -- --
1783
12 -do- 2018-307- C/O link road to main road Luhna to Guru -- -- -- -- -- -- -- -- -- -- 30 % work -- --
827 Ravi Dass Bhawan
completed
13 -do- 2007-307- C/O Road from Baroi Maholkar via lower 2010 57.83 57.83 11.06.2009 -- 66.63 66.63 66.63 -- -- >80% 1 Years --
55342 Jadrangal.

14 -do- 5054-04- 50456 C/O Massal Sakra Basti Ghorab road. 2007 31.27 31.27 29.06.2006 -- 70.16 70.16 70.16 -- -- 100% -- --
789-01
15 -do- SOOS 2015-307-208 C/O Road in Ward No. -1 Karahpura. 2018 24.20 24.20 28.03.2018 -- 48.56 48.56 48.56 -- -- <50% 3 Years --

16 -do- 2016-307- C/O Link road from Village Ghorab. 2016 43.97 43.97 28.03.2016 -- 64.02 64.02 64.02 -- -- >50% 2 Years --
1003
17 -do- 2007-307- C/O Thana Bargran to Lower Thana Bushal --
55385/27 link road. 2008 0.00 0.00 0 0 0 55.13 55.13 0 55.00 55% > 2 year

18 -do- 2009- C/O link road Bushal Khart Khas. --


307/58659/25
2013 90.54 90.54 2010 0 0 28.69 28.69 0 10.0 50% > 2 year

19 -do- 2013-307- C/O link road Paisa Chowk (NH-88 Un- --


286/24
connected Basti to Balugloa). 2013 59.20 59.20 2012 0 0 14.04 14.04 0 20.0 50% > 2 year

20 -do- 2009-307- C/O link road Bane-Di-Hatti to Khapper --


58661/25
Nallah.
0 0 0 0 0 0 81.06 81.06 0 5.00 50% > 2 year
21 -do- 2009-307- C/O link road Nagani Harizan Basti to
2011 48.61 48.61 2010 0 0 8.95 8.95 0 40.00 50% > 2 year
--
58660/25 Kalroo.
22 -do- 2007-307- C/O link road to village Chakban Rajiana
-- -- -- Awaited -- -- -- -- -- -- -- -- --
55408
23 -do- 2009-307- C/O link road village Gabla Andrad
-- -- -- -do- -- -- -- -- -- -- -- -- --
58663
24 -do- 2019-307-652 C/O link road Bhorni to Harijan Basti SE 5th Circle Palampur vide
Masandkar via Chamargalua letter No. 8248-54 DATED:- 29-
-- 62.97 62.97 1-2020 -- -- -- -- -- -- -- -- --

25 2019-307-613 C/O link road Jhamaka to Than Km 0/000 5th Circle Palampur vide letter
to 1/000 No. 8255-61 DATED:- 29-1- 10 % work
83.95 83.95 2020 completed

26 -do- 2019-307-616 C/O link road Dhiman Basti to village DC Kangra at Dharamshala vide
letter No.1-11/2019-ESOMSA-DC-
Garni in GP Kandi km. 0/0 to 1/100 Kangra-SCSP-AA&ES-2019-20-
-- 46.18 46.18 676-685 DATED:- 20-01-2020 -- -- -- -- -- -- -- -- --

5054-04-
27 -do- 789-01- 2018-307-800 C/O jeepable road in GP Kaled for Ward
-- -- -- Awaited -- -- -- -- -- -- -- -- --
SOON No. 4 and 5
28 -do- Rural Road 2015-307-196 C/O road from NH-22 to Tikka Malan -do-
Chakban Ambari road iva Sh. Jagdish -- -- -- -- -- -- -- -- -- -- -- --
Chand House
29 -do- 2018-307-826 C/O jeepable road for Gujjar Basti in GP DC Kangra at Dharamshala vide
letter No.1-11/2019-ESOMSA-DC-
Massal Kangra-SCSP-AA&ES-2019-20-
-- 62.97 62.97 656-665 DATED:- 20-01-2020 -- -- -- -- -- -- -- -- --

30 -do- 2007-307- C/O link road to village Chakban Rajiana


-- -- -- Awaited -- -- -- -- -- -- -- -- --
55408
31 -do- 2015-307- C/O link road Gadiya Khas to Lahru via
-- -- -- -do- -- -- -- -- -- -- -- -- --
1322 Baluhi
32 -do- 2010-307-870 C/O link road to Paddar -do-
-- -- -- -- -- -- -- -- -- -- -- --

33 -do- 2019-307- C/O link road Danoa to Kharat Khas via -do- 5 % work
1044 Drad km. 0/0 to 2/500 -- -- -- -- -- -- -- -- -- -- --
completed
35 -do- 2020-307- C/O link road Dhiman Basti to village 87.6 87.60 A/A & E/S accorded by SE
2069 Bushal Km 0/00 to 2/000 Palampur No. PW-SEV-WS-
-- -- -- -- -- -- -- -- -- --
VIII - Road/2020-21/ 2592-98
Dated:- 1/7/2020 for Rs.
36 -do- 2020-307-2070 C/O Link road Harizan Basti Toru 45.62 45.62 87.60
SE Lacs only
Palampur No. PW-SEV-
Saroot Harijan Basti Bha Chhaprehar WS-VIII - Road/2020-21/
Road Km 0/000 to 1/000 -- 2475-81 Dated:- 29/6/2020 -- -- -- -- -- -- -- -- --

37 -do- 2020-307-2118 C/O Link road Jagni Bholu Baba to 83.97 83.97 SE Palampur No. PW-SEV-
Churan Surani road Km 0/000 to 2/000 WS-VIII - Road/2020-21/
-- 2654-60 Dated:- 1/7/2020 -- -- -- -- -- -- -- -- --

Total :- 1317.35 1317.35 0.00 346.08 533.95 437.24 50.00 333.00

V Panchayat Connectivity
5054-04-789-02- SOOS- C/O link road to Unconnected Panchayat with National
Highway.
1 PWD 2007-307- C/O link road to Sadoon to Akrana 2005 48.45 48.45 PW CE(N) Misc road 5th -- 31.00 31.00 -- 20.00 25.00 upto 50 to -- --
Tanda 55061 circle 2005-10037-43 dt. 70%
31.3.05

2 -do- 2016-307- Link road Jabbar to Thakur Basti -- -- -- Awaited -- -- -- -- 12.20 -- Not yet started -- --
1013 Khanog
3 -do- 2016-307- C/O Link road from Chandron to -- -- -- Awaited -- -- -- -- -- -- Not yet started -- --
993 Kandi
4 -do- 2019-307- C/O link road village Uperla -- -- -- Awaited -- -- -- -- -- -- -- -- --
655 Dibber km. 0/0 to 2/0
5 -do- 5054-04- 2007-307- C/O link road Rajianan to -- -- -- Awaited -- -- -- -- -- -- 30 % Work -- --
55463 Surani via Churan completed
789-02-
-do- SOON 2018-307- C/O link road to village Chakkan Accd. By DC Kangra at Dharamshala
6 -- -- 71.37 vide letter No.1-11/2019-ESOMSA-
-- -- -- -- -- -- 15 % work -- --
865 Gheen Soharn to village Thathal
Nagrota Bagwan DC-Kangra-SCSP-AA&ES-2019-20- completed
686-695 DATED:- 20-01-2020 for
Rs. 7137000.00 only

7 -do- 2020-307- C/O link road Bada Noun to Chotta -- -- -- Awaited -- -- -- -- -- -- -- -- --


2115 Noun ward No. 4 Rajiana Dhiman
Basti

8 -do- 2020-307- C/O Link road from Jugani Balugaloa -- -- -- Awaited -- -- -- -- -- -- -- -- --


2118 to Churn Surani Km 0/000 to 1/000

Total :- 48.45 119.82 31.00 31.00 0.00 32.20 25.00

VI Bridges
1 HPPWD., 5054-04- 307-546 C/O Bridge on Bhagan Khad to link village 2013 54.72 54.72 31.12.2012 -- 63.99 63.99 63.99 -- -- 100% -- --
Tanda 789-04- Paddar
Bridges
2 307-1018 C/O Bridge over Naura Khad linking Village 2016 130.35 130.35 08.09.2016 -- 36.00 36.00 36.00 -- -- 100% -- --
Jassoure.

-do- 2016-307- C/O bridge on Harizan Basti Khapper 2017 73.64 73.64 2017 -- 112.86 112.86 112.86 -- --
3 1014/30 Nallah road. 100% > 2 year

-do- 2019-307-676 C/O Jeepable bridge over Dibber Khad in Awaited


4 Samloti to connect the Agriculuture office -- -- -- -- -- -- -- -- 50 % Work -- --
and Children park completed

-do- 2019-307-677 C/O jeepable bridge over Sukhad khad in Awaited


5 Kaled -- -- -- -- -- -- -- -- -- -- --

-do- 2018-307- C/O bridge over Bathu Khad on Sadoon Pr. Secy. (PW) G.O.(H.P.) Work is in
1984 Kandi road No. PBW(B)F(5)7/2017 progress
6 -- -- 298.94 Dated:- 24-02-2020
-- -- -- -- -- -- --

-do- 2020-307- C/O 19.75 mtr. Span bridge on Bhaloon Chief Engineer (KZ)
2152 Khad on Baldhar Rounkhar via Bhehru Dharamshala vide letter No.
road PW-CE(KZ)/WS/W-
7 -- -- 164.17 4/SCSP/2019-20/ 2173-78 -- -- -- -- -- -- -- --
Dated:- 7/9/2020 for Rs.
164.17 only

-do- 2020-307- C/O bridge on Baner Khad to connect Awaited


8 2153 village Jassour to Barai road -- -- -- -- -- -- -- -- -- -- --

Total :- 258.71 721.82 212.85 212.85 0.00


VII Buildin
gs
PWD Tanda4059-01- 2019-307- C/O BDO Office building Nagrota -- -- -- A/A & E/S Awaited -- -- -- -- -- -- -- -- --
789-01 579 Bagwan
SOON
1 2019-307- C/O HP PWD Baroh Sub-Division -- 20.00 20.00 SE 5TH Circle Palampur vide -- -- -- -- -- 20.00 50% Work -- --
580 Junior Engineer Office building at his office Letter No. completed
PW/SEV/WS-
Nagrota Bagwan VIII/Building/2019/- 7408-14
dt 11-12-2019 Rs. 20.00 lacs

2 2020-307- C/O AE Office building at Baroh -- 73.62 73.62 A/A & E/S Accorded by -- -- -- -- -- 73.62 Work is in -- --
2211 DC Kangra at progress
Dharamshala vide Letter
No. 1-11/2019-ESOMSA-
DC-Kangra-SCSP-
AA&ES(PN-R-G-
Bldg)2020-21-5083-5089
dt 21/8/2020 Rs.
73,62,000.00 only

Total :- 93.62 93.62 0.00 0.00 0.00 0.00 0.00 93.62 0.00 0.00 0.00
VIII Special Central Assistance
1 PWD 2020-307- C/O link road to village Bari Da -- 45.62 45.62 No. PW-SEV-WS-VIII - -- -- -- -- -- 45.62 20 % work 1 to 2 Years
Tanda 2094 Lahar road Km 0/000 to 1/000 Road/2020-21/ 2508-14 completed
Dated:- 30/6/2020

5054-04-
2 -do- 789-01 2020-307- C/O Link road N.H. Lakhdata -- 45.62 45.62 No. PW-SEV-WS-VIII - -- -- -- -- -- 45.62 --do-- --do--
2096 Nihargalu to Ambkhola Dhardi Road/2020-21/ 2501-7
Ludret km 0/000 to 1/000 Dated:- 30/6/2020

Total :- 91.24 91.24 0.00 0.00 0.00 0.00 0.00 91.24


Grand Total :- 2054.85 2589.33 90.00 633.16 911.03 480.47 82.20 661.45

Executive Engineer,
HP PWD Division,
Tanda at Nagrota Bagwan.
Proforma-II
Constituency/ District Wise Quarterly Progress Report of Works under SCSP being executed by Public Works Department for the year 2020-21
Sr.No Head Code Name of Work Reference of A/A & E/S Financial Achievement 2020-21 upto 31-3-2021 ( Rs Physical Achievement upto 31-3-2021 Remarks
. in Lac.)

No. & Date Amount Out lay Expenditure Expenditure Cumulative Jeepable Motorable Cross Soling Wearing Tarring Retaining Any Other
(Rs. in Lacs) 2020-21 upto Previous during the Expenditure (Kms) (Kms) Drainage (Kms) (Kms) (Kms) Wall/ Breast
Quarter quater (Kms) Wall (Rmtr)
31.3.2021

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

NAGROTA BAGWAN CONSTITUENCY


I PMGSY ----------------------------------------------------------- NIL ------------------------------------------------------------------

II CRF ----------------------------------------------------------- NIL ------------------------------------------------------------------

III NABARD

5054-03- 2015-307- राड से गांब खनोग के लिए सम्‍पर्क सड़क का No. PW-SEV-WS-II- 44.96 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000
789-02- 1304 निर्माण कि0मी0 Road./2016-11047-53 dt.
S00N
1 31.3.2016

--do-- 2015-307- गांव गारनी के लिए सम्‍पर्क सड़क का निर्माण -- do -- 11034-40 68.83 Deposit 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000
1306 कि0मी0 0/000 से 1/900 Dated:- 31.3.2016
2
--do-- 30

--do-- 2015-307- गांव हरयात के लिए सम्‍पर्क सड़क का निर्माण -- do -- 11027-33 43.54 Deposit 34.08 0.00 34.08 0.00 0.00 0.00 0.00 0.465 0.000 0.000 0.000 cc= 0.465
1307 कि0मी0 0/000 से 1/000 Dated:- 31.3.2016
3
--do-- 30

--do-- 2015-307- गांब मटयाल के लिए सम्‍पर्क सड़क का निर्माण No. PW-SEV-WS-II- 44.18 Deposit 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000
1308 कि0मी0 0/000 से 3/500 Road./2016-11075-81 dt.
4
--do-- 31.3.2016 30

--do-- 2015-307- C/O Link road to Village Ghorab --do-- 11041-46 dt. 43.97 -- 0.00 0.00 0.00
6 1305 Km 0/00 to 2/100. 31.03.2016 -- -- -- -- -- -- -- --

Total :- 34.08 0.00 34.08 0.000 0.000 0.000 0.000 0.465 0.000 0.000 0.000
IV RURAL ROADS
Nagrota Constituency.
5054-04- 2007-307- कण्डी थिल सडक । Secy. SJE No. SJE B-C (10)- 58.82 8.00 14.50 3.02 17.52 0.000 0.000 0.000 0.000 0.000 0.160 0.000 0.000 CC=
1 789-01- 55341 16/2009 II- loose dt. 0.850
S00N 01/2010.

--do-- 2007-307- कण्डा सडक का निर्माण । Pr. Secy. SJE No. SJ&E-B- 40.75 8.00 2.66 12.25 14.91 0.000 0.000 0.000 0.450 0.000 0.000 0.000 0.000 CC =
2 55423 C(10) 28/06 Loose -I dt 0.450
20-9-07
--do-- 2011-307- संपर्क सड़क बरोह मंदिर से खारट वाया कनोगु हाउस Pr. Secy. No. SJE-B-C(10) 219.59 10.00 131.51 16.22 147.73 0.000 0.000 0.000 0.450 0.000 0.000 0.000 0.000 CC =
3 336 गुज्रेडा से पंजलेहड़ा का निर्माण 11/2011-Loose dt. 0.450
10.1.12

--do-- 2016-307- चकवन से कोठी उपरली वाया बग गुलेहड़ हेतु संपर्क --do-- -- 5.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4 992 सड़क
--do-- 2016-307- लुदरेट हलदवाड़ी सुन्नी संपर्क सड़क का निर्माण --do-- -- 9.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5 994
--do-- 2016-307- उस्तेहड़ से खजानचंद के घर तक संपर्क सड़क का No. PW.SEV-WS-VIII- 28.10 5.00 11.10 0.00 11.10 0.000 0.100 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 995 निर्माण SCSP/2016-110836-42
Dated:- 6.1.17
--do-- 2016-307- C/O Link road to village Bag SE 5TH Circle Palampur vide letter 19.50 2.00 20.60 0.00 20.60 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000 CC=
No. PW-SEV-WS-VIII-SCSP/2020-
1660 0.250
7 8538-44 Dt. 25.02.202

--do-- 2016-307- C/O Jeepable road to village No. PW-SEV-WS-VIII/SCSP/2019- 8.70 2.00 6.61 0.00 6.61 0.000 0.250 0.000 0.250 0.107 0.000 0.000 0.000 CC=
3650-56 Dt. 16-8-2019
8 1661 Sarotri 0.250

--do-- 2016-307- C/O link road to village Matial No. PW-SEV-WS-II- 44.18 8.00 41.99 0.00 41.99 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 cc= 0.200
9 1004 Road./2016-11075-81 dt.
31.3.2016
--do-- 2017-- C/O link road Garni -- do -- 11034-40 Dated:- 68.83 5.00 20.28 0.00 20.28 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
307-1782 31.3.2016
10

--do-- 2017-307- Jeepable road to village Bag A/A & E/S Awaited -- 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
11 1783

--do-- 2018-307- C/O link road to main road Luhna to --do-- -- 5.00 2.64 0.00 2.64 0.000 0.270 0.000 0.270 0.270 0.000 0.000 0.000 CC=
827 Guru Ravi Dass Bhawan 0.270
12

5054-04-789- 2007-307- C/O Road from Baroi Maholkar via Pr. Secy. SJ&E No. SJE-B-C (10) 57.83 8.00 88.50 3.19 91.69 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CC=
13 01 SOOS 55342 lower Jadrangal. -14/08 dt. 11.06.2009. 0.350

50456 C/O Massal Sakra Basti Ghorab road. CE(N) No. Misc road/ 5th Circle/ 31.27 7.92 2.88 0.00 2.88 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
14 2006 /7216-22 dt.29-6-06.

2015-307- C/O Road in Ward No. -1 Karahpura. SE 5th letter No PW/ SEV -WS-II 24.20 9.00 13.72 1.10 14.82 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
15 208 road/ 2018 -10506-12,Dt
28.03.2018
2016-307- C/O Link road from Village Ghorab. SE 5th letter No PW-SEV- WS-II 43.97 9.00 1.49 2.43 3.92 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
16 1003 road/2016-11041-46 dt
31.03.2016
5054-04- 2007-307- C/O Thana Bargran to Lower Thana - 0.00 8.00 41.06 0.00 41.06 0.000 0.000 0.750 1.500 1.500 0.000 0.000 0.000
789-01- 55385/27 Bushal link road. CC =
17 S00N 0.100,
S/D =
0.400
--do-- 2009- C/O link road Bushal Khart Khas. do dt. 28.1.2010 90.54 5.00 26.90 7.80 34.70 0.000 0.100 0.000 0.550 0.550 0.000 0.000 0.000 CC =
307/58659/25 0.550,
18 S/D =
0.300

--do-- 2013-307- C/O link road Paisa Chowk (NH-88 Un- do No.SJE-B-C(10)-15/2012- 59.20 5.00 10.54 8.62 19.16 0.000 0.300 0.000 0.150 0.150 0.000 0.000 0.000 CC=
19 286/24 connected Basti to Balugloa). Loose dt. 5.9.2012 0.150
--do-- 2009-307- C/O link road Bane-Di-Hatti to Khapper - 0.00 10.00 20.99 3.06 24.05 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CC =
20 58661/25 Nallah. 0.450
--do-- 2009-307- C/O link road Nagani Harizan Basti to Pr. Secy. SJE No. SJE-B- 48.61 15.00 31.56 0.00 31.56 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
58660/25 Kalroo. C(10)18/III Loose dt. 22.3.10 CC =
21 0.195,
S/D =
0.105
--do-- 2007-307- C/O link road to village Chakban Rajiana A/A & E/S Awaited -- 5.00 2.88 0.00 2.88 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
22 55408
2015-307- C/O link road Gadiya Khas to Lahru via --do-- -- 5.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
23 1322 Baluhi
2010-307-870 C/O link road to Paddar --do-- -- 10.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
24
--do-- 2009-307- C/O link road village Gabla Andrad --do-- -- 10.00 0.00 8.02 8.02 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 cc =
25 58663 0.200
--do-- 2019-307-652 C/O link road Bhorni to Harijan Basti SE 5th Circle Palampur vide letter No. 62.97 5.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
8248-54 DATED:- 29-1-2020
Masandkar via Chamargalua
26

2019-307-613 C/O link road Jhamaka to Than Km 0/000 5th Circle Palampur vide letter No. 8255- 83.95 5.00 0.00 7.87 7.87 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
61 DATED:- 29-1-2020
to 1/000
27

--do-- 2019-307-616 C/O link road Dhiman Basti to village DC Kangra at Dharamshala vide 46.18 5.00 10.37 2.93 13.30 0.000 0.000 0.000 0.090 0.000 0.000 0.000 0.000 CC=
Garni in GP Kandi km. 0/0 to 1/100 letter No.1-11/2019-ESOMSA-DC- 0.090
Kangra-SCSP-AA&ES-2019-20- 676-
28 685 DATED:- 20-01-2020

--do-- 2018-307-800 C/O jeepable road in GP Kaled for Ward A/A & E/S Awaited -- 5.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
29 No. 4 and 5
0.00 0.00
--do-- 2015-307-196 C/O road from NH-22 to Tikka Malan --do-- -- 2.00 2.81 0.00 2.81 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
30 Chakban Ambari road iva Sh. Jagdish
Chand House
--do-- 2018-307-826 C/O jeepable road for Gujjar Basti in GP DC Kangra at Dharamshala vide 62.97 5.00 1.32 1.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Massal letter No.1-11/2019-ESOMSA-
31 DC-Kangra-SCSP-AA&ES-2019- 0.00
20- 656-665 DATED:- 20-01-2020

--do-- 2007-307- C/O link road to village Chakban Rajiana --do-- -- 5.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
32 55408
0.00 0.00
--do-- 2019-307- C/O link road Danoa to Kharat Khas via --do-- -- 7.92 12.67 0.00 12.67 0.000 1.500 0.250 0.400 0.000 0.000 0.000 0.000 cc= 0.400
33 1044 Drad km. 0/0 to 2/500

--do-- 2020-307- C/O link road Dhiman Basti to village A/A & E/S accorded by SE 87.60 10.00 0.00 6.10 6.10 0.000 0.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2069 Bushal Km 0/00 to 2/000 Palampur No. PW-SEV-WS-
35 VIII - Road/2020-21/ 2592-98
Dated:- 1/7/2020 for Rs. 87.60
Lacs only
--do-- 2020-307- C/O Link road Harizan Basti Toru A/A & E/S accorded by SE 45.62 10.00 0.00 11.25 11.25 0.000 1.500 0.000 0.000 0.000 0.000 0.000 0.000 12 mtr.
2070 Saroot Harijan Basti Bha Chhaprehar Palampur No. PW-SEV-WS-VIII Span (1 No.
- Road/2020-21/ 2475-81 Dated:- Bridge
36 Road Km 0/000 to 1/000 completed)
29/6/2020 for Rs. 45.62 Lacs only
--do-- 2020-307- C/O Link road Jagni Bholu Baba to A/A & E/S accorded by SE 83.97 7.45 0.00 0.00 0.00 0.000 0.980 0.000 0.980 0.980 0.000 0.000 0.000 0.000
2118 Churan Surani road Km 0/000 to 2/000 Palampur No. PW-SEV-WS-VIII
- Road/2020-21/ 2654-60 Dated:-
37 1/7/2020 for Rs. 83.97 Lacs only

Total :- 1317.35 241.29 518.26 95.18 613.44 0.000 6.400 1.000 5.640 3.707 0.160 0.000 0.000 0.000

V Panchayat Connectivity
5054-04-789-02- SOOS- C/O link road to Unconnected Panchayat with
National Highway.
1 5054-04- 2007-307- सम्पर्क सडक सदूं से अखराना । Pr. Secy. SJE E No. SJE-BC 58.69 0.00 71.42 5.76 77.18 0.000 0.200 0.000 0.360 0.360 0.000 0.000 0.000 CC =
789-02- 55061 (10)-14/2008 dt. 1.6.2009 0.360
S00N

2 --do-- 2016-307- जब्बर से ठाकु र बस्ती खानोग हेतु संपर्क सड़क A/A & E/S Awaited -- 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1013 का निर्माण

3 --do-- 2016-307- चंदरौन से कं डी हेतु संपर्क सड़क का निर्माण --do-- -- 0.00 21.27 3.15 24.42 0.000 0.200 0.000 0.000 0.000 0.000 0.000 0.000 CC=
993 0.200
4 --do-- 2019-307- C/O link road village Uperla --do-- -- 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
655 Dibber km. 0/0 to 2/0
5 --do-- 2007-307- C/O link road Rajianan to --do-- -- 0.00 21.32 7.05 28.37 0.000 0.000 0.500 0.000 0.700 0.600 0.000 0.000 S/D =
55463 Surani via Churan 0.200

6 --do-- 2018-307- C/O link road to village DC Kangra at Dharamshala vide 71.37 0.00 0.00 12.45 12.45 0.000 0.000 0.000 0.325 0.325 0.000 0.000 0.000 CC =
865 Chakkan Gheen Soharn to letter No.1-11/2019-ESOMSA-DC- 0.365
village Thathal Nagrota Kangra-SCSP-AA&ES-2019-20- 686-
695 DATED:- 20-01-2020
Bagwan

7 --do-- 2020-307- C/O link road Bada Noun to A/A & E/S Awaited -- 7.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2115 Chotta Noun ward No. 4
Rajiana Dhiman Basti
8 --do-- 2020-307- C/O Link road from Jugani --do-- -- 7.45 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2118 Balugaloa to Churn Surani Km
0/000 to 1/000

Total :- 130.06 14.45 114.01 28.41 142.42 0.000 0.400 0.500 0.685 1.385 0.600 0.000 0.000 0.000

VI Bridges
1 5054-04- 307-546 C/O Bridge on Bhagan Khad to link village SE 5th Circle PW -SEV/ WS- 54.72 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
789-04- Paddar II/Bridge/ 2012-13 - 29034-
Bridges 41dt.31.12.2012
2 307-1018 C/O Bridge over Naura Khad linking Pr Secy. SJE-B-C(10)-17/2013 130.75 0.00 6.46 0.00 6.46 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Village Jassoure. Loose dt 08.09.2016.

2016-307- C/O bridge on Harizan Basti Khapper SE. 5th Circle Palampur 12926- 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1014/30 Nallah road. 32 dt 16/3/2017
3 73.64
2019-307-676 C/O Jeepable bridge over Dibber Khad in A/A & E/S Awaited 0.00 11.84 11.84 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Abutment
Samloti to connect the Agriculuture office completed &
4 -- 10.00 slab to be
and Children park
laid

2019-307-677 C/O jeepable bridge over Sukhad khad in --do-- 8.61 0.00 8.61 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5 Kaled -- 20.00

2018-307- C/O bridge over Bathu Khad on Sadoon Pr. Secy. (PW) G.O.(H.P.) No. 298.94 0.00 4.67 4.67 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1984 Kandi road PBW(B)F(5)7/2017 Dated:- 24-
6 02-2020 70.00

2020-307- C/O 19.75 mtr. Span bridge on 50.00 7.82 0.00 7.82 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
7 2152 Bhaloon Khad on Baldhar Rounkhar -- --
via Bhehru road
2020-307- C/O bridge on Baner Khad to connect 50.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
8 2153 village Jassour to Barai road -- --

Total :- 558.05 200.00 22.89 16.51 39.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

VII Buildings

4059-01- 2019-307- C/O BDO Office building Nagrota A/A & E/S Awaited -- 0 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
789-01 579 Bagwan
SOON
1 2019-307- C/O HP PWD Baroh Sub-Division SE 5TH Circle Palampur vide his 20.00 15.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
office Letter No. PW/SEV/WS-
580 Junior Engineer Office building at VIII/Building/2019/- 7408-14 dt
Nagrota Bagwan 11-12-2019 Rs. 20.00 lacs

2 2020-307- C/O AE Office building at Baroh A/A & E/S Accorded by DC Kangra 73.62 20.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
at Dharamshala vide Letter No. 1-
2211 11/2019-ESOMSA-DC-Kangra-
SCSP-AA&ES(PN-R-G-Bldg)2020-
21-5083-5089 dt 21/8/2020 Rs.
73,62,000.00 only

Total :- 93.62 35.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

VIII Special Central


Assistance
1 2020-307- C/O link road to village Bari Da SE Palampur No. PW-SEV- 45.62 5.00 0.00 0.00 0.00 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 CC = 0.045
2094 Lahar road Km 0/000 to 1/000 WS-VIII - Road/2020-21/ 2508-
14 Dated:- 30/6/2020

5054-04-789-
2 01 2020-307- C/O Link road N.H. Lakhdata SE Palampur No. PW-SEV- 45.62 5.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2096 Nihargalu to Ambkhola Dhardi WS-VIII - Road/2020-21/ 2501-
Ludret km 0/000 to 1/000 7 Dated:- 30/6/2020

Total :- 91.24 10.00 0.00 0.00 0.00 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 0.000
Grand Total :- 2190.32 500.74 689.24 140.10 829.34 0.000 6.800 1.500 6.525 5.557 0.760 0.000 0.000 CC= 4.372,
S/D = 0.705

Executive Engineer,
HP PWD Division,
Tanda at Nagrota Bagwan.