Area of GF

Total Plinth Area

Preliminary Estimate

S No Description Quantity Unit Rate


1 R.C.C. framed structure upto six storeys.
1.1 Floor height 3.60 mtr.(Office/ College) sq.mtr. 25,800.00
1.2 Floor height 3.60 mtr. (Hospital) sq.mtr. 27,100.00
1.3 Floor height 3.60 mtr.(School) sq.mtr. 20,700.00
1.4 Floor height 3.00 mtr. (Hostel / Resi. Qtr.) sq.mtr. 19,700.00
2 COMPOSITE (PARTIALLY LOAD BEARING
AND PARTIALLY RCC FRAMED STRUCTURE
(Upto six storeys)
2.1
Floor ht. 3.60 m. (Office / College) sq.mtr. 21,900.00
2.2 Floor ht. 3.60 m. (Hospitals) sq.mtr. 23,000.00
3 COMPOSITE (PARTIALLY LOAD BEARING
AND PARTIALLY RCC FRAMED STRUCTURE
(Upto six storeys)
3.1 Floor height 3.60 metre (School) sq.mtr. 17,800.00
4 COMPOSITE (PARTIALLY LOAD BEARING
AND PARTIALLY RCC FRAMED STRUCTURE
(Upto six storeys)
4.1 Floor height 3.00 mtr. (Hostel / Resi. Qtr.) sq.mtr. 16,800.00
5 EXTRA FOR
5.1
Extra for every additional storey over six storeys upto
twelve storeys
5.1.1 For seven to twelve storey. For every additional
storey. sq.mtr. 100.00
5.1.2 For thirteen to eighteen storey. For every additional
storey. sq.mtr. 200.00
5.1.3
For nineteen to twenty four storey. For every
additional storey. sq.mtr. 300.00
5.1.4 For twenty five to thirty storey. For every additional
storey. sq.mtr. 400.00
5.1.5
For thirty one to thirty six storey. For every additional
storey. sq.mtr. 500.00
5.1.6 For thirty seven to forty storey. For every additional
storey. sq.mtr. 600.00

Page 1 of 12
5.2

Every 0.3 m.or part there of, additional / lesser height


of floor above normal floor height of 3.60 m / 3.00 m sq.mtr. 350.00
5.3
Every 0.3 m. higher plinth over normal plinth height
of 0.45 m. (on G.F. area only ) sq.mtr. 350.00
5.4

Every 0.3mtr. deeper foundations over normal depth of


1.20mtr. (on Ground Floor area only) sq.mtr. 200.00
5.5

Making stronger foundations to take load of one


additional floor at a later date (on area of additional
floor only) For RCC framed structures. sq.mtr. 1,500.00
5.6

Making stronger foundations to take load of one


additional floor at a later date (on area of additional
floor only) For Composite structures. sq.mtr. 600.00
5.7
RCC raft foundation (on Ground Floor area only) sq.mtr. 10,000.00
5.8
Pile foundation (on Ground Floor area only) sq.mtr. 16,000.00
6 EXTRA FOR
6.1
Stronger structural members to take heavy load above
500 kg/sqm upto 1000 kg/sqm sq.mtr. 1,700.00
7 BASEMENT FLOOR
7.1
Floor ht. upto 3.35 m. i/c water proofing. sq.mtr. 31,000.00
7.2

Add or deduct for every 0.30 m or part thereof, height


against normal height of 3.35 m. sq.mtr. 1,000.00
8 FIRE FIGHTING
8.1 With wet riser system sq.mtr. 800.00
8.2
With wet riser and sprinkler system sq.mtr. 1,200.00
9 FIRE ALARM SYSTEM
9.1 Manual Fire Alarm system sq.mtr. 250.00
9.2 Automatic Fire Alarm system sq.mtr. 600.00

Page 2 of 12
10

Pressurized mechanical ventilation system in the


basements (with supply duct of exhaust blowers). On
basement area only. sq.mtr. 1,050.00
11 STILT PORTION
11.1
Stilt portion of Multistorey upto floor height 3.60 mtr
(on stilt area only) sq.mtr. 8,000.00
11.2
Every 0.3 m additional height above 3.60 m sq.mtr. 200.00
12
Internal water supply & sanitary installations.(Office/ 100
College) B.cost 4.00
13
Internal water supply & sanitary installations. 100
(Hospitals) B.cost 10.00
14 100
Internal water supply & sanitary installations. (School) B.cost 5.00
15
Internal water supply & sanitary installations. (Hostel 100
with attached toilet) B.cost 12.00
16
Internal water supply & sanitary installations. (Hostel 100
with common toilet) B.cost 8.00
17
Internal water supply & sanitary installations. (Qtr. 100
Type I to VIII) B.cost 9.00
18
External services connections and local body approval
charges.
18.1 100
Electrical External Service Connections B.cost 3.75
18.2 100
Civil External Service Connections B.cost 1.25
18.3 100
Local body approvals including tree cutting etc. B.cost 1.25
19 100
Internal electric installations. B.cost 12.50
20 Extra for :
20.1 100
Power wiring & plugs B.cost 4.00
20.2 100
Lighting conductors. B.cost 0.25

Page 3 of 12
20.3 100
Telephone conduits B.cost 0.25
20.4
Third Party Quality Assurance (preferably on request 100
of client department) B.cost 1.00
21 PASSENGER LIFTS
21.1
Passenger lift Capacity 8 persons, 544Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,600,000.00
21.2 Additional price for each additional floor E.floor 90,000.00
21.3
Passenger lift Capacity 8 persons, 544Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,800,000.00
21.4 Additional price for each additional floor E.floor 90,000.00
21.5
Passenger lift Capacity 13 persons, 884Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,800,000.00
21.6 Additional price for each additional floor E.floor 90,000.00
21.7
Passenger lift Capacity 13 persons, 884Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,000,000.00
21.8 Additional price for each additional floor E.floor 90,000.00
21.9
Passenger lift Capacity 16 persons, 1088Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,400,000.00
21.1 Additional price for each additional floor E.floor 110,000.00
21.11
Passenger lift Capacity 16 persons, 1088Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,600,000.00
21.12 Additional price for each additional floor E.floor 110,000.00
21.13
Passenger lift Capacity 16 persons, 1088Kg, Speed
2.50mtr./sec., Travel G+12, Power operated doors, AC
variable voltage. and variable frequency controls Each 7,000,000.00
21.14 Additional price for each additional floor E.floor 110,000.00
21.15
Bed lift Capacity 20 persons, 1360Kg, Speed
0.75mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,400,000.00

Page 4 of 12
21.16 Additional price for each additional floor E.floor 110,000.00
21.17
Bed lift Capacity 20 persons, 1360Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,700,000.00
21.18 Additional price for each additional floor E.floor 110,000.00
21.19
Bed lift Capacity 20 persons, 1360Kg, Speed
2.50mtr./sec., Travel G+12, Power operated doors, AC
variable voltage. and variable frequency controls Each 7,500,000.00
21.2 Additional price for each additional floor E.floor 110,000.00
22 GOODS LIFT (2 SPEED)
22.1 Goods lift Capacity 1 Ton Speed 0.50mtr./sec., Travel
G+4 Each 2,600,000.00
22.2 Additional price for each additional floor E.floor 85,000.00
22.3 Goods lift Capacity 2 Ton Speed 0.50mtr./sec., Travel
G+5 Each 3,300,000.00
22.4 Additional price for each additional floor E.floor 85,000.00
22.5 Goods lift Capacity 3 Ton Speed 0.25mtr./sec., Travel
G+12 Each 4,100,000.00
22.6 Additional price for each additional floor E.floor 100,000.00
23 Over head tank without independent staging litre 20.00
24 Over head tank with staging height upto 20 metres litre 30.00
25 Over head tank with staging height between 20 metres
& upto 30 metres litre 35.00
26 Over head tank with staging height between 30 metres
& 40 metres litre 40.00
27 Underground sump litre 20.00
28 Levelling sq.mtr. 300.00
29 Internal roads & paths
29.1 Internal road with WBM and Bituminous top sq.mtr. 175.00
29.2 Internal road with WMM and Bituminous top sq.mtr. 1,600.00
29.3 Cement Concrete pavement with vaccum dewatered
concrete sq.mtr. 2,200.00
29.4 Footpath with PCC base , 60mm thick paver blocks
and kerb stone edging on one side sq.mtr. 2,600.00
30 External Sewerage mtr. 3,300.00
31 Filter Water Supply
31.1 Distribution lines100 mm dia and below mtr. 1,300.00
31.2 Peripheral grid 150 mm to 300 mm dia pipes mtr. 3,600.00
31.3 Unfiltered water supply distribution lines mtr. 1,700.00
32 Storm water drains sq.mtr. 8,600.00
33 Rain Water Harvesting (RWH) sq.mtr. 3,300.00
34 Trenches for services mtr. 6,200.00

Page 5 of 12
35 Boundary wall with 1.5 metre. normal height from
GL & 0.60 meter high MS grill, and including steel
gates / wicket gates etc.
35.1 Composite structure metre 8,600.00
35.2 Precast RCC wall metre 7,500.00
36 HORTICULTURE WORKS
36.1

Horticulture Operations including 30 cm earth filling ,


grassing, tree plantations/shrubs and potted plants etc. sq.mtr. 250.00
36.2 Vertical Plantation sq.mtr. 40.00

Page 6 of 12
Amount Code No
1.1
- 1.1.1
- 1.1.1A
- 1.1.1B
- 1.1.2

1.2

- 1.2.1
- 1.2.1A

MR 1.2
- MR 1.2.1B

1.2
- 1.2.2
1.3

1.3.1

- 1.3.1.1

- 1.3.1.2

- 1.3.1.3

- 1.3.1.4

- 1.3.1.5

- 1.3.1.6

Page 7 of 12
- 1.3.2

- 1.3.3

- 1.3.4

- 1.3.5

- 1.3.5A

- 1.3.6

- 1.3.7
- MR 1.3

- MR 1.3.8
- 1.4

- 1.4.1

- 1.4.2
- 1.5
- 1.5.1

- 1.5.2
- 1.6
- 1.6.1
- 1.6.2

Page 8 of 12
- 1.7
- 1.8

- 1.8.1

- 1.8.2

- 2.1

- 2.1A

- 2.1B

- 2.1C

- 2.1D

- 2.1E

- 2.2

- 2.2.1

- 2.2.2

- 2.2.3

- 2.3
- 2.4

- 2.4.1

- 2.4.2

Page 9 of 12
- 2.4.3

- 2.4.4
- 3.1

- 3.1.1
- 3.1.1A

- 3.1.2
- 3.1.2A

- 3.1.3
- 3.1.3A

- 3.1.4
- 3.1.4A

- 3.1.5
- 3.1.5A

- 3.1.6
- 3.1.6A

- 3.1.7
- 3.1.7A

- 3.1.8

Page 10 of 12
- 3.1.8A

- 3.1.9
- 3.1.9A

- 3.1.10
- 3.1.10A
- 3.2

- 3.2.1
- 3.2.1A

- 3.2.2
- 3.2.2A

- 3.2.3
- 3.2.3A
- 4.1
- 4.2

- 4.3

- 4.4
- 4.5
- 5.1
- 5.2
- 5.2.1
- 5.2.2

- 5.2.3

- 5.2.4
- 5.3
- 5.4
- 5.4.1
- 5.4.2
- 5.4.3
- 5.5
- 5.6
- 5.7

Page 11 of 12
- 5.8
- 5.8.1
- 5.8.2
- 5.9

- 5.9.1
- 5.9.2

Page 12 of 12

You might also like