Sub-Contractor Approval – Review Checklist
Design and Build for Construction of Panda
Project Name: Project ID: BA 2020 C048 G
Enclosure & Touristic Viewing Facility at Al Khor Zoo
(Yes / No /
NA)
Covering Letters/Transmittal from the Contractor Cover Letter attached, please refer
1 addressed to the Supervision Consultant proposing the Yes to folder no. 1
Sub-Contractor
Arabic and English CR and other
2 Commercial Register Yes legal documents attached, please
refer to folder no.2
Compliance Statement with Qatar standard specification The scope is not contracting nor
3 requirements (QCS 2014 or latest updates) / Project N/A material supply.
Specification
PES ISO certificates, ICV
International quality certification (BS EN ISO and / or
4 Yes scorecard certificate, GSAS
others) BSI Kite mark, certificate are attached, please
refer to folder no.3
5 Company Quality Manual / Inspecting and Testing Plans N/A The scope is not material supply.
Name Name
Signature Signature
Date Date
1. Cover Letter
Pre-Qualification Document
ON PROJECT OWNER’S LETTERHAED
Date: 23/05/2021
Ref:
Dear Sirs:
We are pleased to appoint Subcontractor Petroltecnica Environmental Services (PES), holding a valid
Service Provider License (SP no. SPD-QA263-00265), as our representative for GSAS-D&B, Conformance
to Design Audit (CDA) stage for Design and Build for Construction of Panda Enclosure & Touristic Viewing
Facility at Al Khor Zoo (Project ID: BA 2020 C 048 G) which on the following terms and conditions: -
1. The appointee will carry out the duties and responsibilities as outlined by GSAS Trust.
2. The delegation of the authority however, does not relieve us from the responsibility and
accountability for this project.
3. Should the appointee-unable to deliver within GSAS Trust expectations, we are hereby
responsible to find a suitable replacement within (4-6) weeks upon the receipt of a written notice
from GSAS Trust.
Pre-Qualification Document
><Bar Code
**58429
5000044743 ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ: 58429 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ:
ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ: ﺑﺘﺮﻭﻟﺘﻜﻨﻜﺎ ﻟﻠﺨﺪﻣﺎﺕ ﺍﻟﺒﻴﺌﻴﻪ ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ:
17/12/2021 ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ: 19/12/2012 ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ:
200000 ﺭﺍﺱ ﺍﻟﻤﺎﻝ: ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ:
ﻗﻄﺮ ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ: ﻧﺸﻂ ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ:
0 ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ:
ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ
55871421 ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ: 9218 ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ:
ﺍﻟﻤﺎﻟﻚ
Page 1 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 58429 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
><Bar Code
ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ
Page 2 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 58429 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
Issue Date:
Page No: 1
*58429*
Issue Date: 01/11/2020
Owner
Page 1 of 2
CR No : 58429
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
Issue Date:
Page No: 1
Business Activities
Page 2 of 2
CR No : 58429
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
3. Certificates
(ISO Cert., ICV Scorecard Cert.
and GSAS Cert.)
Pre-Qualification Document
CERTIFICATE
This is to certify that the
Certificate No :: I-OHSC202005005
Authorized Signatory………………………………….
BQC Assessment Private Limited
Website: www.bqccert.com, E-mail: info@bqccert.com,Ph: + 91 9810618108
BQC Assessment Pvt. Ltd. is accredited by International Accreditation Services (IAS), United States of
America vide MSCB Number 124. Accreditation details are available with IAS, (International Accreditation
Service) Inc. USA, at www.iasonline.org The validity of this certificate can be verified at www.bqccert.com
or through info@bqccert.com. This certificate is the property of BQC Assessment Pvt. Ltd. and must be
returned on request.
CERTIFICATE
This is to certify that the
ISO 9001:2015
This certificate is applicable to the following scope:
M ANAG EM ENT SYSTEM CERTIFICATE
Certificate No :: I-QSC202005011
Authorized Signatory………………………………….
BQC Assessment Private Limited
Website: www.bqccert.com, E-mail: info@bqccert.com,Ph: + 91 9810618108
BQC Assessment Pvt. Ltd. is accredited by International Accreditation Services (IAS), United States of
America vide MSCB Number 124. Accreditation details are available with IAS, (International Accreditation
Service) Inc. USA, at www.iasonline.org The validity of this certificate can be verified at www.bqccert.com
or through info@bqccert.com. This certificate is the property of BQC Assessment Pvt. Ltd. and must be
returned on request.
CERTIFICATE
This is to certify that the
Environmental Management
System
ISO 14001:2015
M ANAG EM ENT SYSTEM CERTIFICATE
Certificate No :: I-ESC202005007
Authorized Signatory………………………………….
BQC Assessment Private Limited
Website: www.bqccert.com, E-mail: info@bqccert.com,Ph: + 91 9810618108
BQC Assessment Pvt. Ltd. is accredited by International Accreditation Services (IAS), United States of
America vide MSCB Number 124. Accreditation details are available with IAS, (International Accreditation
Service) Inc. USA, at www.iasonline.org The validity of this certificate can be verified at www.bqccert.com
or through info@bqccert.com. This certificate is the property of BQC Assessment Pvt. Ltd. and must be
returned on request.
4. Summary of Experiences
Pre-Qualification Document
Petroltecnica Environmental Services
Projects Executed
Project Name Project Awarder
Environmental Impact Assessment Study for "Proposed Metal Recycling Facility" AL DIQAH METAL RECYCLING FACTORY
LOC and CDA for WOQOD Fuel Station at Lusail AL ATTIYAH ARCHITECTURAL GROUP HOLDING
Consultancy Support Services / CEMP Review and Endorsement_P.O. Q7000MC20022 Associated Consulting Engineers - ACE
ENERGOPROJEK ENTEL_Environmental Compliance Monitoring & Report Generation_P.O. 4900005653 GALFAR AL MISNAD
Environmental Support Services for Construction Phase - New Naval Base GENERIC ENGINEERING TECNOLOGIES WLL
PROJECT NO. 327 (PJ-QETAIFAN)_ENVIRONMENTAL COMPLIANCE MONITORING_WEEKLY QATAR BUILDING ENGINEERING COMPANY
RELOCATION OF SPINY TAILED LIZARDS AT AL KHARSAA SOLAR PROJECT SITE POWERCHINA GUIZHOU ENGINEERING CO. LTD
Project Name: Qatar Power Transmission System Expansion Phase 13 Package S7 (GTC 735D/2015)_Environmental
GALFAR AL MISNAD
Compliance Monitoring & Report Generation_P.O. No. 490005372
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR STIFF EXTRUSION TECHNOLOGY AND ALUMINUM DROSS
SUSTAINABLE WASTE MANAGEMENT - HBK HOLDING
AND SPENT POT LINING (SPL) PROCESSING)
Environmental Compliance Monitoring & Report Generation_Project Name: Qatar Power Transmission System Expansion
GALFAR AL MISNAD
Phase 13 Package S7 (GTC 735D/2015)_'P.O. No. 4900005102
RATA Test of CEMS
Petroserv Controls & Communication
Epic for Miscellaneous Instrumentations PCRs in Dukhan Fields
RATA & STACK MONITORING SERVICES FOR KEPPEL SEGHERS - YEAR 2019_'P.O. HETS/2018/22 Hanaditech
Dust Monitoring Services for Stage 3 works - Qetaifan Island MIDMAC CONTRACTING CO. WLL
PES
Projects Executed Page 1 of 5
Project Name Project Awarder
Environmental Support Services VITO MIDDLE EAST
PREPARATION OF ENVIRONMENTAL IMPACT ASSESSMENT STUDY & OBTAIN ENVIRONMENTAL PERMIT Qatar Building Company
Environmental Support Services for Construction Phase - New Naval Base GENERIC ENGINEERING TECNOLOGIES WLL
Environmental Monitoring & Analysis Services for Ambient Air & Noise Monitoring ELSEWEDY CABLES
IA 12/13 DS002 ST Group 9 P014 - D Ring Road Interim Improvements PARSONS INTERNATIONAL
Contract 2 - General Engineering Consultancy Services for Local Roads & Drainage Projects Doha North - Area 3 - Doha
PARSONS INTERNATIONAL
North New subdivisions, DN121, DN122, DN123 & DN124
Environmental Compliance Monitoring QTECH Switchgear-Air Quality, Noise & Stack Monitoring
Master Requirement 5 - Traffic Impact Study, Design and Tendering Services for Al Khor Industrial / Logistic Site PARSONS INTERNATIONAL
Epic for Miscellaneous Instrumentation PCRs in Dukhan Fields_P.O. No. PRJ17012BZ-PETROLTECNICA Petrocon ECC WLL
Relative Accuracy Test Audit (RATA) & Stack Testing Program for KEPPEL SEGHERS for 2 Years Hanaditech
Services Monitoring & Measuring Air Quality Services for Outdoor Air Quality Monitoring and Measurement_P.O. No.
Mowasalat
4500030137
Environmental Compliance Monitoring & Report Generation_'P.O. No. 4900004164 GALFAR AL MISNAD
PES
Projects Executed Page 2 of 5
Project Name Project Awarder
Environmental Services (Annual CTO Compliance Report and Laboratory Testing Services for Ash Samples) United Medical Waste Management
Flue Gas Stack Emission Testing on 3 SMRs Quarterly Testing_P.O. 18PO00209 GASAL Q.S.C.
Dust and Noise Environmental Monitoring Service for Headquarters of Passport Affairs Al Aali International
Design and Construction of National Syber Security Center at Wadi Al Sail, Doha, Qatar Al Aali International
Charges for the Air Quality Monitoring for measurements of pollutants (SO2, CO, O3 and Nox) and as per KM requirement
Larsen & Toubro Limited, Construction_AQM
for PH12 Package (Ashmak & Musherib Substation)
Audit, Review of CEMS Analyzer Package and RATA Services Petroserv Controls & Communication
Environmental Monitoring at United Medical Waste Management Operational Area United Medical Waste Management
Environmental Impact Assessment (EIA) for Hazardous Waste Treatment in Mesaieed Industrial City United Medical Waste Management
GSAS Construction Certificate Service Construction of HQ of General Directorate of Borders Passports, Expatriates Affairs,
Al Aali International
Nationality and Travel Docs Department
Relative Accuracy Test Audit (RATA) & Stack Testing Program for Keppel Seghers (Keppel)_'P.O. No. HETS/2017/12 Hanaditech
APG - Architecture & Planning Group, Agrotech S.p.A. & Pras Qatar
Contract No. NPP/0085 -New Port Project Strategic Food Security Facilities
JV
PES
Projects Executed Page 3 of 5
Project Name Project Awarder
Testing of Air Quality - Exova Indoor Air Quality Monitoring at St.15 Server Room Gulf Warehousing Company
GSAS Assessment for AL Khareej Tower RES/37 (MEDAD)_Lusail City MEDAD Engineering Consultant W.L.L.
Provide RATA & Stack Testing Services at QP Refining OPS Qatar Petroleum
Relocation of Spiny Tailed Lizards indetified within the QEZ-3 Project Areas Al Jabeer Construction and Energy Projects W.L.L.
Calibration and RATA of Online CEMS THC and HCL excluded from the Scope_'P.O. No. HETS/2016/9 Hanaditech
Remediation of Seawater Containing Drilling (soda ash and SC VIS HVP/GSTP) and Ready Mix Mortar during excavation at
QDSBG Construction
sea side wall panel 46
PES
Projects Executed Page 4 of 5
Project Name Project Awarder
Environmental Assessment of Drilling Slurry (Soda Ash and SVC VIS HVP/GSTP) QDSBG Construction
Master Planning and Engineering Consultancy Services For Qatar economic Zone 3_Project No. 9317 WORLEY PARSONS
PES
Projects Executed Page 5 of 5
Petroltecnica Environmental Services
Projects under Execution
Pre-Qualification Document
6. Projects Under Execution
Pre-Qualification Document
Petroltecnica Environmental Services
Projects under Execution
Pre-Qualification Document
ORGANIZATIONAL CHART
I General Manager
I
Director
Executive Assistant
I HR&ADMIN
DEPARTMENT
I FINANCE
DEPARTMENT
SUSTAINABILITY
DEPARTMENT
I ENVIRONMENTAL
DEPARTMENT
I
I HR Executive
I Accountant & Procurement Sustainability Manager Environmental Manager
I Receptionist
I Sustainability Specialist
Environmental Engineers
Instrumentation Engineer
D
ocument Controller
Sustainability Specialist
Chemical Engineer
PRO/ Mandoob
Y�I rivers
!!!!!!!!!!!!!!!
D
�I HSE Engineer
Electrician
REV.01